CN105965212A - Manufacturing technological method for manufacturing tee joint through double-metal compound steel plate - Google Patents

Manufacturing technological method for manufacturing tee joint through double-metal compound steel plate Download PDF

Info

Publication number
CN105965212A
CN105965212A CN201610471554.9A CN201610471554A CN105965212A CN 105965212 A CN105965212 A CN 105965212A CN 201610471554 A CN201610471554 A CN 201610471554A CN 105965212 A CN105965212 A CN 105965212A
Authority
CN
China
Prior art keywords
threeway
welding
steel plate
pipe
coating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610471554.9A
Other languages
Chinese (zh)
Other versions
CN105965212B (en
Inventor
祭立柱
韩木杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Hengtong Pipe Fittings Group Co ltd
Original Assignee
HEBEI YUPENG HEAVY INDUSTRY PIPELINE EQUIPMENT MANUFACTURING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HEBEI YUPENG HEAVY INDUSTRY PIPELINE EQUIPMENT MANUFACTURING Co Ltd filed Critical HEBEI YUPENG HEAVY INDUSTRY PIPELINE EQUIPMENT MANUFACTURING Co Ltd
Priority to CN201610471554.9A priority Critical patent/CN105965212B/en
Publication of CN105965212A publication Critical patent/CN105965212A/en
Application granted granted Critical
Publication of CN105965212B publication Critical patent/CN105965212B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P15/00Making specific metal objects by operations not covered by a single other subclass or a group in this subclass
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L41/00Branching pipes; Joining pipes to walls
    • F16L41/02Branch units, e.g. made in one piece, welded, riveted

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Pressure Welding/Diffusion-Bonding (AREA)
  • Heat Treatment Of Steel (AREA)
  • Heat Treatment Of Articles (AREA)

Abstract

The invention discloses a manufacturing technological method for manufacturing a tee joint through a double-metal compound steel plate. The manufacturing technological method comprises the technological steps of purchase and rechecking of raw materials; welding thermal treatment simulated experiment, and product technology presetting; blanking and steel tube prefabrication; rolled tube welding; compression molding; thermal treatment; treatment of inner and outer surfaces; nondestructive inspection; groove processing; pickling and passivating treatment; and finished product detection.

Description

A kind of bimetallic clad steel plate threeway method of manufacturing technology
Technical field
The present invention relates to produce metal tube, the process of metal tube and tubing technical field, particularly a kind of bimetallic clad steel plate threeway method of manufacturing technology by the mode of rolling.
Background technology
Before carrying out dual-metal clad steel pipe part (pipe line steel+N08825) trial-production at home, external pipe fitting manufacturing enterprise has produced composite pipe product, and in Turkmenistan natural gas line conveying engineering one phase project, apply, but the nickel base alloy layer of external product uses bead-welding technology, from technical standpoint, there is difficulty, and expensive, delivery cycle is longer, so in the second stage of the project oil base oneself upon support the domestic trial-production having the Ji Jia supplier of mature experience and good achievement to carry out new product at conventional oil and gas pipes.
Summary of the invention
It is an object of the invention to provide a kind of stable mechanical performance, the bimetallic clad steel plate threeway method of manufacturing technology that efficiency is high.
This technique is by studying three universal steel plate component analyses, performance evaluation after three-way welding technique and threeway heat treatment, determine wlding choose, welding condition and Technology for Heating Processing, after making shaping and heat treatment, mechanical performance and the metallographic structure of threeway meet standard-required.
Choose suitable wlding and reasonable welding procedure;
Take the Technology for Heating Processing of repeated hardening.
Threeway manufacture main technological steps (see Fig. 1):
(1) raw-material buying, reinspection:
Buying belongs to metallurgical compound Explosion composite steel plate (high-strength steel+Nickel-Based Steel), and the material of buying is carried out chemistry one-tenth
Divide, mechanical performance, adhesive strength, corrosion resistance etc. are checked and test, carry out ultrasound examination one by one simultaneously, detect
Whether base material exists internal flaw and whether faying face has peeling.
(2) sweating heat processes simulation experiment, Product Process makes a reservation for
Through rechecking the test plate (panel) extracting three pieces of 300mm*600mm in qualified sheet stock, output the groove of X-type at the centre plasma that plate is wide along long side direction, and groove is polished the heat affected area of metallic luster removal cutting, these three pieces of test plate (panel)s are welded into test piece for welding according to welding manner N06625 welding wire and the CHE607GX welding rod of the welding procedure analog roll sealing of tube of assessment of conformity, test piece for welding is after Non-Destructive Testing is qualified, determine the common heat treatment temperature parameter area being suitable for of bi-material, in this range, preferably go out most suitably used concrete heating and heat treatment parameter;
(3) blanking, steel pipe prefabricated
According to product and technological requirement, by art work sheet setting-out on steel plate, cutting stock, select numerical control cutting machine cutting;Design specialized cutting produces district, it is ensured that material blanking accurate;
(4) pipe crimping welding
According to technological requirement, steel plate is rolled into drum by veneer reeling machine, and pipe longitudinal joint is welded, form, after the circle of school, the blank manufacturing threeway;nullBefore roll bending,Fibre board on clad surface bedding,Avoid that coiling process occurring, coating metal scratches to contact with carbon steel tooling device with coating,Ensure to hold successfully after X-type groove staggered edge free and straight flange phenomenon at boil on the nape opposite the mouth,After the method ground with machinery in groove is removed the heat affected area of thermal cutting,With rustless steel wire wheel by clean for the polishing of each in groove and both sides 50mm inner surface,According to the welding procedure of the assessment of conformity basic unit to pipe、Transition zone、Coating successively welds,Basic unit is monitored at any time during welding、Transition zone、Coating throat thickness,Reach standard-required,The strictest heat input controlling welding and interlayer temperature,And the degree of gas shield and the cleanliness factor of successively back chipping,Ensure that welding bead quality reaches highest standard,Avoid there is pore、Slag inclusion lacks,Source of corrosion is caused to pipe fitting,The most both ensure that deposited metal possessed good mechanical property,Improve again its erosion-resisting ability;
(5) compressing
nullHeat within the three-way pipe billet that Non-Destructive Testing is qualified loads gas heating furnace after welding job is completed,Carry out compression molding on a hydraulic press,Its overall process operation is: flattens three bulge perforate redraing arm supervisor school circles of fourth contact and goes to hold round mouth,In pressing process, the first pipe to be ensured presses predetermined heating schedule heating,Control programming rate≤200 DEG C/h,It is warming up to 950 DEG C ± 10 DEG C and is incubated compacting of coming out of the stove for 30 ± 10min minute,The strict immersion amount controlling base pipe weld seam side body during bulge,Ensure that immersion line flushes with the tyre bead of the placenta going out arm,And strictly monitor whole under press through journey,Control threeway sidewall and do not allow that some indent phenomenons occur,Avoid coating metal that fold occurs,In forming process,High temperature resistant Pulvis Talci is all coated with all moulds of industrial equipment surfaces of coating contacts,Both lubrication can have been played,When can avoid again pipe fitting high temperature, coating contacts with carbon steel moulds of industrial equipment,Pipe must be placed on outside stove after every time compacting or drawing and reenter stove when the temperature until pipe is down to below AC1 and carry out post bake,Thus avoid the variant part bit length phase to be in lower change point temperatures above continuously and cause metal grain degree superheating phenomenon such as thick grade to occur,Due good organization state before product had not only had the round and smooth presentation quality of standard but also had heat treatment is controlled by process above,Three-way forming、Remove end、After the circle of school, its key dimension is measured;
(6) heat treatment
Tempering heat treatment process is added according to quenching, during quenching, charging temperature≤300 DEG C, programming rate controls at≤200 DEG C/h, is warming up to insulation when 940 DEG C~960 DEG C, temperature retention time controls 30~45min, cooling down in pure water, charging temperature≤300 DEG C during tempering, programming rate controls at≤200 DEG C/h, being warming up to insulation when 520 DEG C~560 DEG C, temperature retention time controls to cool down in atmosphere 40~60min;
(7) inner and outer surfaces processes
Threeway surfaces externally and internally is carried out reconditioning process;Process grade and reach Sa3.2 level;
(8) nondestructive inspection
Threeway body is carried out penetrant inspection and ultrasonic inspection;Butt welded seam carries out radiographic inspection and ultrasonic inspection;
(9) groove
Threeway pipe end is machined out groove, it is ensured that coating inner diameter deviation < 0.5mm, coating wall thickness deviation+2mmm/-0.5mm.
(10) acid wash passivation processes
Utilize acid wash passivation liquid that threeway inwall carries out brushing acid wash passivation process, qualified after carry out the cleaning at residual night and be dried.
(11) finished product detection
By standard, finished product threeway is carried out piece by piece physical dimension and shape position error detection on platform, carry out Non-Destructive Testing piece by piece simultaneously.And extract sample part carry out physicochemical property and corrosion resistance detection.
Accompanying drawing explanation
Fig. 1 is bimetallic clad steel plate threeway manufacturing process process chart
Detailed description of the invention
The present invention is described in further detail below.
(1) raw-material buying, reinspection:
The Explosion composite steel plate that buying Sichuan Jinglei Science & Technology Co., Ltd. produces, and the material of buying is carried out the inspections such as chemical composition, mechanical performance, adhesive strength, corrosion resistance and test, carrying out ultrasound examination one by one, detection base material whether there is internal flaw and whether faying face has peeling simultaneously.
(2) sweating heat processes simulation experiment, Product Process makes a reservation for
Through rechecking the test plate (panel) extracting three pieces of 300mm*600mm in qualified sheet stock, output the groove of X-type at the centre plasma that plate is wide along long side direction, and groove is polished the heat affected area of metallic luster removal cutting, these three pieces of test plate (panel)s are welded into test piece for welding according to welding manner N06625 welding wire and the CHE607GX welding rod of the welding procedure analog roll sealing of tube of assessment of conformity, test piece for welding is after Non-Destructive Testing is qualified, determine the common heat treatment temperature parameter area being suitable for of bi-material, in this range, preferably go out most suitably used concrete heating and heat treatment parameter;
The heat treatment process parameter of test piece for welding and results of property such as following table:
(3) blanking, steel pipe prefabricated
According to product and technological requirement, by art work sheet setting-out on steel plate, cutting stock, select numerical control cutting machine cutting;Design specialized cutting produces district, it is ensured that material blanking accurate;
(4) pipe crimping welding
The threeway specification of this trial-production is φ 610 × 610 × 610 × 29mm equal tee, according to design, steel plate is rolled on large-scale rolling machine the tubular pipe of φ 780 × 975mm, before roll bending, fibre board on clad surface bedding, it is to avoid occur in coiling process that coating metal scratches and contact with carbon steel tooling device with coating.Ensure to hold successfully after X-type groove staggered edge free and straight flange phenomenon at boil on the nape opposite the mouth.By remove the heat affected area of thermal cutting in groove by the method for machinery mill after, with rustless steel wire wheel by clean for the polishing of each in groove and both sides 50mm inner surface, according to the welding procedure of assessment of conformity, the basic unit of pipe, transition zone, coating are successively welded.Basic unit, excessive layer, coating throat thickness is monitored at any time during welding; reach standard-required; the strictest heat input controlling welding and interlayer temperature; and the degree of gas shield and the cleanliness factor of successively back chipping; ensure that welding bead quality reaches highest standard, it is to avoid there is the shortcoming such as pore, slag inclusion, cause source of corrosion to pipe fitting; the most both ensure that deposited metal possessed good mechanical property, improve again its erosion-resisting ability.According to the requirement (internal diameter φ 569) of threeway internal diameter alignment, the threeway mold that external diameter is 635mm that my company uses specialized designs to make is suppressed.
(5) compressing
nullHeat within the three-way pipe billet that Non-Destructive Testing is qualified loads gas heating furnace after welding job is completed,Carry out compression molding on a hydraulic press,Its overall process operation is: flattens three bulge perforate redraing arm supervisor school circles of fourth contact and goes to hold round mouth,In pressing process, the first pipe to be ensured presses predetermined heating schedule heating,Control programming rate≤200 DEG C/h,It is warming up to 950 DEG C ± 10 DEG C and is incubated compacting of coming out of the stove for 30 ± 10min minute,The strict immersion amount controlling base pipe weld seam side body during bulge,Ensure that immersion line flushes with the tyre bead of the placenta going out arm,And strictly monitor whole under press through journey,Control threeway sidewall and do not allow that some indent phenomenons occur,Avoid coating metal that fold occurs,In forming process,High temperature resistant Pulvis Talci is all coated with all moulds of industrial equipment surfaces of coating contacts,Both lubrication can have been played,When can avoid again pipe fitting high temperature, coating contacts with carbon steel moulds of industrial equipment,Pipe must be placed on outside stove after every time compacting or drawing and reenter stove when the temperature until pipe is down to below AC1 and carry out post bake,Thus avoid the variant part bit length phase to be in lower change point temperatures above continuously and cause metal grain degree superheating phenomenon such as thick grade to occur,Due good organization state before product had not only had the round and smooth presentation quality of standard but also had heat treatment is controlled by process above,Three-way forming、Remove end、After the circle of school, its key dimension is measured;, result meets the requirement of machining finished product, and measured value see table:
Threeway end key dimension measured value unit: mm after molding
(6) heat treatment
Tempering heat treatment process is added according to quenching, during quenching, charging temperature≤300 DEG C, programming rate controls at≤200 DEG C/h, is warming up to insulation when 940 DEG C~960 DEG C, temperature retention time controls 30~45min, cooling down in pure water, charging temperature≤300 DEG C during tempering, programming rate controls at≤200 DEG C/h, being warming up to insulation when 520 DEG C~560 DEG C, temperature retention time controls to cool down in atmosphere 40~60min;
(7) inner and outer surfaces processes
Threeway surfaces externally and internally is carried out reconditioning process;Process grade and reach Sa3.2 level;
(8) nondestructive inspection
Threeway body is carried out penetrant inspection and ultrasonic inspection;Butt welded seam carries out radiographic inspection and ultrasonic inspection;
(9) groove
Threeway pipe end is machined out groove, it is ensured that coating inner diameter deviation < 0.5mm, coating wall thickness deviation+2mmm/-0.5mm.
(10) acid wash passivation processes
Utilize acid wash passivation liquid that threeway inwall carries out brushing acid wash passivation process, qualified after carry out the cleaning at residual night and be dried.
(11) finished product detection
By standard, finished product threeway is carried out piece by piece physical dimension and shape position error detection on platform, carry out Non-Destructive Testing piece by piece simultaneously.And extract sample part carry out physicochemical property and corrosion resistance detection.
Bimetallic clad steel plate system (L415MS+N08825) threeway has passed through China Research Inst. of Petroleum and Natural-Gas Piping Science's testing of materials center (mechanical property) and the detection evaluation of China University Of Petroleum Beijing's (corrosion resistance test), mechanics properties testing report is shown in " threeway report number: PMC-N1311775-CZHT ", threeway corrosion resistance test report number: 2013 oil glyphomancy [M] No. 306, No. 266, No. 267, No. 268, No. 269, No. 270, No. 272, No. 273, No. 274.Product design reasonable quality is reliable and stable, has reached the object performance index of similar products at home and abroad.
Above-described embodiment is only for technology design and the feature of the explanation present invention; its object is to allow the personage being familiar with this art will appreciate that present disclosure and to be carried out; can not limit the scope of the invention with this; all equivalence changes made according to spirit of the invention or modification; effect is similar, all should contain within the scope of the present invention.

Claims (6)

1. a bimetallic clad steel plate threeway method of manufacturing technology, it is characterised in that its processing step is:
(1) raw-material buying, reinspection:
Buying belongs to metallurgical compound Explosion composite steel plate, and the raw material Explosion composite steel plate of buying is carried out chemical composition, machine Tool performance, adhesive strength, the inspection of corrosion resistance and test, carry out ultrasound examination simultaneously one by one, and detection base material is No there is internal flaw and whether faying face has peeling;
(2) sweating heat processes simulation experiment, Product Process makes a reservation for
The sheet stock qualified through reinspection extracts the test plate (panel) of three pieces of 300mm*600mm, wide at plate along long side direction Centre plasma outputs the groove of X-type, and groove polish the heat affected area that metallic luster removal is cut, these three pieces examinations Plate welds with N06625 welding wire and CHE607GX welding rod according to the welding manner of the welding procedure analog roll sealing of tube of assessment of conformity Becoming test piece for welding, test piece for welding, after Non-Destructive Testing is qualified, determines the common heat treatment temperature parameter being suitable for of bi-material Scope;
(3) blanking, steel pipe prefabricated
According to product and technological requirement, by art work sheet setting-out on steel plate, cutting stock;
(4) pipe crimping welding
According to technological requirement, steel plate is rolled into drum by veneer reeling machine, and pipe longitudinal joint is welded, formed after the circle of school Manufacture the blank of threeway;Before roll bending, fibre board on clad surface bedding, it is to avoid coiling process occurs coating metal scratch and Coating contacts with carbon steel tooling device, it is ensured that hold after X-type groove staggered edge free and straight flange phenomenon at boil on the nape opposite the mouth successfully, will be with machinery in groove After the method for mill removes the heat affected area of thermal cutting, with rustless steel wire wheel, each in groove and both sides 50mm inner surface is polished Totally, according to the welding procedure of assessment of conformity, the basic unit of pipe, transition zone, coating are successively welded, during welding at any time Monitoring basic unit, transition zone, coating throat thickness;
(5) compressing
Heat within the three-way pipe billet that Non-Destructive Testing is qualified loads gas heating furnace after welding job is completed, enter on a hydraulic press Row compression molding;
(6) heat treatment
Adding tempering heat treatment process according to quenching, during quenching, charging temperature≤300 DEG C, programming rate controls at≤200 DEG C/h, rises Temperature is incubated to when 940 DEG C~960 DEG C, and temperature retention time controls 30~45min, cools down, charging temperature during tempering in pure water ≤ 300 DEG C, programming rate controls at≤200 DEG C/h, is warming up to insulation when 520 DEG C~560 DEG C, and temperature retention time controls 40~60min Cool down in atmosphere;
(7) inner and outer surfaces processes
Threeway surfaces externally and internally is carried out reconditioning process;Process grade and reach Sa3.2 level;
(8) nondestructive inspection
Threeway body is carried out penetrant inspection and ultrasonic inspection;Butt welded seam carries out radiographic inspection and ultrasonic inspection;
(9) groove
Threeway pipe end is machined out groove, it is ensured that coating inner diameter deviation < 0.5mm, coating wall thickness deviation+2mm/-0.5mm;
(10) acid wash passivation processes
Utilize acid wash passivation liquid that threeway inwall carries out brushing acid wash passivation process, qualified after carry out the cleaning at residual night and be dried;
(11) finished product detection
By standard, finished product threeway is carried out piece by piece physical dimension and shape position error detection on platform, carry out Non-Destructive Testing piece by piece simultaneously; And extract sample part carry out physicochemical property and corrosion resistance detection.
A kind of bimetallic clad steel plate threeway method of manufacturing technology the most according to claim 1, it is characterised in that step Suddenly the Explosion composite steel plate in (1) uses high-strength steel to be combined mutually with Nickel-Based Steel.
A kind of bimetallic clad steel plate threeway method of manufacturing technology the most according to claim 1, it is characterised in that step (2) also include the common heat treatment temperature parameter area being suitable for according to bi-material suddenly, determines most suitably used concrete Heating and the step of heat treatment parameter.
A kind of bimetallic clad steel plate threeway method of manufacturing technology the most according to claim 1, it is characterised in that step Suddenly cutting described in (3) selects numerical control cutting machine to cut in cutting production district, it is ensured that the accurate cutting of material blanking.
A kind of bimetallic clad steel plate threeway method of manufacturing technology the most according to claim 1, it is characterised in that step Suddenly heat input and interlayer temperature to welding in welding process in (4), and the degree of gas shield and successively back chipping Cleanliness factor detects and controls.
A kind of bimetallic clad steel plate threeway method of manufacturing technology the most according to claim 1, it is characterised in that step Suddenly in (5), the operation of compression molding includes: flatten three bulge perforate redraing arm supervisor schools of fourth contact Circle goes to hold round mouth, and in pressing process, the first pipe to be ensured presses the heating of predetermined heating schedule, control programming rate≤ 200 DEG C/h, it is warming up to 950 DEG C ± 10 DEG C, is incubated compacting of coming out of the stove for 30 ± 10min minute, strictly controls during bulge The immersion amount of base pipe weld seam side body, it is ensured that immersion line flushes with the tyre bead of the placenta going out arm, and strictly monitors whole Press through journey under individual, control threeway sidewall and do not allow that some indent phenomenons occur, it is to avoid fold, molding occurs in coating metal Cheng Zhong, all coats high temperature resistant Pulvis Talci with all moulds of industrial equipment surfaces of coating contacts, and pipe is in every time compacting or draws Must be placed on outside stove the temperature until pipe after pulling out to be down to during below AC1 reenter stove and carry out post bake, threeway becomes Type, go end, school circle after its key dimension is measured.
CN201610471554.9A 2016-06-24 2016-06-24 A kind of bimetallic clad steel plate threeway method of manufacturing technology Active CN105965212B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610471554.9A CN105965212B (en) 2016-06-24 2016-06-24 A kind of bimetallic clad steel plate threeway method of manufacturing technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610471554.9A CN105965212B (en) 2016-06-24 2016-06-24 A kind of bimetallic clad steel plate threeway method of manufacturing technology

Publications (2)

Publication Number Publication Date
CN105965212A true CN105965212A (en) 2016-09-28
CN105965212B CN105965212B (en) 2018-04-20

Family

ID=57019188

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610471554.9A Active CN105965212B (en) 2016-06-24 2016-06-24 A kind of bimetallic clad steel plate threeway method of manufacturing technology

Country Status (1)

Country Link
CN (1) CN105965212B (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107009100A (en) * 2017-05-11 2017-08-04 山东电力建设第工程公司 A kind of new big footpath skew T preparation method
CN108561641A (en) * 2018-06-20 2018-09-21 长兴云腾新能源科技有限公司 A kind of manufacturing process of semiconductor high-cleanness stainless steel pipe fitting
CN108723721A (en) * 2018-06-11 2018-11-02 江阴中南重工有限公司 Sandwich is molded the manufacturing method of threeway
CN108942085A (en) * 2017-05-17 2018-12-07 中科智远信息科技有限公司 Radar fixing frame hole forming process
CN109465610A (en) * 2019-01-10 2019-03-15 河北宇鹏重工科技有限公司 A kind of technique using the manufacture low temperature molding threeway of X80 steel plate
CN109487117A (en) * 2018-12-29 2019-03-19 江苏万源新材料股份有限公司 A kind of production technology of reducing copper threeway
CN109514197A (en) * 2018-11-27 2019-03-26 泉州市精英阀业有限公司 A kind of production method of automatic closure furnace body valve
CN109732295A (en) * 2019-02-26 2019-05-10 无锡市星达石化配件有限公司 A kind of pipeline spigot-and-socket pipe fitting method for shaping
CN111015077A (en) * 2018-10-10 2020-04-17 江苏升创管业有限公司 Manufacturing process of handrail tube for rail transit
CN114227148A (en) * 2021-11-17 2022-03-25 山东天晟机械装备股份有限公司 Machining device and machining process for special steel plate for hydraulic support structural part
CN115555805A (en) * 2022-09-30 2023-01-03 陕西飞机工业有限责任公司 Large-diameter airplane guide pipe digital manufacturing method
CN117961446A (en) * 2024-03-28 2024-05-03 河北汇中管道装备有限公司 Bimetal composite pipe fitting and preparation method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102284671A (en) * 2010-06-21 2011-12-21 中国石油天然气集团公司 Manufacturing process method for high-steel-grade large-aperture thick-wall tee joint
CN103317306A (en) * 2013-06-09 2013-09-25 宝鸡石油钢管有限责任公司 Spiral seam thermometal composite welded pipe manufacturing method
CN103350320A (en) * 2012-12-27 2013-10-16 华东理工大学 Production method of corrosion-resistant bimetal composite pipe
CN103722346A (en) * 2013-12-25 2014-04-16 江苏玉龙钢管股份有限公司 Corrosion-resistant metallurgical composite bimetal longitudinal submerged-arc welded steel pipe and method for manufacturing same
CN105171349A (en) * 2015-09-14 2015-12-23 上海海隆复合钢管制造有限公司 Preparation method for hydraulic pressure composite thermometal oil pipe
CN105690910A (en) * 2016-01-15 2016-06-22 宝山钢铁股份有限公司 9Ni steel and stainless steel composite steel plate for LNG storage tank and movable vessel and manufacturing method of composite steel plate

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102284671A (en) * 2010-06-21 2011-12-21 中国石油天然气集团公司 Manufacturing process method for high-steel-grade large-aperture thick-wall tee joint
CN103350320A (en) * 2012-12-27 2013-10-16 华东理工大学 Production method of corrosion-resistant bimetal composite pipe
CN103317306A (en) * 2013-06-09 2013-09-25 宝鸡石油钢管有限责任公司 Spiral seam thermometal composite welded pipe manufacturing method
CN103722346A (en) * 2013-12-25 2014-04-16 江苏玉龙钢管股份有限公司 Corrosion-resistant metallurgical composite bimetal longitudinal submerged-arc welded steel pipe and method for manufacturing same
CN105171349A (en) * 2015-09-14 2015-12-23 上海海隆复合钢管制造有限公司 Preparation method for hydraulic pressure composite thermometal oil pipe
CN105690910A (en) * 2016-01-15 2016-06-22 宝山钢铁股份有限公司 9Ni steel and stainless steel composite steel plate for LNG storage tank and movable vessel and manufacturing method of composite steel plate

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
林阳: "双金属复合钢管制备工艺及性能研究", 《中国优秀硕士学位论文全文数据库(工程科技I辑)》 *
赵红玉等: "双金属复合管件及管道预制成套工艺研究", 《华北六省区锻压技术文集(2012)》 *

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107009100B (en) * 2017-05-11 2019-10-11 山东电力建设第一工程公司 A kind of novel major diameter skew T production method
CN107009100A (en) * 2017-05-11 2017-08-04 山东电力建设第工程公司 A kind of new big footpath skew T preparation method
CN108942085A (en) * 2017-05-17 2018-12-07 中科智远信息科技有限公司 Radar fixing frame hole forming process
CN108723721A (en) * 2018-06-11 2018-11-02 江阴中南重工有限公司 Sandwich is molded the manufacturing method of threeway
CN108561641A (en) * 2018-06-20 2018-09-21 长兴云腾新能源科技有限公司 A kind of manufacturing process of semiconductor high-cleanness stainless steel pipe fitting
CN111015077A (en) * 2018-10-10 2020-04-17 江苏升创管业有限公司 Manufacturing process of handrail tube for rail transit
CN109514197A (en) * 2018-11-27 2019-03-26 泉州市精英阀业有限公司 A kind of production method of automatic closure furnace body valve
CN109514197B (en) * 2018-11-27 2021-01-15 泉州市精英阀业有限公司 Manufacturing method of automatic closing furnace body valve
CN109487117A (en) * 2018-12-29 2019-03-19 江苏万源新材料股份有限公司 A kind of production technology of reducing copper threeway
CN109465610A (en) * 2019-01-10 2019-03-15 河北宇鹏重工科技有限公司 A kind of technique using the manufacture low temperature molding threeway of X80 steel plate
CN109732295A (en) * 2019-02-26 2019-05-10 无锡市星达石化配件有限公司 A kind of pipeline spigot-and-socket pipe fitting method for shaping
CN114227148A (en) * 2021-11-17 2022-03-25 山东天晟机械装备股份有限公司 Machining device and machining process for special steel plate for hydraulic support structural part
CN115555805A (en) * 2022-09-30 2023-01-03 陕西飞机工业有限责任公司 Large-diameter airplane guide pipe digital manufacturing method
CN117961446A (en) * 2024-03-28 2024-05-03 河北汇中管道装备有限公司 Bimetal composite pipe fitting and preparation method thereof

Also Published As

Publication number Publication date
CN105965212B (en) 2018-04-20

Similar Documents

Publication Publication Date Title
CN105965212B (en) A kind of bimetallic clad steel plate threeway method of manufacturing technology
CN106112389B (en) A kind of bimetallic clad steel plate elbow method of manufacturing technology
CN102284671B (en) Manufacturing process method for high-steel-grade large-aperture thick-wall tee joint
CN110052792B (en) Manufacturing method of cylinder barrel for hydraulic cylinder
CN101811154A (en) Method for producing hot-bending elbow
WO2022095271A1 (en) Method for preparing multilayer metal composite pipe
CN108226210B (en) Thermal simulation method for preparing stainless steel/carbon steel composite ribbed steel bar
CN106938285A (en) A kind of manufacture method of stainless steel square tube
CN103710715A (en) Cold-drawing and cold-rolling mixed molding method of stainless steel seamless pipe
CN102248372A (en) Method for producing single-sided composite stainless steel cold rolling base stock
CN113084459B (en) Continuous intelligent forming process for stainless steel straight welded pipe
CN102560057A (en) Heat treatment process method and system for hot rolled seamless steel tubes
CN105414902A (en) Manufacturing method of closure head of nuclear equipment
CN112170520A (en) Production method and production system of 110-steel-grade super dual-phase steel seamless steel pipe
CN105864427A (en) Ultrahigh pressure container and manufacturing method
CN106140865B (en) The preparation method of seamless steel pipe
CN115890039A (en) Welding manufacturing method of steam turbine hollow blade
Elshalakany et al. An experimental investigation of the formability of low carbon steel tailor-welded blanks of different thickness ratios
JP4593399B2 (en) Manufacturing method of UO steel pipe excellent in low temperature crack resistance and UO steel pipe
CN104786013A (en) Manufacturing method for nickel board end sockets
CN101543873B (en) Method for manufacturing butt welding pipe cap by shaping thermoformed composite stainless steel plate
CN100392153C (en) Process of composite stainless steel / copper double metal rod
KR20210007628A (en) Manufacturing Method for High-Manganese Cold Drawn Steel Pipes for Cryogenic Usage for the Shipbuilding and Marine Plant and the High-Manganese Cold Drawn Steel Pipes Thereof
Aslani et al. Spiral welded tubes-imperfections, residual stresses, and buckling characteristics
CN109175659A (en) A kind of metal composite products combination interface localization method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 061300 Zhenggang Industrial Park, Yanshan County, Cangzhou City, Hebei Province

Patentee after: Hebei Hengtong Group Yupeng Heavy Engineering Technology Co.,Ltd.

Address before: 061300 Zhenggang Industrial Park, Yanshan County, Cangzhou City, Hebei Province

Patentee before: HEBEI YUPENG HEAVY INDUSTRY TECHNOLOGY Co.,Ltd.

Address after: 061300 Zhenggang Industrial Park, Yanshan County, Cangzhou City, Hebei Province

Patentee after: HEBEI YUPENG HEAVY INDUSTRY TECHNOLOGY Co.,Ltd.

Address before: 061300 Zhenggang Industrial Park, Yanshan County, Cangzhou City, Hebei Province

Patentee before: HEBEI YUPENG HEAVY INDUSTRY PIPELINE EQUIPMENT MANUFACTURING Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210611

Address after: 061000 houhan village, Hanji Town, Yanshan County, Cangzhou City, Hebei Province

Patentee after: Hebei Hengtong Pipe Fittings Group Co.,Ltd.

Address before: 061300 Zhenggang Industrial Park, Yanshan County, Cangzhou City, Hebei Province

Patentee before: Hebei Hengtong Group Yupeng Heavy Engineering Technology Co.,Ltd.