CN106012970A - Construction method for covering foundation bed with geotechnical cloth to prevent back silting - Google Patents

Construction method for covering foundation bed with geotechnical cloth to prevent back silting Download PDF

Info

Publication number
CN106012970A
CN106012970A CN201610345229.8A CN201610345229A CN106012970A CN 106012970 A CN106012970 A CN 106012970A CN 201610345229 A CN201610345229 A CN 201610345229A CN 106012970 A CN106012970 A CN 106012970A
Authority
CN
China
Prior art keywords
bedding
geotextiles
construction
construction method
foundation bed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610345229.8A
Other languages
Chinese (zh)
Inventor
高平原
刘常煜
曹海岳
孔令臣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC First Harbor Engineering Co Ltd
No 1 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Original Assignee
CCCC First Harbor Engineering Co Ltd
No 1 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC First Harbor Engineering Co Ltd, No 1 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd filed Critical CCCC First Harbor Engineering Co Ltd
Priority to CN201610345229.8A priority Critical patent/CN106012970A/en
Publication of CN106012970A publication Critical patent/CN106012970A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/12Revetment of banks, dams, watercourses, or the like, e.g. the sea-floor
    • E02B3/122Flexible prefabricated covering elements, e.g. mats, strips

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Revetment (AREA)

Abstract

A construction method for covering a foundation bed with geotechnical cloth to prevent back silting includes the steps that firstly, the foundation bed is covered with the geotechnical cloth; secondly, pressing is conducted through gravel bags, wherein a row of gravel bags is pressed on the periphery of the geotechnical cloth at every interval of 10 meters, and drifting of the geotechnical cloth is prevented; and thirdly, foundation bed dredging treatment is conducted before fine flattening. By the adoption of the construction method, the silting prevention effect is remarkable, and the construction method has the beneficial effects that settlings generated due to back silting in stone gaps of the foundation bed are reduced, dredging is more thorough, and construction quality is improved greatly; the dredging construction process is simplified, construction is simper, easy and fast, and construction efficiency is improved; and the expenses of ship machines are saved on the economic aspect.

Description

A kind of bedding covers the construction method that geotechnological non-return of deploying troops on garrison duty becomes silted up
Technical field
The present invention relates to the construction technology of harbour bedding, particularly relate to a kind of bedding and cover geotechnological non-return silt of deploying troops on garrison duty Construction method.
Background technology
PORT OF YINKOU needed to stop work due to temperature reason during the March of annual December to next year, and this will lead Cause gravity type quay termination bedding, fail to install in time the bedding end face of square (caisson), the most mounted side Block (caisson) tailing edge needs the most exposed, and back-silt substantial amounts of mud deposit, for ensureing square (caisson) And the coefficient of sliding friction between bedding meets requirement, before next procedure is constructed, the side of needs refutes and assembles conjunction ducker Member carries out desilting.
In tradition desilting technique, need water high-pressure hydraulic pump under diver that the surface of bedding is progressively cleared up, The impulsive force the utilizing water pump deposit that will back-silt rushes, and the deposit that back-silts flows away along with the trend of sea water, utilizes Such mode reaches the purpose of desilting.But this desilting mode has certain drawback: (1) desilting is the most thorough The end, owing to trend is uncontrolled, time mud deposit blown afloat can not be fully erased;(2) in stone gap Mud can not be removed thoroughly;(3) removing long 100 meters, the bedding of wide 17 meters, cooperation ducker refutes in needs side The 6-7 days used time of member is the most long-time;Not only desilting is not thorough, and cost is high, and opens next procedure construction Exhibition has certain restriction.
Summary of the invention
The present invention solves that the problems referred to above provide a kind of overburden soil work cloth on bedding in case non-return silt is become silted up in a large number The construction method of mud.
The technical solution used in the present invention:
A kind of bedding covers the construction method that geotechnological non-return of deploying troops on garrison duty becomes silted up, and the steps include:
(1) bedding covers geotextiles: cover 1~2 layer in winterization or long-time idle bedding top Geotextiles;
(2) sandstone bag compacting: press a sand discharge stone bag at interval of 10 meters on geotextiles periphery, prevent geotechnique Cloth drifts about;
(3) thin flat front bedding desilting processes: bedding to be carried out at desilting before carefully putting down bedding by Second Year Reason, under Divers, sandstone bag is first removed by water, is then tied down by geotextiles one end nylon rope, and nylon rope is solid The side of being scheduled on is refuted, and utilization side refutes agitation anchor hawser shifting ship and geotextiles slowly dragged away to another direction from a direction.
Beneficial effects of the present invention: the anti-silting effect of the inventive method is obvious, has advantage as follows:
(1) decrease the deposit that back-silts in bedding stone gap, make desilting more thorough, substantially increase construction Quality;
(2) simplify the construction process of desilting, construct simpler, brisk, improve the efficiency of construction;
(3) economic aspect also saves ship machine expense.
Accompanying drawing explanation
Fig. 1 is the schematic diagram that bedding of the present invention covers upper geotextiles.
Wherein: 1-sandstone bag;2-geotextiles;3-bedding.
Detailed description of the invention
250 meters of winterization have been thrown in 205#, 206# general berth, celestial being's island harbour district, PORT OF YINKOU October As a example by bedding, the method is specifically described.
A kind of bedding covers the construction method that geotechnological non-return of deploying troops on garrison duty becomes silted up, and the steps include:
(1) bedding covers geotextiles: lead to the length 100 meters of berth winterization at celestial being's island harbour district 205#, wide The bedding top of 30 meters covers 1~2 layer of geotextiles;
(2) sandstone bag compacting: press a sand discharge stone bag at interval of 10 meters on geotextiles periphery, prevent geotechnique Cloth drifts about;
(3) before thin flat, bedding desilting processes: Second Year March, to enter bedding before carefully putting down bedding Row desilting processes, and under Divers, sandstone bag is first removed by water, is then tied down by geotextiles one end nylon rope, The nylon rope side of being fixed on is refuted, and utilization side refutes agitation anchor hawser shifting ship and geotextiles delayed to another direction from a direction Slowly drag away.
Use the method to have only to 1~2 day to complete, save about 5 day time, the machine-team that each side refutes Taking by 5400 yuan/day, the bedding desilting of such 100 meters just can save 27000 yuan, because of celestial being's island harbour district 205#, 206# general berth 250 mesityl bed saves 67500 yuan altogether.
Above one embodiment of the present of invention is described in detail, but described content has been only the preferable of the present invention Embodiment, it is impossible to be considered the practical range for limiting the present invention.All according to the present patent application scope made equal Deng change and improvement etc., within all should still belonging to the patent covering scope of the present invention.

Claims (1)

1. a bedding covers the construction method that geotechnological non-return of deploying troops on garrison duty becomes silted up, it is characterised in that construction procedure is:
(1) bedding covers geotextiles: cover 1~2 layer in winterization or long-time idle bedding top Geotextiles;
(2) sandstone bag compacting: press a sand discharge stone bag at interval of 10 meters on geotextiles periphery, prevent geotechnique Cloth drifts about;
(3) thin flat front bedding desilting processes: bedding to be carried out at desilting before carefully putting down bedding by Second Year Reason, under Divers, sandstone bag is first removed by water, is then tied down by geotextiles one end nylon rope, and nylon rope is solid The side of being scheduled on is refuted, and utilization side refutes agitation anchor hawser shifting ship and geotextiles slowly dragged away to another direction from a direction.
CN201610345229.8A 2016-05-23 2016-05-23 Construction method for covering foundation bed with geotechnical cloth to prevent back silting Pending CN106012970A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610345229.8A CN106012970A (en) 2016-05-23 2016-05-23 Construction method for covering foundation bed with geotechnical cloth to prevent back silting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610345229.8A CN106012970A (en) 2016-05-23 2016-05-23 Construction method for covering foundation bed with geotechnical cloth to prevent back silting

Publications (1)

Publication Number Publication Date
CN106012970A true CN106012970A (en) 2016-10-12

Family

ID=57095709

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610345229.8A Pending CN106012970A (en) 2016-05-23 2016-05-23 Construction method for covering foundation bed with geotechnical cloth to prevent back silting

Country Status (1)

Country Link
CN (1) CN106012970A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109537522A (en) * 2019-01-23 2019-03-29 珠江水利委员会珠江水利科学研究院 The application method of utricule structure, anti-siltation device and anti-siltation device
CN109653230A (en) * 2019-01-29 2019-04-19 珠江水利委员会珠江水利科学研究院 A kind of anti-siltation device and anti-siltation method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1045617A (en) * 1990-03-11 1990-09-26 山西省交通厅 Device of automatically laying rollers for preventing flushing
CN1730832A (en) * 2005-08-30 2006-02-08 云南省环境科学研究院 Technology for repairing basement of lake steep bank inshore water area
CN103613257A (en) * 2013-12-05 2014-03-05 中国科学院东北地理与农业生态研究所 Active covering method for in-situ remediation of sediments
KR101428628B1 (en) * 2014-04-21 2014-08-08 주식회사 유신 Plate binding type stone filled strand net for local scour protection and pier scour protection construction method using the same
CN104878792A (en) * 2015-05-28 2015-09-02 中交一航局第二工程有限公司 Rigid frame-type geotextile covering silt prevention system and method of immersed tunnel foundation bed

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1045617A (en) * 1990-03-11 1990-09-26 山西省交通厅 Device of automatically laying rollers for preventing flushing
CN1730832A (en) * 2005-08-30 2006-02-08 云南省环境科学研究院 Technology for repairing basement of lake steep bank inshore water area
CN103613257A (en) * 2013-12-05 2014-03-05 中国科学院东北地理与农业生态研究所 Active covering method for in-situ remediation of sediments
KR101428628B1 (en) * 2014-04-21 2014-08-08 주식회사 유신 Plate binding type stone filled strand net for local scour protection and pier scour protection construction method using the same
CN104878792A (en) * 2015-05-28 2015-09-02 中交一航局第二工程有限公司 Rigid frame-type geotextile covering silt prevention system and method of immersed tunnel foundation bed

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109537522A (en) * 2019-01-23 2019-03-29 珠江水利委员会珠江水利科学研究院 The application method of utricule structure, anti-siltation device and anti-siltation device
CN109537522B (en) * 2019-01-23 2023-12-05 珠江水利委员会珠江水利科学研究院 Bag body structure, anti-fouling device and use method of anti-fouling device
CN109653230A (en) * 2019-01-29 2019-04-19 珠江水利委员会珠江水利科学研究院 A kind of anti-siltation device and anti-siltation method
CN109653230B (en) * 2019-01-29 2023-11-28 珠江水利委员会珠江水利科学研究院 Anti-fouling device and anti-fouling method

Similar Documents

Publication Publication Date Title
Brambati et al. The Lagoon of Venice: geological setting, evolution and land subsidence
Kendall et al. Recent algal mats of a Persian Gulf lagoon
US10557238B2 (en) Lost sand collecting apparatus for preventing coastal erosion
Demicco et al. Facies sequences of a semi‐arid closed basin: the Lower Jurassic East Berlin Formation of the Hartford Basin, New England, USA
CN106012970A (en) Construction method for covering foundation bed with geotechnical cloth to prevent back silting
Oertel et al. Suspended-sediment distribution and certain aspects of phytoplankton production off Georgia, USA
CN109626581A (en) A kind of method of hydraulic reclamation silty sand and fine sand construction artificial swamp
CN104186178B (en) Economical seashore saline soil greening quick planting method
FitzGerald et al. 10.7 Tidal Inlets and Lagoons along Siliciclastic Barrier Coasts
Semeniuk Quaternary stratigraphy of the tidal flats, King Sound, Western Australia
CN102758462A (en) Stem punching device for self-propelled trailing suction hopper dredgers and construction method thereof
Anthony et al. Sedimentation in a tropical, microtidal, wave‐dominated coastal‐plain estuary
Cudzil et al. Fluvial, tidal and storm sedimentation in the Chilhowee Group (Lower Cambrian), northeastern Tennessee, USA
CN203505073U (en) Lotus root digging machine
CN104612128B (en) Vacuum preloading reinforcement construction method applicable to underwater silt environment
CN101672025A (en) Method for plugging flood drainage chute cover plate of tailing reservoir
CN108396706A (en) The ecology of solidification riverbed soil, which subtracts infiltration method, solidified earth and ecology and subtracts, oozes structure
KR101718213B1 (en) Silt protector apparatus and anchor manufacturing and installation method of this same
Dette et al. Permeable pile groin fields
Gallop et al. Form and function of natural and engineered perched beaches
CN106400728A (en) River and lake reclamation area
CN205801427U (en) A kind of carrier bar of ship of quarrying
Gardner Pediments and terraces along the Moapa Valley, Clark County, Nevada
ES2020400A6 (en) Erosion protection measures and installation procedure - involve double T=shaped interlocking concrete revetment blocks
CN202482818U (en) Protection device capable of preventing bank erosion

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20161012

RJ01 Rejection of invention patent application after publication