CN106012838B - A kind of Post-tension Prestress Construction anchor plate and its application method - Google Patents

A kind of Post-tension Prestress Construction anchor plate and its application method Download PDF

Info

Publication number
CN106012838B
CN106012838B CN201610318930.0A CN201610318930A CN106012838B CN 106012838 B CN106012838 B CN 106012838B CN 201610318930 A CN201610318930 A CN 201610318930A CN 106012838 B CN106012838 B CN 106012838B
Authority
CN
China
Prior art keywords
anchor plate
plate
cone
anchor
post
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610318930.0A
Other languages
Chinese (zh)
Other versions
CN106012838A (en
Inventor
耿彦生
徐*鑫
徐鑫
刘思谋
肖剑
陈仕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mcc Communication Construction Group Co Ltd
Original Assignee
Mcc Communication Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mcc Communication Construction Group Co Ltd filed Critical Mcc Communication Construction Group Co Ltd
Priority to CN201610318930.0A priority Critical patent/CN106012838B/en
Publication of CN106012838A publication Critical patent/CN106012838A/en
Application granted granted Critical
Publication of CN106012838B publication Critical patent/CN106012838B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Reinforcement Elements For Buildings (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The present invention provides a kind of Post-tension Prestress Construction anchor plate, including the backing plate and cone being connected as one, it is characterized in that, on the anchor plate steel strand beam is used for multiple, through backing plate and the duct of cone overall length, also, the injected hole for being connected to the multiple duct is provided on the backing plate.Solves the problems, such as often to occur in stretching process anchor plate rupture, pipeline caves in, collapses anchor accident.

Description

A kind of Post-tension Prestress Construction anchor plate and its application method
Technical field
The present invention relates to post-tensioned construction devices, specifically, are related to a kind of Post-tension Prestress Construction anchor plate And its application method.
Background technology
The heavy constructions such as the large and medium-sized bridge of highway, railroad bridge, more and more using post stressed concrete Structure.Critical component in prestressed anchor backing plate post tensioning structure.The effect of anchor plate is support anchorage, by stretching force Pass to concrete component.
Anchor plate of the prior art is trumpet type ironcasting, and either circular anchor plate or flat type anchor plate are being opened Anchor plate fracture phenomena often occurs during drawing, post-tensioned prestressing pipeline even occurs sometimes and caves in, can more very collapse The security incident of anchor.The method for handling anchor plate rupture is that steel wire bundle is moved back anchor, digs out broken concrete, polishes anchor plate The concrete of surrounding, the steel plate of adequate thickness, steel plate central openings, steel wire bundle are passed through from perforate on pad.Meanwhile in steel plate Injected hole is reserved at one jiao.Again steel strand beam, installation anchorage, tensioning, slip casting, sealing off and covering anchorage.Processing procedure and its cumbersome, and move back Security incident easily occurs for anchor, and security risk is brought to construction personnel.
The content of the invention
The present invention provides a kind of Post-tension Prestress Construction anchor plate and its application method, at least to solve in tensioning Anchor plate rupture often occurs in the process, pipeline caves in, collapses the problem of anchor accident.
According to an aspect of the present invention, a kind of Post-tension Prestress Construction anchor plate is provided, including being connected as one Backing plate and cone, which is characterized in that on the anchor plate have it is multiple for steel strand beam, through backing plate and cone The duct of overall length, also, the injected hole for being connected to the multiple duct is provided on the backing plate.
Preferably, there is a plurality of ribs on the outer wall of the cone.
Preferably, the cross section of the cone is circular or rectangle.
According to another aspect of the present invention, a kind of application method of Post-tension Prestress Construction anchor plate is provided, is wrapped Include following steps:A. setting-out goes out the position of anchor plate in template, and anchor plate is fixed in template;B. by the loudspeaker of anchor plate The miner diameter end of cylinder is connected with bellows, at blend compounds cloth sealed connection;C. spiral reinforcement is covered on the cone of anchor plate, And it is fixed with stiffener;D. more steel wire bundles from bellows are penetrated and is pierced by from each duct of anchor plate.
Description of the drawings
By the way that embodiment is described with reference to accompanying drawings below, features described above of the invention and technological merit will become More understand and be readily appreciated that.
Fig. 1 is the stereoscopic schematic diagram for the circular anchor plate of Post-tension Prestress Construction for representing the embodiment of the present invention;
Fig. 2 is the stereoscopic schematic diagram for the Post-tension Prestress Construction Flat shape anchor tie-plate for representing the embodiment of the present invention.
Specific embodiment
A kind of embodiment of Post-tension Prestress Construction anchor plate of the present invention described below with reference to the accompanying drawings. Those of ordinary skill in the art will recognize, without departing from the spirit and scope of the present invention, can be with various Different modes or its combination are modified described embodiment.Therefore, attached drawing and description are regarded as illustrative in nature, It is not intended to limit the scope of the claims.In addition, in the present specification, attached drawing is drawn not in scale, and it is identical Reference numeral represent identical part.
The present invention provides a kind of Post-tension Prestress Construction anchor plate, and Fig. 1 is the post stretching for representing the embodiment of the present invention The stereoscopic schematic diagram of the circular anchor plate of pre-stress construction, including the backing plate 1 being connected as one and cone 2, cone 2 Bigger diameter end and backing plate 1 connect, and the miner diameter end of cone 2 can be connected in construction with bellows.Have in the center of backing plate 1 more It is a that perpendicular to the duct of plate face 11, multiple ducts 11 pass through backing plate 1 and cone 2 with penetrating through, in Post-tension Prestress Construction, The miner diameter end of cone is connected with bellows, the multiple steel wire bundles being pierced by from bellows are penetrated from the miner diameter end of cone Multiple ducts 11 in anchor plate are pierced by the backing plate 1 of anchor plate.It is passed through in duct quantity and bellows in anchor plate The quantity of steel wire bundle is identical.For example, if through 7 beam steel wire bundles, which uses 7 duct anchor pads in bellows Plate, if using 11 duct anchor plates through 11 beam steel wire bundles, the anchor plate in bellows.The anchor plate uses multi-pore channel Steel wire bundle structure so that will not be contacted between steel wire bundle, so as to avoid phase mutual friction, winding between steel wire bundle.Also, Also there is injected hole 13, which penetrates backing plate 1 and extend to the position communicated with each duct 11 on cone. After prestressed stretch-draw is carried out, vacuum grouting is carried out from injected hole 13.Also, in the surrounding of backing plate 1, also with multiple mounting holes 12, for anchor plate to be fixed on template.
In addition, on the outer wall of cone, there can also be the ribs for strengthening its structural strength, as shown in Figure 1, should add Strong rib 22 is incorporated in strip on the outer wall of cone, and can be the outer wall that a plurality of ribs compartment of terrain is arranged in cone On.
Fig. 2 is the stereoscopic schematic diagram for the Post-tension Prestress Construction Flat shape anchor tie-plate for representing the embodiment of the present invention, knot Structure is similar with Fig. 1.Equally there is backing plate 3 and cone 4, only backing plate 3 and cone 4 are flat, similarly, backing plate 3 On also have multiple steel strand beams duct 31, duct 31 along backing plate length direction be distributed, and anchor plate have injected hole 33, The injected hole 33 penetrates backing plate 3 and extends to the position communicated with each duct 31.On the outer wall of cone 4, also may be used With with a plurality of ribs 42.
It is cavity inside the cone of anchor plate of the prior art, more steel wire bundles are easily rubbed, wound, and cavity Structural strength it is weak.The cone of the multi-pore channel anchor plate is multi-pore channel entity structure, with shatter-resistant, resistance to compression, resistance to deformation Ability, it is ensured that stretching method pre-stress construction quality, reduce construction personnel's security risk.
According to another aspect of the present invention, a kind of application method of Post-tension Prestress Construction anchor plate is provided, including Following steps:
A. go out the position of anchor plate according to drawing setting-out in advance in template, anchor plate is fixed on by template by mounting hole On, and ensure that its anchoring face is vertical with steel wire bundle.
B. the miner diameter end of the cone of anchor plate is connected with bellows, at blend compounds cloth sealed connection.
C. spiral reinforcement is covered on the cone of anchor plate, overlaps spiral reinforcement center line and anchor plate center line, And it is fixed with stiffener.
D. more steel wire bundles from bellows are penetrated and is pierced by from each duct of anchor plate.That is, steel Strand bundle is penetrated from one end of bellows, multiple ducts in the cone being connected by the other end with bellows, from backing plate Place is pierced by.
After steel wire bundle lashing is completed, concreting is carried out, when concrete strength reaches the 90% of design strength, Anchorage can be installed and carry out post-stressed tensioning, then, carried out very by the injected hole on anchor plate in design time Pneumatics is starched, then cuts off the steel wire bundle more than length, is carried out concrete sealing off and covering anchorage, that is, is completed Post-tension Prestress Construction.
The Post-tension Prestress Construction anchor plate of the present invention is simple in structure, has preferable shatter-resistant, resistance to compression, resistance to deformation Performance, it is ensured that construction quality and construction personnel safety.
The foregoing is only a preferred embodiment of the present invention, is not intended to limit the invention, for the skill of this field For art personnel, the invention may be variously modified and varied.Within the spirit and principles of the invention, that is made any repaiies Change, equivalent substitution, improvement etc., should all be included in the protection scope of the present invention.

Claims (4)

1. a kind of Post-tension Prestress Construction anchor plate, including the backing plate being connected as one and solid cone, feature Be, have on the anchor plate it is multiple for steel strand beam, through backing plate and the duct of cone overall length, it is also, described The injected hole for being connected to the multiple duct is provided on backing plate,
Wherein, the plate face of the backing plate is plane, and the duct is perpendicular to the plate face of backing plate.
2. anchor plate according to claim 1, which is characterized in that there is a plurality of ribs on the outer wall of the cone.
3. anchor plate according to claim 1, which is characterized in that the cross section of the cone is circular or rectangle.
4. a kind of Post-tension Prestress Construction anchor plate of the anchor plate any one of usage right requirement 1 to 3 makes With method, comprise the following steps:
A. setting-out goes out the position of anchor plate in template, and anchor plate is fixed in template;
B. the miner diameter end of the cone of anchor plate is connected with bellows, at blend compounds cloth sealed connection;
C. spiral reinforcement is covered on the cone of anchor plate, and is fixed with stiffener;
D. more steel wire bundles from bellows are penetrated and is pierced by from each duct of anchor plate.
CN201610318930.0A 2016-05-13 2016-05-13 A kind of Post-tension Prestress Construction anchor plate and its application method Active CN106012838B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610318930.0A CN106012838B (en) 2016-05-13 2016-05-13 A kind of Post-tension Prestress Construction anchor plate and its application method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610318930.0A CN106012838B (en) 2016-05-13 2016-05-13 A kind of Post-tension Prestress Construction anchor plate and its application method

Publications (2)

Publication Number Publication Date
CN106012838A CN106012838A (en) 2016-10-12
CN106012838B true CN106012838B (en) 2018-06-05

Family

ID=57100498

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610318930.0A Active CN106012838B (en) 2016-05-13 2016-05-13 A kind of Post-tension Prestress Construction anchor plate and its application method

Country Status (1)

Country Link
CN (1) CN106012838B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107313556A (en) * 2017-07-31 2017-11-03 中国十七冶集团有限公司 A kind of post-stressed steel strand wires flat anchorage

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5720139A (en) * 1996-02-26 1998-02-24 Sorkin; Felix L. Method and apparatus for installing a multi-strand anchorage system
CN2563218Y (en) * 2002-07-05 2003-07-30 耿书岭 Fixing end ground tackle
CN2658262Y (en) * 2003-09-27 2004-11-24 柳州海威姆建筑机械有限公司 Anti-corrosion anchor head
CN101899812A (en) * 2010-08-16 2010-12-01 中冶建工有限公司 Backing plate under anchorage for post-tensioning method
CN102979253A (en) * 2012-12-13 2013-03-20 大连民族学院 Anchor system for fixing steel strand in pre-stressed structure
CN204826419U (en) * 2015-08-05 2015-12-02 柳州市威尔姆预应力有限公司 Bury ground tackle deeply
CN205741920U (en) * 2016-05-13 2016-11-30 中冶交通建设集团有限公司 A kind of Post-tension Prestress Construction anchor plate

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5720139A (en) * 1996-02-26 1998-02-24 Sorkin; Felix L. Method and apparatus for installing a multi-strand anchorage system
CN2563218Y (en) * 2002-07-05 2003-07-30 耿书岭 Fixing end ground tackle
CN2658262Y (en) * 2003-09-27 2004-11-24 柳州海威姆建筑机械有限公司 Anti-corrosion anchor head
CN101899812A (en) * 2010-08-16 2010-12-01 中冶建工有限公司 Backing plate under anchorage for post-tensioning method
CN102979253A (en) * 2012-12-13 2013-03-20 大连民族学院 Anchor system for fixing steel strand in pre-stressed structure
CN204826419U (en) * 2015-08-05 2015-12-02 柳州市威尔姆预应力有限公司 Bury ground tackle deeply
CN205741920U (en) * 2016-05-13 2016-11-30 中冶交通建设集团有限公司 A kind of Post-tension Prestress Construction anchor plate

Also Published As

Publication number Publication date
CN106012838A (en) 2016-10-12

Similar Documents

Publication Publication Date Title
US10378208B2 (en) Steel-fiber composite material concrete combined column, and post-earthquake repair method thereof
CA2946531C (en) Modified permanent cap
KR20070083474A (en) Shearing force reinforcing structure and shearing force reinforcing member
US10633861B2 (en) Post-tension tendon pocket former with a ribbed formwork securing mechanism and method of use thereof
TW200411107A (en) A cable repairing and enhancing method of a reinforced concrete structure
US3909142A (en) Coupling assembly for stressing tendons of multi-span concrete structures
US11268280B2 (en) Anchorage of continuous fiber-reinforced polymer strands
CN106012838B (en) A kind of Post-tension Prestress Construction anchor plate and its application method
KR101346344B1 (en) Unbonded psc i beam with fixation part of tendon in the inner position of concrete and manufacturing method of the same
CN205741920U (en) A kind of Post-tension Prestress Construction anchor plate
KR102048287B1 (en) Tendon spreading fixing appratus for prestressed girder
US20150121801A1 (en) Rebar used in concrete
CN106121268B (en) The system and method for prestress rope integrative consolidation slab column
CN209669918U (en) For the lattice barricade in geological disaster engineering
KR102206157B1 (en) Prestressed girder for bridge and method of manuafacturing thereof
JP3724866B2 (en) Building construction materials and water leakage prevention methods
CN206680859U (en) A kind of abutment prestressed reinforcement frame mounting
CA2987148A1 (en) Compact anchor for post-tensioned concrete segment
US20150176276A1 (en) Post-tension concrete leave out splicing system and method
KR20180011528A (en) Prestressed Hybrid Composite Girder Utilizing Truss Action
JP2014214457A (en) Load resistant body and ground anchor
JP2020124918A (en) Concrete reinforcement material, concrete structure having concrete reinforcement material, and method for producing the same
JP2009144500A (en) Shearing reinforcement structure for column-beam joint part of uppermost story
CN104594562B (en) Carbon fiber composite steel tube concrete column and method of construction thereof
CN105937207A (en) Corrugated pipe for post-tensioned pre-stressed construction, and application method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant