CN106013390A - Nuclear island temporary pit automatic drainage system and drainage method - Google Patents

Nuclear island temporary pit automatic drainage system and drainage method Download PDF

Info

Publication number
CN106013390A
CN106013390A CN201610565631.7A CN201610565631A CN106013390A CN 106013390 A CN106013390 A CN 106013390A CN 201610565631 A CN201610565631 A CN 201610565631A CN 106013390 A CN106013390 A CN 106013390A
Authority
CN
China
Prior art keywords
immersible pump
interim
melt pit
water
water level
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610565631.7A
Other languages
Chinese (zh)
Inventor
伍家彬
徐连杰
赵鑫
余春建
刘振勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China General Nuclear Power Corp
China Nuclear Power Engineering Co Ltd
Original Assignee
China General Nuclear Power Corp
China Nuclear Power Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China General Nuclear Power Corp, China Nuclear Power Engineering Co Ltd filed Critical China General Nuclear Power Corp
Priority to CN201610565631.7A priority Critical patent/CN106013390A/en
Publication of CN106013390A publication Critical patent/CN106013390A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F1/00Methods, systems, or installations for draining-off sewage or storm water
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/10Collecting-tanks; Equalising-tanks for regulating the run-off; Laying-up basins

Landscapes

  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Structures Of Non-Positive Displacement Pumps (AREA)

Abstract

The invention discloses a nuclear island temporary pit automatic drainage system and drainage method. The system comprises a temporary pit used for accommodating wastewater in a system, a float-type liquidometer used for collecting water-level signals at different heights in the temporary pit, a submersible pump used for pumping out water in the temporary pit, an electronic control unit which is used for receiving the water-level signals at different heights in the temporary pit, performing judgment according to different water levels, sending out start and stop signals of the submersible pump and automatically opening or closing each corresponding submersible pump, and a pipeline assembly which is used for gathering water in the pit and draining out of a safe workshop. The float-type liquidometer and the electronic control unit are arranged on the temporary pit to solve the problem that the submersible pump cannot be started or stopped in time due to not timely response in the prior art, and the nuclear island temporary pit automatic drainage system and drainage method can be used for effectively improving the drainage efficiency and drainage quality, reducing the equipment damage rate, improving the safety coefficient and reducing the use cost.

Description

A kind of nuclear island interim melt pit automatization's drainage system and water discharge method
Technical field
The present invention relates to nuclear power station water system debug field, particularly relate to a kind of automatic for the interim melt pit of nuclear island Change drainage system and water discharge method.
Background technology
In the process of construction of nuclear island, each system be debugged, and during debugging inevitably Producing substantial amounts of waste water, the most in time, to be discharged by the waste water during debugging efficiently be that each system is universal The common problem faced.
Conventional way is that first minimum point at nuclear island factory building arranges some interim melt pits as transfer, will debug The water produced in journey is first discharged in melt pit nearby, then connects fire hose by lower ground by immersible pump temporarily Water in hole pumps to outside the Factory Building of higher point.
And above-mentioned drainage system and mode are suitable only for the single system debugging stage, when it come to arrive the connection of multisystem Adjust, then surge due to dewatering needs, the quantity meeting of the melt pit of required setting, immersible pump and fire hose Corresponding increase, the setting of drainage path is the most increasingly complex, and will arrange accordingly for each drainage path Personnel's staff on duty, according to draining process, immersible pump is carried out manual operation, as latent in started in time and stopping Water pump etc..And due to the restriction of human body energy, draining personnel after the manual operation of long-time high intensity, can be caused Absent minded, response not in time and operational motion is slow, thus causes draining not carry out at any time, Stop at any time.If additionally, the immersible pump quantity arranged is inadequate, it is impossible to meet the drainage requirement of each system, then Immersible pump also needs to often move back and forth between each interim melt pit, easily causes damage, and draining terminates to stop The instantaneous water of lower immersible pump also can be back to low spot from high point, causes melt pit to return water, affects drainage efficiency, and And due in interim melt pit foreign body many, easily cause immersible pump blocking.Moreover, due to the setting of each melt pit The parameter such as position, the degree of depth is inconsistent, causes the cause different in size of required fire hose, also implies that fire water Band needs to configure adaptor to meet the demand of each melt pit difference drainage path.But at fire hose switching one Denier connects shakiness and will result in and leak, metal run out, and disturbs draining process, pollutes working environment, and be laid on Ground fire hose is as easy as rolling off a log causes a series of safe mass event because artificially trampling breakage.
Therefore, during nuclear island system integration and test, it is necessary to provide a kind of drainage efficiency and displacement mass high, Manpower can be greatly decreased, it is to avoid during termination of pumping water from high point toward low spot reflux, device damage rate is low, put into little and The most extraordinary drainage system of practicality, novelty, generalization and water discharge method.
Summary of the invention
The present invention is directed to present in prior art during nuclear island joint debugging drainage efficiency and displacement mass is low, manpower Consume big, safety coefficient is the highest, termination of pumping time the water capacity easily from high point toward low spot backflow and immersible pump, fire water The problem that the device damage rates such as band are high, it is provided that one can be effectively improved drainage efficiency and displacement mass, reduction Device damage rate, improve safety coefficient, reduce use cost nuclear island interim melt pit automatization's drainage system and Water discharge method.
The technical scheme that the present invention proposes with regard to above-mentioned technical problem is as follows:
On the one hand, it is provided that a kind of nuclear island interim melt pit automatization drainage system, described system includes:
Multiple interim melt pits, multiple interim melt pits are separately positioned on different safe Factory Building regions, are used for housing system The water discharged in system;
Multiple float type level gauges, each float type level gauge is correspondingly arranged in an interim melt pit, is used for adopting Collect the water level signal of differing heights in interim melt pit;
Multiple immersible pumps, each immersible pump correspondence is arranged in an interim melt pit, for by interim melt pit Water extract out;
ECU, connects each float type level gauge and each immersible pump, the control panel of ECU respectively There is automatic mode, for receiving the water level signal of differing heights in interim melt pit, enter according to different water levels Row judges, and sends immersible pump start stop signal, automatically turns on or close the immersible pump of each correspondence.
Further, described system also includes:
Line component, connects each described immersible pump, for being collected by the water in each described interim melt pit Heel row is to outside safe Factory Building.
Further, described system also includes that multiple check-valves, each described check-valves are separately positioned on correspondence Connect on line component and with each corresponding described immersible pump, when being used for avoiding termination of pumping water from high point to low spot Backflow to corresponding interim melt pit.
Further, described line component includes multiple first by-pass line, multiple second by-pass lines and main pipe line, Wherein: one end of each first by-pass line connects corresponding immersible pump, the other end connects corresponding check-valves, For the water in immersible pump is inputted to described second by-pass line;
One end of each second by-pass line connects corresponding check-valves, and the other end connects main pipe line, for by only Return the water in valve to input to main pipe line;
One end of main pipe line is each second by-pass line meet, is used for collecting each second by-pass line defeated The water entered, and by the other end of main pipe line, water is delivered to outside Factory Building.
Further, described first by-pass line, the second by-pass line and main pipe line are DN65 blueness PE plastics Pipe.
Further, described drainage system also includes switching device, is used for connecting described immersible pump and pipeline group Part.
Further, described switching device is fire hose.
Further, described line component is additionally provided with flange, be used for connecting described first by-pass line, Two by-pass lines and main pipe line.
Further, the control panel of described ECU also has manual mode, for scene manually Realize the start and stop of immersible pump.
Further, described ECU includes memory module, it is judged that module and control module,
Described memory module for storage pre-set first pre-conditioned and second pre-conditioned;
According to actually detected water level signal, described judge module is for judging whether it meets described first and preset Condition or second pre-conditioned, when the water level of each interim melt pit meet described first pre-conditioned time, described Immersible pump is opened;When the water level of each interim melt pit meet described second pre-conditioned time, described immersible pump stops Only;
Described control module is for meeting above-mentioned default first condition or pre-when described actually detected water level signal If during second condition, described immersible pump start stop signal is sent to corresponding described immersible pump.
Further, described interim melt pit is provided with cover plate, described cover plate offers through hole, for float The float of formula liquidometer passes and natural lowering is in described interim melt pit.
Further, described drainage system is used for EPR, CPR or AP1000.
On the other hand, it is provided that a kind of nuclear island interim melt pit automatization water discharge method, described method includes:
S1, melt pit and immersible pump are arranged: according to each system debug dewatering needs, in the different on-demand settings of Factory Building Multiple interim melt pits;And correspondence installs immersible pump described in each described interim melt pit;
S2, float type level gauge are arranged: in each described interim melt pit being provided with described immersible pump, correspondence sets Put a float type level gauge, the water level signal of differing heights in the interim melt pit of Real-time Collection;
S3, water level signal according to the differing heights of actual acquisition, the water level in each interim melt pit of real-time judge Whether meet start and stop requirement, and send immersible pump start stop signal.
Further, described step S1 also includes: clean out the foreign material in described interim melt pit, and upper State and on interim melt pit, cover plate is set.
Further, also including in described step S3: be provided with ECU, described ECU has certainly Dynamic model formula, pre-sets first pre-conditioned or second pre-conditioned by its control panel, when each temporarily The water level of melt pit meet described first pre-conditioned time, described immersible pump open;Water when each interim melt pit Position meet described second pre-conditioned time, described immersible pump stop;
Described ECU according to actually detected water level signal judge whether to meet described first pre-conditioned or Second is pre-conditioned, and described actually detected water level signal meet different pre-conditioned time, by described Immersible pump start stop signal sends to corresponding described immersible pump.
Further, step S2a is also included between described step S2 and S3: line component is arranged: arrange pipe Line component, connects each immersible pump, and arranges check-valves on line component;
Further, step S4 is also included: each described immersible pump is according to the start stop signal received, by right Water in the interim melt pit answered is discharged, and the unified heel row that collects is to outside safe Factory Building.
Further, the control panel of described ECU also includes manual mode, real manually for scene The start and stop of existing immersible pump.
The technical scheme that the embodiment of the present invention provides has the benefit that
1, by install additional on interim melt pit cover plate prevent foreign body introduce melt pit, can be greatly reduced immersible pump block up Plug damages risk.
2, check-valves is set on the line component of nuclear island interim melt pit drainage system, water when can avoid termination of pumping Backflow from high point to low spot so that draining fully, efficiently, can effectively prevent from being connected to drainage pipeline networks simultaneously On each melt pit between mutually go here and there water.
3, ECU is connected with float type level gauge, immersible pump, by float type level gauge for water level Measurement send the start stop signal of immersible pump, it is achieved automatization's draining of interim melt pit, it is not necessary to when personnel are long Between on duty, significantly reduce manpower.
4, line component selects the blue PE plastic tube of DN65 can take into account displacement and pump lift simultaneously, And color is eye-catching, it is difficult to be trampled damage by people.Additionally, plastic tube is with low cost, it is easy to cutting, can basis On-the-spot actual demand intercepts different length flexibly, then by itself and the special Flange joint of match of pipe diameter, can be effective Prevent from leaking, metalling run out.Use PE pipe to replace traditional fire hose as water-drainage tube part simultaneously, effectively eliminate Metal run out, leak, get an electric shock equivalent risk, safe mass is greatly improved.
5, drainage system and the method for the present invention are unrelated with heap-type, can be at heaps such as EPR, CPR, AP1000 Type so other occasions any from low spot to the local application of high point draining.
Accompanying drawing explanation
For the technical scheme being illustrated more clearly that in the embodiment of the present invention, required in embodiment being described below Accompanying drawing to be used is briefly described, it should be apparent that, the accompanying drawing in describing below is only the present invention's Some embodiments, for those of ordinary skill in the art, on the premise of not paying creative work, Other accompanying drawing can also be obtained according to these accompanying drawings.
Fig. 1 is a kind of nuclear island interim melt pit automatization drainage system control figure that the embodiment of the present invention one provides;
Fig. 2 is a kind of nuclear island interim melt pit automatization drainage system structural representation that the embodiment of the present invention one provides Figure;
Fig. 3 is a kind of line component structural representation that the embodiment of the present invention one provides;
Fig. 4 is the control panel schematic diagram of a kind of ECU that the embodiment of the present invention one provides;
Fig. 5 is another drainage system control structure schematic diagram that the embodiment of the present invention one provides;
Fig. 6 is the nuclear island interim melt pit automatization water discharge method flow chart that the embodiment of the present invention two provides;
Fig. 7 is the setting of the nuclear island interim melt pit automatization each parts of water discharge method that the embodiment of the present invention two provides Flow chart.
Detailed description of the invention
In order to solve during the nuclear island joint debugging in the presence of prior art drainage efficiency and displacement mass is low, people Power consume big, safety coefficient is the highest, termination of pumping time the water capacity easily from high point toward low spot backflow and immersible pump, fire-fighting The problem that the device damage rates such as water band are high, it is desirable to provide one can the row of being effectively improved in nuclear island joint debugging Water efficiency and displacement mass, reduction device damage rate, the safety coefficient that improves, the nuclear island of reduction use cost face Time melt pit automatization drainage system and water discharge method, its core concept is: corresponding in each interim melt pit One float type level gauge is installed, and is connected in the start stop apparatus of immersible pump, it is achieved immersible pump automatic Start and stop, this start stop apparatus includes connecting each float type level gauge and the ECU of each immersible pump, automatically controlled Unit controls the opening and closing of each immersible pump according to the water level signal of actual acquisition;And the present invention is row Installing Slow Close Valve on water pipeline can prevent water from backflowing to low spot from high point and mutually going here and there between each melt pit Water;Replacing fire hose with PE plastic tube, solution is leaked, problem of metalling run out.
For making the object, technical solutions and advantages of the present invention clearer, real to the present invention below in conjunction with accompanying drawing The mode of executing is described in further detail.
Embodiment one:
As a example by Taishan 1 machine nuclear island safe Factory Building automatization drainage system, seeing Fig. 1, described system includes: Multiple float type level gauges 100, the multiple immersible pumps 300 corresponding with multiple float type level gauges 100, and often One float type level gauge 100 and the corresponding ECU 200 connected of each immersible pump 300, wherein:
Each float type level gauge 100 is the water level signal of differing heights in the corresponding interim melt pit of Real-time Collection;
Multiple immersible pumps 300, each immersible pump correspondence is arranged in an interim melt pit, and being used for will provisionally Water in hole is extracted out;
ECU 200, the water level signal of differing heights in each interim melt pit of real-time reception, according to connecing Different water level signal in each interim melt pit received judge, and send immersible pump 300 start stop signal, Automatically turning on or close the immersible pump 300 of each correspondence, it is achieved that water Gao Zeqi, water is low, the automatization stopped Control.
Fig. 1 of the embodiment of the present invention one shows 1 ... N number of float type level gauge 100,1 ... N number of latent Water pump 300, the water level signal of all collections all sends to ECU, in reality of the present invention is applied, altogether There are 10 interim melt pits to be distributed in different Factory Buildings, 10 interim melt pits have been respectively mounted a float-type Liquidometer 100 and an immersible pump 300, the draining in multiple different Factory Buildings.
Fig. 2 is a kind of nuclear island interim melt pit automatization drainage system structural representation that the embodiment of the present invention one provides Figure, in conjunction with Fig. 1, the structure of the present invention is described in further detail below: Fig. 2 include interim melt pit 1, Cover plate 2, check-valves 3, float type level gauge 100, immersible pump 300, ECU 200 and pipeline group Part.
Multiple interim melt pits 1 are separately positioned on the bottom of 3 safe Factory Buildings, are used for housing nuclear island joint debugging The water that in journey, each system is discharged;Add cover plate 2 on interim melt pit 1, be used for preventing foreign body from introducing melt pit, can Immersible pump 300 blocked and damage risk is greatly reduced;Fig. 2 embodiment of the present invention shows have 3 The through hole that the float of individual float type level gauge 100 is each passed through on melt pit cover plate 2 is correspondingly arranged at 3 temporarily In melt pit 1, and natural lowering is in described interim melt pit 1, and above-mentioned float type level gauge 100 can be examined in real time Survey the height of water level in interim melt pit 1.
3 immersible pump 300 correspondences are arranged in 3 interim melt pits 1, for by the interim melt pit of each correspondence Water in 1 is extracted out;The power supply of immersible pump 300 is provided by temporary source case.For meeting the draining need of each system Asking, the quantity of immersible pump can adjust according to actual interim melt pit quantity.Configuration multiple stage immersible pump can be protected The independence of card melt pit draining, it is to avoid the dismounting repeatedly of immersible pump, move, install, extends immersible pump with this Service life, it is also possible to reduce the dismounting repeatedly of power supply, installation, thus ensure the safety of personnel.Certainly Not by number quantitative limitation in actual application.
ECU 200 connects each float type level gauge 100 and each immersible pump 300, ECU respectively The control panel of 200 has automatic mode, for receiving the water level signal of differing heights in interim melt pit, according to Different water levels judges, and sends immersible pump 300 start stop signal, automatically turns on or to close each right The immersible pump 300 answered, realizes the Automated condtrol of drainage system with this.
Line component connects each immersible pump 300, for the water in each interim melt pit 1 is extracted out, and warp Cross and collect heel row to outside safe Factory Building.
Also including multiple check-valves 3, each check-valves 3 is separately positioned on the line component of correspondence, is used for When avoiding termination of pumping, water backflows to corresponding interim melt pit 1 to low spot from high point, can effectively prevent from connecting simultaneously Water is mutually gone here and there between each interim melt pit 1 on drainage pipeline networks.Wherein interim melt pit 1, float type level gauge 100, the quantity one_to_one corresponding of immersible pump 300 and check-valves 3, each float type level gauge 100 and immersible pump 300 are connected to ECU, it is achieved that the Auto-drainage of drainage system and being uniformly controlled.
Seeing Fig. 3, described line component includes multiple first by-pass line 7, multiple second by-pass line 8 and house stewards Line 9, wherein: one end of each first by-pass line 7 connects corresponding immersible pump 300, the other end connects correspondence Check-valves 3, for the water in immersible pump 300 is inputted to described second by-pass line 8;
One end of each second by-pass line 8 connects corresponding check-valves 3, and the other end connects main pipe line 9, is used for Water in check-valves 3 is inputted to main pipe line 9;
One end of main pipe line 9 is each second by-pass line 8 meet, is used for collecting each second arm The water of line 8 input, and sewer water being delivered to outside Factory Building by the other end of main pipe line 9.
Above-mentioned first by-pass line the 7, second by-pass line 8 and main pipe line 9 are DN65 blueness PE plastic tube. Line component selects the blue PE plastic tube of DN65 can take into account displacement and pump lift simultaneously, and color is waken up Mesh, is difficult to be trampled damage by people.Additionally, plastic tube is with low cost, it is easy to cutting, can be according to on-the-spot actual Demand intercepts different length, flexible arrangement pipeline.
Additionally, because immersible pump 300 can not be directly connected to above-mentioned PE pipe, therefore said system also includes using In the switching device connecting immersible pump 300 and line component, it is preferred that described switching device is fire hose. Meanwhile, PE pipe preferably puts in interim melt pit, so can reduce the length of fire hose as far as possible, though fire-fighting Water band and PE pipe junction leak on a small quantity, it is also possible to directly drain back in melt pit, are finally drawn out of outside Factory Building not The situation metalled run out, leak can be caused.Use simultaneously PE pipe replace traditional fire hose as water-drainage tube part, Can effectively eliminate that fire hose is damaged and explosion and metalling run out, leak and touching of producing at fire hose coupling Electricity equivalent risk, is greatly improved safe mass.
Be additionally provided with flange (not shown) on line component, be used for connecting above-mentioned first by-pass line 7, Two by-pass lines 8 and main pipe line 9.This set can avoid the phenomenon leaked at switching, metal run out, and enters one Step reduces the electric shock risk caused because leaking, and improves safety coefficient.
Meanwhile, seeing Fig. 4, the control panel 6 of ECU 200 also can have manual mode, can be according to need It is used for the on-the-spot start and stop realizing immersible pump 300 manually.
In the embodiment of the present invention, seeing Fig. 5, described ECU 200 farther includes: memory module 201, Judge module 202 and control module 203;Wherein: described memory module 201 pre-sets for storage First is pre-conditioned and second pre-conditioned;
Described judge module 202 is described first pre-for judging whether to meet according to actually detected water level signal If condition or second pre-conditioned, when the water level of each described interim melt pit 1 meets described first pre-conditioned Time, described immersible pump 300 is opened;Bar is preset when the water level of each described interim melt pit 1 meets described second During part, described immersible pump 300 stops;
Described control module 203 is for meeting above-mentioned default first condition when described actually detected water level signal Or during default second condition, described immersible pump 300 start stop signal is sent to corresponding described immersible pump 300.
Its operation principle is as follows: above-mentioned ECU 200 can collect float-type in each described interim melt pit 1 Real time water level signal detected by liquidometer 100, and by judge module 202, above-mentioned water level signal is entered Row judges, by it with described memory module 201 in pre-set first pre-conditioned and second pre-conditioned Contrast, after drawing comparative result, then by described control module 203, immersible pump 300 start and stop are believed Number it is sent to the described immersible pump 300 of connection corresponding with described ECU 200.Concrete, when each described The water level of interim melt pit 1 meet described first pre-conditioned time, control module 203 sends immersible pump 300 and opens Opening signal, described immersible pump 300 is opened;When the water level of each described interim melt pit 1 meets described second pre- If during condition, control module 203 sends immersible pump 300 and stops signal, and described immersible pump 300 stops.By The running status of immersible pump 300 can be automatically controlled by this by described ECU 200, it is achieved diving The automatic start-stop of pump 300, from the most on duty without manpower, decreases manpower consumption, and above-mentioned ECU 200 reacts timely, can control immersible pump 300 in real time fast and accurately, it is to avoid Because reaction causes the generation of phenomenons such as metalling run out, leak not in time during manual operation.
Embodiment two:
The embodiment of the present invention additionally provides a kind of nuclear island automatization water discharge method, sees Fig. 6, and the method includes:
S1, melt pit and immersible pump are arranged: according to each system debug dewatering needs, in the different on-demand settings of Factory Building Multiple interim melt pits;And correspondence installs immersible pump described in each described interim melt pit;
S2, float type level gauge are arranged: in each described interim melt pit being provided with described immersible pump, correspondence sets Put a float type level gauge, the water level signal of differing heights in the interim melt pit of Real-time Collection;
S3, immersible pump control: according to the water level signal of the differing heights of actual acquisition, real-time judge is each temporarily Whether the water level in melt pit meets start and stop requirement, and sends immersible pump start stop signal.
Further, described step S1 also includes: clean out the foreign material in described interim melt pit, and upper State and on interim melt pit, cover plate is set;
Further, also including in described step S3: be provided with ECU, described ECU has certainly Dynamic model formula, pre-sets first pre-conditioned or second pre-conditioned by its control panel, when each temporarily The water level of melt pit meet described first pre-conditioned time, described immersible pump open;Water when each interim melt pit Position meet described second pre-conditioned time, described immersible pump stop;
Described ECU according to actually detected water level signal judge whether to meet described first pre-conditioned or Second is pre-conditioned, and described actually detected water level signal meet different pre-conditioned time, by described Immersible pump start stop signal sends to corresponding described immersible pump;
Further, see Fig. 7, also there is between described step S2 and S3 step S2a: line component sets Put: line component is set, connect each immersible pump, and check-valves is set on line component;
Also include step S4: draining: each described immersible pump is according to the start stop signal received, by corresponding Water in interim melt pit is discharged, and the unified heel row that collects is to outside safe Factory Building.
Preferably, the control panel of described ECU also includes manual mode, realizes manually for scene The start and stop of immersible pump.Realize the Automated condtrol of draining, it is not necessary to special messenger guards, reply and save manpower consumption.
Additionally, above-mentioned water discharge method can be used for different reactor types, such as EPR, CPR or AP1000.
It should be noted that the invention described above embodiment sequence number is just to describing, do not represent the excellent of embodiment Bad.
Technique effect contrasts:
Before enforcement:
On-the-spot manpower demand: 6 people, needs long-time on-the-spot on duty or awaits orders.
Scene is likely to occur at fire hose breakage, fire hose coupling to pop at any time metals run out, and needs scene to make an inspection tour (2 people);Need cleaning team personnel on site to clean fire hose if desired and leak (3 people await orders);Special messenger is needed to monitor Melt pit liquid level is met an urgent need break-make immersible pump power supply (1 people);
Safe mass risk: fire hose leaks, metals run out;Immersible pump damages;Electric shock risk.
Job step: need special messenger to place immersible pump at melt pit, lays draining fire hose, arranges special messenger to patrol Depending on.If metalling run out, special messenger need to be arranged to sweep water.Need after draining to reclaim fire hose and immersible pump.
After enforcement:
On-the-spot manpower demand: 1 people, it is not necessary to long-time on-the-spot on duty.Only need 1 people that the state of immersible pump is set, Can leave subsequently.
Safe mass risk: immersible pump damages risk and is greatly reduced, without leaking, metal run out, electric shock risk.
Job step: immersible pump is got to automatic mode.
In sum, the invention provides a kind of nuclear island interim melt pit automatization's drainage system and water discharge method, Compared to existing technologies, it prevents foreign body from introducing melt pit by adding cover plate on interim melt pit, Immersible pump blocking can be greatly reduced and damage risk;ECU is connected with float type level gauge, immersible pump, By float type level gauge, the measurement of water level is sent to the start stop signal of immersible pump, it is achieved interim melt pit Automatization's draining, it is not necessary to personnel are the most on duty, significantly reduces manpower;Line component selects DN65's Blue PE plastic tube can take into account displacement and pump lift simultaneously, and color is eye-catching, is difficult to be trampled damage by people, Replaced traditional fire hose can effectively eliminate as water-drainage tube part metal run out, leak, get an electric shock equivalent risk, Safe mass is greatly improved.Additionally, plastic tube is with low cost, it is easy to cutting, can be according to on-the-spot actual demand Intercept different length flexibly, then by itself and the special Flange joint of match of pipe diameter, can effectively prevent from leaking, running Water, and water backflow from high point to low spot when providing check valves to avoid termination of pumping on above-mentioned line component, Prevent string water, improve drainage efficiency.
One of ordinary skill in the art will appreciate that all or part of step realizing above-described embodiment can be passed through Hardware completes, it is also possible to instructing relevant hardware by program and complete, described program can be stored in In a kind of computer-readable recording medium, storage medium mentioned above can be read only memory, disk or CD etc..
The foregoing is only presently preferred embodiments of the present invention, not in order to limit the present invention, all the present invention's Within spirit and principle, any modification, equivalent substitution and improvement etc. made, should be included in the present invention's Within protection domain.

Claims (15)

1. a nuclear island interim melt pit automatization drainage system, it is characterised in that described system includes:
Multiple interim melt pits, multiple described interim melt pits are separately positioned on different safe Factory Building regions, are used for receiving The water discharged in appearance system;
Multiple float type level gauges, each described float type level gauge is correspondingly arranged in interim melt pit described in, For gathering the water level signal of differing heights in described interim melt pit;
Multiple immersible pumps, each described immersible pump correspondence is arranged in interim melt pit described in, for facing described Time melt pit in water extract out;
ECU, connects each described float type level gauge and each described immersible pump, described automatically controlled list respectively The control panel of unit has automatic mode, for receiving the water level letter of differing heights in each described interim melt pit Number, judge according to different water levels, and correspondence send described immersible pump start stop signal, automatically turn on or Close the described immersible pump of each correspondence.
Drainage system the most according to claim 1, it is characterised in that described system also includes:
Line component, connects each described immersible pump, for the water in each described interim melt pit is collected heel row Outside safe Factory Building.
Drainage system the most according to claim 2, it is characterised in that described system also includes multiple stopping Return valve, each described check-valves be separately positioned on correspondence described line component on, and with each corresponding institute Stating immersible pump to connect, during for avoiding termination of pumping, water backflows to corresponding described interim melt pit to low spot from high point.
Drainage system the most according to claim 3, it is characterised in that described line component includes multiple First by-pass line, multiple second by-pass lines and main pipe line, wherein: one end of each described first by-pass line is even Connecing the described immersible pump of correspondence, the other end of each described first by-pass line connects corresponding described check-valves, For the water in described immersible pump is inputted to described second by-pass line;
One end of each described second by-pass line connects corresponding described check-valves, each described second by-pass line The other end connect described main pipe line, for by the water input in corresponding described check-valves to described main pipe line;
One end of described main pipe line is each described second by-pass line meet, is used for collecting each described second The water of by-pass line input, and by the other end of described main pipe line, water is delivered to outside Factory Building.
Drainage system the most according to claim 4, it is characterised in that described first by-pass line, second By-pass line and main pipe line are DN65 blueness PE plastic tube.
Drainage system the most according to claim 2, it is characterised in that described drainage system also includes turning Connection device, is used for connecting described immersible pump and described line component.
Drainage system the most according to claim 6, it is characterised in that described switching device is fire water Band.
Drainage system the most according to claim 2, it is characterised in that also set up on described line component There is flange, be used for connecting described first by-pass line, the second by-pass line and main pipe line.
Drainage system the most according to claim 1, it is characterised in that the chain of command of described ECU Plate also has manual mode, realizes the start and stop of immersible pump manually for scene.
Drainage system the most according to claim 1, it is characterised in that described ECU includes depositing Storage module, it is judged that module and control module,
Described memory module for storage pre-set first pre-conditioned and second pre-conditioned;
According to actually detected water level signal, described judge module is for judging whether it meets described first and preset Condition or second pre-conditioned, when the water level of each described interim melt pit meet described first pre-conditioned time, Described immersible pump is opened;When the water level of each described interim melt pit meet described second pre-conditioned time, described Immersible pump stops;
Described control module is for meeting above-mentioned default first condition or pre-when described actually detected water level signal If during second condition, described immersible pump start stop signal is sent to corresponding described immersible pump.
11. drainage systems according to claim 1, it is characterised in that on each described interim melt pit Being provided with cover plate, described cover plate offers through hole, the float for described float type level gauge passes and natural Lowering is in corresponding described interim melt pit.
12. 1 kinds of nuclear island interim melt pit automatization water discharge methods, it is characterised in that comprise the steps:
S1, melt pit and immersible pump are arranged: according to each system debug dewatering needs, in the different on-demand settings of Factory Building Multiple interim melt pits, and immersible pump described in corresponding installation one in each described interim melt pit;
S2, float type level gauge are arranged: in each described interim melt pit being provided with described immersible pump, correspondence sets Put a float type level gauge, the water level signal of differing heights in the corresponding described interim melt pit of Real-time Collection;
S3, immersible pump control: according to the water level signal of the differing heights of actual acquisition, and real-time judge is each described Whether the water level in interim melt pit meets start and stop requirement, and sends corresponding described immersible pump start stop signal.
13. water discharge methods according to claim 12, it is characterised in that also wrap in described step S1 Include: clean out the foreign material in described interim melt pit, and cover plate is set on the described interim melt pit of each correspondence;
Step S2a is also included: line component is arranged: arrange line component between described step S2 and S3, Connect each described immersible pump, and the check-valves of each correspondence is set on described line component.
14. water discharge methods according to claim 12, it is characterised in that also wrap in described step S3 Including: be provided with ECU, described ECU has automatic mode, is pre-set by its control panel First is pre-conditioned or second pre-conditioned, presets when the water level of each described interim melt pit meets described first During condition, described immersible pump is opened;When the water level of each described interim melt pit meets described second pre-conditioned Time, described immersible pump stops;
Described ECU according to actually detected water level signal judge whether to meet described first pre-conditioned or Second is pre-conditioned, and described actually detected water level signal meet different pre-conditioned time, by described Immersible pump start stop signal sends to corresponding described immersible pump.
15. water discharge methods according to claim 12, it is characterised in that also include step S4: each Water in corresponding described interim melt pit, according to the start stop signal received, is discharged, and is united by described immersible pump One collects heel row to outside safe Factory Building.
CN201610565631.7A 2016-07-18 2016-07-18 Nuclear island temporary pit automatic drainage system and drainage method Pending CN106013390A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610565631.7A CN106013390A (en) 2016-07-18 2016-07-18 Nuclear island temporary pit automatic drainage system and drainage method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610565631.7A CN106013390A (en) 2016-07-18 2016-07-18 Nuclear island temporary pit automatic drainage system and drainage method

Publications (1)

Publication Number Publication Date
CN106013390A true CN106013390A (en) 2016-10-12

Family

ID=57119450

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610565631.7A Pending CN106013390A (en) 2016-07-18 2016-07-18 Nuclear island temporary pit automatic drainage system and drainage method

Country Status (1)

Country Link
CN (1) CN106013390A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107893911A (en) * 2017-10-30 2018-04-10 广州地铁设计研究院有限公司 The booster monitoring system of feed pipe
CN108151967A (en) * 2017-11-16 2018-06-12 中国核电工程有限公司 A kind of nuclear power plant nuclear island workshop liquid leakage rate measuring device
CN114164847A (en) * 2021-11-11 2022-03-11 北京城建集团有限责任公司 Emergency drainage system and method for underground building

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0523389A1 (en) * 1991-06-20 1993-01-20 Hitachi, Ltd. Drainage water pumping station
JP2010236190A (en) * 2009-03-30 2010-10-21 Kubota Corp Controller for submerged pump, manhole pump device, and operation method for the manhole pump device
CN202466780U (en) * 2012-01-30 2012-10-03 无锡日窒热交换机器有限公司 Sewage discharge automatic water level control box
CN203588085U (en) * 2013-11-11 2014-05-07 青岛三利中德美水设备有限公司 Automatic control sewage system
CN204728443U (en) * 2015-07-09 2015-10-28 唐山东华钢铁企业集团有限公司 A kind of sewage automatic drain system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0523389A1 (en) * 1991-06-20 1993-01-20 Hitachi, Ltd. Drainage water pumping station
JP2010236190A (en) * 2009-03-30 2010-10-21 Kubota Corp Controller for submerged pump, manhole pump device, and operation method for the manhole pump device
CN202466780U (en) * 2012-01-30 2012-10-03 无锡日窒热交换机器有限公司 Sewage discharge automatic water level control box
CN203588085U (en) * 2013-11-11 2014-05-07 青岛三利中德美水设备有限公司 Automatic control sewage system
CN204728443U (en) * 2015-07-09 2015-10-28 唐山东华钢铁企业集团有限公司 A kind of sewage automatic drain system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
段树林: "《船舶动力装置测试技术》", 31 December 2009, 大连海事大学出版社 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107893911A (en) * 2017-10-30 2018-04-10 广州地铁设计研究院有限公司 The booster monitoring system of feed pipe
CN108151967A (en) * 2017-11-16 2018-06-12 中国核电工程有限公司 A kind of nuclear power plant nuclear island workshop liquid leakage rate measuring device
CN108151967B (en) * 2017-11-16 2021-05-18 中国核电工程有限公司 Nuclear power plant nuclear island factory building liquid leakage rate measuring device
CN114164847A (en) * 2021-11-11 2022-03-11 北京城建集团有限责任公司 Emergency drainage system and method for underground building
CN114164847B (en) * 2021-11-11 2023-09-15 北京城建集团有限责任公司 Emergency drainage system and method for underground building

Similar Documents

Publication Publication Date Title
CN205827196U (en) A kind of pump house waterflooding warning system
CN106013390A (en) Nuclear island temporary pit automatic drainage system and drainage method
CN206639025U (en) A kind of pump house control system with flood function
CN205561967U (en) Basement boiler room leak remote alarm and automatic safety device
CN204919792U (en) Drainage trouble emergency treatment type area back flush lifting means
CN207799481U (en) A kind of anti-bath system of rail traffic underground station goat
CN105843100A (en) Coal mine underground automatic drainage control system
CN206021517U (en) A kind of supply equipment trouble call warning system
CN205644256U (en) Property equipment is concentrated and distribution control management system
CN211849905U (en) Automatic drainage system for data center manhole
CN106906886A (en) Intelligent central drainage system and method
CN209280041U (en) A kind of dedicated hydrology inspection well of drainage pipeline networks
CN212052999U (en) Water supply system
CN220978259U (en) Novel drainage control device of distributed water collecting tank
CN208395947U (en) A kind of draining of unit maintenance and seepage from powerhouse drainage system
CN219923980U (en) Skid-mounted chemical circulation cleaning device
CN207073184U (en) A kind of cable duct of substation drainage system
CN104912813A (en) Water and gas separation detection protection device for precisely judging water diversion state of mine draining pump
CN205296343U (en) Be applied to waste fitting discharging in workshop
CN106371394A (en) Remote monitoring and processing method for working condition of drainage pump station equipment
CN206346726U (en) Water injection well in oil fields surveys re-injection immediately device in leakage soiling solution scene during tune
CN219141945U (en) Automatic monitoring well system for in-situ remediation of groundwater
CN109914319A (en) A kind of construction site fugitive dust control method based on BIM technology
CN109708704A (en) A kind of dedicated hydrology inspection well of drainage pipeline networks
CN109610521A (en) A kind of drainage system and method improving piping lane space utilization

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20161012

RJ01 Rejection of invention patent application after publication