CN105971607A - Method for gob-side entry retaining of medium-thickness coal seam - Google Patents

Method for gob-side entry retaining of medium-thickness coal seam Download PDF

Info

Publication number
CN105971607A
CN105971607A CN201610335849.3A CN201610335849A CN105971607A CN 105971607 A CN105971607 A CN 105971607A CN 201610335849 A CN201610335849 A CN 201610335849A CN 105971607 A CN105971607 A CN 105971607A
Authority
CN
China
Prior art keywords
gob
support
entry retaining
medium
side entry
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610335849.3A
Other languages
Chinese (zh)
Inventor
贾后省
张梦婕
冯志耀
臧海智
贾俊飞
赵强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan University of Technology
Original Assignee
Henan University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan University of Technology filed Critical Henan University of Technology
Priority to CN201610335849.3A priority Critical patent/CN105971607A/en
Publication of CN105971607A publication Critical patent/CN105971607A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • E21C41/18Methods of underground mining; Layouts therefor for brown or hard coal
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F13/00Transport specially adapted to underground conditions
    • E21F13/06Transport of mined material at or adjacent to the working face
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F15/00Methods or devices for placing filling-up materials in underground workings
    • E21F15/005Methods or devices for placing filling-up materials in underground workings characterised by the kind or composition of the backfilling material

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Mechanical Engineering (AREA)
  • Remote Sensing (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The invention relates to a method for gob-side entry retaining of a medium-thickness coal seam and belongs to the technical field of gob-side entry retaining. The method is characterized in that by taking the advantage of large space of a working face of the medium-thickness coal seam, part of a support of the working face on the gob-side entry retaining side is changed into a top coal caving support and a long tail beam support, and a scraper conveyor, a transfer crusher, a transfer belt conveyor and a downward-spreading conveyor are arranged behind the supports on the working face; and in the working face propelling process, the top coal caving support is directly adopted for conveying gangue above a gob downwards, the downwards-conveyed gangue is downwards spread to the gob area on the gob-side entry retaining side to form a beside-entry support after the procedures of conveying, crushing, transferring and downward spreading, and the whole process is carried out in the gob area. Meanwhile, before the gangue is stacked, flexible protecting plates with holes are adopted for separation in advance so as to adapt to roof settling and prevent the gangue from entering an entry, cementing material filling and reinforcing are carried out, and the flexible protecting plates with the holes can be recycled. The method has important significance to guarantee of the gob-side entry retaining stability, increase of the resource recovery rate and simplifying of a beside-entry support process.

Description

A kind of medium-thickness seam gob-side entry retaining method
Technical field
The invention belongs to edge air gallery technology field, more particularly to a kind of directly carry out in goaf the transferring of spoil, transport, transport, under raise operation, the Gangue raised under utilization is built into the gob-side entry retaining method of roadside support.
Background technology
Gob side entry retaining coal-mining method has significant effect to aspects such as improving resource recovery, reduction tunnelling rate, alleviation digging tight relationship, compare girdle gob side entry retaining, the gob side entry retaining of medium-thickness seam stay lane difficulty generally the biggest, ore deposit pressure manifests the most violent, and cost-effective roadside support is always difficult point and the key of medium-thickness seam edge air gallery technology.For problems, scientific research both at home and abroad and engineering staff propose many effective correlation techniques, such as spoil pack pile, close standing props, cementing material filling etc., achieve the gob side entry retaining of medium-thickness seam to a certain extent, but typically all spend huge, and be difficult to thoroughly solve to stay lane adjoining rock stability sex chromosome mosaicism and roadside support seal problem.The present invention recommends a kind of medium-thickness seam gob-side entry retaining method, directly carry out in goaf the transferring of spoil, transport, transport, under the operation such as raise, the Gangue raised under utilization is built into roadside support, and roadside support done strengthen, encapsulation process, gob side entry retaining stability is ensured, resource recovery improves and the simplification of roadside support technique is significant.
Summary of the invention
It is an object of the invention to provide a kind of medium-thickness seam gob-side entry retaining method, directly carry out in goaf the transferring of spoil, transport, transport, under the operation such as raise, the Gangue raised under utilization is built into roadside support, and whole process is all carried out in goaf, and spoil is without gug or carries out extra process.
Its technical problem of the present invention be the technical scheme is that
A kind of medium-thickness seam gob-side entry retaining method, utilize the advantage that medium-thickness seam work surface space is big, first Liu Xiang side face sub-stent is changed into sublevel caving hydrau lic support and long-tail boom support, and drag conveyor is arranged at force piece rear, reprint disintegrating machine, transhipment belt conveyor, under raise conveyer, during the advance of the face, sublevel caving hydrau lic support is directly used to be transferred by above goaf spoil, transport through drag conveyor, reprint crusher in crushing, transhipment belt conveyor is transported to down raise conveyer, under raise conveyer by goaf, side, rock Xia Yangzhiliu lane formed roadside support, whole process is all carried out in goaf.Wherein, conveyor lengths can be raised under determining according to roadway support width, and then determine long-tail boom support quantity, according to high-volume determining sublevel caving hydrau lic support quantity and drag conveyor length under spoil.
A kind of medium-thickness seam gob-side entry retaining method, the reprinting disintegrating machine used, transhipment belt conveyor, under raise conveyer and be respectively positioned on below long-tail boom support tail boom, and under raise conveyer and be suspended to long-tail boom support tail boom, it is ensured that enough roadside support height.
A kind of medium-thickness seam gob-side entry retaining method, hydraulic prop and flexible backplate is installed in Xiang Bang position, side, Liu Xiang goaf, to adapt to crush and prevent spoil from sealing in stay lane, simultaneously, its flexible backplate is provided with hole, injects cemented filling material by the hole of band hole flexibility backplate to Gangue, it is achieved the reinforcing of roadside support, sealing, after cemented filling material solidifies, hydraulic prop can be removed and be circulated use with band hole flexibility backplate.
Beneficial effects of the present invention:
1. low cost: required roadside packing aggregate is the spoil obtained on the spot, it is not necessary to extra filling aggregate, roadside packing device;Meanwhile, whole process is all carried out in goaf, and spoil without gug or additionally transports, and simplifies roadside support technique.
2. supporting effect is good: roadside support width manifests the factors such as severe degree and freely designs according to staying lane height, Liu Xiang ore deposit pressure, it is ensured that stay the surrounding rock stability in lane.
3. support efficiency is high: whole roadside support process all advances with coal-face and synchronization carries out, reprint disintegrating machine, transport belt conveyor, under raise the equipment needed therebies such as conveyer and move with working surface hydraulic support simultaneously, noiseless to coal mining.
4. safety is good: spoil can inject cemented filling material during piling up in real time, it is achieved the airtight and reinforcing of gob side entry retaining roadside support, it is therefore prevented that water in gob area penetrates into tunnel, harmful gas seals in tunnel and spontaneous combustion of remaining coal threatens mine safety.
Accompanying drawing explanation
When considered in conjunction with the accompanying drawings, by referring to detailed description below, can more completely be more fully understood that the present invention and easily learn the beneficial effect that many of which is adjoint, but accompanying drawing described herein is used for providing a further understanding of the present invention, constitute the part of the present invention, the schematic description and description of the present invention is used for explaining the present invention, is not intended that inappropriate limitation of the present invention, wherein:
Fig. 1 is medium-thickness seam gob side entry retaining entirety top view.
Fig. 2 is method, apparatus profile after work surface.
Fig. 3 is to raise process profile under spoil.
Fig. 4 is band hole flexibility guard plate apparatus schematic diagram.
Fig. 5 is sublevel caving hydrau lic support and the schematic diagram of spoil transport below.
Detailed description of the invention
With reference to Fig. 1,2,3,4,5, the present invention will be described, a kind of medium-thickness seam gob-side entry retaining method, utilize the advantage that medium-thickness seam work surface space is big, first Liu Xiang side face sub-stent is changed into sublevel caving hydrau lic support 8 and long-tail boom support 6, and force piece rear arrange drag conveyor 2, reprint disintegrating machine 7, transhipment belt conveyor 5, under raise conveyer 3.During the advance of the face, sublevel caving hydrau lic support 8 is directly used to be transferred by spoil 11 above goaf 1, transport through drag conveyor 2, reprint that disintegrating machine 7 is broken, transhipment belt conveyor 5 is transported to down raise conveyer 3, under raise conveyer 3 goaf, side, rock 11 Xia Yangzhiliu lane 1 formed roadside support 4, whole process is all carried out in goaf 1.Wherein, conveyer 3 length can be raised under determining according to roadway support width, and then determine long-tail boom support 6 quantity, high-volume determine sublevel caving hydrau lic support 8 quantity and drag conveyor 2 length for 11 times according to spoil.
A kind of medium-thickness seam gob-side entry retaining method, the reprinting disintegrating machine 7 that used, transhipment belt conveyor 5, under raise conveyer 3 and be respectively positioned on below long-tail boom support 6 tail boom 13, raise conveyer 3 under and and be suspended to long-tail boom support 6 tail boom 13, it is ensured that enough roadside support 4 height.
A kind of medium-thickness seam gob-side entry retaining method, hydraulic prop 10 and flexible backplate 9 is installed in Xiang Bang position, side, Liu Xiang goaf 1, to adapt to crush and prevent spoil 11 from sealing in stay lane, simultaneously, its flexible backplate 9 is provided with hole 12, injects cemented filling material by the hole 12 of band hole flexibility backplate 9 to Gangue, it is achieved the reinforcing of roadside support 4, sealing, after cemented filling material solidifies, hydraulic prop 10 can be removed and be circulated use with band hole flexibility backplate 9.
The method has the advantages such as low cost, supporting effect is good, support efficiency is high, safety is good, and to the guarantee of gob side entry retaining stability, resource recovery improves and the simplification of roadside support technique is significant.
Above example is to make those of ordinary skill in the art understand the present invention; and the detailed description that the present invention is carried out; but it is contemplated that; can also make other changes and modifications in the range of the claim without departing from the present invention is contained, these change and modifications the most within the scope of the present invention.

Claims (3)

1. a medium-thickness seam gob-side entry retaining method, it is characterized in that the advantage utilizing medium-thickness seam work surface space big, change Liu Xiang side face sub-stent into sublevel caving hydrau lic support and long-tail boom support, and drag conveyor is arranged at force piece rear, reprint disintegrating machine, transhipment belt conveyor, under raise conveyer, during the advance of the face, sublevel caving hydrau lic support is directly used to be transferred by above goaf spoil, transport through drag conveyor, reprint crusher in crushing, transhipment belt conveyor is transported to down raise conveyer, under raise conveyer by goaf, side, rock Xia Yangzhiliu lane formed roadside support, whole process is all carried out in goaf.
A kind of medium-thickness seam gob-side entry retaining method the most according to claim 1, it is characterized in that reprinting disintegrating machine, transhipment belt conveyor, under raise conveyer and be respectively positioned on below long-tail boom support tail boom, raise conveyer under and and be suspended to long-tail boom support tail boom, it is ensured that enough roadside support height.
A kind of medium-thickness seam gob-side entry retaining method the most according to claim 1, it is characterized in that installing hydraulic prop and flexible backplate in Xiang Bang position, side, Liu Xiang goaf, to adapt to crush and prevent spoil from sealing in stay lane, simultaneously, its flexible backplate is provided with hole, cemented filling material is injected to Gangue by the hole of band hole flexibility backplate, realize the reinforcing of roadside support, sealing, after cemented filling material solidifies, hydraulic prop can be removed and be circulated use with band hole flexibility backplate.
CN201610335849.3A 2016-05-20 2016-05-20 Method for gob-side entry retaining of medium-thickness coal seam Pending CN105971607A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610335849.3A CN105971607A (en) 2016-05-20 2016-05-20 Method for gob-side entry retaining of medium-thickness coal seam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610335849.3A CN105971607A (en) 2016-05-20 2016-05-20 Method for gob-side entry retaining of medium-thickness coal seam

Publications (1)

Publication Number Publication Date
CN105971607A true CN105971607A (en) 2016-09-28

Family

ID=56957089

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610335849.3A Pending CN105971607A (en) 2016-05-20 2016-05-20 Method for gob-side entry retaining of medium-thickness coal seam

Country Status (1)

Country Link
CN (1) CN105971607A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107387083A (en) * 2017-09-15 2017-11-24 中国矿业大学 A kind of medium-thickness seam gob side entry retaining roadside support body construction method supported using spoil
CN107575228A (en) * 2017-09-15 2018-01-12 中国矿业大学 A kind of coal-mining method for reducing double lane protection pillar sizes and reducing roadway deformation amount
CN111271098A (en) * 2020-01-16 2020-06-12 国家能源集团宁夏煤业有限责任公司 Construction method for gob-side entry retaining under metal false roof beside coal pillar
CN112112672A (en) * 2020-09-22 2020-12-22 中国矿业大学 Gob-side entry retaining roadside support body construction method based on gangue cement-based material

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2407340A1 (en) * 1977-10-28 1979-05-25 Gewerk Eisenhuette Westfalia Mine gallery support for material stowing - has shield members between floor and roof members adjusted to contour of material
CN1936271A (en) * 2006-08-21 2007-03-28 山东盛泉矿业有限公司 Method for filling coal-steam-free extraction working surface goaf by coal mine waste rock
CN103388488A (en) * 2013-08-21 2013-11-13 大同煤矿集团有限责任公司 Thin seam gob-side entry retaining filling method
CN104018837A (en) * 2014-06-20 2014-09-03 中国矿业大学 Spacing-filling gob-side entry retaining method for treating dinting gangue
CN104453994A (en) * 2014-11-18 2015-03-25 中国矿业大学(北京) Gob-side entry retaining method for putting top waste rock down to achieve roadway side packing

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2407340A1 (en) * 1977-10-28 1979-05-25 Gewerk Eisenhuette Westfalia Mine gallery support for material stowing - has shield members between floor and roof members adjusted to contour of material
CN1936271A (en) * 2006-08-21 2007-03-28 山东盛泉矿业有限公司 Method for filling coal-steam-free extraction working surface goaf by coal mine waste rock
CN103388488A (en) * 2013-08-21 2013-11-13 大同煤矿集团有限责任公司 Thin seam gob-side entry retaining filling method
CN104018837A (en) * 2014-06-20 2014-09-03 中国矿业大学 Spacing-filling gob-side entry retaining method for treating dinting gangue
CN104453994A (en) * 2014-11-18 2015-03-25 中国矿业大学(北京) Gob-side entry retaining method for putting top waste rock down to achieve roadway side packing

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107387083A (en) * 2017-09-15 2017-11-24 中国矿业大学 A kind of medium-thickness seam gob side entry retaining roadside support body construction method supported using spoil
CN107575228A (en) * 2017-09-15 2018-01-12 中国矿业大学 A kind of coal-mining method for reducing double lane protection pillar sizes and reducing roadway deformation amount
CN111271098A (en) * 2020-01-16 2020-06-12 国家能源集团宁夏煤业有限责任公司 Construction method for gob-side entry retaining under metal false roof beside coal pillar
CN111271098B (en) * 2020-01-16 2021-06-08 国家能源集团宁夏煤业有限责任公司 Construction method for gob-side entry retaining under metal false roof beside coal pillar
CN112112672A (en) * 2020-09-22 2020-12-22 中国矿业大学 Gob-side entry retaining roadside support body construction method based on gangue cement-based material

Similar Documents

Publication Publication Date Title
AU2013358812B2 (en) Solid-filling coal mining method with two pre-excavated tunnels for advancing
CN103742148B (en) The soft coal-mining method covering the descending waste filling of supporting of a kind of half-edge coal seam
CN104405437B (en) A kind of solid filling with combine the hybrid working face mining method of adopting
CN102606152B (en) Novel quick digging and anchoring integrated machine for rectangular coal roadway
CN105298496B (en) Complete adopt of reserved working face coal column is set to fill coal-mining method entirely
CN110424966B (en) Ultrahigh water material filling working face gangue pumping entry retaining non-coal pillar mining method
CN202611695U (en) Novel rectangular coal roadway quick driving and bolting all-in-one machine
CN104453994A (en) Gob-side entry retaining method for putting top waste rock down to achieve roadway side packing
CN104500070B (en) Continuous coal mining machine paste filling mining method
CN103953345B (en) A kind of small section entry retaining along gob side exploitation method
CN104775819A (en) Deep inclined coal seam mining roadway mine pressure control mining method
CN106321102A (en) Coalmine consolidated solid strip filling coal mining method
CN109882239B (en) Open-pit end slope coal-pressing radial filling mining method
CN101749020A (en) Forward coal mining by filling method
CN110410076B (en) Filling mining method for recovering left coal pillars in goaf of old house pillar
CN105971607A (en) Method for gob-side entry retaining of medium-thickness coal seam
CN106907177B (en) A kind of girdle gob side entry retaining roadside packing method for protecting support
CN102877848B (en) Method for performing coal mining and gangue cementation stripe filling simultaneously
CN104632220A (en) Mining method with adjustable and controllable structure size of gentle dip medium-thickness ore body strip column reconstructed stope
CN107091091A (en) A kind of steeply-inclined seam mining gob-side entry retaining method of prefabricated arc support
CN104533419B (en) Method for partial recovery of residual coal from wide coal pillar
CN109630112B (en) N00 mining method of cut top filling
CN108756875B (en) The continuous quarrying apparatus of row's open coal mine medium-thickness seam and method in a kind of
CN108301833B (en) Full negative pressure short wall filling coal mining method
CN105240012A (en) F-type section coal-mining method allowing commingled mining of coal pillars

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20160928

RJ01 Rejection of invention patent application after publication