CN1059992A - 110 KV single-pillar towers installation of dual lightning wires - Google Patents

110 KV single-pillar towers installation of dual lightning wires Download PDF

Info

Publication number
CN1059992A
CN1059992A CN 90107794 CN90107794A CN1059992A CN 1059992 A CN1059992 A CN 1059992A CN 90107794 CN90107794 CN 90107794 CN 90107794 A CN90107794 A CN 90107794A CN 1059992 A CN1059992 A CN 1059992A
Authority
CN
China
Prior art keywords
lightning
cross
arm
installation
towers
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 90107794
Other languages
Chinese (zh)
Inventor
秦国梅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PROSPECT DESIGN INST GUANGXI ELECTRIC POWER INDUSTRY BUREAU
Original Assignee
PROSPECT DESIGN INST GUANGXI ELECTRIC POWER INDUSTRY BUREAU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PROSPECT DESIGN INST GUANGXI ELECTRIC POWER INDUSTRY BUREAU filed Critical PROSPECT DESIGN INST GUANGXI ELECTRIC POWER INDUSTRY BUREAU
Priority to CN 90107794 priority Critical patent/CN1059992A/en
Publication of CN1059992A publication Critical patent/CN1059992A/en
Pending legal-status Critical Current

Links

Landscapes

  • Suspension Of Electric Lines Or Cables (AREA)

Abstract

The invention belongs to a kind of 110 kilovolts of power transmission sequence single-pillar towers and establish the lightning protection method of installation of dual lightning wires.It is characterized in that fixing the lightning conducter cross-arm 3 of respective length at ground connection place, single-column shaft tower 1 upper end 2, lightning conducter 4 is set up at two ends at this cross-arm respectively, the installation site of other cross-arm, lead, insulator string etc. still is the invariant position that 110 KV single-pillar towers are established single lightning conducter.

Description

110 KV single-pillar towers installation of dual lightning wires
The invention belongs to a kind of 110 kilovolts of methods that the power transmission sequence single-pillar towers is established installation of dual lightning wires.
At present, the lightning protection method of 110 kilovolts of power transmission sequences is mainly taked following 2 kinds of methods: 1) single-pillar towers is established single lightning conducter; 2) door type twin columns tower erection installation of dual lightning wires.The 1st kind of method so lightning fault often takes place, influences safe power supply because lightning protection properties is lower in actual motion.Though the 2nd kind of method lightning protection effect is better, but because the quantity of 110 kilovolt in electrical network is more and divide cloth cover wider, so, if all adopt the lightning protection of door type twin columns tower erection installation of dual lightning wires, then the investment of Zeng Jiaing is more, is difficult under existing conditions to realize.
For improving the lightning protection properties of existing 110 kilovolt, improve the power supply reliability of electrical network, the purpose of this invention is to provide the lightning protection method that a kind of 110 KV single-pillar towers are established installation of dual lightning wires.This method is established single lightning conducter method than single-pillar towers, and lightning withstand level improves 14%, and shielding lead rate reduces 80%, hits the bar rate and reduces 35%, and trip-out rate reduces 40%, and lightning protection properties significantly improves; Than the method for door type twin columns tower erection installation of dual lightning wires, lightning protection properties is identical, but per 100 km can be reduced investment outlay about 450,000 yuan.
The not only newly-built line project of the present invention can adopt, and can be used to transform the circuit of just establishing single lightning conducter at operating 110 kilovolts of single-pillar towers.Use the present invention, small investment, it is remarkable to improve lightning protection effect.
The formation of invention: fix the lightning conducter cross-arm 3 of respective length at ground connection place, 110 kilovolt single-column shaft towers, 1 upper end 2, set up lightning conducter 4 respectively at the two ends of this cross-arm then.The invariant position of other cross-arm, lead, insulator string etc.
With reference to the accompanying drawings enforcement of the present invention is further described below.
Fig. 1 is the schematic diagram that 110 KV single-pillar towers are established installation of dual lightning wires.
According to shown in Figure 1, the lightning conducter cross-arm 3 in that respective length is fixed at the upper end of 110 kilovolt single-column shaft towers 1 ground connection place 2 sets up lightning conducter 4 respectively at the two ends of this cross-arm then.The invariant position of other cross-arm, lead, insulator string etc.About the strength problem of single-column shaft tower, can solve according to different meteorological conditions, the different conductor trade mark, different spans.Can adopt corresponding reinforcement measure to special circumstances.
Description of drawings:
1, single-column shaft tower
2, ground connection place
3, lightning conducter cross-arm
4, lightning conducter
5, upper conductor cross-arm
6, insulator string
7, upper conductor
8, lower wire cross-arm
9, lower wire

Claims (1)

1, a kind of 110 KV single-pillar towers method of establishing installation of dual lightning wires, it is characterized in that at ground connection place, single-column shaft tower 1 upper end 2 fixing on the lightning conducter cross-arm 3 of respective length, set up lightning conducter 4 respectively at the two ends of this cross-arm.
CN 90107794 1990-09-15 1990-09-15 110 KV single-pillar towers installation of dual lightning wires Pending CN1059992A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 90107794 CN1059992A (en) 1990-09-15 1990-09-15 110 KV single-pillar towers installation of dual lightning wires

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 90107794 CN1059992A (en) 1990-09-15 1990-09-15 110 KV single-pillar towers installation of dual lightning wires

Publications (1)

Publication Number Publication Date
CN1059992A true CN1059992A (en) 1992-04-01

Family

ID=4880714

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 90107794 Pending CN1059992A (en) 1990-09-15 1990-09-15 110 KV single-pillar towers installation of dual lightning wires

Country Status (1)

Country Link
CN (1) CN1059992A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2011026310A1 (en) * 2009-09-02 2011-03-10 Nantong Shenma Power Technology Co. Ltd. Composite insulated tower for grid
CN115663743A (en) * 2022-12-06 2023-01-31 国网江苏省电力有限公司南通供电分公司 Distribution lines overhead ground wire's mounting structure
WO2023070276A1 (en) * 2021-10-25 2023-05-04 谭晓正 Simple lightning protection processing method for outdoor pole

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2011026310A1 (en) * 2009-09-02 2011-03-10 Nantong Shenma Power Technology Co. Ltd. Composite insulated tower for grid
WO2023070276A1 (en) * 2021-10-25 2023-05-04 谭晓正 Simple lightning protection processing method for outdoor pole
CN115663743A (en) * 2022-12-06 2023-01-31 国网江苏省电力有限公司南通供电分公司 Distribution lines overhead ground wire's mounting structure

Similar Documents

Publication Publication Date Title
CN209924551U (en) Double-loop cable terminal tower
CN2930035Y (en) Phase jumper wire draining device in 330kVJG1 type iron tower
CN1059992A (en) 110 KV single-pillar towers installation of dual lightning wires
CN114086812A (en) Double-loop cable terminal tower with switching bearing platform support structure
CN2482239Y (en) Cable connecting device for transformer
CN201247663Y (en) Whole insulation composite greatcoat type metal-oxide lighting arrester core body
CN204651068U (en) A kind of insulating tube type busbar production method conductors dedicated
CN112149946A (en) Method and system for planning positions of lightning arresters of power transmission line
CN201507140U (en) Composite material pole tower
CN2456279Y (en) Zinc oxide lightning arrester for power lines
CN1138326C (en) Step-up method from 35 KV to 110 KV
CN105610081B (en) A kind of Chinese character pin-shaped GIS outlets arrangement for being used for 500kV and following voltage class
CN2168914Y (en) Insulated glass fibre reinforced plastic crossbar
CN113572117B (en) Device and method for realizing overhead drilling by adopting single-trunk-shaped terminal tower
CN216086109U (en) Wind deflection and lightning stroke prevention flashover limiter
CN2291708Y (en) Lightning-proof wave-blocking insulator for electric power lightning conductor
CN213585095U (en) 110 kilovolt double-loop triangular arrangement cable terminal pole
CN221126864U (en) Cable terminal tower capable of directly climbing tower by using converging cable in distributed new energy power plant area
CN2185918Y (en) Power transformer with built-in lightning arrester
CN217824162U (en) Insulated drainage wire prepared from insulated cable and suitable for double drainage strings
CN210724148U (en) Single-circuit cable down-lead rod
CN201466620U (en) Lightning protection device for overhead insulated wire
CN106451309A (en) 10 kV/380 V combined pole distribution line lightning-proof apparatus
CN216740925U (en) Four-loop aerial cable terminal tower
CN219874761U (en) Equipment connection structure and booster station of compact booster station

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination