CN106013049A - 岩溶地区基桩工程施工方法 - Google Patents

岩溶地区基桩工程施工方法 Download PDF

Info

Publication number
CN106013049A
CN106013049A CN201610418375.9A CN201610418375A CN106013049A CN 106013049 A CN106013049 A CN 106013049A CN 201610418375 A CN201610418375 A CN 201610418375A CN 106013049 A CN106013049 A CN 106013049A
Authority
CN
China
Prior art keywords
foundation pile
underground
karst
point position
pile point
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610418375.9A
Other languages
English (en)
Other versions
CN106013049B (zh
Inventor
黄泽普
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Pengxiang Construction Group Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201610418375.9A priority Critical patent/CN106013049B/zh
Publication of CN106013049A publication Critical patent/CN106013049A/zh
Application granted granted Critical
Publication of CN106013049B publication Critical patent/CN106013049B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/02Improving by compacting
    • E02D3/10Improving by compacting by watering, draining, de-aerating or blasting, e.g. by installing sand or wick drains
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes
    • E02D15/04Placing concrete in mould-pipes, pile tubes, bore-holes or narrow shafts
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/36Concrete or concrete-like piles cast in position ; Apparatus for making same making without use of mouldpipes or other moulds

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Civil Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Soil Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Agronomy & Crop Science (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
  • Piles And Underground Anchors (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

一种岩溶地区基桩工程施工方法是,探明基桩点位所对应的地下溶洞的状况;揭穿基桩点位地下隐藏的溶洞,把钢筋构件直插溶洞底部,钢筋构件套有袋囊,之后对袋囊进行灌浆充填;再对基桩点周围溶洞钻减压通孔。或在基桩点位下方的暗河或溶洞前后方钻减压通孔,并放置气囊,提供气压,使气囊堵塞溶洞,把钢筋构件直插溶洞内,并对溶洞灌浆充填,凝结固化后,释放气囊气压,并保持减压通孔畅通。本发明的岩溶地区基桩工程施工方法工程造价低,确保基建工地及相邻区域基岩的稳定及基桩的牢固,使地表与地下深处空气相通,保持了地表与地下的应力场平衡,化解了地下深处随地下水位的变化形成的气压,为地面建筑物的安全提供了保障。

Description

岩溶地区基桩工程施工方法
技术领域
本发明涉及一种岩溶地区基桩工程施工方法。
背景技术
岩溶地区的地貌特征多数呈现大面积的丛峰山区和少量的山间盆地,山多地少的现实导致城镇建设基本上都是建筑在岩溶盆地之上。这些岩溶盆地的地下,由于地壳运动及地下水的溶蚀作用,往往形成与盆地长轴方向一致,面积不等,由溶洞溶隙组成的岩溶发育带。在岩溶发育带的区域内地面塌陷频发,勘查钻探时气压上冲或吸钻现象较为常见,基桩施工过程中打穿溶洞的情况经常发生。因此,由地基不稳导致建筑在岩溶发育带上的地面工程面临随时垮塌的威胁。
目前,人们对治理岩溶塌陷及基桩施工过程中打穿溶洞的加固方法还没有相对成熟的手段。常用的方法就是往溶洞内充填,这种无底洞式的充填,不仅浪费大量的人力、物力,而且效果不佳,因为地下溶蚀带的形态结构复杂,更为重要的是,随意往溶洞内进行充填,地下暗河***的部分通道将被堵塞,地下应力场的平衡被打破,随着地下水位的变化,充填处及相邻区域必然产生巨大的张力或吸力,最终导致新的地基不稳。
发明内容
本发明的目的就是提供一种工程造价低,能确保基桩牢固和区域范围内地基稳固的岩溶地区基桩工程施工方法。
本发明的岩溶地区基桩工程施工方法之一是,在岩溶发育区的基建工地上,按规划设计的基桩点位布置纵向和横向的物探线路,利用物探仪器,探明每个基桩点位所对应的地下溶洞、溶隙的发育状况;当基桩点位下方存在暗河或溶洞时,揭穿基桩点位地下隐藏的溶洞,把钢筋构件直插溶洞底部,钢筋构件套有按溶洞形态大小裁剪而成的袋囊,之后对袋囊进行灌浆充填;再对上述基桩点周围较浅的溶洞钻减压通孔,以释放地下溶洞的气压。
本发明的岩溶地区基桩工程施工方法之二是,在岩溶发育区的基建工地上,按规划设计的基桩点位布置纵向和横向的物探线路,利用物探仪器,探明每个基桩点位所对应的地下溶洞、溶隙的发育状况;当基桩点位下方存在暗河或溶洞时,在基桩点位下方的暗河或溶洞前方及后方钻减压通孔,并通过减压通孔向地下溶洞内放置气囊,用空压机通过加压管向气囊内持续提供气压,待气囊堵塞地下溶洞通道后,揭穿基桩点位地下隐藏的溶洞,把钢筋构件直插溶洞底部,并对基桩点位地下的溶洞灌浆充填;灌浆充填物凝结固化后,释放气囊中的气压,并保持减压通孔畅通。
本发明的岩溶地区基桩工程施工方法,工程造价低、操作方法简单,在基建工程的初始阶段采用科学的技术手段和工程措施,确保基建工地及相邻区域基岩的稳定及基桩的牢固,使地表与地下深处空气相通,保持了地表与地下的应力场平衡,化解了地下深处随地下水位的变化形成的气压,为地面建筑物的安全提供了保障。
附图说明
图1为本发明的施工示意图;
图2为本发明的另一施工示意图;
土壤层,2、减压通孔,3、暗河及溶洞,4、基桩钢筋构件,5、袋囊,6、基岩,7、加压管,8、气囊。
具体实施方式
实施例1(如图1):
一种岩溶地区基桩工程施工方法是,在岩溶发育区的基建工地上,按规划设计的基桩点位布置纵向和横向的物探线路,运用高密度电法等物探仪器,探明每个基桩点位所对应的地下溶洞、溶隙的发育状况;当基桩点位下方存在暗河或溶洞时,揭穿基桩点位地下隐藏的溶洞,把钢筋构件直插溶洞底部,钢筋构件套有按溶洞形态大小裁剪而成的袋囊,之后对袋囊进行灌浆充填;再对上述基桩点周围较浅(离土壤层近)的溶洞钻减压通孔,以释放地下溶洞的气压。
实施例2(如图2):
一种岩溶地区基桩工程施工方法是,在岩溶发育区的基建工地上,按规划设计的基桩点位布置纵向和横向的物探线路,运用高密度电法等物探仪器,探明每个基桩点位所对应的地下溶洞、溶隙的发育状况;当基桩点位下方存在暗河或溶洞时,在基桩点位下方的暗河或溶洞前方及后方钻减压通孔,并通过减压通孔向地下溶洞内放置气囊,用空压机通过加压管(加压管***减压通孔中)向气囊内持续提供气压,待气囊堵塞地下溶洞通道后,揭穿基桩点位地下隐藏的溶洞,把钢筋构件直插溶洞底部,并对基桩点位地下的溶洞灌浆充填;灌浆充填物凝结固化后,释放气囊中的气压,取出加压管和气囊,并保持减压通孔畅通。

Claims (2)

1.一种岩溶地区基桩工程施工方法,其特征在于:在岩溶发育区的基建工地上,按规划设计的基桩点位布置纵向和横向的物探线路,利用物探仪器,探明每个基桩点位所对应的地下溶洞、溶隙的发育状况;当基桩点位下方存在暗河或溶洞时,揭穿基桩点位地下隐藏的溶洞,把钢筋构件直插溶洞底部,钢筋构件套有按溶洞形态大小裁剪而成的袋囊,之后对袋囊进行灌浆充填;再对上述基桩点周围较浅的溶洞钻减压通孔,以释放地下溶洞的气压。
2.一种岩溶地区基桩工程施工方法,其特征在于:在岩溶发育区的基建工地上,按规划设计的基桩点位布置纵向和横向的物探线路,利用物探仪器,探明每个基桩点位所对应的地下溶洞、溶隙的发育状况;当基桩点位下方存在暗河或溶洞时,在基桩点位下方的暗河或溶洞前方及后方钻减压通孔,并通过减压通孔向地下溶洞内放置气囊,用空压机通过加压管向气囊内持续提供气压,待气囊堵塞地下溶洞通道后,开始对基桩点位地下隐藏的溶洞进行压力灌浆充填;之后,揭穿基桩点位地下隐藏的溶洞,把钢筋构件直插溶洞底部,并对基桩点位地下的溶洞灌浆充填;灌浆充填物凝结固化后,释放气囊中的气压,并保持减压通孔畅通。
CN201610418375.9A 2016-06-13 2016-06-13 岩溶地区基桩工程施工方法 Expired - Fee Related CN106013049B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610418375.9A CN106013049B (zh) 2016-06-13 2016-06-13 岩溶地区基桩工程施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610418375.9A CN106013049B (zh) 2016-06-13 2016-06-13 岩溶地区基桩工程施工方法

Publications (2)

Publication Number Publication Date
CN106013049A true CN106013049A (zh) 2016-10-12
CN106013049B CN106013049B (zh) 2018-09-21

Family

ID=57088148

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610418375.9A Expired - Fee Related CN106013049B (zh) 2016-06-13 2016-06-13 岩溶地区基桩工程施工方法

Country Status (1)

Country Link
CN (1) CN106013049B (zh)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109629563A (zh) * 2019-01-10 2019-04-16 湖北工业大学 一种桩基围护施工方法
CN109629562A (zh) * 2019-01-10 2019-04-16 湖北工业大学 一种穿越溶洞的灌注桩施工方法
CN109653197A (zh) * 2019-01-10 2019-04-19 湖北工业大学 一种可三维拓展的桩基施工方法
CN109750662A (zh) * 2019-01-10 2019-05-14 湖北工业大学 一种穿越溶洞段的基桩施工方法
CN115125940A (zh) * 2022-07-09 2022-09-30 广东省第一建筑工程有限公司 一种溶洞区域无预处理的全套管灌注桩
CN115679955A (zh) * 2022-10-09 2023-02-03 重庆大学 一种溶腔内桩基施工装置及施工方法
CN116289878A (zh) * 2023-04-27 2023-06-23 中建七局第二建筑有限公司 一种古岩溶充填型溶洞充填物流化改良囊式注入治理方法

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19944821A1 (de) * 1999-09-18 2001-03-22 Franki Grundbau Gmbh Verfahren zur Herstellung einer wassersperrenden Sohle im Erdreich
CN101270582A (zh) * 2007-06-01 2008-09-24 中铁西北科学研究院有限公司 地下洞室内设置支撑柱的方法
CN101649606A (zh) * 2009-07-13 2010-02-17 黄泽普 岩溶洼地无负压堵漏成湖方法

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19944821A1 (de) * 1999-09-18 2001-03-22 Franki Grundbau Gmbh Verfahren zur Herstellung einer wassersperrenden Sohle im Erdreich
CN101270582A (zh) * 2007-06-01 2008-09-24 中铁西北科学研究院有限公司 地下洞室内设置支撑柱的方法
CN101649606A (zh) * 2009-07-13 2010-02-17 黄泽普 岩溶洼地无负压堵漏成湖方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
周云虎: "柳州银都大厦岩溶地基及基础处理", 《红水河》 *

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109629563A (zh) * 2019-01-10 2019-04-16 湖北工业大学 一种桩基围护施工方法
CN109629562A (zh) * 2019-01-10 2019-04-16 湖北工业大学 一种穿越溶洞的灌注桩施工方法
CN109653197A (zh) * 2019-01-10 2019-04-19 湖北工业大学 一种可三维拓展的桩基施工方法
CN109750662A (zh) * 2019-01-10 2019-05-14 湖北工业大学 一种穿越溶洞段的基桩施工方法
CN109629563B (zh) * 2019-01-10 2020-06-09 湖北工业大学 一种桩基围护施工方法
CN109629562B (zh) * 2019-01-10 2020-07-10 湖北工业大学 一种穿越溶洞的灌注桩施工方法
CN115125940A (zh) * 2022-07-09 2022-09-30 广东省第一建筑工程有限公司 一种溶洞区域无预处理的全套管灌注桩
CN115125940B (zh) * 2022-07-09 2024-02-13 广东省第一建筑工程有限公司 一种溶洞区域无预处理的全套管灌注桩
CN115679955A (zh) * 2022-10-09 2023-02-03 重庆大学 一种溶腔内桩基施工装置及施工方法
CN115679955B (zh) * 2022-10-09 2024-06-04 重庆大学 一种溶腔内桩基施工装置及施工方法
CN116289878A (zh) * 2023-04-27 2023-06-23 中建七局第二建筑有限公司 一种古岩溶充填型溶洞充填物流化改良囊式注入治理方法
CN116289878B (zh) * 2023-04-27 2024-03-22 中建七局第二建筑有限公司 一种古岩溶充填型溶洞充填物流化改良囊式注入治理方法

Also Published As

Publication number Publication date
CN106013049B (zh) 2018-09-21

Similar Documents

Publication Publication Date Title
CN106013049A (zh) 岩溶地区基桩工程施工方法
Zheng et al. Test and numerical research on wall deflections induced by pre-excavation dewatering
CN102493822A (zh) 一种通过富水断层影响带的隧道的帷幕注浆施工方法
CN103643918B (zh) 一种针对奥陶系灰岩矿区的寻找及防止矿井渗水的方法
US9879401B2 (en) Oil and gas well and field integrity protection system
CN105888607A (zh) 一种地面钻探和注浆方法
CN109440794A (zh) 一种适用于浅埋地铁盾构施工隧道岩溶的精细处置方法
CN109593957B (zh) 一种离子型稀土矿原地浸取的主动抽提方法
CN110705095A (zh) 一种岩溶地面塌陷分析方法
CN107237332A (zh) 一种采用复合型土钉墙的含流砂层基坑边坡支护方法
CN112814737A (zh) 基于叠层多分支水平井的陷落柱超前治理方法及***
CN209066468U (zh) 一种基坑降水装置
CN105369800B (zh) 导洞内钻孔灌注桩中***钢管柱一次成型施工方法
CN109583047B (zh) 一种隧道突水突泥地表塌陷形成时间的预测方法
Hwang et al. Evaluation of performance of diaphragm walls by wall deflection paths
CN105064384B (zh) 真空管井降水***
CN209482334U (zh) 增加抗滑桩施工安全度的临时降低边坡地下水装置
Mitew-Czajewska Numerical analysis of a 36 m deep diaphragm wall–parametric study
Ihm et al. Ground subsidence risk ratings for pre-excavation
CN109356182A (zh) 增加抗滑桩施工安全度的临时降低边坡地下水装置及其施工方法
CN104264724A (zh) 既有建构筑物下方基础内部水平深孔注浆加固方法
Furlani et al. 3-D finite element modeling and construction aspects for vertical shafts in Metro C Rome
JP6401575B2 (ja) ニューマチックケーソン工法におけるケーソン作業室への適正送気圧力の決定方法
CN202830937U (zh) 基坑支护桩锚杆接长结构
Roberti et al. Stabilization of a collapsed rock mass and installation of 100 tons permanent strand anchors at the Punatsangchhu-II Hydroelectric project, Bhutan

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20180813

Address after: 517100 B 301, North Xincheng garden, New Town Road, Lian Ping County, Heyuan, Guangdong.

Applicant after: GUANGDONG PENGXIANG CONSTRUCTION Co.,Ltd.

Address before: 330025 a 3 unit, 502 room, peach blossom District, No. 50, an Shi Road, Nanchang, Jiangxi.

Applicant before: Huang Zepu

GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 517100 north new town avenue, Lian Ping County, Heyuan, Guangdong

Patentee after: Guangdong Pengxiang Construction Group Co.,Ltd.

Address before: 517100 B 301, North Xincheng garden, New Town Road, Lian Ping County, Heyuan, Guangdong.

Patentee before: GUANGDONG PENGXIANG CONSTRUCTION Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180921