CN105970818A - Bridge plate lifting device of installation equipment for prefabricated and assembled type viaduct bridge plates - Google Patents
Bridge plate lifting device of installation equipment for prefabricated and assembled type viaduct bridge plates Download PDFInfo
- Publication number
- CN105970818A CN105970818A CN201610375862.1A CN201610375862A CN105970818A CN 105970818 A CN105970818 A CN 105970818A CN 201610375862 A CN201610375862 A CN 201610375862A CN 105970818 A CN105970818 A CN 105970818A
- Authority
- CN
- China
- Prior art keywords
- groove
- main piston
- piston head
- latch
- bridge plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Body Structure For Vehicles (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
Description
Claims (1)
- The most prefabricated assembled overpass bridge plate installs the bridge plate suspender of equipment, it is characterized in that: it is mainly made up of main piston head (1), pin rod device (2), bridge plate suspension ring (3), main piston head base (4), S-shaped plate (5), drive link (12), round handle (15);Main piston head (1) has pin hole (6), groove A(7), main piston head base (4) is fixed with main piston head (1);Pin rod device (2) is by latch (8), connecting rod (9), quarter butt (10) forms, one end of connecting rod (9) one end and latch (8) is fixed, the upper end of the other end of connecting rod (9) and quarter butt (10) is fixed, the upper end of latch (8) is fluted (11), equipped with bearing A(13 on quarter butt (10));The foot of bridge plate suspension ring (3) is embedded in the concrete of bridge plate (18), and suspension ring are on the bridge floor of bridge plate (18);S-shaped plate (5) has groove B(14), the upper end of drive link (12) is fixed with round handle (15), the lower end of drive link (12) is fixed with S-shaped plate (5) centre of form midpoint, drive link (12) is equipped with bearing B(16), bearing B(16) the side of side and door frame girder (17) fix, drive link (12) can be around bearing B(16) rotate but can not move up and down;The latch (8) of pin rod device (2) penetrates in pin hole (6) and the bridge plate suspension ring (3) of main piston head (1), the quarter butt (10) of pin rod device (2) inserts the groove B(14 of S-shaped plate (5)) in, bearing A(13 on quarter butt (10)) can be along the groove B(14 of S-shaped plate (5)) slide, drive quarter butt (10) along the groove B(14 of S-shaped plate (5)) slide; nullThe operation principle of the present invention is: first rotate round handle (15),Make the groove A(7 of latch (8) all pull-outs main piston head (1)) in,Movable portal crane,Make the groove A(7 of main piston head (1)) alignment bridge plate suspension ring (3),Reversely rotate round handle (15) again,Round handle (15) drives drive link (12) and S-shaped plate (5) around bearing B(16) rotate,The groove B(14 of S-shaped plate (5)) drive again the bearing A(13 on quarter butt (10)) along the groove B(14 of S-shaped plate (5)) and side slip,Effect of contraction due to pin hole (6),Latch (8) and connecting rod (9) can only move left and right,Therefore in latch (8) is gradually pushed pin hole (6) by quarter butt (10) and connecting rod (9),When round handle (15) 90-degree rotation,The bearing A(13 of quarter butt (10)) be just in the groove A(7 of S-shaped plate (5)) outer point,Now latch (8) is pushed fully into interior and pin hole (6) the groove (11) of pin hole (6) and is just directed at bridge plate suspension ring (3),Start the main piston hydraulic system of gantry crane,Main piston head (1) somewhat rises,The groove (11) of latch (8) is by bridge plate suspension ring (3) jack-up of bridge plate (18),The bearing A(13 of quarter butt (10) simultaneously) somewhat can rise with main piston head (1),Due to round handle (15)、Drive link (12) and S-shaped plate (5) can not rise,Therefore,Bearing A(13) at the groove B(14 of S-shaped plate (5)) in somewhat rise,But still at the groove B(14 of S-shaped plate (5)) in,Bridge plate (18) just can be with movement after rising;When, after bridge plate (18) movement to precalculated position, declining main piston head (1), bridge plate (18) is in place, then reversely rotates round handle (15), makes the groove A(7 of latch (8) all pull-outs main piston head (1)) in;Need explanation: when latch (8) is pushed fully in pin hole (6), the centrage of main piston head (1) holds A(13 off axis) the mobile groove A(7 to S-shaped plate (5)) outer point time bearing A(13) distance of central point M is A value;When latch (8) is drawn out in pin hole (6) completely, the centrage of main piston head (1) holds A(13 off axis) the mobile groove A(7 to S-shaped plate (5)) inner side end points time bearing A(13) the distance of central point N be B value, B value is more than or equal to latch (8) from left end pull-out groove A(7 with the difference of A value) the distance C value of right flank.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610375862.1A CN105970818B (en) | 2016-05-31 | 2016-05-31 | Prefabricated assembled overpass bridge plate installs the bridge plate suspender of equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610375862.1A CN105970818B (en) | 2016-05-31 | 2016-05-31 | Prefabricated assembled overpass bridge plate installs the bridge plate suspender of equipment |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105970818A true CN105970818A (en) | 2016-09-28 |
CN105970818B CN105970818B (en) | 2017-07-18 |
Family
ID=57011315
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610375862.1A Active CN105970818B (en) | 2016-05-31 | 2016-05-31 | Prefabricated assembled overpass bridge plate installs the bridge plate suspender of equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105970818B (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2003313824A (en) * | 2002-04-25 | 2003-11-06 | Kajima Corp | Construction method of overhead crossing, overhead crossing and moving frame |
CN203451046U (en) * | 2013-09-17 | 2014-02-26 | 无锡美克申思科技有限公司 | Lifting device |
CN104404888A (en) * | 2014-12-12 | 2015-03-11 | 青岛第一市政工程有限公司 | Large hoisting system allowing gradient to be adjusted in air and application |
CN104828691A (en) * | 2015-04-27 | 2015-08-12 | 中铁工程机械研究设计院有限公司 | Stepless adjustable lifting appliance for large-tonnage eccentric box girders |
CN204690604U (en) * | 2015-04-20 | 2015-10-07 | 中交二公局第二工程有限公司 | A kind of rotating in air suspender being applied to the stiff girder lifting of suspension bridge steel purlin and installing |
WO2015185959A1 (en) * | 2014-06-06 | 2015-12-10 | Soletanche Freyssinet | Method for building a bridge and bridge-building apparatus |
-
2016
- 2016-05-31 CN CN201610375862.1A patent/CN105970818B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2003313824A (en) * | 2002-04-25 | 2003-11-06 | Kajima Corp | Construction method of overhead crossing, overhead crossing and moving frame |
CN203451046U (en) * | 2013-09-17 | 2014-02-26 | 无锡美克申思科技有限公司 | Lifting device |
WO2015185959A1 (en) * | 2014-06-06 | 2015-12-10 | Soletanche Freyssinet | Method for building a bridge and bridge-building apparatus |
CN104404888A (en) * | 2014-12-12 | 2015-03-11 | 青岛第一市政工程有限公司 | Large hoisting system allowing gradient to be adjusted in air and application |
CN204690604U (en) * | 2015-04-20 | 2015-10-07 | 中交二公局第二工程有限公司 | A kind of rotating in air suspender being applied to the stiff girder lifting of suspension bridge steel purlin and installing |
CN104828691A (en) * | 2015-04-27 | 2015-08-12 | 中铁工程机械研究设计院有限公司 | Stepless adjustable lifting appliance for large-tonnage eccentric box girders |
Also Published As
Publication number | Publication date |
---|---|
CN105970818B (en) | 2017-07-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US3053015A (en) | Method of building construction | |
CN107504263B (en) | Internal expansion type pipe jacking withdrawal and stopping device, system and method | |
CN104563491B (en) | Application method of the convenient hydraulic from clambing shuttering | |
BR112015021465A2 (en) | building system | |
CN107761722B (en) | Device and method for improving pile side bearing capacity of steel pipe pile | |
US20160144908A1 (en) | Rig movement and rotation assembly | |
CN204920172U (en) | Elevartor shaft operation platform | |
CN105970818A (en) | Bridge plate lifting device of installation equipment for prefabricated and assembled type viaduct bridge plates | |
CN105672231A (en) | Pile shoe structure for self-elevating drilling platform | |
CN104278803A (en) | Reinforced concrete stair sliding support | |
DE202012011083U1 (en) | Device for acoustic testing of components | |
WO2012025645A3 (en) | Semi-prefabricated building and associated construction method | |
RU2536534C2 (en) | Double-armature mechanical packer | |
KR100646166B1 (en) | Climbing apparatus of placing boom for construction works | |
CN205742245U (en) | A kind of concrete prefabricated assembled foundation for tower crane | |
KR101646157B1 (en) | Device of slip form hydraulic jack including safety device | |
EP1849926A3 (en) | Mobile partition wall | |
US20110223272A1 (en) | Apparatus for slipform casting | |
KR20180013643A (en) | Gangform climbing apparatus | |
KR200366291Y1 (en) | Wall form climbing system for constructing concrete wall of high-rise buldings | |
CN204174853U (en) | Reinforced concrete stairs sliding support | |
CN205776992U (en) | Drawing and pulling type lifting floor | |
CN105804081B (en) | The device of horizontal grouting ductule is extracted and be pressed into a kind of narrow and small place | |
CN110616826B (en) | Sliding shock isolation device of girderless masonry structure | |
CN104048109B (en) | A kind of hanging structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C41 | Transfer of patent application or patent right or utility model | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20161018 Address after: Room 2, building 457, Huangpu Road, Huangdao, Shandong, Qingdao, 266555, China Applicant after: Qingdao Lantian Chuangxian Technology Services Limited Address before: 430064, Wuhan, Hubei province Hongshan District lion mountain street, school 84, 73, 7, 2 room Applicant before: WUHAN CHUANGXIAN PATENT TECHNOLOGY SERVICE CO., LTD. |
|
CB03 | Change of inventor or designer information |
Inventor after: Ye Feng Inventor after: Peng Baoan Inventor before: Peng Baoan |
|
CB03 | Change of inventor or designer information | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20200918 Address after: 239000 No.66 Tianle Road, Chuzhou City, Anhui Province Patentee after: ANHUI SANJIANG CONSTRUCTION ENGINEERING Co.,Ltd. Address before: Room 2, building 457, Huangpu Road, Huangdao, Shandong, Qingdao, 266555, China Patentee before: QINGDAO LANTIAN CHUANGXIAN TECHNOLOGY SERVICE Co.,Ltd. |
|
TR01 | Transfer of patent right |