CN106013778A - Aluminum alloy formwork suspending system - Google Patents

Aluminum alloy formwork suspending system Download PDF

Info

Publication number
CN106013778A
CN106013778A CN201610414727.3A CN201610414727A CN106013778A CN 106013778 A CN106013778 A CN 106013778A CN 201610414727 A CN201610414727 A CN 201610414727A CN 106013778 A CN106013778 A CN 106013778A
Authority
CN
China
Prior art keywords
aluminum
plate
aluminum alloy
stay tube
bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610414727.3A
Other languages
Chinese (zh)
Inventor
饶松青
钟文辉
黄相蔚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Nanlyu Aluminum Mold Technology Co ltd
Original Assignee
Fujian Nanlyv Aluminum Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Nanlyv Aluminum Engineering Co Ltd filed Critical Fujian Nanlyv Aluminum Engineering Co Ltd
Priority to CN201610414727.3A priority Critical patent/CN106013778A/en
Publication of CN106013778A publication Critical patent/CN106013778A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/36Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

The invention relates to an aluminum alloy formwork suspending system which comprises a slab formwork, sedimentation baffles, angle aluminum, supporting tubes and fixing assemblies. The sedimentation baffles are fixed to the angle aluminum, the angle aluminum is supported on the slab formwork through the supporting tubes, through holes are formed in the positions, corresponding to the supporting tubes, on the slab formwork, each fixing assembly comprises a bolt and a nut, one end of each bolt sequentially penetrates through the corresponding through hole and the corresponding supporting tube and then is in threaded connection with the corresponding angle aluminum, and the other end of each bolt is in threaded connection with the nut to make the angle aluminum and the corresponding supporting tube fixed on the slab formwork. The aluminum alloy formwork suspending system is simple in construction process, ensures that a suspended formwork is simple to fix and does not defect during concrete pouring and further ensures the construction quality, the construction time is saved, and the construction costs are reduced.

Description

A kind of aluminum alloy mould plate hangs die body system
Technical field
The present invention relates to technical field of building construction, a kind of aluminum alloy mould plate hangs die body system.
Background technology
Along with the development of building industry, construction unit is more and more higher to the requirement of construction quality.At present, aluminium alloy Building template is higher owing to reclaiming usage amount, is widely used in high level and tier building construction.But, During practice of construction, when using aluminum alloy mould plate of the prior art to pour sedimentation, hang mould be difficult to fixing with Location, causes sedimentation location to be forbidden, and quality is the most up to standard.
Summary of the invention
In order to overcome the defect of above-mentioned prior art, the technical problem to be solved is to provide a kind of aluminum Alloy templates hangs die body system, and this construction technology hanging die body system is simple, it is ensured that hang mould fixing simple, concrete Hang when pouring mould will not sideslip, and then ensure construction quality.
In order to solve above-mentioned technical problem, the technical solution used in the present invention is:
A kind of aluminum alloy mould plate hangs die body system, including slab form, settling baffle, aluminum corner brace, props up stay tube and consolidates Determining assembly, described settling baffle is fixed in aluminum corner brace, and described aluminum corner brace is supported on slab form by a stay tube, On described slab form, the position corresponding to a stay tube offers through hole, and described fixation kit includes bolt and spiral shell Mother, one end of described bolt threadeds with aluminum corner brace after sequentially passing through through hole and stay tube, described bolt another One end is connected with nut thread makes aluminum corner brace and a stay tube be fixed on slab form.
The beneficial effects of the present invention is: the aluminum alloy mould plate that the present invention provides hangs die body system, construction technology letter Single, it is ensured that to hang mould fixing simple, hang during concreting mould will not sideslip, and then ensure construction quality, and And save the engineering time, reduce construction cost.
Accompanying drawing explanation
Fig. 1 show the aluminum alloy mould plate of the embodiment of the present invention and hangs the structural representation of die body system.
Label declaration:
1-slab form;2-settling baffle;3-aluminum corner brace;4-props up stay tube;5-fixation kit; 6-spacer;7-steel pad;50-bolt;51-nut.
Detailed description of the invention
By describing the technology contents of the present invention in detail, being realized purpose and effect, below in conjunction with embodiment also Accompanying drawing is coordinated to be explained.
Refer to shown in Fig. 1, the aluminum alloy mould plate that the present invention provides hangs die body system, including slab form 1, sinks Downshift plate 2, aluminum corner brace 3, stay tube 4 and fixation kit 5, described settling baffle 2 is fixed in aluminum corner brace 3, Described aluminum corner brace 3 is supported on slab form 1 by a stay tube 4, corresponding to supporting on described slab form 1 The position of pipe 4 offers through hole, and described fixation kit 5 includes bolt 50 and nut 51, described bolt 50 One end sequentially pass through through hole and stay tube 4 after threaded with aluminum corner brace 3, the other end of described bolt 50 with Nut 51 is threaded makes aluminum corner brace 3 and a stay tube 4 be fixed on slab form 1.
Knowable to foregoing description, the beneficial effects of the present invention is: the aluminum alloy mould plate that the present invention provides hangs mould System, construction technology is simple, it is ensured that hang mould fixing simple, hang during concreting mould will not sideslip, and then Ensure construction quality, and save the engineering time, reduce construction cost.
Further, it is provided with spacer 6 between described settling baffle 2 and slab form 1.
Further, connected by bolt and nut or pin pin sheet between described settling baffle 2 and aluminum corner brace 3, Aluminum corner brace 3 is stretched out sedimentation and is hung mould.
Further, described settling baffle 2 is made up of flat aluminium alloy plate and inner corner trim.Flat aluminium alloy plate and inner corner trim It is preferably made to meet the on-gauge plate of modulus, when sedimentation is less than or equal to 100mm, is 100mm's with height Flat board and inner corner trim, to facilitate the connection between aluminum alloy mould plate.Between aluminum alloy mould plate with bolt and nut or Pin pin sheet connects.
Further, described stay tube 4 is PVC plastic pipe.
Further, it is provided with steel pad 7 between described nut 51 and slab form 1.
Continuing referring to shown in Fig. 1, the aluminum alloy mould plate of the present invention hangs the construction method of die body system and is:
In high-rise and tier building are constructed, when there is sedimentation, do sedimentation gear with flat aluminium alloy plate and inner corner trim Plate 2, mentions by aluminum corner brace 3 and fixes settling baffle 2, supports aluminum corner brace 3 with PVC plastic pipe (stay tube 4), Again with bolt 50 and nut 51 fixing PVC plastic tube, non-water-tight slab form 1 is holed, bolt 50 perforation are fixed on aluminum corner brace 3 and PVC plastic pipe on slab form 1.Described flat aluminium alloy plate and inner corner trim do Become and meet the on-gauge plate of modulus, when sedimentation is less than or equal to 100mm, with the flat board that height is 100mm and Inner corner trim, to facilitate the connection between aluminum alloy mould plate.With bolt and nut or pin pin between aluminum alloy mould plate Sheet connects.It is connected with bolt and nut or pin pin sheet between described aluminum corner brace 3 and settling baffle 2, aluminum corner brace 3 Stretch out sedimentation and hang mould.Described PVC plastic pipe is erected on slab form 1, and it plays protection bolt 50 and props up The effect of support angle aluminum 3.Described bolt 50 and nut 51 play the effect of fixing aluminum corner brace 3.
Construction method of the present invention can guarantee that construction quality, and saves the engineering time, reduces construction cost.
Refer to shown in Fig. 1, embodiments of the invention one are:
Aluminum alloy mould plate hangs die body system, including slab form 1, settling baffle 2, aluminum corner brace 3, stay tube 4 and Fixation kit 5, described settling baffle 2 is fixed in aluminum corner brace 3, and described aluminum corner brace 3 is supported on by a stay tube 4 On slab form 1, on described slab form 1, the position corresponding to a stay tube 4 offers through hole, described solid Determine assembly 5 and include that bolt 50 and nut 51, one end of described bolt 50 sequentially pass through through hole and a stay tube 4 Threadeding with aluminum corner brace 3 afterwards, the other end of described bolt 50 is threadeded with nut 51 to be made aluminum corner brace 3 and props up Stay tube 4 is fixed on slab form 1.It is provided with cement pad between described settling baffle 2 and slab form 1 Block 6.Being connected by bolt and nut or pin pin sheet between described settling baffle 2 and aluminum corner brace 3, aluminum corner brace 3 is stretched out Mould is hung in sedimentation.Described settling baffle 2 is made up of flat aluminium alloy plate and inner corner trim.Described stay tube 4 is PVC plastic Material pipe.
In sum, the aluminum alloy mould plate that the present invention provides hangs die body system, and construction technology is simple, it is ensured that hang mould Fixing simple, hang during concreting mould will not sideslip, and then ensure construction quality, and when saving construction Between, reduce construction cost.
The foregoing is only embodiments of the invention, not thereby limit the scope of the claims of the present invention, every profit The equivalents made by description of the invention and accompanying drawing content, or directly or indirectly it is used in relevant technology Field, is the most in like manner included in the scope of patent protection of the present invention.

Claims (6)

1. an aluminum alloy mould plate hangs die body system, it is characterised in that: include slab form, settling baffle, angle Aluminum, stay tube and fixation kit, described settling baffle is fixed in aluminum corner brace, and described aluminum corner brace is propped up by a stay tube Support is on slab form, and on described slab form, the position corresponding to a stay tube offers through hole, described fixing Assembly includes that screw bolt and nut, one end of described bolt connect with aluminum corner brace screw thread after sequentially passing through through hole and a stay tube Connecing, the other end of described bolt is connected with nut thread makes aluminum corner brace and a stay tube be fixed on slab form.
Aluminum alloy mould plate the most according to claim 1 hangs die body system, it is characterised in that: described sedimentation gear Spacer it is provided with between plate and slab form.
Aluminum alloy mould plate the most according to claim 1 hangs die body system, it is characterised in that: described sedimentation gear Connected by bolt and nut or pin pin sheet between plate and aluminum corner brace.
Aluminum alloy mould plate the most according to claim 1 hangs die body system, it is characterised in that: described sedimentation gear Plate is made up of flat aluminium alloy plate and inner corner trim.
Aluminum alloy mould plate the most according to claim 1 hangs die body system, it is characterised in that: described stay tube For PVC plastic pipe.
Aluminum alloy mould plate the most according to claim 1 hangs die body system, it is characterised in that: described sedimentation gear Plate is the on-gauge plate meeting modulus.
CN201610414727.3A 2016-06-13 2016-06-13 Aluminum alloy formwork suspending system Pending CN106013778A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610414727.3A CN106013778A (en) 2016-06-13 2016-06-13 Aluminum alloy formwork suspending system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610414727.3A CN106013778A (en) 2016-06-13 2016-06-13 Aluminum alloy formwork suspending system

Publications (1)

Publication Number Publication Date
CN106013778A true CN106013778A (en) 2016-10-12

Family

ID=57087918

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610414727.3A Pending CN106013778A (en) 2016-06-13 2016-06-13 Aluminum alloy formwork suspending system

Country Status (1)

Country Link
CN (1) CN106013778A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100786711B1 (en) * 2006-08-09 2007-12-21 백운기 Non-support concrete slab form system combined with ceiling finish
US20080031686A1 (en) * 2003-01-20 2008-02-07 Paul Gillespie Concrete slab form system
TW200936859A (en) * 2008-02-22 2009-09-01 Kun Qing Construction Co Ltd Preassembly floor template device and construction method using concrete floor template of said device
CN203626242U (en) * 2013-12-21 2014-06-04 中建四局第三建筑工程有限公司 Fixing device for bay window suspension formwork in aluminum alloy formwork
CN203924704U (en) * 2014-06-19 2014-11-05 晟通科技集团有限公司 Aluminum alloy pattern plate system
CN204754196U (en) * 2015-06-11 2015-11-11 晟通科技集团有限公司 A template system for floor subsides department

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080031686A1 (en) * 2003-01-20 2008-02-07 Paul Gillespie Concrete slab form system
KR100786711B1 (en) * 2006-08-09 2007-12-21 백운기 Non-support concrete slab form system combined with ceiling finish
TW200936859A (en) * 2008-02-22 2009-09-01 Kun Qing Construction Co Ltd Preassembly floor template device and construction method using concrete floor template of said device
CN203626242U (en) * 2013-12-21 2014-06-04 中建四局第三建筑工程有限公司 Fixing device for bay window suspension formwork in aluminum alloy formwork
CN203924704U (en) * 2014-06-19 2014-11-05 晟通科技集团有限公司 Aluminum alloy pattern plate system
CN204754196U (en) * 2015-06-11 2015-11-11 晟通科技集团有限公司 A template system for floor subsides department

Similar Documents

Publication Publication Date Title
CN207131072U (en) A kind of super thick shear wall corner template reinforcing device
CN107012889B (en) The construction method of piping lane and piping lane construction template component
CN209025427U (en) A kind of raft plate guide wall form board installs node
CN205531261U (en) Subassembly is fixed to outrigger I -steel
CN205713106U (en) External corner template reinforcing apparatus
CN106013778A (en) Aluminum alloy formwork suspending system
CN208884991U (en) Deformation slit formwork
CN206267520U (en) A kind of self-supporting post-cast strip is poured with hanging mould
CN207686280U (en) A kind of aluminum alloy mould plate early dismantling head device that assortable full hall scaffold uses
CN206289954U (en) A kind of concrete-pouring template and wall casting system
CN207672995U (en) A kind of In Great Basement late poured band support template
CN212224611U (en) Shear force wall pouring template reinforcing apparatus
CN211369523U (en) Template system of expansion joint shear force wall
CN208534040U (en) A kind of location structure positioned for controlling pre-buried vertical casing
CN209307875U (en) A kind of bridge steel template with adjustable support structure
CN206957209U (en) Building template circular arc-shaped corner structure
CN207647181U (en) A kind of wall hangs mould template reinforcing device
CN207714722U (en) A kind of setting assembling type suspension scaffold
CN207727982U (en) A kind of building wall corner Constructional Col-umn Construction template
CN210217140U (en) Balcony beam side hangs mould support piece
CN206591822U (en) Embedded box support meanss
CN207296113U (en) A kind of steel bar girder blooking-hanging type floor support plate
CN207633760U (en) A kind of cast-in-place concrete floor outboard template fixing bracket
CN205531285U (en) Scaffold frame is encorbelmented shaped steel and is reserved bolt hole and establish structure
CN218234355U (en) Reinforcing steel bar hanging rack platform for wall formwork installation

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: Fujian aluminum Road North Industrial Park in Luoyuan Bay Economic Development Zone of Fuzhou city of Fujian Province, No. 1 350600

Applicant after: FUJIAN PROVINCE SOUTH ALUMINUM ENGINEERING CO.,LTD.

Address before: Fujian aluminum Road North Industrial Park in Luoyuan Bay Economic Development Zone of Fuzhou city of Fujian Province, No. 1 350600

Applicant before: FUJIAN NANLV ALUMINIUM ENGINEERING Co.,Ltd.

CB02 Change of applicant information
TA01 Transfer of patent application right

Effective date of registration: 20170817

Address after: Nanping City, Fujian province 353000 Yanping District Industrial Road No. 91

Applicant after: FUJIAN NANLYU ALUMINUM MOLD TECHNOLOGY Co.,Ltd.

Address before: Fujian aluminum Road North Industrial Park in Luoyuan Bay Economic Development Zone of Fuzhou city of Fujian Province, No. 1 350600

Applicant before: FUJIAN PROVINCE SOUTH ALUMINUM ENGINEERING CO.,LTD.

TA01 Transfer of patent application right
RJ01 Rejection of invention patent application after publication

Application publication date: 20161012

RJ01 Rejection of invention patent application after publication