CN106013633A - Safety guarantee system for standing type dual-engaged accessible roof and mounting process of safety guarantee system - Google Patents

Safety guarantee system for standing type dual-engaged accessible roof and mounting process of safety guarantee system Download PDF

Info

Publication number
CN106013633A
CN106013633A CN201610463825.6A CN201610463825A CN106013633A CN 106013633 A CN106013633 A CN 106013633A CN 201610463825 A CN201610463825 A CN 201610463825A CN 106013633 A CN106013633 A CN 106013633A
Authority
CN
China
Prior art keywords
roof
plate
steel
roofing
heat
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610463825.6A
Other languages
Chinese (zh)
Other versions
CN106013633B (en
Inventor
胡逸伦
程峰
石晓光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANDONG YABAITE TECHNOLOGY Co Ltd
Original Assignee
SHANDONG YABAITE TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANDONG YABAITE TECHNOLOGY Co Ltd filed Critical SHANDONG YABAITE TECHNOLOGY Co Ltd
Priority to CN201610463825.6A priority Critical patent/CN106013633B/en
Publication of CN106013633A publication Critical patent/CN106013633A/en
Application granted granted Critical
Publication of CN106013633B publication Critical patent/CN106013633B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D13/00Special arrangements or devices in connection with roof coverings; Protection against birds; Roof drainage ; Sky-lights
    • E04D13/12Devices or arrangements allowing walking on the roof or in the gutter
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D11/00Roof covering, as far as not restricted to features covered by only one of groups E04D1/00 - E04D9/00; Roof covering in ways not provided for by groups E04D1/00 - E04D9/00, e.g. built-up roofs, elevated load-supporting roof coverings
    • E04D11/02Build-up roofs, i.e. consisting of two or more layers bonded together in situ, at least one of the layers being of watertight composition

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Roof Covering Using Slabs Or Stiff Sheets (AREA)

Abstract

The invention discloses a safety guarantee system for a standing type dual-engaged accessible roof. The system comprises a roof system and an anti-falling system, wherein a roof purlin is arranged in the roof system, and the anti-falling system is mounted and welded to the roof purlin; a round steel tube is arranged in the anti-falling system and arranged on the roof purlin, a steel plate is arranged on the round steel tube, and a ring is arranged on the steel plate; flashing plates are arranged on the side surface of the round steel tube, and a hoop is arranged on outer sides of the flashing plates. According to the safety guarantee system for the standing type dual-engaged accessible roof, the anti-falling system is mounted on the roof purlin and forms an overall stress body together with the roof purlin, so that the stress form of a roof plate during falling of an object is optimized, the deformation of the roof plate under stress is reduced, the bearing capacity of the roof is improved, the overall stability of the roof is greatly improved, and the roof is enabled to better meet construction requirements.

Description

People's safe-guard system and mounting process thereof on a kind of upright double occlusion roofings
Technical field
The invention belongs to the realm of building construction, particularly to people's safe-guard system and mounting process thereof on one the most double occlusion roofing.
Background technology
Along with socioeconomic fast development, the rhythm of the live and work of people is all constantly being accelerated, and is also such for building field.Traditional building is the most all to use reinforced concrete to build, and needs to expend substantial amounts of human and material resources, and the duration of construction is longer, and, the requirement to weather is higher.For the venue that some are large-scale the most impracticable, thus existing a lot of building is gradually replaced by steel construction, owing to its construction of steel building is simple, the man power and material expended is few, and, it is the highest for the requirement of weather, thus is paid close attention to the most widely.
Existing roofing drop preventer is only through on plate helps installing aluminium alloy fixture, so drop preventer simply forms stress form with roof boarding, do not form an entirety with roofing, the stress performance that so may result in roof boarding is poor, serious affects the safety that whole roofing uses, and fall arrest performance is likely to cause impact.
Summary of the invention
Goal of the invention: in order to overcome above deficiency, it is an object of the invention to provide people's safe-guard system on a kind of upright double occlusion roofings, and its simple in construction is reasonable in design, is greatly improved the stress performance of roofing, improves the construction quality of roofing.
Technical scheme: to achieve these goals, the invention provides people's safe-guard system on a kind of upright double occlusion roofings, including: Roof system and drop preventer, wherein, being provided with roof purline in described Roof system, described drop preventer erecting and welding is on roof purline;Being provided with round steel pipe in described drop preventer, described round steel pipe is located on roof purline, and, described round steel pipe is provided with steel plate, and described steel plate is provided with annulus, and, the side of described round steel pipe is provided with flashing plate, and the outside of described flashing plate is provided with anchor ear.People's safe-guard system on heretofore described a kind of upright double occlusion roofings, by being arranged on roof purline at drop preventer, drop preventer is made to form a stress entirety with roof purline, optimize the stress form of roof boarding when object falls, decrease the deformation condition under roof boarding stressing conditions, improve the bearing capacity of roofing, substantially increase the stability in the large of roofing, and then allow it better meet the demand of construction.
Heretofore described Roof system is by main steel construction, heat-insulation layer and roofing, and described heat-insulation layer is located at the top of main steel construction, and described roofing is located at the upper of heat-insulation layer, the setting of described heat-insulation layer, is greatly improved the heat-insulating property of roofing.
The lower section of heretofore described heat-insulation layer is provided with die mould perforation steel sole plate, described die mould perforation steel sole plate is arranged over waterproof vapour-binding film, described waterproof vapour-binding film be arranged over heat-preservation cotton, described waterproof vapour-binding film is ensureing while its water resistance, also plays well every vapour effect.
The bottom of heretofore described roofing is provided with die mould steel sole plate, described die mould steel sole plate is arranged over zinc-plated levelling steel plate, described zinc-plated levelling steel plate be arranged over waterproof roll, described waterproof roll be arranged over ventilation noise suppression network, described ventilation noise suppression network be arranged over roof boarding, described ventilation sound insulation net, while ensureing soundproof effect, also ensure that its air permeable effect.
Roof boarding of the present invention uses standing seam roof slabs, and, it is respectively arranged at two ends with the first U-shaped hook and the second U-shaped hook, roof boarding described in two is connected by occlusion mode, and, being provided with fastener at the occlusion of roof boarding described in two, described fastener matches with roof boarding, is greatly improved its stability connected and safety.
Heretofore described die mould steel sole plate is connected with zinc-plated levelling steel plate by " Z " font angle steel, improves the stability connected.
Heretofore described waterproof roll is "U" shaped, and its two ends are close in round steel pipe, and the outside of described waterproof roll is provided with flashing plate, is greatly improved the sealing of waterproof roll and round steel pipe, it is ensured that its waterproof effect.
Fluid sealant packing, the use of described fluid sealant are passed through in the end that heretofore described flashing plate is connected with waterproof roll, are greatly improved its sealing property, improve its water resistance further.
Heretofore described roof boarding uses stile double occlusion aluminum-magnesium-manganese alloy roof plate.
The mounting process of people's safe-guard system on a kind of upright pair of heretofore described occlusion roofing, concrete mounting process is as follows:
(1): first measure according to construction drawing;
(2): after being measured, drop preventer is assembled, i.e. steel plate is installed in round steel pipe, then annulus is installed on steel plate;
(3): after above-mentioned drop preventer assembles, from bottom to up main steel construction, heat-insulation layer and roofing are installed successively according to roof structure order;
(4): after above-mentioned roof structure installation, by drop preventer erecting and welding to roof purline, and, at the lower section lining 3mm aluminium sheet of aluminum weldering welding during welding;
(5): then roof boarding and drop preventer carry out receive limit and processes, will be layed in the outside of waterproof roll by flashing plate, its base exceeds the supreme 100mm of drop preventer;
(6) fluid sealant packing is passed through in the end: after above-mentioned flashing plate lays, being connected with waterproof roll by flashing plate.
The particular order of heretofore described roof structure is as follows:
(1): be first fixed on main steel construction by purlin supporting plate, during purlin supporting plate is installed, another group workmen will install heat-insulation layer;
(2): during heat-insulation layer is installed, first the die mould perforation steel sole plate in heat-insulation layer is fixedly connected with main steel construction by connector;
(3): more waterproof vapour-binding film, heat-preservation cotton are layed in successively on die mould perforation steel sole plate;
(4): after above-mentioned heat-insulation layer installation, roof purline is fixed on purlin supporting plate, then the profiled sheet in roofing is connected with roof purline;
(5): then zinc-plated levelling steel plate is connected with profiled sheet by " Z " font angle steel;
(6): again waterproof roll and ventilation noise suppression network are sequentially arranged on zinc-plated levelling steel plate;
(7): finally roof boarding is carried out occlusion and installs, and reinforced the connection by rustless steel fastener in the junction of two roof boardings.
The mounting process of people's safe-guard system on a kind of upright pair of heretofore described occlusion roofing, its installation method is simple, convenient, the installation of anti-drop system, it is greatly improved the roofing ability to bear to dropped object, reduces the deformation under roof boarding stressing conditions, optimize roofing entirety stress form, effectively raise the safety and stability of roofing, thus allow it better meet the demand of developer.
Technique scheme is it can be seen that there is advantages that
People's safe-guard system on 1 heretofore described a kind of upright double occlusion roofings, by being arranged on roof purline at drop preventer, drop preventer is made to form a stress entirety with roof purline, optimize the stress form of roof boarding when object falls, decrease the deformation condition under roof boarding stressing conditions, improve the bearing capacity of roofing, substantially increase the stability in the large of roofing, and then allow it better meet the demand of construction.
2, the mounting process of people's safe-guard system on a kind of upright pair of heretofore described occlusion roofing, its installation method is simple, convenient, the installation of anti-drop system, it is greatly improved the roofing ability to bear to dropped object, reduces the deformation under roof boarding stressing conditions, optimize roofing entirety stress form, effectively raise the safety and stability of roofing, thus allow it better meet the demand of developer.
Accompanying drawing explanation
Fig. 1 is longitudinal node structure schematic diagram of stile double occlusion drop preventer in the present invention;
Fig. 2 is the horizontal node structure schematic diagram of stile double occlusion drop preventer in the present invention;
In figure: Roof system-1, drop preventer-2, roof purline-3, main steel construction-11, heat-insulation layer-12, roofing-13, die mould perforation steel sole plate-14, waterproof vapour-binding film-15, heat-preservation cotton-16, die mould steel sole plate-17, waterproof roll-18, ventilation noise suppression network-19, roof boarding-20, round steel pipe-21, steel plate-22, annulus-23, flashing plate-24, anchor ear-25.
Detailed description of the invention
Below in conjunction with the accompanying drawings and specific embodiment, it is further elucidated with the present invention.
Embodiment 1
People's safe-guard system on upright double occlusion roofings as a kind of in Fig. 1 and Fig. 2, including: Roof system 1 and drop preventer 2, described Roof system 1 is by main steel construction 11, heat-insulation layer 12 and roofing 13;
The relation of above-mentioned each parts is as follows:
Wherein, being provided with roof purline 3 in described Roof system 1, described drop preventer 2 erecting and welding is on roof purline 3;Described drop preventer 2 is provided with round steel pipe 21, described round steel pipe 21 is located on roof purline 3, and, described round steel pipe 21 is provided with steel plate 22, and described steel plate 22 is provided with annulus 23, and, the side of described round steel pipe 21 is provided with flashing plate 24, the outside of described flashing plate 24 is provided with anchor ear 25, and described heat-insulation layer 12 is located at the top of main steel construction 11, and the top of heat-insulation layer 12 is located at by described roofing 13.
The lower section of the heat-insulation layer 12 described in the present embodiment is provided with die mould perforation steel sole plate 14, and described die mould perforation steel sole plate 14 is arranged over waterproof vapour-binding film 15, described waterproof vapour-binding film 15 be arranged over heat-preservation cotton 16.
The bottom of the roofing 13 described in the present embodiment is provided with die mould steel sole plate 17, described die mould steel sole plate 17 is arranged over zinc-plated levelling steel plate, described zinc-plated levelling steel plate be arranged over waterproof roll 18, described waterproof roll 18 be arranged over ventilation noise suppression network 19, described ventilation noise suppression network 19 be arranged over roof boarding 20, described roof boarding 20 uses standing seam roof slabs, and, it is respectively arranged at two ends with the first U-shaped hook and the second U-shaped hook, roof boarding 20 described in two is connected by occlusion mode, and, it is provided with fastener at the occlusion of roof boarding 20 described in two, described fastener matches with roof boarding 20.
Die mould steel sole plate 17 described in the present embodiment is connected with zinc-plated levelling steel plate by " Z " font angle steel.
Waterproof roll 18 described in the present embodiment is in "U" shaped, and its two ends are close in round steel pipe 21, and, the outside of described waterproof roll 18 is provided with splash guard 4, and fluid sealant packing is passed through in the end that described flashing plate 4 is connected with waterproof roll 18.
Embodiment 2
On a kind of upright pair of occlusion roofing described in the present embodiment, on the upright double occlusion roofings in the mounting process of people's safe-guard system, people's safe-guard system is identical with embodiment 1.
People's safe-guard system on a kind of upright double occlusion roofings as depicted in figs. 1 and 2, including: Roof system 1 and drop preventer 2, described Roof system 1 is by main steel construction 11, heat-insulation layer 12 and roofing 13;
The relation of above-mentioned each parts is as follows:
Wherein, being provided with roof purline 3 in described Roof system 1, described drop preventer 2 erecting and welding is on roof purline 3;Described drop preventer 2 is provided with round steel pipe 21, described round steel pipe 21 is located on roof purline 3, and, described round steel pipe 21 is provided with steel plate 22, and described steel plate 22 is provided with annulus 23, and, the side of described round steel pipe 21 is provided with flashing plate 24, the outside of described flashing plate 24 is provided with anchor ear 25, and described heat-insulation layer 12 is located at the top of main steel construction 11, and the top of heat-insulation layer 12 is located at by described roofing 13.
The lower section of the heat-insulation layer 12 described in the present embodiment is provided with die mould perforation steel sole plate 14, and described die mould perforation steel sole plate 14 is arranged over waterproof vapour-binding film 15, described waterproof vapour-binding film 15 be arranged over heat-preservation cotton 16.
The bottom of the roofing 13 described in the present embodiment is provided with die mould steel sole plate 17, described die mould steel sole plate 17 is arranged over zinc-plated levelling steel plate, described zinc-plated levelling steel plate be arranged over waterproof roll 18, described waterproof roll 18 be arranged over ventilation noise suppression network 19, described ventilation noise suppression network 19 be arranged over roof boarding 20, described roof boarding 20 uses standing seam roof slabs, and, it is respectively arranged at two ends with the first U-shaped hook and the second U-shaped hook, roof boarding 20 described in two is connected by occlusion mode, and, it is provided with fastener at the occlusion of roof boarding 20 described in two, described fastener matches with roof boarding 20.
Die mould steel sole plate 17 described in the present embodiment is connected with zinc-plated levelling steel plate by " Z " font angle steel.
Waterproof roll 18 described in the present embodiment is in "U" shaped, and its two ends are close in round steel pipe 21, and the outside of described waterproof roll 18 is provided with flashing plate 4, and fluid sealant packing is passed through in the end that described flashing plate 4 is connected with waterproof roll 18.
The mounting process of people's safe-guard system on a kind of upright pair of occlusion roofing described in the present embodiment, concrete mounting process is as follows:
(1): first measure according to construction drawing;
(2): after being measured, drop preventer 2 is assembled, i.e. steel plate 22 is installed in round steel pipe 21, then annulus 23 is installed on steel plate 22;
(3): after above-mentioned drop preventer 2 assembles, from bottom to up main steel construction 11, heat-insulation layer 12 and roofing 13 are installed successively according to roof structure order;
(4): after above-mentioned roof structure installation, by drop preventer 2 erecting and welding to roof purline 3, and, at the lower section lining 3mm aluminium sheet of aluminum weldering welding during welding;
(5): then roof boarding 20 and drop preventer 2 carry out receive limit and processes, will be layed in the outside of waterproof roll 18 by flashing plate 2, its base exceeds the supreme 100mm of drop preventer 2;
(6) fluid sealant packing is passed through in the end: after above-mentioned flashing plate 2 lays, being connected with waterproof roll 18 by flashing plate 2.
The particular order of the roof structure described in the present embodiment is as follows:
(1): be first fixed on by purlin supporting plate on main steel construction 11, during purlin supporting plate is installed, another group workmen will install heat-insulation layer 2;
(2): during heat-insulation layer 2 is installed, first the die mould perforation steel sole plate 14 in heat-insulation layer 12 is fixedly connected with main steel construction 11 by connector;
(3): more waterproof vapour-binding film 15, heat-preservation cotton 16 are layed on die mould perforation steel sole plate 14 successively;
(4): after the installation of above-mentioned heat-insulation layer 12, roof purline 3 is fixed on purlin supporting plate, then the profiled sheet 17 in roofing 13 is connected with roof purline 3;
(5): then zinc-plated levelling steel plate is connected with profiled sheet 17 by " Z " font angle steel;
(6): again waterproof roll 18 and ventilation noise suppression network 19 are sequentially arranged on zinc-plated levelling steel plate;
(7): finally roof boarding 20 is carried out occlusion and installs, and reinforced the connection by rustless steel fastener in the junction of two roof boardings 20.
The above is only the preferred embodiment of the present invention, it is noted that for those skilled in the art, under the premise without departing from the principles of the invention, it is also possible to make some improvement, and these improvement also should be regarded as protection scope of the present invention.

Claims (10)

1. people's safe-guard system on upright double occlusion roofings, it is characterized in that: including: Roof system (1) and drop preventer (2), wherein, being provided with roof purline (3) in described Roof system (1), described drop preventer (2) erecting and welding is on roof purline (3);
Described drop preventer (2) is provided with round steel pipe (21), described round steel pipe (21) is located on roof purline (3), and, described round steel pipe (21) is provided with steel plate (22), described steel plate (22) is provided with annulus (23), and, the side of described round steel pipe (21) is provided with flashing plate (24), and the outside of described flashing plate (24) is provided with anchor ear (25).
People's safe-guard system on one the most according to claim 1 the most double occlusion roofing, it is characterized in that: described Roof system (1) is by main steel construction (11), heat-insulation layer (12) and roofing (13), described heat-insulation layer (12) is located at the top of main steel construction (11), and the top of heat-insulation layer (12) is located at by described roofing (13).
People's safe-guard system on one the most according to claim 2 the most double occlusion roofing, it is characterized in that: the lower section of described heat-insulation layer (12) is provided with die mould perforation steel sole plate (14), described die mould perforation steel sole plate (14) is arranged over waterproof vapour-binding film (15), described waterproof vapour-binding film (15) be arranged over heat-preservation cotton (16).
People's safe-guard system on one the most according to claim 2 the most double occlusion roofing, it is characterized in that: the bottom of described roofing (13) is provided with die mould steel sole plate (17), described die mould steel sole plate (17) is arranged over zinc-plated levelling steel plate, described zinc-plated levelling steel plate be arranged over waterproof roll (18), described waterproof roll (18) be arranged over ventilation noise suppression network (19), described ventilation noise suppression network (19) be arranged over roof boarding (20).
People's safe-guard system on one the most according to claim 4 the most double occlusion roofing, it is characterized in that: described roof boarding (20) uses standing seam roof slabs, and, it is respectively arranged at two ends with the first U-shaped hook and the second U-shaped hook, roof boarding (20) described in two is connected by occlusion mode, and, it being provided with fastener at the occlusion of roof boarding described in two (20), described fastener matches with roof boarding (20).
People's safe-guard system on one the most according to claim 4 the most double occlusion roofing, it is characterised in that: described die mould steel sole plate (17) is connected with zinc-plated levelling steel plate by " Z " font angle steel.
People's safe-guard system on one the most according to claim 4 the most double occlusion roofing, it is characterized in that: described waterproof roll (18) is in "U" shaped, its two ends are close in round steel pipe (21), and, the outside of described waterproof roll (18) is provided with flashing plate (4).
People's safe-guard system on one the most according to claim 7 the most double occlusion roofing, it is characterised in that: fluid sealant packing is passed through in the end that described flashing plate (4) is connected with waterproof roll (18).
9. the mounting process of people's safe-guard system on upright double occlusion roofings, it is characterised in that: concrete mounting process is as follows:
(1): first measure according to construction drawing;
(2): after being measured, drop preventer (2) is assembled, i.e. steel plate (22) is installed in round steel pipe (21), then annulus (23) is installed on steel plate (22);
(3): after above-mentioned drop preventer (2) assembles, from bottom to up main steel construction (11), heat-insulation layer (12) and roofing (13) are installed successively according to roof structure order;
(4): after above-mentioned roof structure installation, by drop preventer (2) erecting and welding to roof purline (3), and, at the lower section lining 3mm aluminium sheet of aluminum weldering welding during welding;
(5): roof boarding (20) and drop preventer (2) then carry out receive limit and processes, will be layed in the outside of waterproof roll (18) by flashing plate (2), its base exceeds drop preventer (2) supreme 100mm;
(6) fluid sealant packing is passed through in the end: after above-mentioned flashing plate (2) lays, being connected with waterproof roll (18) by flashing plate (2).
The mounting process of people's safe-guard system on a kind of upright pair of occlusion roofing the most according to claim 9, it is characterised in that: the particular order of described roof structure is as follows:
(1): be first fixed on by purlin supporting plate on main steel construction (11), during purlin supporting plate is installed, another group workmen will install heat-insulation layer (2);
(2): during heat-insulation layer (2) is installed, first die mould perforation steel sole plate (14) in heat-insulation layer (12) is fixedly connected with main steel construction (11) by connector;
(3): more waterproof vapour-binding film (15), heat-preservation cotton (16) are layed on die mould perforation steel sole plate (14) successively;
(4): after above-mentioned heat-insulation layer (12) installation, roof purline (3) is fixed on purlin supporting plate, then the profiled sheet (17) in roofing (13) is connected with roof purline (3);
(5): then zinc-plated levelling steel plate is connected with profiled sheet (17) by " Z " font angle steel;
(6): again waterproof roll (18) and ventilation noise suppression network (19) are sequentially arranged on zinc-plated levelling steel plate;
(7): finally roof boarding (20) is carried out occlusion and installs, and reinforced the connection by rustless steel fastener in the junction of two roof boardings (20).
CN201610463825.6A 2016-06-23 2016-06-23 People's safe-guard system and its mounting process on a kind of upright double occlusion roofings Expired - Fee Related CN106013633B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610463825.6A CN106013633B (en) 2016-06-23 2016-06-23 People's safe-guard system and its mounting process on a kind of upright double occlusion roofings

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610463825.6A CN106013633B (en) 2016-06-23 2016-06-23 People's safe-guard system and its mounting process on a kind of upright double occlusion roofings

Publications (2)

Publication Number Publication Date
CN106013633A true CN106013633A (en) 2016-10-12
CN106013633B CN106013633B (en) 2018-12-04

Family

ID=57086782

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610463825.6A Expired - Fee Related CN106013633B (en) 2016-06-23 2016-06-23 People's safe-guard system and its mounting process on a kind of upright double occlusion roofings

Country Status (1)

Country Link
CN (1) CN106013633B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107143098A (en) * 2017-07-12 2017-09-08 天元建设集团有限公司 A kind of secondary waterproof structure of metal roof and construction method
CN108104495A (en) * 2018-01-18 2018-06-01 精工工业建筑***有限公司 A kind of safety device for roofing construction
CN108166659A (en) * 2017-12-28 2018-06-15 山东雅百特科技有限公司 A kind of safety-type, wind resistance lifts metal Roof construction system and its mounting process
CN108360765A (en) * 2017-12-29 2018-08-03 山东雅百特科技有限公司 A kind of drop preventer is pierced by roofing hole and its processing method
CN109057175A (en) * 2018-09-19 2018-12-21 中铁第四勘察设计院集团有限公司 Metal Roof system with maintenance riding track
CN110284672A (en) * 2019-07-12 2019-09-27 浙江东南网架股份有限公司 A kind of high performance self-adaption waterproofing node being pierced by metal Roof component and its operating method
CN113338551A (en) * 2020-09-30 2021-09-03 中国建筑第二工程局有限公司 Steel structure roof equipment supporting system and construction method

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001262784A (en) * 2000-03-16 2001-09-26 Yoshinori Nakai Doubly tiled roof structure
JP2004124397A (en) * 2002-09-30 2004-04-22 Sumitomo Forestry Co Ltd Residence roof structure by using roof panel
CN201169871Y (en) * 2008-03-19 2008-12-24 新疆光正钢结构工程技术有限责任公司 Heat preservation structure of steel structure roofing condensate water-proof
CN202064534U (en) * 2011-05-06 2011-12-07 山东万事达建筑钢品科技有限公司 Multifunctional vertical lockrand point-supporting aluminum-magnesium-manganese alloy roof
CN102409814A (en) * 2011-11-30 2012-04-11 哈尔滨工业大学空间钢结构幕墙有限公司 Double-layer waterproof noise-reducing heat-preserving sound-absorbing metal roof
CN203008249U (en) * 2012-12-17 2013-06-19 上海建工五建集团有限公司 Roof structure
CN104746806A (en) * 2015-03-27 2015-07-01 华东建筑设计研究院有限公司 Double-layer water-proof roof surface system
CN205804791U (en) * 2016-06-23 2016-12-14 山东雅百特科技有限公司 People's safe-guard system on a kind of upright double occlusion roofings

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001262784A (en) * 2000-03-16 2001-09-26 Yoshinori Nakai Doubly tiled roof structure
JP2004124397A (en) * 2002-09-30 2004-04-22 Sumitomo Forestry Co Ltd Residence roof structure by using roof panel
CN201169871Y (en) * 2008-03-19 2008-12-24 新疆光正钢结构工程技术有限责任公司 Heat preservation structure of steel structure roofing condensate water-proof
CN202064534U (en) * 2011-05-06 2011-12-07 山东万事达建筑钢品科技有限公司 Multifunctional vertical lockrand point-supporting aluminum-magnesium-manganese alloy roof
CN102409814A (en) * 2011-11-30 2012-04-11 哈尔滨工业大学空间钢结构幕墙有限公司 Double-layer waterproof noise-reducing heat-preserving sound-absorbing metal roof
CN203008249U (en) * 2012-12-17 2013-06-19 上海建工五建集团有限公司 Roof structure
CN104746806A (en) * 2015-03-27 2015-07-01 华东建筑设计研究院有限公司 Double-layer water-proof roof surface system
CN205804791U (en) * 2016-06-23 2016-12-14 山东雅百特科技有限公司 People's safe-guard system on a kind of upright double occlusion roofings

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107143098A (en) * 2017-07-12 2017-09-08 天元建设集团有限公司 A kind of secondary waterproof structure of metal roof and construction method
CN108166659A (en) * 2017-12-28 2018-06-15 山东雅百特科技有限公司 A kind of safety-type, wind resistance lifts metal Roof construction system and its mounting process
CN108360765A (en) * 2017-12-29 2018-08-03 山东雅百特科技有限公司 A kind of drop preventer is pierced by roofing hole and its processing method
CN108360765B (en) * 2017-12-29 2023-11-10 山东雅百特科技有限公司 Anti-falling system penetrating out of roof hole and processing method thereof
CN108104495A (en) * 2018-01-18 2018-06-01 精工工业建筑***有限公司 A kind of safety device for roofing construction
CN108104495B (en) * 2018-01-18 2023-12-15 精工工业建筑***有限公司 Safety protection device for roof construction
CN109057175A (en) * 2018-09-19 2018-12-21 中铁第四勘察设计院集团有限公司 Metal Roof system with maintenance riding track
CN109057175B (en) * 2018-09-19 2024-05-17 中铁第四勘察设计院集团有限公司 Metal roofing system of area maintenance horse way
CN110284672A (en) * 2019-07-12 2019-09-27 浙江东南网架股份有限公司 A kind of high performance self-adaption waterproofing node being pierced by metal Roof component and its operating method
CN113338551A (en) * 2020-09-30 2021-09-03 中国建筑第二工程局有限公司 Steel structure roof equipment supporting system and construction method

Also Published As

Publication number Publication date
CN106013633B (en) 2018-12-04

Similar Documents

Publication Publication Date Title
CN106013633A (en) Safety guarantee system for standing type dual-engaged accessible roof and mounting process of safety guarantee system
CN205804791U (en) People's safe-guard system on a kind of upright double occlusion roofings
CN113982198B (en) Lotus leaf molding roof
CN108590033A (en) A kind of factory building roof rack project installation structure and its construction method
CN216475513U (en) Metal roof
CN208473113U (en) A kind of factory building roof rack project installation structure
CN106013621A (en) Roof maintenance system and mounting process thereof
CN216276498U (en) Gutter structure arranged on metal roof
CN214531426U (en) New-type outdoor top cap of full package assembly
CN112282345B (en) Prestressed cable-stayed hanging basket installation method and installation structure
CN214461844U (en) Prestressed light energy-saving roof board
CN205153244U (en) Metal roof waterproof people pore structure
CN108086520A (en) A kind of construction method of steel structure wave net laminated concrete face integral quakeproof wall
CN210713208U (en) Transformer substation's assembled integration guard room
CN209942063U (en) Waterproof composite roof decorated by steel structure support and aluminum honeycomb plate
CN207739485U (en) A kind of energy-saving environment protection curtain wall structure
CN219298558U (en) Node waterproof construction based on roofing
CN109322411A (en) Multiple-story Lightweight Steel building floor connect engineering method with metope node
CN113958359B (en) Tunnel air delivery duct top partition plate and construction method
CN216516085U (en) Daylighting roof construction joint
CN221031055U (en) Waterproof passive exhaust structure of energy-saving roofing blast pipe wear-free
CN218622690U (en) Waterproof device for bridge construction separation structure seam of high-speed rail station house
CN220365183U (en) Profile steel cantilever steel truss sloping roof structure
CN219448125U (en) Corrosion-resistant and strong wind-resistant belt corridor
CN210508822U (en) Assembled energy-conserving window installation node

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181204

Termination date: 20190623

CF01 Termination of patent right due to non-payment of annual fee