CN106013153A - End protector for construction of steel pipe pile and working method thereof - Google Patents

End protector for construction of steel pipe pile and working method thereof Download PDF

Info

Publication number
CN106013153A
CN106013153A CN201610533147.6A CN201610533147A CN106013153A CN 106013153 A CN106013153 A CN 106013153A CN 201610533147 A CN201610533147 A CN 201610533147A CN 106013153 A CN106013153 A CN 106013153A
Authority
CN
China
Prior art keywords
pipe pile
steel
wall
protecting device
steel pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610533147.6A
Other languages
Chinese (zh)
Inventor
郭星宇
杨砚宗
陈晖�
王克文
郭俊杰
董科亨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Changkai Geotechnical Engineering Co Ltd
Original Assignee
Shanghai Changkai Geotechnical Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Changkai Geotechnical Engineering Co Ltd filed Critical Shanghai Changkai Geotechnical Engineering Co Ltd
Priority to CN201610533147.6A priority Critical patent/CN106013153A/en
Publication of CN106013153A publication Critical patent/CN106013153A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D13/00Accessories for placing or removing piles or bulkheads, e.g. noise attenuating chambers
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D7/00Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses an end protector for construction of a steel pipe pile and a working method thereof. The end protector comprises a limiting protrusion block welded to the outer wall of the end of the steel pipe pile and a protective jacket fastened to the outer side of the end of the steel pipe pile, wherein a limiting groove matched with the limiting protrusion block is formed in the inner wall of the protective jacket; the limiting groove in the inner wall of the protective jacket and the limiting protrusion block are arranged correspondingly in a matched mode and are fastened, and therefore the protective jacket can be fixed to the end of the steel pipe pile; and a pile driving and drawing machine clamps the end protector and exerts excitation force for pressing the steel pipe pile into the preset depth. The end protector has the advantages of being simple in structure and capable of being repeatedly used; through the end protector, direct contact between a clamp of the pile driving and drawing machine and the steel pipe pile can be avoided, damage of a pipe body can be avoided, the end of the steel pipe pile can be protected against deformation, subsequent pile extension can be smooth, the force can be well transmitted to the steel pipe pile, hoisting of the steel pipe pile can be assisted, and construction can be carried out smoothly.

Description

A kind of end-protecting device for steel-pipe pile construction and method of work thereof
Technical field
The invention belongs to Geotechnical Engineering field, be specifically related to a kind of end-protecting device for steel-pipe pile construction and method of work thereof.
Background technology
Steel-pipe pile, because having good strength and stability, is widely applied in Geotechnical Engineering field.For saving the duration, pile-driving and-pulling machine clamping steel pipe one end is commonly used in the construction of steel-pipe pile, by exciting force, steel pipe inserts soil body desired depth.
But because pile-driving and-pulling machine exciting force is relatively big, the position that the end of clamped steel pipe is the most longer is often deformed and other damages, or makes fixture cannot directly clamp steel pipe because diameter of steel tube is less, also needs steel tube end part certain area is carried out cutting process etc..These have to when causing the follow-up pile extension of steel-pipe pile first cut off upper end deformation or the part body of cutting process, cause waste of material, cut off steel pipe simultaneously and also produce a large amount of artificial, machinery and time cost.
Summary of the invention
In place of it is an object of the invention to according to above-mentioned the deficiencies in the prior art; a kind of end-protecting device for steel-pipe pile construction and method of work thereof are provided; this end-protecting device by arranging a protection set in steel-pipe pile end; and arrange the most spacing projection and groove structure between steel-pipe pile outer wall and guarantor's jacket inner wall, consequently facilitating pile-driving and-pulling machine clamps steel-pipe pile end and constitutes protection.
The object of the invention realizes being completed by techniques below scheme:
A kind of end-protecting device for steel-pipe pile construction; it is characterized in that described end-protecting device includes the spacing block set being welded on the outer wall of described steel-pipe pile end and is anchored on the protection set outside described steel-pipe pile end; wherein, described guarantor's jacket inner wall has the limited impression matched with described spacing block set.
Described protection set is made up of two semicircle anchor ear bolts.
Described limited impression is welded in the upper liner plate on described guarantor's jacket inner wall by interval and lower liner plate encloses and forms, and the vertical spacing between described upper liner plate and described lower liner plate matches with the height of described spacing block set.
Described spacing block set is the sleeve pipe being welded on the outer wall of described steel-pipe pile end.
Described spacing block set is the some curved plates along the welding of described steel-pipe pile end outer wall interval.
Described protection puts port and is welded with on a shrouding, and described shrouding and is welded with a riser.
A kind of method of work relating to arbitrary above-mentioned end-protecting device for steel-pipe pile construction, it is characterised in that described method of work comprises the steps: prefabricated described protection set, and the upper port overlapped in described protection welds shrouding and riser successively;Described steel-pipe pile end outer wall welds described spacing block set;Described protection set is set in described steel-pipe pile end, makes the limited impression on described guarantor's jacket inner wall arrange with described spacing block set Corresponding matching and fasten, so that described protection set is fixed on described steel-pipe pile end;Pile-driving and-pulling machine is utilized to clamp described riser and apply exciting force so that described steel-pipe pile is pressed into desired depth.
The limited impression that described protection puts offers method: described protection set is made up of two semicircle anchor ears, and on the inwall of described semicircle anchor ear, liner plate and lower liner plate are welded in interval, thus enclose the described limited impression of composition.
It is an advantage of the invention that apparatus structure is simple, can quick assembling reusing;Pile-driving and-pulling machine fixture can be avoided to contact with the direct of steel-pipe pile by this end-protecting device, it is to avoid body damages, and protection steel-pipe pile end is indeformable; make follow-up pile extension smooth; simultaneously can power transmission, can also auxiliary lifting steel-pipe pile to steel pipe pile body well, it is ensured that construction is smoothed out.
Accompanying drawing explanation
Fig. 1 is the end-protecting device structural representation being arranged on steel-pipe pile in the present invention;
Fig. 2 is that in the present invention, pile-driving and-pulling machine clamping steel-pipe pile end-protecting device carries out the schematic diagram constructed;
Fig. 3 is the a-a view in Fig. 2 of the present invention;
Fig. 4 is the b-b view in Fig. 2 of the present invention.
Detailed description of the invention
Inventive feature and other correlated characteristic are described in further detail by embodiment below in conjunction with accompanying drawing, in order to the understanding of technical staff of the same trade:
Such as Fig. 1-4, in figure, labelling 1-13 is respectively as follows: riser 1, shrouding 2, upper liner plate 3, sleeve pipe 4, bolt hole 5, side wing 6, semicircle anchor ear 7, lower liner plate 8, protection set 9, steel-pipe pile 10, fixture 11, pile-driving and-pulling machine 12, bolt 13.
Embodiment: as Figure 1-4; the present embodiment is specifically related to a kind of end-protecting device for steel-pipe pile construction and method of work thereof, and this end-protecting device includes the spacing block set being fixedly welded on outside steel-pipe pile 10 end and the protection set 9 in steel-pipe pile 10 end that is fixedly clamped.
Spacing block set is weldingly fixed on the outside of steel-pipe pile 10 end; primarily serve the vertical spacing to protection set 9 and intermal force; it can be specifically the Steel Casing 4 employed in the present embodiment; the form of other spacing block set can certainly be used, such as along the curved plate form of the steel-pipe pile 10 circumferentially spaced-apart laying of outer wall.
Protection set 9 is specifically made up of two semicircular anchor ear 7, has the side wing 6 of outwards extension in the both sides of semicircle anchor ear 7, constitutes bolt fastening by plugging bolt 13 in the bolt hole 5 on side wing 6 and tightening between two semicircular anchor ear 7.In addition; the inwall of two semicircular anchor ear 7 is welded with curved upper liner plate 3 and lower liner plate 8; the most at a certain distance thus enclose composition limited impression; this upper and lower spacing distance is identical with the height of sleeve pipe 4; i.e. limited impression is suitable with the size shape of spacing block set (sleeve pipe 4), and mating between spacing block set with limited impression can constitute the spacing of in the vertical direction to protection set 9.It should be noted that the generation type for limited impression is the most unique, it is also possible to directly offer cell body on the inwall of semicircle anchor ear 7 by machining mode.
Upper port at protection set 9 is welded with a horizontal direction shrouding 2, and is vertically welded with riser 1 on the axis of shrouding 2, and riser 1 clamps for the fixture 11 on pile-driving and-pulling machine 12 as held part, thus drives protection set 9 and to steel-pipe pile 10 power transmission.
As Figure 1-4, the method for work in steel-pipe pile work progress is applied to comprise the steps: the present embodiment medial end portions protection device
(1) sheathed sleeve pipe 4 being welded and fixed outside the body upper end of steel-pipe pile 10, thus constitute spacing block set;
(2) fabricated 9:
Upper inside wall at semicircle anchor ear 7 is fitted and is arranged liner plate 3 and weld, and the inner wall lower at semicircle anchor ear 7 is fitted and arranged lower liner plate 8 and weld afterwards, thus forms limited impression in the clearance space between upper liner plate 3 and lower liner plate 8;By corresponding for two semicircular anchor ear 7 splicing, the upper port at each semicircle anchor ear 7 welds the shrouding 2 of semicircular in shape, vertical welding riser 1 on shrouding 2 afterwards the most respectively, makes protection set 9 one prefabricated entirety of composition;
(3) be transported to job site and be set in the end of steel-pipe pile 10 by prefabricated protection set 9, making sleeve pipe 4 be embedded between upper liner plate 3 and lower liner plate 8, i.e. spacing block set mates with limited impression composition;Afterwards by bolt hole 5 one_to_one corresponding on both sides semicircle anchor ear 7 side wing 6, each bolt hole 5 inserts bolt 13 and tightens, so that two semicircular anchor ear 7(i.e. protects set 9) it is anchored on the end of steel-pipe pile 10;
(4) set 9 to be protected is after the end quick assembling of steel-pipe pile 10; start pile-driving and-pulling machine 12; fixture 11 thereon is utilized to clamp riser 1; thus at spacing block set with power transmission under the coupling of limited impression to steel-pipe pile 10; it is lifted to first segment steel-pipe pile 10 design at stake position, afterwards it is applied exciting force to be pressed into the desired depth to the soil body;
(6) after first segment steel-pipe pile 10 completes press-in; bolt 13 of outwarding winding is laid down the protection set 9 of its upper end and installs to the upper end sleeve pipe 4 of second section steel-pipe pile 10; utilize the fixture 11 on pile-driving and-pulling machine 12 to clamp riser 1 the bottom lifting of second section steel-pipe pile 10 to the upper end of first segment steel-pipe pile 10 and both to be welded and fused, afterwards it is applied exciting force to be pressed into the desired depth to the soil body;
(7) the press-in construction of each joint steel-pipe pile 10 and so forth, it is sequentially completed.
End-protecting device in the present embodiment can avoid directly contact of pile-driving and-pulling machine fixture and steel-pipe pile, and protection steel-pipe pile end is indeformable, simultaneously can power transmission well, it is ensured that construct and be smoothed out.

Claims (8)

1. the end-protecting device for steel-pipe pile construction; it is characterized in that described end-protecting device includes the spacing block set being welded on the outer wall of described steel-pipe pile end and is anchored on the protection set outside described steel-pipe pile end; wherein, described guarantor's jacket inner wall has the limited impression matched with described spacing block set.
A kind of end-protecting device for steel-pipe pile construction the most according to claim 1, it is characterised in that described protection set is made up of two semicircle anchor ear bolts.
A kind of end-protecting device for steel-pipe pile construction the most according to claim 1; it is characterized in that described limited impression is welded in the upper liner plate on described guarantor's jacket inner wall by interval and lower liner plate encloses and forms, the vertical spacing between described upper liner plate and described lower liner plate matches with the height of described spacing block set.
A kind of end-protecting device for steel-pipe pile construction the most according to claim 1, it is characterised in that described spacing block set is the sleeve pipe being welded on the outer wall of described steel-pipe pile end.
A kind of end-protecting device for steel-pipe pile construction the most according to claim 1, it is characterised in that described spacing block set is the some curved plates along the welding of described steel-pipe pile end outer wall interval.
A kind of end-protecting device for steel-pipe pile construction the most according to claim 1, it is characterised in that described protection puts port and is welded with on a shrouding, and described shrouding and is welded with a riser.
7. the method for work relating to the arbitrary described end-protecting device for steel-pipe pile construction of claim 1-6; it is characterized in that described method of work comprises the steps: prefabricated described protection set, and the upper port overlapped in described protection welds shrouding and riser successively;Described steel-pipe pile end outer wall welds described spacing block set;Described protection set is set in described steel-pipe pile end, makes the limited impression on described guarantor's jacket inner wall arrange with described spacing block set Corresponding matching and fasten, so that described protection set is fixed on described steel-pipe pile end;Pile-driving and-pulling machine is utilized to clamp described riser and apply exciting force so that described steel-pipe pile is pressed into desired depth.
The method of work of a kind of end-protecting device for steel-pipe pile construction the most according to claim 7; it is characterized in that the limited impression that described protection puts is offered method and is: described protection set is made up of two semicircle anchor ears; on the inwall of described semicircle anchor ear, liner plate and lower liner plate are welded in interval, thus enclose the described limited impression of composition.
CN201610533147.6A 2016-07-08 2016-07-08 End protector for construction of steel pipe pile and working method thereof Pending CN106013153A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610533147.6A CN106013153A (en) 2016-07-08 2016-07-08 End protector for construction of steel pipe pile and working method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610533147.6A CN106013153A (en) 2016-07-08 2016-07-08 End protector for construction of steel pipe pile and working method thereof

Publications (1)

Publication Number Publication Date
CN106013153A true CN106013153A (en) 2016-10-12

Family

ID=57108874

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610533147.6A Pending CN106013153A (en) 2016-07-08 2016-07-08 End protector for construction of steel pipe pile and working method thereof

Country Status (1)

Country Link
CN (1) CN106013153A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106702898A (en) * 2017-02-27 2017-05-24 郑州大学 Anchor head of parallel-steel wire inhaul cable and manufacturing method of anchor head
WO2018090539A1 (en) * 2016-11-15 2018-05-24 广东中科华大工程技术检测有限公司 Pile-top protection apparatus for inspection of foundation pile
CN108331004A (en) * 2018-01-14 2018-07-27 浙江大学 A kind of device of reduction relative settlement suitable for multi-column pier foundation
CN109930498A (en) * 2019-04-09 2019-06-25 南京林业大学 A kind of method of disposal for going deep into bed stabilization bridge vertical member
CN113774898A (en) * 2021-09-24 2021-12-10 广东一新长城建筑集团有限公司 Static pressure prestressed pipe pile and construction process thereof

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2913467Y (en) * 2006-05-29 2007-06-20 刘小檀 Pile top hoop device for deadweight carrying detection of building pipe pile
JP2007154456A (en) * 2005-12-01 2007-06-21 Nippon Steel Engineering Co Ltd Structure for reinforcing pile head during construction of steel pipe pile, and construction method for steel pipe pile
JP2010043471A (en) * 2008-08-13 2010-02-25 Nippon Concrete Ind Co Ltd Pile construction apparatus and pile construction method
CN201473977U (en) * 2009-05-18 2010-05-19 中冶实久建设有限公司 Dismountable cast-in-place pile compression dead load pile head protection device
KR20120132660A (en) * 2011-05-29 2012-12-07 주식회사 장평건설 Pile cap structure
CN202913412U (en) * 2012-10-30 2013-05-01 福州市第三建筑工程公司 Column pile combined sleeve cap
CN202989924U (en) * 2012-12-12 2013-06-12 江苏省交通工程集团有限公司 Special construction pile cap for concrete tubular pile
CN105317038A (en) * 2014-06-26 2016-02-10 中国二十冶集团有限公司 PHC tube pile buffer pile cap
CN105507323A (en) * 2015-11-24 2016-04-20 江苏省电力公司连云港供电公司 Small-diameter steel pipe pile side static-pressure hoop device
CN205857182U (en) * 2016-07-08 2017-01-04 上海长凯岩土工程有限公司 A kind of end-protecting device for steel-pipe pile construction

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007154456A (en) * 2005-12-01 2007-06-21 Nippon Steel Engineering Co Ltd Structure for reinforcing pile head during construction of steel pipe pile, and construction method for steel pipe pile
CN2913467Y (en) * 2006-05-29 2007-06-20 刘小檀 Pile top hoop device for deadweight carrying detection of building pipe pile
JP2010043471A (en) * 2008-08-13 2010-02-25 Nippon Concrete Ind Co Ltd Pile construction apparatus and pile construction method
CN201473977U (en) * 2009-05-18 2010-05-19 中冶实久建设有限公司 Dismountable cast-in-place pile compression dead load pile head protection device
KR20120132660A (en) * 2011-05-29 2012-12-07 주식회사 장평건설 Pile cap structure
CN202913412U (en) * 2012-10-30 2013-05-01 福州市第三建筑工程公司 Column pile combined sleeve cap
CN202989924U (en) * 2012-12-12 2013-06-12 江苏省交通工程集团有限公司 Special construction pile cap for concrete tubular pile
CN105317038A (en) * 2014-06-26 2016-02-10 中国二十冶集团有限公司 PHC tube pile buffer pile cap
CN105507323A (en) * 2015-11-24 2016-04-20 江苏省电力公司连云港供电公司 Small-diameter steel pipe pile side static-pressure hoop device
CN205857182U (en) * 2016-07-08 2017-01-04 上海长凯岩土工程有限公司 A kind of end-protecting device for steel-pipe pile construction

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2018090539A1 (en) * 2016-11-15 2018-05-24 广东中科华大工程技术检测有限公司 Pile-top protection apparatus for inspection of foundation pile
CN106702898A (en) * 2017-02-27 2017-05-24 郑州大学 Anchor head of parallel-steel wire inhaul cable and manufacturing method of anchor head
CN106702898B (en) * 2017-02-27 2018-09-04 郑州大学 A kind of parallel wire stay anchor head and preparation method thereof
CN108331004A (en) * 2018-01-14 2018-07-27 浙江大学 A kind of device of reduction relative settlement suitable for multi-column pier foundation
CN108331004B (en) * 2018-01-14 2023-06-16 浙江大学 Device suitable for reducing differential settlement of pile group foundation
CN109930498A (en) * 2019-04-09 2019-06-25 南京林业大学 A kind of method of disposal for going deep into bed stabilization bridge vertical member
CN113774898A (en) * 2021-09-24 2021-12-10 广东一新长城建筑集团有限公司 Static pressure prestressed pipe pile and construction process thereof
CN113774898B (en) * 2021-09-24 2022-06-28 广东一新长城建筑集团有限公司 Static pressure prestressed pipe pile and construction process thereof

Similar Documents

Publication Publication Date Title
CN106013153A (en) End protector for construction of steel pipe pile and working method thereof
CN205857182U (en) A kind of end-protecting device for steel-pipe pile construction
CN104213555B (en) Ultra-long pile foundation steel protection tube nondestructive recovery method
KR20130061536A (en) Connection apparatus of steel pipe for strut, steel pipe strut using thereof and method of constructing the steel pipe strut
CN106013763A (en) Flat iron fastener type external scaffold wall connecting piece
CN211171973U (en) Positioning protection device for assisting in lowering of pile foundation reinforcement cage
JP5695307B2 (en) Small diameter steel pipe pile joint structure and small diameter steel pipe pile construction method
CN206385532U (en) It is a kind of to be used for the piling template of CFG
JP2018096194A (en) Pile head processing construction method and pile head processing structure, and steel cylindrical member with anchor member used for the structure
KR101577727B1 (en) PHC pile joint and jointing method using the same
CN112278185B (en) Reinforcing ring installation device and reinforcing ring installation method
CN104959491A (en) Fast steel bar straightener and method for utilizing straightener for straightening steel bars
JP5642988B2 (en) Detachable guide jig and steel pipe pile construction method using the same
CN210134420U (en) Composite hoop for trestle steel pipe pile parallel connection
JP2020111905A (en) Pile head joining structure and construction method therefor
CN113774898B (en) Static pressure prestressed pipe pile and construction process thereof
CN104154369A (en) Punching device and punching method for lined PCCP (prestressed concrete cylinder pipe)
CN108914987A (en) Pile crown construction method for high strain monitoring
CN202809991U (en) Mechanical cold-connection wall tied reinforcement construction member after being pre-buried
CN219793659U (en) Butt joint positioning device for main chord pipe of steel pipe arch
CN219632272U (en) Circle calibrating device for manual pipe jacking steel pipe
CN210179075U (en) PE pipeline and geomembrane butt-joint structure
CN214517290U (en) Pile head reinforcing steel bar bending auxiliary tool for cast-in-place pile
CN210086821U (en) Beam-penetrating sleeve positioner
JP4075623B2 (en) Steel pipe joining structure and joining method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20161012

RJ01 Rejection of invention patent application after publication