CN105971608A - Thick-coal-seam large-mining-height gob-side roadway retaining method - Google Patents

Thick-coal-seam large-mining-height gob-side roadway retaining method Download PDF

Info

Publication number
CN105971608A
CN105971608A CN201610478978.8A CN201610478978A CN105971608A CN 105971608 A CN105971608 A CN 105971608A CN 201610478978 A CN201610478978 A CN 201610478978A CN 105971608 A CN105971608 A CN 105971608A
Authority
CN
China
Prior art keywords
layer
roadway
retaining method
gob
thick
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610478978.8A
Other languages
Chinese (zh)
Inventor
梁华杰
王丽
魏中举
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liupanshui Normal University
Original Assignee
Liupanshui Normal University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Liupanshui Normal University filed Critical Liupanshui Normal University
Priority to CN201610478978.8A priority Critical patent/CN105971608A/en
Publication of CN105971608A publication Critical patent/CN105971608A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • E21C41/18Methods of underground mining; Layouts therefor for brown or hard coal
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • E21D11/15Plate linings; Laggings, i.e. linings designed for holding back formation material or for transmitting the load to main supporting members
    • E21D11/152Laggings made of grids or nettings
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D15/00Props; Chocks, e.g. made of flexible containers filled with backfilling material
    • E21D15/14Telescopic props
    • E21D15/44Hydraulic, pneumatic, or hydraulic-pneumatic props
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F15/00Methods or devices for placing filling-up materials in underground workings
    • E21F15/02Supporting means, e.g. shuttering, for filling-up materials
    • E21F15/04Stowing mats; Goaf wire netting; Partition walls

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Remote Sensing (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The present invention provides a thick-coal-seam large-mining-height gob-side roadway retaining method which comprises the following operating steps: 1) arranging supporting pillars on the side, near a stoping area, of a roadway; 2) arranging a filling layer and a rubber air bag layer between the supporting pillars and the stoping area; 3) arranging a latticed strengthening protecting net at the top of the roadway, wherein the latticed strengthening protecting net is embedded into the top rock stratum of the roadway through anchor ropes; 4) further arranging a layer of light-reflecting air cushion layer at the bottom of the latticed strengthening protecting net; 5) inflating the rubber air bag layer, filling the filling layer with concrete, and when the concrete is concreted, removing the rubber air bag layer; 6) along with the propulsion of the stoping working surface, repeating the steps till the whole roadway is finished. Through the designed filling layer and rubber air bag layer in the steps, the rapid propulsion of the filling layer in thick-coal-seam large-mining-height gob-side roadway retaining can be effectively realized; the latticed strengthening protecting net at the top of the roadway is embedded into the filling layer to form an integrity, so that the structural stability of the whole roadway is improved.

Description

A kind of thick seam large mining height gob-side entry retaining method
Technical field
The present invention relates to gob side entry retaining field, coal seam, be specifically related to a kind of thick seam large mining height along empty Stay lane method.
Background technology
Along with present socioeconomic development, the living standard of people is also constantly promoting, Coal resources, one of energy mineral resources.25% is accounted in world's primary energy consumption figure.I The reserves of state's coal resources relatively horn of plenty, but owing to the economy of China is when development, for money Asking for of source resource is the strongest, and the yield consuming coal in production accounts for world's coal production 45%, yield ranks first in the world.
But limited due to coal resource, and in the middle of the exploitation of China's last 100 years, by major part Earth's surface seam mining totally, research is that the important of present mine coal is ground in the coal seam of underground deep layer Studying carefully direction, although rich reserves in subterranean coal, coal seam is thicker, but during exploitation the most easily Cause danger, wrongful exploitation, can bring huge economic loss and casualties.And it is thick During seam mining, easily produce wasting of resources phenomenon.
Summary of the invention
For the deficiencies in the prior art, the invention provides a kind of thick seam large mining height gob side entry retaining Method, it is possible to effectively realizing the exploitation of effective year of the effective high seam for high seam, increase is opened The effective area adopted and the structural stability in tunnel promote.
For realizing object above, the present invention is achieved by the following technical programs:
A kind of thick seam large mining height gob-side entry retaining method, operating procedure is as follows:
1) in tunnel, back production district one side is provided with pillar;
2) packed layer and rubber pneumatic bag floor are set between pillar and back production district;
3) top in tunnel arranges the anti-net of latticed reinforcement, and anchor cable is crossed by the anti-Netcom of latticed reinforcement Embed in the cap rock layer in tunnel;
4) bottom at the anti-net of latticed reinforcement arranges one layer of reflective air cushion layer again.
5) rubber pneumatic bag layer is inflated, then fill concrete in packed layer, treat concrete Solidification, removes rubber pneumatic bag layer;
6) along with the propelling repeat the above steps of stope, until the completing of whole tunnel.
Preferably, described step 2) in often to arrange the spacing between pillar be 20-50cm.
Preferably, the two ends of described anchor cable are claw-like structures, and are connected by middle pole.
Preferably, a length of 30-40cm of described pole.
Preferably, the anti-net of described latticed reinforcement embeds in packed layer, the coagulation in layer to be filled Soil solidification, forms entirety.
Preferably, described pillar is that fluid pressure type inflates post.
The invention provides a kind of thick seam large mining height gob-side entry retaining method, by step designs Packed layer and rubber pneumatic bag layer, when effectively achieving thick seam large mining, quickly pushing away of packed layer Enter, and the top net trellis in tunnel is strengthened anti-net and embedded in packed layer, forms entirety, promotes Overall tunnel structural stability, it is simple to the back production district of high seam carries out seam mining.Whole Method can be promoted in deep seam mining.
Accompanying drawing explanation
In order to be illustrated more clearly that the embodiment of the present invention or technical scheme of the prior art, below The accompanying drawing used required in embodiment or description of the prior art will be briefly described, aobvious and Easily insight, for those of ordinary skill in the art, in the premise not paying creative work Under, it is also possible to other accompanying drawing is obtained according to these accompanying drawings.
The overall structure schematic diagram of Fig. 1 present invention;
Wherein: 1, tunnel;2, back production district;3, pillar;4, packed layer;5, rubber pneumatic bag Layer;6, the anti-net of latticed reinforcement;7, reflective air cushion layer;8, anchor cable;81, pole.
Detailed description of the invention
For making the purpose of the embodiment of the present invention, technical scheme and advantage clearer, below will knot Close the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, It is fully described by.Based on the embodiment in the present invention, those of ordinary skill in the art are not making Go out the every other embodiment obtained under creative work premise, broadly fall into present invention protection Scope.
As it is shown in figure 1, the present embodiment provides a kind of thick seam large mining height gob-side entry retaining method, operation Step is as follows:
1) in tunnel 1, back production district one side is provided with pillar 3;
2) packed layer 4 and rubber pneumatic bag floor 5 are set between pillar 3 and back production district 2;
3) top in tunnel 1 arranges the anti-net of latticed reinforcement 6, and the anti-net of latticed reinforcement 6 leads to Cross in the cap rock layer that anchor cable 8 embeds tunnel 1;
4) bottom at the anti-net of latticed reinforcement 6 arranges one layer of reflective air cushion layer 7 again.
5) rubber pneumatic bag layer 5 is inflated, then fill concrete in packed layer 4, wait to mix Solidifying soil solidification, removes rubber pneumatic bag layer 5, easy and simple to handle;
6) along with the propelling repeat the above steps of stope, until the completing of whole tunnel 1.
Step 2) in often to arrange the spacing between pillar 3 be 20-50cm.
The two ends of anchor cable 8 are claw-like structures, and are connected by middle pole 81, realize effectively By more firm to anti-for latticed reinforcement net 6 and the cap rock layer in tunnel 1 fixing.
The a length of 30-40cm of pole 81.
The anti-net of latticed reinforcement 6 embeds in packed layer, the concrete setting in layer 4 to be filled, shape Integral, it is effectively increased the stability in tunnel 1 really, even if when there is mine disaster, grid Shape strengthens anti-net 6 also can form independent baffle space with packed layer 4.
Pillar 3 inflates post for fluid pressure type, conveniently carries out the site location altitude mixture control in tunnel 1.
Above example only in order to technical scheme to be described, is not intended to limit;Although With reference to previous embodiment, the present invention is described in detail, those of ordinary skill in the art It is understood that the technical scheme described in foregoing embodiments still can be modified by it, Or wherein portion of techniques feature is carried out equivalent;And these amendments or replacement, not The essence making appropriate technical solution departs from the spirit and scope of various embodiments of the present invention technical scheme.

Claims (6)

1. a thick seam large mining height gob-side entry retaining method, it is characterised in that operating procedure is as follows:
1) in tunnel, back production district one side is provided with pillar;
2) packed layer and rubber pneumatic bag floor are set between pillar and back production district;
3) top in tunnel arranges the anti-net of latticed reinforcement, and anchor cable is crossed by the anti-Netcom of latticed reinforcement Embed in the cap rock layer in tunnel;
4) bottom at the anti-net of latticed reinforcement arranges one layer of reflective air cushion layer again.
5) rubber pneumatic bag layer is inflated, then fill concrete in packed layer, treat concrete Solidification, removes rubber pneumatic bag layer;
6) along with the propelling repeat the above steps of stope, until the completing of whole tunnel.
2. thick seam large mining height gob-side entry retaining method as claimed in claim 1, it is characterised in that Described step 2) in often to arrange the spacing between pillar be 20-50cm.
3. thick seam large mining height gob-side entry retaining method as claimed in claim 1, it is characterised in that The two ends of described anchor cable are claw-like structures, and are connected by middle pole.
4. thick seam large mining height gob-side entry retaining method as claimed in claim 3, it is characterised in that The a length of 30-40cm of described pole.
5. thick seam large mining height gob-side entry retaining method as claimed in claim 1, it is characterised in that The anti-net of described latticed reinforcement embeds in packed layer, the concrete setting in layer to be filled, shape Integral.
6. thick seam large mining height gob-side entry retaining method as claimed in claim 1, it is characterised in that Described pillar is that fluid pressure type inflates post.
CN201610478978.8A 2016-06-27 2016-06-27 Thick-coal-seam large-mining-height gob-side roadway retaining method Pending CN105971608A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610478978.8A CN105971608A (en) 2016-06-27 2016-06-27 Thick-coal-seam large-mining-height gob-side roadway retaining method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610478978.8A CN105971608A (en) 2016-06-27 2016-06-27 Thick-coal-seam large-mining-height gob-side roadway retaining method

Publications (1)

Publication Number Publication Date
CN105971608A true CN105971608A (en) 2016-09-28

Family

ID=57019243

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610478978.8A Pending CN105971608A (en) 2016-06-27 2016-06-27 Thick-coal-seam large-mining-height gob-side roadway retaining method

Country Status (1)

Country Link
CN (1) CN105971608A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109779681A (en) * 2019-01-23 2019-05-21 山东科技大学 A kind of supporting-isolation combined type Paste-filling System and placement method
CN111255514A (en) * 2020-03-29 2020-06-09 新汶矿业集团有限责任公司 Deep non-roadside filling gob-side entry retaining supporting structure and supporting method
CN112502706A (en) * 2020-11-27 2021-03-16 安徽理工大学 Large-dip-angle coal seam trend coal pillar-free sublevel filling mining method
CN112502772A (en) * 2020-11-27 2021-03-16 安徽理工大学 Goaf solid waste-ultrahigh water paste alternating filling method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2057685U (en) * 1989-03-16 1990-05-30 黑龙江商学院 Flexible gas-filled formwork
CN102155260A (en) * 2011-05-23 2011-08-17 中国矿业大学 Method for filling heavy-pitch coal bed goaf
CN104929666A (en) * 2015-04-30 2015-09-23 中国矿业大学 Top breaking gob-side entry retaining method for tender roofs
CN105370304A (en) * 2015-12-07 2016-03-02 平顶山天安煤业股份有限公司 High stress strong disturbance coal seam gob-side entry retaining multistage reinforcing method
CN105525930A (en) * 2016-01-21 2016-04-27 成都科创佳思科技有限公司 Reinforced electric power tunnel

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2057685U (en) * 1989-03-16 1990-05-30 黑龙江商学院 Flexible gas-filled formwork
CN102155260A (en) * 2011-05-23 2011-08-17 中国矿业大学 Method for filling heavy-pitch coal bed goaf
CN104929666A (en) * 2015-04-30 2015-09-23 中国矿业大学 Top breaking gob-side entry retaining method for tender roofs
CN105370304A (en) * 2015-12-07 2016-03-02 平顶山天安煤业股份有限公司 High stress strong disturbance coal seam gob-side entry retaining multistage reinforcing method
CN105525930A (en) * 2016-01-21 2016-04-27 成都科创佳思科技有限公司 Reinforced electric power tunnel

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109779681A (en) * 2019-01-23 2019-05-21 山东科技大学 A kind of supporting-isolation combined type Paste-filling System and placement method
CN109779681B (en) * 2019-01-23 2021-06-25 山东科技大学 Support-isolation combined paste filling system and method
CN111255514A (en) * 2020-03-29 2020-06-09 新汶矿业集团有限责任公司 Deep non-roadside filling gob-side entry retaining supporting structure and supporting method
CN111255514B (en) * 2020-03-29 2021-09-28 新汶矿业集团有限责任公司 Deep non-roadside filling gob-side entry retaining supporting structure and supporting method
CN112502706A (en) * 2020-11-27 2021-03-16 安徽理工大学 Large-dip-angle coal seam trend coal pillar-free sublevel filling mining method
CN112502772A (en) * 2020-11-27 2021-03-16 安徽理工大学 Goaf solid waste-ultrahigh water paste alternating filling method

Similar Documents

Publication Publication Date Title
CN105971606B (en) A kind of thick sandstone coal wall recovery method
CN101864987B (en) Building method of filled wall body for gob-side entry retaining of large-inclination coal seam
CN105715297B (en) Half-edge coal seam gob side entry retaining spoil administering method
CN102226399A (en) Soft rock four-line large-span tunnel three-bench cable-bracing excavation construction method
CN105971608A (en) Thick-coal-seam large-mining-height gob-side roadway retaining method
CN103696803B (en) Be used for mine underground tailings cemented filling barricade device
CN103256053B (en) Excavation and construction method of underground cavity ball coronary dome
CN104061001B (en) Gob side entry retaining exploitation support process method
CN102720498B (en) Gob-side entry retaining mining process for coal face
CN103061771B (en) Second mining mine fully mechanized coal face cuts eye driving and supporting method thereof
CN103161480A (en) Method for actively supporting lane side filling gob-side entry retaining
CN107725052B (en) One kind, which is adopted, stays integration exploitation gob side entry top plate constant-resistance anchor body beam method for protecting support
CN107143338B (en) A kind of coal mine roadway driving and method for protecting support
CN104762980A (en) Energy dissipation, shock absorption and anti-liquefaction rigid and flexible slide-resistant pile and construction method
CN105201506B (en) The mining methods of afterwards filling are reinforced before a kind of heir
CN110118089B (en) Mining FRP grid-coal gangue-self-compacting concrete regenerated top plate and construction method thereof
CN105927243B (en) A kind of underground country rock tomography suspension device and method for protecting support
CN109538210A (en) A kind of soft extremely irregularcoal seam fully mechanized coal face gob-side entry retaining method of high methane three
CN102966359A (en) Working face ventilation oxidization zone roof control method
CN204343306U (en) Tunnel, landslide integration Reinforcement device
CN206205903U (en) A kind of base plate release ruggedized construction of control deep tunnel bottom distension
CN104405392B (en) Three soft high seam tunnel jackings are kept on file anchor rete cord active support longwall top coal caving method
CN109268063A (en) The method for constructing gob side entry retaining shield lane wall using drift-sand filling net cage
CN106285692A (en) A kind of construction method of gob side entry retaining
CN106677806B (en) A kind of tubular type canopy frame support structure for underworkings, tunnel

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20160928

RJ01 Rejection of invention patent application after publication