CN105989546A CN201610227776.6A CN201610227776A CN105989546A CN 105989546 A CN105989546 A CN 105989546A CN 201610227776 A CN201610227776 A CN 201610227776A CN 105989546 A CN105989546 A CN 105989546A
Authority
CN
China
Prior art keywords
data
analysis
project
engineering
transmitting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610227776.6A
Other languages
Chinese (zh)
Inventor
蒋文新
张晓东
廖布伟
陈洪彦
郭晓丹
孙晶
蔡建伟
王静
朱春卉
李鹏
时雨
孙艳丽
郭慧
王斯妮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Economic and Technological Research Institute of State Grid Jilin Electric Power Co Ltd
Original Assignee
Economic and Technological Research Institute of State Grid Jilin Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Economic and Technological Research Institute of State Grid Jilin Electric Power Co Ltd filed Critical Economic and Technological Research Institute of State Grid Jilin Electric Power Co Ltd
Priority to CN201610227776.6A priority Critical patent/CN105989546A/en
Publication of CN105989546A publication Critical patent/CN105989546A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply

Landscapes

  • Business, Economics & Management (AREA)
  • Health & Medical Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Human Resources & Organizations (AREA)
  • Marketing (AREA)
  • Primary Health Care (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a power transmission and transformation construction cost basic data collection and analysis system comprising a construction cost analysis data collection module, a data verification module, a decision support module, a result output module, an allocation management module, a system management module and a database. The main advantages of the power transmission and transformation construction cost basic data collection and analysis system are that a provincial company construction cost analysis basic database can be established by the system so that the basic data can be provided for later construction cost analysis, and performing of later construction cost analysis work of the state grid, the energy bureau, the provincial company and the research institute is facilitated for an electric power company; and construction cost analysis indicator collection work is allocated to daily work by information means so that the workload of construction cost indicator collection can be reduced for all power supply companies and relevant organizations, the accuracy of indicator data collection can be enhanced by automatic verification and indicator data verification and thus the real, effective and accurate sample data can be provided for the construction cost analysis work.

Description

Project of transmitting and converting electricity cost basic data is collected and the system of analysis
Technical field
The present invention relates to a kind of project of transmitting and converting electricity cost basic data collect and analysis system, be mainly used in Utilities Electric Co., to the project of transmitting and converting electricity analysis of prices, belongs to project of transmitting and converting electricity analysis of prices field.
Background technology
In recent years, along with deepening continuously of power system reform and maintaining sustained and rapid growth of national economy, The power grid construction of China and transformation achieve significant achievements, but along with the increasing of scale of investment, engineering is made Valency level is more notable on the impact of power network development, and the most therefore electricity power engineering cost receives much concern." ten Three or five " period, each power grid enterprises continue to strengthen investment and are used for power grid construction, and enterprise operation is with sustainable Development will face more challenges, carry out project of transmitting and converting electricity cost basic data manage concentratedly, resource common Enjoy and cost statistical analysis system theoretical research works with application practice, become for disclosing cost level Law, carry out the construction fund etc. that the cost Control of electricity power engineering construction project, Appropriate application are limited, Huge facilitation will be played.
At present, each province's unit carries out analysis of prices basic data collection work and mainly relies on manual collection And collect calculating, need substantial amounts of data are received during analysis of prices basic data is collected Collection, statistics, computational analysis etc. process.These information data amounts are huge, data structure is complicated, collection Arranging and amount of calculation is big, in the case of, task short in the time is tight, data statistics work occupies Company's skill is through personnel's most working time and energy, and manual calculation simultaneously easily causes the analysis of prices Result is inaccurate, affects analysis of prices data accuracy, affects fairness and the section of cost horizontal analysis The property learned.
Therefore, the application about electricity power engineering analysis of prices data collection in a set of applicable Jilin Province is studied System, plays critical effect, for Jilin Electric Province company electrical network for carrying out analysis of prices work Project investment Payment control improves investment decision level, improves investment decision mechanism and suffer from important meaning Justice.
Summary of the invention
It is desirable to provide a kind of project of transmitting and converting electricity cost basic data is collected and the system of analysis, with Solve that existing manual calculation exists to easily cause analysis of prices result inaccurate, affect analysis of prices number According to accuracy, affect fairness and the science of cost horizontal analysis, and ineffective problem.
The technical scheme is that a kind of project of transmitting and converting electricity cost basic data is collected and analyzes system System, defeated including analysis of prices data collection module, data check module, decision support module, achievement Go out module, be equipped with management module, system management module and data base.
Wherein, described analysis of prices data collection module is mainly used in realizing project of transmitting and converting electricity cost Analysis foundation datamation auxiliary is made a report on, and responds Guo Wang company project of transmitting and converting electricity according to Jilin power network and makes Valency is analyzed, Bureau of Energy analysis of prices work is to project of transmitting and converting electricity and 35kV rural power grids Analysis of Engineering Construction Cost Requirement, realizes Guo Wang company, the collection of Bureau of Energy's full dose Analysis of Engineering Construction Cost basic data in systems. The data collected include: engineering foundation information, main economic and technical indices, target of budgetary estimate, clearing refer to Mark etc..By setting up project of transmitting and converting electricity analysis of prices basic data and project file data extracting rule, From project file, extract analysis of prices basic data, then complete by the way of making a report on and import by hand The collection work of analysis of prices basic data;The initial data that this analysis of prices data collection module is collected In addition to being directly stored in data base, it is also fed to data check module and carries out the verification of data;
Described data check module is for the relevant data to the conveying of analysis of prices data collection module The correctness of automatic Verification analysis of prices basic data and logic rule;During making a report on index, By the logical calculated of system automatic Verification achievement data, the correctness of data form.If going wrong, Then provide business subsidiary discriminant, the problem that prompting the user discover that by corresponding information.Jilin Province Utilities Electric Co. has company of prefectures and cities under its command and completes after analysis of prices index makes a report on, and system is according to engineering type (power transformation, circuit), build pipe unit, electric pressure etc. and automatically collect engineering sum, and electrical network work Journey analysis of prices index.
If going wrong, prompting user adjusts, and the most automatically collects making of all prefecture-level companies report Valency analysis foundation data;The index that this module is commonly used according to different engineering types, formulates engineering screening bar Part, and according to screening conditions, list the engineering of correspondence, and the achievement data that engineering is corresponding can be consulted; It is transported to the decision support module decision-making foundation as the latter through verified data, is the most also stored in In data base standby;
The data of typing are processed by described decision support module by performance model and method, Collect, prediction, draw required integrated information and information of forecasting, provide decision-making for policymaker Foundation, assist them to make scientific and reasonable decision-making;
Described result output module is mainly used in the analysis of prices this decision support module 3 exported The carrying out of basic data is made a report on and exports with many bores, it is provided that the flexible configuration function of data sheet;
Described outfit management module is for analysis report Template Manager and analysis of prices Template Manager. Each provincial electric power company the most periodically works out the analysis of prices report in year, exports according to result output module Data and the requirement of Guo Wang company and the demand of company of each province and the actual feelings of local power network company Condition, makes analysis report template and analysis of prices template, makes in time for annual cost change Adjust in time, improve efficiency and the accuracy of work;
User and whole system platform are managed by described system management module, carry out user Authority setting, implements effectively management;Including division unit, user's management and system journal, power transmission and transformation The use role of Construction Cost Data collecting platform can be summarized as " each provincial electric power company ", " prefectures and cities Utilities Electric Co. ", " Electric Design consulting firm ", " unit in charge of construction ", " goods and materials unit " five classes User, every kind of role has the function of oneself in the project of transmitting and converting electricity cost data management platform of Jilin;
Described data base includes: project of transmitting and converting electricity profile data system, project of transmitting and converting electricity technology warp Ji supplemental characteristic system and project of transmitting and converting electricity cost data system.
A kind of preferably technical scheme, described project of transmitting and converting electricity profile data body as the present invention Owner's engineering to be included basic condition, natural conditions, construction criteria and measuring and calculating standard, cover power transformation The achievement data index of multiple engineering such as engineering, line project.
Another kind of preferably technical scheme, described project of transmitting and converting electricity Technological Economy as the present invention Supplemental characteristic system includes three below subsystem:
(1) power transformation engineering techno economic parameter data system, including: transformer station's form includes open air Stand, half indoor station, indoor station, semi-underground station and 5 kinds of station, underground form;Main transformer includes the current period Number of units, number of units at a specified future date and 3 leading indicators of individual capacity;Current period outlet is returned number, distribution pattern and breaks Road device number of units, 3 indexs of wiring patterns are both needed to consider low-pressure side, medium voltage side, 3 kinds, high-pressure side respectively Situation;Cable material is divided into control cable and 1kv and following power cable two class;Enter the station road by length Degree metering;
(2) line project techno economic parameter data system: line project is divided into overhead transmission line engineering With cable run engineering;
(3) communication engineering techno economic parameter data system:
Wherein, communication engineering includes communication equipment engineering and optical cable telecommunication line, communication equipment engineering Technological Economy system is it is important that collect optical transmission device achievement data, including transmission capacity, tables of equipment The indexs such as valency and light mouth quantity;Optical cable telecommunication line technical-economic index mainly includes line traffic mode (optical fiber), built on stilts mode, line length, optical cable model, optical cable stamen number and optical cable unit price;Wherein, Built on stilts mode includes making somebody a mere figurehead, direct-burried, pipeline and other modes.
Described project of transmitting and converting electricity cost data system includes following two subsystem:
(1) power transformation engineering cost data system, including:
Architectural engineering expense mainly includes complex building construction cost, full station power distribution equipment construction cost, field Outside the smooth expense in ground, basement process expense, retaining wall and bank protection expense, outer water source expense of standing and station Power supply expense etc.;Be always or usually as specified soil replacement cushion method, dirt replacement cushion method, gravel of method for processing foundation changes The multiple method such as Comprehensive Land Use;Original equipment cost includes protecting secondary device acquisition expenses and the intelligence such as observing and controlling Relevant device purchase commodity can be changed;Other fees mainly include building place requisition and cleaning takes, project is built If administration fee, project construction service charge, Operational preparation take, Over-size transport test fee etc.;Site clearing Expense comprises except land requisition expense unexpected construction site rent, migrates compensation and excess cleaning expense; The completion of works final accounts stage calculates the value-added tax deduction amount of tax to be paid;
(2) line project cost data system, including: overhead transmission line body expense includes basis work Journey expense, tower engineering expense, earth work expense, stringing engineering cost, adnexa engineering cost and Ancillary works expense;Cable run body expense includes cable electrical, tunnel, comb, raceway groove, straight Bury body expense;Build place requisition and cleaning expense mainly includes that the permanent sapce charge of column foot, column foot are permanent Take up an area unit price number felling damages, housing demolition damages and large-scale factories and miness compensation for demolition etc..
As another preferred technical scheme of the present invention, described analysis of prices data collection mould Block, data check module and result output module are each provided at subordinate data collector terminal;Described decision-making Support module, outfit management module, system management module and data base are located at higher level's data analysis system; Wherein, the described Utilities Electric Co. that subordinate data collector terminal is various places city-level sets up, for user terminal; Described higher level's data analysis system is provided with the application server sum being connected with described information Intranet According to storehouse server, set up for provincial agency.Described user terminal uses browser to pass through local Net accesses application server and file server;Described application server and database server use Same server;Described user terminal also includes economic technology expert terminals.
In order to reach superior technique effect, in subordinate data collector terminal and higher level data analysis system It is provided with fire wall between the LAN of system;This system is based on WEB framework, uses B/S mode development, System deployment uses and is saving corporate level deployment, the pattern of multistage application.
Main advantages of the present invention include: this system can be used to set up company of province analysis of prices basis Data base, provides basic data for the later stage analysis of prices, it is simple to Utilities Electric Co. is follow-up carries out state's net, energy Source office, company of province, through grind institute the analysis of prices work;By by information-based means, cost being divided Analysis index collection work is shared to routine work, alleviates each electric company and relevant unit's Cost Index The workload collected.And by automatic Check and verification achievement data, improve the standard that achievement data is collected Really property, provide really for analysis of prices work, effectively, sample data accurately.
Accompanying drawing explanation
Fig. 1 is that the system of the present invention constitutes schematic diagram;
Fig. 2 is the project of transmitting and converting electricity profile data system schematic diagram of data base of the present invention;
Fig. 3 is the power transformation engineering techno economic parameter data system schematic diagram of data base of the present invention;
Fig. 4 is the line project techno economic parameter data system schematic diagram of data base of the present invention;
Fig. 5 is the power transformation engineering cost data system schematic diagram of data base of the present invention;
Fig. 6 is the line project cost data system schematic diagram of data base of the present invention;
Fig. 7 is the functional schematic of the present invention;
Fig. 8 is that the system of the specific embodiment of the invention constitutes block diagram;
Fig. 9 is the workflow diagram of the embodiment of the present invention.
Detailed description of the invention
Further describing the present invention, advantages of the present invention and feature below in conjunction with specific embodiment will Apparent along with description.It should be understood that described embodiment is only exemplary, not to the present invention Scope constitute any restriction.It will be understood by those skilled in the art that without departing from the present invention's The details of technical solution of the present invention and form can be modified or replace under spirit and scope, but this A little amendments or replacement each fall within protection scope of the present invention.
See Fig. 1~Fig. 7, one project of transmitting and converting electricity analysis of prices basic data collection system of the present invention, Including analysis of prices data collection module 1, data check module 2, decision support module 3, achievement Output module 4, outfit management module 5 and system management module 6.
The function of above-mentioned each module is respectively described below:
1, analysis of prices data collection module (1):
Analysis of prices data collection module (1) is mainly used in realizing project of transmitting and converting electricity analysis of prices basis Datamation auxiliary is made a report on.According to state's net analysis of prices, Bureau of Energy's analysis of prices, each electric power saving public affairs The department analysis of prices, the index of our unit's analysis of prices, it is achieved dividing of project of transmitting and converting electricity analysis of prices index Class, the index of the electrical network analysis of prices is divided into: project profile, main economic and technical indices, investment divide Analysis table, equipment and materials table etc..By setting up project of transmitting and converting electricity analysis of prices basic data and project file Data extracting rule, extracts analysis of prices basic data from project file, then made a report on by manual and The mode imported completes the collection work of analysis of prices basic data.Analysis of prices data collection module (1) initial data collected, in addition to being directly stored in data base (7), is also fed to data check Module (2) carries out the verification of data.
Analysis of prices data collection module (1) can use keyboard, touch screen, image acquisition device etc. to receive To gathering data.
Described analysis of prices data collection module (1) arranges multiple, and the electric power for various places city-level is public Department sets up, as user terminal.
2, data check module (2): analysis of prices data collection module (1) is carried by this module The correctness of relevant automatic data-check analysis of prices basic data and logic rule, if occurring asking Topic, prompting user adjusts, and the most automatically collects the analysis of prices basic data of all prefecture-level companies report. The index that this module is commonly used according to different engineering types, formulates engineering screening conditions, and according to screening bar Part, lists the engineering of correspondence, and can consult the achievement data that engineering is corresponding.Through verified number According to being transported to the decision support module (3) decision-making foundation as the latter, the most also it is stored in data base (7) Interior standby.
3, decision support module (3):
Decision support module (3) is mainly used in the power transmission and transformation work after inspection module (2) is checked The law-analysing of journey cost change, construction costs fee structure are analyzed, construction costs analysis of Influential Factors And the big function of construction costs exponential forecasting four.Realize analysis of prices data management platform to project of transmitting and converting electricity Engineering characteristic, expenditure pattern and researching and analysing the impact of construction costs.Meanwhile, for company of province The information of predictability is provided, helps company of province that data base and data are carried out multi-angle, seen in all directions Examine analysis.
The data of typing are carried out by the main of this decision support module (3) by performance model and method Process, collect, prediction, draw required integrated information and information of forecasting, carry for policymaker For the foundation of decision-making, them are assisted to make scientific and reasonable decision-making.
4, result output module (4):
Result output module (4) is mainly used in the analysis of prices this decision support module (3) exported The carrying out of basic data is made a report on and exports with many bores, it is provided that the flexible configuration function of data sheet.According to Practical business, flexible customization State Grid Corporation of China analysis of prices basic data form, Bureau of Energy's cost are divided Analysis basic data, company of province self analysis of prices demand, according to the project of transmitting and converting electricity analysis of prices collected Basic data, quickly generates and meets the analysis of prices base data table that many bores difference requires.
5, it is equipped with management module (5):
It is equipped with management module for analysis report Template Manager and analysis of prices Template Manager.Each electric power saving Company the most periodically works out the analysis of prices report in year, exports according to result output module (4) Data and the requirement of Guo Wang company and the demand of company of each province and the practical situation of local power network company, Make analysis report template and analysis of prices template, make in time in time for annual cost change Adjust, improve efficiency and the accuracy of work.Additionally, system provides the customization function of index form, Flexibly customized report form template, it is achieved State Grid Corporation of China's analysis of prices, Bureau of Energy's analysis of prices, each Provincial electric power company's analysis of prices, our unit's analysis of prices index report output.
6, system management module (6):
System management module (6) includes division unit, user's management and system journal.Power transmission and transformation work The use role of journey cost data collection platform can be summarized as " each provincial electric power company ", " various places civil power Power company ", " Electric Design consulting firm ", " unit in charge of construction ", " goods and materials unit " five class use Family, every kind of role has the function of oneself, solely in the project of transmitting and converting electricity cost data management platform of Jilin Vertical property is higher.User and whole system platform are managed by this module, carry out user right and set Fixed, implement effectively management.
The data base (7) of the present invention according to Guo Wang company, Bureau of Energy and company of each province to the analysis of prices Requirement, carry out project of transmitting and converting electricity analysis of prices basic data collection work, set up a data cover The project of transmitting and converting electricity analysis of prices basic database that wide, data content is perfect, for each provincial electric power company Carry out project of transmitting and converting electricity analysis of prices work to lay a solid foundation, promote to promote analysis of prices level, for entering one Step promotes project of transmitting and converting electricity constructing benefits and provides decision-making foundation and important leverage.
Project of transmitting and converting electricity analysis of prices data generally include power transformation engineering data, line project data (frame Ceases to be busy road project data and cable run project data), communication engineering data, rural power grids project data etc. Multiple project data.As the core data in the project of transmitting and converting electricity analysis of prices, project of transmitting and converting electricity cost The integrity of data and accuracy directly affect reliability and the utilizability of analysis of prices conclusion.
The requirement of project of transmitting and converting electricity analysis of prices basic data is had by state's net, Bureau of Energy, company of each province Different criterions, make a report on and many for effectively realizing the process of project of transmitting and converting electricity analysis of prices basic data Bore output function, needs to set up comprehensive and systematic project of transmitting and converting electricity analysis of prices data system, supports Repeatedly quoting and exporting of data, meets each kiowatt from different aspects and divides project of transmitting and converting electricity cost The needs of analysis data.Herein from the comprehensive angle of analysis of prices data collection, emphasis chooses change Electrical engineering and this two classes engineering of line project, mainly from project profile, techno economic parameter, engineering cost Project of transmitting and converting electricity cost data system is built by three aspects.The data base 7 of the present invention includes following several Plant data system.
1, project of transmitting and converting electricity profile data system: see Fig. 2, project of transmitting and converting electricity overview number of the present invention The aspects such as engineering basic condition, natural conditions, construction criteria, measuring and calculating standard are mainly included according to system, Cover the achievement data index of multiple engineering such as power transformation engineering, line project.
2, project of transmitting and converting electricity techno economic parameter data system of the present invention includes three below subsystem:
(1) power transformation engineering techno economic parameter data system:
As it is shown on figure 3, transformer station's form includes open air station, half indoor station, indoor station, semi-underground Stand and 5 kinds of station, underground form;Main transformer includes current period number of units, number of units at a specified future date and individual capacity 3 Leading indicator;It is equal that number, distribution pattern and chopper number of units, 3 indexs of wiring patterns are returned in current period outlet Low-pressure side, medium voltage side, 3 kinds, high-pressure side situation need to be considered respectively;Cable material be divided into control cable and 1kv and following power cable two class;Enter the station road by length metering.
(2) line project techno economic parameter data system:
Line project technical parameter data system is as shown in Figure 4.Line project is divided into overhead transmission line work Journey and cable run engineering.
Overhead transmission line engineering overhead transmission line type includes conventional type, compact, austerity and Great span 4 types;Path should be noted that single loop, double loop, three loops, four loops, a hanging wire (contain Restringing) statistical;Shaft tower can be divided into angle steel tower, steel tube tower, cement pole by material classification And steel pipe pole, classification can be divided into tangent tower, strained angled tower and the tower height tower more than 70m by type; Wire and wire rod ground wire index need to add up wire rod amount price and model;Different designs icing wind speed circuit is long Degree need to consider without ice formation, light ice formation, middle ice formation and four kinds of situations of heavy icing area;Topography profile include flat, Hills, the network of waterways, mire, mountain region, high mountain etc.;Geological conditions include frozen soil, common soil, hard soil, Fluffing of moulding sand stone, puddle, drift sand hole rock are artificial;Earthwork includes foundation ditch, ground connection, basal plane and point Peak 4 class;Base class mainly include step, board-like, plug-in type, draw dig, rock build-in, anchor Bar, bored concrete pile, artificial digging pile etc. are several.
Cable run engineering emphasis needs to consider that electric part technical specification and civil engineering portion of techniques refer to Mark.Electrical technology condition is divided into cable loop number number, cable length, cable model, cross-section of cable face In the middle of long-pending, cable and terminal fitting number etc.;Civil engineering portion of techniques condition need consider tunnel, comb, Raceway groove and 4 aspects of direct-burried;Additionally need consideration bright open tunnel, bored tunnel, shield tunnel 3 kinds Multiple different indexs such as the cross-sectional area in dissimilar tunnel, length of tunnel and process well number;Cable It is divided into domestic, joint, 3 class of import with cable connector, selects difference according to actual demands of engineering Class and type.
(3) communication engineering techno economic parameter data system:
Communication engineering includes communication equipment engineering and optical cable telecommunication line.Communication equipment engineering warp Ji system is it is important that collect optical transmission device achievement data, including transmission capacity, equipment unit price and light The indexs such as mouth quantity;Optical cable telecommunication line technical-economic index mainly includes line traffic mode (light Fine), built on stilts mode, line length, optical cable model, the index such as optical cable stamen number and optical cable unit price, its In, built on stilts mode includes making somebody a mere figurehead, direct-burried, pipeline and other modes.
3, project of transmitting and converting electricity cost data system, including following two subsystem:
(1) power transformation engineering cost data system:
Power transformation engineering cost data system is as shown in Figure 5.Wherein, architectural engineering expense mainly includes main At control (comprehensively) building construction cost, complete stand power distribution equipment construction cost, levelling of the land expense, ground Reason expense, retaining wall and bank protection expense, outer water source expense of standing and station external power expense etc.;At ground Reason method is always or usually as specified the soil multiple method such as replacement cushion method, dirt replacement cushion method, gravel replacement cushion method; Original equipment cost includes protecting the secondary device acquisition expenses such as observing and controlling and intelligent relevant device purchase commodity; Other fees mainly include building place requisition and cleaning expense, project construction management expense, project construction clothes Business takes, Operational preparation expense, Over-size transport test fee etc.;Expenses for removal of debris comprises except land requisition expense is anticipated Outer construction site rent, migration compensation and excess cleaning take;The completion of works final accounts stage calculates The value-added tax deduction amount of tax to be paid.
(2) line project cost data system:
Line project cost data system is as shown in Figure 6.Wherein, overhead transmission line body expense includes Foundation engineering expense, tower engineering expense, earth work expense, stringing engineering cost, adnexa engineering Expense and ancillary works expense;Cable run body expense includes cable electrical, tunnel, comb, ditch Road, direct-burried body expense;Build place requisition and cleaning expense mainly includes the permanent sapce charge of column foot, tower Base forever takes up an area unit price number felling damages, housing demolition damages and large-scale factories and miness compensation for demolition Deng.
Seeing Fig. 7 and Fig. 8, for the actual motion system of the present invention, this system includes multiple subordinate Data collector terminal, LAN (the information inside network of power system) and higher level's data analysis system. Described analysis of prices data collection module (1), data check module (2) and result output module (4) subordinate data collector terminal it is located at;Described decision support module (3), outfit manage module (5), system management module (6) and data base (7) are located at higher level's data analysis system.
The described Utilities Electric Co. that subordinate data collector terminal is various places city-level sets up, for user terminal; Described higher level's data analysis system is provided with the application server sum being connected with described information Intranet According to storehouse server, set up for provincial agency.
Described user terminal uses browser to access application server and file service by LAN Device;Described application server and database server use same server.
Described user terminal also includes economic technology expert terminals.
It is provided with fire prevention between the LAN of subordinate data collector terminal and higher level's data analysis system Wall;This system is based on WEB framework, uses B/S mode development, and system deployment uses in company of province Aspect is disposed, the pattern of multistage application.
One specific implementation process of the present invention is as it is shown in figure 9, multiple subordinates data collector terminal is recorded Enter to collect cost data, and be transferred to upper progression by information Intranet after these cost data are arranged According to the system of analysis, the cost information received is analyzed just verifying data by higher level's data analysis system Really property, and verified data are transported to subordinate data collector terminal, by the latter by correct data It is stored in data base, in-problem data are corrected and re-typed.

Claims (10)

1. a project of transmitting and converting electricity cost basic data is collected and the system of analysis, it is characterised in that include Analysis of prices data collection module, data check module, decision support module, result output module, It is equipped with management module, system management module and data base.
Project of transmitting and converting electricity cost basic data the most according to claim 1 is collected and the system of analysis, It is characterized in that, described analysis of prices data collection module is mainly used in realizing project of transmitting and converting electricity cost Analysis foundation datamation auxiliary is made a report on, and responds Guo Wang company project of transmitting and converting electricity according to Jilin power network and makes Valency is analyzed, project of transmitting and converting electricity and 35kV rural power grids Analysis of Engineering Construction Cost are wanted by Bureau of Energy's analysis of prices work Ask, realize Guo Wang company, the collection of Bureau of Energy's full dose Analysis of Engineering Construction Cost basic data in systems; The data collected include: engineering foundation information, main economic and technical indices, target of budgetary estimate, clearing refer to Mark;By setting up project of transmitting and converting electricity analysis of prices basic data and project file data extracting rule, from Project file extracts analysis of prices basic data, then completes to make by the way of making a report on and import by hand The collection work of valency analysis foundation data;The initial data that this analysis of prices data collection module is collected removes Directly it is stored in outside data base, is also fed to data check module and carries out the verification of data;
Described data check module is used for the relevant data to the conveying of analysis of prices data collection module certainly The correctness of dynamic verification analysis of prices basic data and logic rule;If going wrong, prompting user adjusts Whole, the most automatically collect the analysis of prices basic data of all prefecture-level companies report;This module is not according to With the index that engineering type is conventional, formulate engineering screening conditions, and according to screening conditions, list correspondence Engineering, and the achievement data that engineering is corresponding can be consulted;It is transported to decision-making through verified data Support module is as the decision-making foundation of the latter, standby in being the most also stored in data base;
The data of typing are processed, converge by performance model and method by described decision support module Always, prediction, draw required integrated information and information of forecasting, provide decision-making for policymaker Foundation, assists them to make scientific and reasonable decision-making;
Described result output module is mainly used in the analysis of prices base this decision support module 3 exported The carrying out of plinth data is made a report on and exports with many bores, it is provided that the flexible configuration function of data sheet;
Described outfit management module is for analysis report Template Manager and analysis of prices Template Manager.Respectively Provincial electric power company the most periodically works out the analysis of prices report in year, according to the output of result output module Data and the requirement of Guo Wang company and the demand of company of each province and the practical situation of local power network company, Make analysis report template and analysis of prices template, make in time in time for annual cost change Adjust, improve efficiency and the accuracy of work;
User and whole system platform are managed by described system management module, carry out user's power Limit sets, and implements effectively management;Including division unit, user's management and system journal, power transmission and transformation work The use role of journey cost data collection platform can be summarized as " each provincial electric power company ", " various places civil power Power company ", " Electric Design consulting firm ", " unit in charge of construction ", " goods and materials unit " five class use Family, every kind of role has the function of oneself in the project of transmitting and converting electricity cost data management platform of Jilin;
Described data base includes: project of transmitting and converting electricity profile data system, project of transmitting and converting electricity Technological Economy Supplemental characteristic system and project of transmitting and converting electricity cost data system.
Project of transmitting and converting electricity cost basic data the most according to claim 2 is collected and the system of analysis, It is characterized in that, described project of transmitting and converting electricity profile data system mainly include engineering basic condition, from So condition, construction criteria and measuring and calculating standard.
Project of transmitting and converting electricity cost basic data the most according to claim 2 is collected and the system of analysis, It is characterized in that, described project of transmitting and converting electricity techno economic parameter data system includes three below daughter System:
(1) power transformation engineering techno economic parameter data system, including: transformer station's form include open air station, Half indoor station, indoor station, semi-underground station and station, underground;Main transformer includes current period number of units, platform at a specified future date Number and individual capacity;Number, distribution pattern and chopper number of units are returned in current period outlet, wiring patterns 3 refers to Mark is both needed to consider low-pressure side, medium voltage side, 3 kinds, high-pressure side situation respectively;Cable material is divided into control cable With 1kv and following power cable two class;Enter the station road by length metering;
(2) line project techno economic parameter data system: line project be divided into overhead transmission line engineering and Cable run engineering;
(3) communication engineering techno economic parameter data system:
Communication engineering includes communication equipment engineering and optical cable telecommunication line, communication equipment engineering technological economy System is it is important that collect optical transmission device achievement data, including transmission capacity, equipment unit price and Guang Kou The indexs such as quantity;Optical cable telecommunication line technical-economic index mainly include line traffic mode (optical fiber), Built on stilts mode, line length, optical cable model, optical cable stamen number and optical cable unit price;Wherein, built on stilts mode Including making somebody a mere figurehead, direct-burried, pipeline and other modes.
Project of transmitting and converting electricity cost basic data the most according to claim 2 is collected and the system of analysis, It is characterized in that, described project of transmitting and converting electricity cost data system includes following two subsystem:
(1) power transformation engineering cost data system, including:
Architectural engineering expense mainly includes complex building construction cost, full station power distribution equipment construction cost, place Smooth expense, basement process expense, retaining wall and bank protection expense, outer water source expense of standing and station dispatch from foreign news agency Source expense etc.;Method for processing foundation be always or usually as specified soil replacement cushion method, dirt replacement cushion method, gravel soil removal and replacement The multiple method such as Sand-gravel-cushion Technioue;Original equipment cost includes protecting secondary device acquisition expenses and the intelligence such as observing and controlling Change relevant device purchase commodity;Other fees mainly include building place requisition and cleaning expense, project construction Administration fee, project construction service charge, Operational preparation take, Over-size transport test fee etc.;Expenses for removal of debris Comprise except land requisition expense unexpected construction site rent, migrate compensation and excess cleaning expense;Work Completion of works's final accounts stage calculates the value-added tax deduction amount of tax to be paid;
(2) line project cost data system, including: overhead transmission line body expense includes foundation engineering Expense, tower engineering expense, earth work expense, stringing engineering cost, adnexa engineering cost and auxiliary Help engineering cost;Cable run body expense includes cable electrical, tunnel, comb, raceway groove, direct-burried Body expense;Build place requisition and cleaning expense mainly includes that the permanent sapce charge of column foot, column foot forever account for Ground unit price number felling damages, housing demolition damages and large-scale factories and miness compensation for demolition.
Project of transmitting and converting electricity analysis of prices basic data the most according to claim 1 collects and surveys system System, it is characterised in that described analysis of prices data collection module, data check module and achievement are defeated Go out module and be each provided at subordinate data collector terminal;Described decision support module, be equipped with management module, System management module and data base are located at higher level's data analysis system.
Project of transmitting and converting electricity cost basic data the most according to claim 6 is collected and the system of analysis, It is characterized in that, the described Utilities Electric Co. that subordinate data collector terminal is various places city-level sets up, for Family terminal;Described higher level's data analysis system is provided with the application service being connected with described information Intranet Device and database server, set up for provincial agency.
Project of transmitting and converting electricity cost basic data the most according to claim 7 is collected and the system of analysis, It is characterized in that, described user terminal uses browser to access application server and literary composition by LAN Part server;Described application server and database server use same server.
Project of transmitting and converting electricity cost basic data the most according to claim 7 is collected and the system of analysis, It is characterized in that, described user terminal also includes economic technology expert terminals.
Project of transmitting and converting electricity cost basic data the most according to claim 7 is collected and analyzes system System, it is characterised in that between the LAN of subordinate data collector terminal and higher level's data analysis system It is provided with fire wall;This system is based on WEB framework, uses B/S mode development, and system deployment uses Saving corporate level deployment, the pattern of multistage application.
CN201610227776.6A 2016-04-13 2016-04-13 Power transmission and transformation construction cost basic data collection and analysis system Pending CN105989546A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610227776.6A CN105989546A (en) 2016-04-13 2016-04-13 Power transmission and transformation construction cost basic data collection and analysis system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610227776.6A CN105989546A (en) 2016-04-13 2016-04-13 Power transmission and transformation construction cost basic data collection and analysis system

Publications (1)

Publication Number Publication Date
CN105989546A true CN105989546A (en) 2016-10-05

Family

ID=57043951

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610227776.6A Pending CN105989546A (en) 2016-04-13 2016-04-13 Power transmission and transformation construction cost basic data collection and analysis system

Country Status (1)

Country Link
CN (1) CN105989546A (en)

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106529803A (en) * 2016-11-09 2017-03-22 国网辽宁省电力有限公司经济技术研究院 General cost management method and system
CN106611386A (en) * 2016-12-06 2017-05-03 广东电网有限责任公司电网规划研究中心 Method and device for generating cost index of power transmission and transformation project
CN107844962A (en) * 2017-11-24 2018-03-27 广东电网有限责任公司电网规划研究中心 A kind of distribution Construction Cost Data based on standard data structure collects system
CN107958370A (en) * 2017-12-04 2018-04-24 国网河北省电力公司经济技术研究院 Project cost data verification method and terminal device
CN109634964A (en) * 2018-12-13 2019-04-16 深圳市航建工程造价咨询有限公司 Cost Index exponent data base management system
CN112036815A (en) * 2020-08-20 2020-12-04 湖北四位元电力有限公司 Method for establishing power distribution network engineering cost index system
CN112232628A (en) * 2020-09-07 2021-01-15 国网宁夏电力有限公司经济技术研究院 Power transmission and transformation project cost data arrangement and deepening application system
CN112232627A (en) * 2020-09-07 2021-01-15 国网宁夏电力有限公司经济技术研究院 Estimation method for cost design elements of power transmission and transformation project
CN112232625A (en) * 2020-09-07 2021-01-15 国网宁夏电力有限公司经济技术研究院 Power transmission and transformation project cost evaluation method based on space-time big data
CN112258343A (en) * 2020-10-21 2021-01-22 海南电网有限责任公司 Distribution network engineering cost information collection system based on BIM multi-dimensionality
CN112561577A (en) * 2020-12-14 2021-03-26 国网新疆电力有限公司经济技术研究院 Power distribution network engineering itemized quotation standard determination method
CN113505217A (en) * 2021-07-29 2021-10-15 永道科技有限公司 Method and system for realizing rapid formation of project cost database based on big data
CN114461687A (en) * 2022-01-07 2022-05-10 国网福建省电力有限公司 Cost data extraction analysis system
CN114548494A (en) * 2022-01-13 2022-05-27 国网湖北省电力有限公司经济技术研究院 Visual cost data prediction intelligent analysis system

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105117850A (en) * 2015-08-31 2015-12-02 国家电网公司 Auxiliary intelligent reviewing system for power transmission and transformation project design
CN105225076A (en) * 2015-11-12 2016-01-06 国网宁夏电力公司经济技术研究院 Analysis of prices data Collection & Processing System
CN105279566A (en) * 2014-05-29 2016-01-27 国家电网公司 Power transmission and transformation project cost prediction method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105279566A (en) * 2014-05-29 2016-01-27 国家电网公司 Power transmission and transformation project cost prediction method
CN105117850A (en) * 2015-08-31 2015-12-02 国家电网公司 Auxiliary intelligent reviewing system for power transmission and transformation project design
CN105225076A (en) * 2015-11-12 2016-01-06 国网宁夏电力公司经济技术研究院 Analysis of prices data Collection & Processing System

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
侯捷旭: "运城供电公司输变电工程造价管理研究", 《中国优秀硕士学位论文全文数据库 工程科技Ⅱ辑》 *
刘宏志 等: "大数据环境下的电网工程造价分析管控体系研究", 《华东电力》 *

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106529803B (en) * 2016-11-09 2020-03-24 国网辽宁省电力有限公司经济技术研究院 General cost management method and system
CN106529803A (en) * 2016-11-09 2017-03-22 国网辽宁省电力有限公司经济技术研究院 General cost management method and system
CN106611386A (en) * 2016-12-06 2017-05-03 广东电网有限责任公司电网规划研究中心 Method and device for generating cost index of power transmission and transformation project
CN107844962A (en) * 2017-11-24 2018-03-27 广东电网有限责任公司电网规划研究中心 A kind of distribution Construction Cost Data based on standard data structure collects system
CN107844962B (en) * 2017-11-24 2020-08-04 广东电网有限责任公司电网规划研究中心 Distribution network engineering cost data collection system based on standard data structure
CN107958370A (en) * 2017-12-04 2018-04-24 国网河北省电力公司经济技术研究院 Project cost data verification method and terminal device
CN109634964B (en) * 2018-12-13 2022-06-14 深圳市航建工程造价咨询有限公司 Cost index database management system
CN109634964A (en) * 2018-12-13 2019-04-16 深圳市航建工程造价咨询有限公司 Cost Index exponent data base management system
CN112036815A (en) * 2020-08-20 2020-12-04 湖北四位元电力有限公司 Method for establishing power distribution network engineering cost index system
CN112232628A (en) * 2020-09-07 2021-01-15 国网宁夏电力有限公司经济技术研究院 Power transmission and transformation project cost data arrangement and deepening application system
CN112232625A (en) * 2020-09-07 2021-01-15 国网宁夏电力有限公司经济技术研究院 Power transmission and transformation project cost evaluation method based on space-time big data
CN112232627A (en) * 2020-09-07 2021-01-15 国网宁夏电力有限公司经济技术研究院 Estimation method for cost design elements of power transmission and transformation project
CN112258343A (en) * 2020-10-21 2021-01-22 海南电网有限责任公司 Distribution network engineering cost information collection system based on BIM multi-dimensionality
CN112258343B (en) * 2020-10-21 2024-03-26 海南电网有限责任公司 BIM multi-dimensional distribution network engineering cost information collection system
CN112561577A (en) * 2020-12-14 2021-03-26 国网新疆电力有限公司经济技术研究院 Power distribution network engineering itemized quotation standard determination method
CN113505217A (en) * 2021-07-29 2021-10-15 永道科技有限公司 Method and system for realizing rapid formation of project cost database based on big data
CN114461687A (en) * 2022-01-07 2022-05-10 国网福建省电力有限公司 Cost data extraction analysis system
CN114548494A (en) * 2022-01-13 2022-05-27 国网湖北省电力有限公司经济技术研究院 Visual cost data prediction intelligent analysis system
CN114548494B (en) * 2022-01-13 2024-07-09 国网湖北省电力有限公司经济技术研究院 Visual cost data prediction intelligent analysis system

Similar Documents

Publication Publication Date Title
CN105989546A (en) Power transmission and transformation construction cost basic data collection and analysis system
CN105976124A (en) GIS-based power grid planning project full-process closed-loop control method and system
Hong et al. Potential assessment and implementation strategy for roof greening in highly urbanized areas: A case study in Shenzhen, China
CN103984997A (en) Transmission project site and line selecting method based on GIS space information
CN107748968A (en) A kind of construction method of distribution network engineering cost Data Analysis Model
CN110110376A (en) A kind of hinge dam type scheme analysis method for quantitatively evaluating and device based on BIM
CN110503238A (en) A kind of wisdom energy is provided multiple forms of energy to complement each other evaluation visualization real example platform
CN103714426A (en) Integrated scheduling system for small and medium radial flow type hydropower station group
CN107505015A (en) A kind of controlling channel device, management system and self-shooter control device
CN109658131A (en) The method for carrying out cost evaluation based on power grid typical cost data
Xi et al. Inter-basin water transfer-supply model and risk analysis with consideration of rainfall forecast information
CN103927693A (en) Distribution network line loss management system
CN110427392A (en) Power distribution network grid management information system based on cloud platform
CN110163434A (en) Method and system for predicting target time sequence in whole process of power grid infrastructure project construction
CN107967599A (en) A kind of Wind Power Project development system and development approach based on exploitation map
CN109784725A (en) Investment decision method and system for power grid project
CN110188972A (en) A kind of non-special customer cut-in method of 10kV power distribution network
CN104331779A (en) Development area construction project management system and method
Smith et al. Transmission Planning for Wind Energy in the USA: Status and Prospects
CN109840646A (en) Voltage monitoring method based on big data processing
Liu et al. Application and study of internet of things used in rural water conservancy project
CN115511543A (en) Power transmission and transformation project cost measuring and calculating method
CN112258343B (en) BIM multi-dimensional distribution network engineering cost information collection system
Zhang et al. Analysis of power distribution network operation without power cut based on actual engineering data
Suryadimal et al. Selection criteria of feasibility assessment on mini hydro power plant in Batang Sumani River Solok West Sumatera

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20161005

RJ01 Rejection of invention patent application after publication