CN105964966A - Hot delivery and hot charging process for bloom casting blanks - Google Patents

Hot delivery and hot charging process for bloom casting blanks Download PDF

Info

Publication number
CN105964966A
CN105964966A CN201610494405.4A CN201610494405A CN105964966A CN 105964966 A CN105964966 A CN 105964966A CN 201610494405 A CN201610494405 A CN 201610494405A CN 105964966 A CN105964966 A CN 105964966A
Authority
CN
China
Prior art keywords
strand
insulation cover
car
thermal insulation
thermal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610494405.4A
Other languages
Chinese (zh)
Other versions
CN105964966B (en
Inventor
宋金平
李林
杨利委
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Iron and Steel Co Ltd
Original Assignee
Nanjing Iron and Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Iron and Steel Co Ltd filed Critical Nanjing Iron and Steel Co Ltd
Priority to CN201610494405.4A priority Critical patent/CN105964966B/en
Publication of CN105964966A publication Critical patent/CN105964966A/en
Application granted granted Critical
Publication of CN105964966B publication Critical patent/CN105964966B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D11/00Continuous casting of metals, i.e. casting in indefinite lengths
    • B22D11/16Controlling or regulating processes or operations

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Metal Rolling (AREA)

Abstract

The invention discloses a hot delivery and hot charging process for bloom casting blanks, comprising the steps of firstly, additionally providing a heat insulation cover on a roller way where casting blanks do not enter a tension leveler and a heat insulation cover on a roller way located between a position that the casting blanks exit out of the tension leveler and a flame cutting position to perform heat insulation; before loading the casting blanks in a truck, firstly confirming a ventilation condition of a workshop to prevent convective wind from happening in a hot charging region; secondly, carrying out preliminary quality monitoring, firstly picking out abnormally-produced casting blanks in time in combination with operation monitoring of process equipment and online site inspection; thirdly, rapidly collecting the casting blanks, keeping the surface temperatures of the casting blanks at 555-625 DEG C before loading the casting blanks in the truck, and transporting the casting blanks in a way that one boiler steel is provided for one truck; and fourthly, transporting the casting blanks by using a heat insulation truck, delivering the casting blanks to a steel mill and waiting for entering a heating furnace once finishing the operation of loading the casting blanks in the truck, wherein the travel time is shorter than 50min; and when reaching the steel mill, unloading the casting blanks from the truck in time, and charging the casting blanks into the heating furnace, wherein the surface temperatures of the casting blanks need exceed 450 DEG C before the casting blanks are charged into the heating furnace, and meanwhile, the unloading and furnace charging time does not exceed 60min.

Description

A kind of technique of bloom strand hot delivery and hot charging
Technical field
The present invention relates to continuous casting process, the technique of a kind of bloom strand hot delivery and hot charging.
Background technology
Iron and steel enterprise is the major power consumer in Industrial-Enterprises in China, and heater for rolling steel is production equipment important during iron and steel produces, and is also one of main energy consumption equipment.Energy-saving and cost-reducing, fundamentally reduce the cost of product, improve the economic performance of product, be the important means of the product commercially competitiveness improving oneself.For heater for rolling steel, in the past few decades, for fully excavating its energy-saving potential, Chinese scholars conducts extensive research for it and explores, and achieves and significantly apply effect, has greatly promoted the progress that reheating furnace energy-saving works.Such as: strengthen production management, improve, improve furnace construction, make full use of high-efficiency energy-saving technology equipment etc..The hot delivery and hot charging technology of heating furnace material base, was once listed in heating furnace and saved the important means of fuel reduction unit consumption.
Implement hot delivering technology of CC billets, it is necessary to assure the high temperature slab quality height produced and good stability, therefore continuous casting technology level plays a very important role in heat send engineering.In order to ensure that continuous casting produces normal, to improve conticaster operating rate, unplanned the breaking of continuous casting need to be strengthened further and water tackling key problem, thus the impact that reduction accident heat is stopped work.And by strengthening organization of production, improving smelting and continuous casting operation level, strengthening device spot check to ensure the direct motion of hot delivering technology of CC billets.Hot delivering technology of CC billets engineering is a system engineering, and tissue difficulty is big, with high content of technology, relate to organization of production, transport, measure, many departments and the specialty such as information network.
When some steel grades are carried out hot delivery and hot charging, surface defect usually occurs, especially in the winter that ambient temperature is low.Defect occurs with intercrystalline crack form, and batch triangular shape crackle occurs in stocking surface.It is relevant in austenite grain boundary precipitation with AlN or VCN, NbCN.AlN speed of separating out in austenite is very slow, when austenite is after ferritic transformation starts, and speed is greatly improved.Major part AlN is that speed of separating out is maximum when about 600~900 DEG C, and actual temperature range depends on carbon content and alloying element content.When AlN separates out, tiny AlN concentrates on γ crystal boundary, prevents the movement of crystal boundary in Formed During Metal Hot Deformation, and mechanical stress is assembled in grain boundary, when stress value exceedes affinity between crystal grain, just creates grain-boundary crack.In strand cooling procedure after solidification, C, N compound can be occurred to separate out in austenite grain boundary, weaken crystal boundary energy, cause A → F phase transformation, volumetric expansion exacerbates weakening of grain-boundary strength, will extend formation face crack when rolling.
All C content carbon steel below 0.3% and C-Mn steel, all surface hardening steel, and many have the steel alloy of fine grained texture, and quiet steel all there will be hot-short phenomenon, particularly containing remaining and that impurity element is higher electric steel.
Consequently, it is desirable to formulate rational heat to send technique and heating technique, to ensure the smooth enforcement of Process of Hot Transfering And Hot Charging.Strengthen continuous casting billet preservation and controlling during transporting, prevent continuous casting billet temperature drop during transporting, make full use of the heat energy of continuous casting billet, energy-conservation consumption can be realized.
Summary of the invention
The technical problem to be solved is, shortcoming for above prior art, the technique proposing a kind of bloom strand hot delivery and hot charging, hot delivery and hot charging process is stable smoothly, and cc billet surface quality is good, and surface occurs without hot cracks, rolled steel performance meets user's requirement, improving yield, reduce energy consumption, conevying efficiency is high.
In order to solve above-mentioned technical problem, the technical scheme is that and be accomplished by: the technique of a kind of bloom strand hot delivery and hot charging, this technique sequentially includes the following steps:
Step one: enter at strand and need to add thermal insulation cover on the roller-way before withdrawal straightening machine, go out withdrawal straightening machine to fire cut between roller-way need to add thermal insulation cover and be incubated;When needing first to confirm power house ventilation situation wind condition before strand entrucking, need first to close the doors and windows, convection current wind must not be had to occur in hot charging region;
Step 2: when, after strand to cold bed, the thermal car of transport strand must arrive entrucking position in advance, and thermal car must have fire resistant heat preserving ability;Then carrying out preliminary quality monitoring, first cohesive process equipment running monitoring and scene, at X-ray inspection X, are chosen in time to producing abnormal strand, according to technological requirement, sentence useless online or enter to cheat slow cooling and process;
Step 3: quickly collect strand, before entrucking, casting blank surface temperature is at 555-625 DEG C, every three strands are sling together, lift in the thermal insulation cover to thermal car, close the most rapidly thermal insulation cover, treat that next lifts fashionable opening, use a car one heat steel to transport, after thermal insulation cover on thermal car is closed, strand is enclosed in the thermal insulation cover on thermal car completely;
Step 4: thermal car transports, after strand entrucking, at once delivers to steel rolling mill and waits that, into heating furnace, running time is less than 50min;To steel rolling mill, unloading in time, load heating furnace, before loading heating furnace, casting blank surface temperature must be more than 450 DEG C, and the shove charge time of simultaneously unloading does not surpasses 60min.
So, pass through technical scheme, thermal insulation cover is added on roller-way before withdrawal straightening machine, go out withdrawal straightening machine to fire cut between roller-way add thermal insulation cover and be incubated, effectively strand is incubated, reduce thermal loss, the condition providing strong is sent for hot charging and heat, during entrucking, first carrying out closes the doors and windows avoids convection current wind to occur, so avoiding the immediate loss of strand heat, reduce casting billet surface oxidation rate, during quickly collecting strand, entrucking temperature is in 555-625 DEG C of interval, this temperature is most stable of casting blank surface temperature, when some steel grades are carried out hot delivery and hot charging, when temperature is less than 555 DEG C, surface defect usually occurs, especially in the winter that ambient temperature is low;Defect occurs with intercrystalline crack form, and batch triangular shape crackle occurs in stocking surface.It is relevant in austenite grain boundary precipitation with AlN or VCN, NbCN, AlN speed of separating out in austenite is the slowest, when austenite is after ferritic transformation starts, speed is greatly improved, major part AlN is that speed of separating out is maximum when about 600~900 DEG C, and actual temperature range depends on carbon content and alloying element content.When AlN separates out, tiny AlN concentrates on γ crystal boundary, prevents the movement of crystal boundary in Formed During Metal Hot Deformation, and mechanical stress is assembled in grain boundary, when stress value exceedes affinity between crystal grain, just creates grain-boundary crack.In strand cooling procedure after solidification, C, N compound can be occurred to separate out in austenite grain boundary, weaken crystal boundary energy, cause A → F phase transformation, volumetric expansion exacerbates weakening of grain-boundary strength, will extend formation face crack when rolling.
All C content carbon steel below 0.3% and C-Mn steel, all surface hardening steel, and many have the steel alloy of fine grained texture, and quiet steel all there will be hot-short phenomenon, particularly containing remaining and that impurity element is higher electric steel.
Strand enters the temperature before heating furnace and is less than 450 DEG C, then can not meet the condition of hot-loading and hot-conveying, if pressing hot-loading and hot-conveying technique to perform heating operation, the tapping temperature of blank cannot meet rolling demand.
Detailed description of the invention
The present invention is described in further detail below:
Embodiment 1
The technique of a kind of bloom strand hot delivery and hot charging that the present embodiment provides, this technique sequentially includes the following steps:
Step one: enter at strand and need to add thermal insulation cover on the roller-way before withdrawal straightening machine, go out withdrawal straightening machine to fire cut between roller-way need to add thermal insulation cover and be incubated;When needing first to confirm power house ventilation situation before strand entrucking, need first to close the doors and windows, convection current wind must not be had to occur in hot charging region;
Step 2: when, after strand to cold bed, the thermal car of transport strand must arrive entrucking position in advance, and thermal car must have fire resistant heat preserving ability;Then carrying out preliminary quality monitoring, first cohesive process equipment running monitoring and scene, at X-ray inspection X, are chosen in time to producing abnormal strand, according to technological requirement, sentence useless online or enter to cheat slow cooling and process;
Step 3: quickly collect strand, before entrucking, casting blank surface temperature is at 555-625 DEG C, every three strands are sling together, lift in the thermal insulation cover to thermal car, close the most rapidly thermal insulation cover, treat that next lifts fashionable opening, use a car one heat steel to transport, after thermal insulation cover on thermal car is closed, strand is enclosed in the thermal insulation cover on thermal car completely;
Step 4: thermal car transports, after strand entrucking, at once delivers to steel rolling mill and waits that, into heating furnace, running time is less than 50min;To steel rolling mill, unloading in time, load heating furnace, before loading heating furnace, casting blank surface temperature must be more than 450 DEG C, and the shove charge time of simultaneously unloading does not surpasses 60min.
Embodiment 2
The technique of a kind of bloom strand hot delivery and hot charging that the present embodiment provides, this technique sequentially includes the following steps:
Step one: enter at strand and need to add thermal insulation cover on the roller-way before withdrawal straightening machine, go out withdrawal straightening machine to fire cut between roller-way need to add thermal insulation cover and be incubated;When needing first to confirm power house ventilation situation before strand entrucking, need first to close the doors and windows, convection current wind must not be had to occur in hot charging region;
Step 2: when, after strand to cold bed, the thermal car of transport strand must arrive entrucking position in advance, and thermal car must have fire resistant heat preserving ability;Then carrying out preliminary quality monitoring, first cohesive process equipment running monitoring and scene, at X-ray inspection X, are chosen in time to producing abnormal strand, according to technological requirement, sentence useless online or enter to cheat slow cooling and process;
Step 3: quickly collect strand, before entrucking, casting blank surface temperature is at 555-600 DEG C, every three strands are sling together, lift in the thermal insulation cover to thermal car, close the most rapidly thermal insulation cover, treat that next lifts fashionable opening, use a car one heat steel to transport, after thermal insulation cover on thermal car is closed, strand is enclosed in the thermal insulation cover on thermal car completely;
Step 4: thermal car transports, after strand entrucking, at once delivers to steel rolling mill and waits that, into heating furnace, running time is less than 40min;To steel rolling mill, unloading in time, load heating furnace, before loading heating furnace, casting blank surface temperature must be more than 460 DEG C, and the shove charge time of simultaneously unloading does not surpasses 55min.
Embodiment 3
The technique of a kind of bloom strand hot delivery and hot charging that the present embodiment provides, this technique sequentially includes the following steps:
Step one: enter at strand and need to add thermal insulation cover on the roller-way before withdrawal straightening machine, go out withdrawal straightening machine to fire cut between roller-way need to add thermal insulation cover and be incubated;When needing first to confirm power house ventilation situation before strand entrucking, need first to close the doors and windows, convection current wind must not be had to occur in hot charging region;
Step 2: when, after strand to cold bed, the thermal car of transport strand must arrive entrucking position in advance, and thermal car must have fire resistant heat preserving ability;Then carrying out preliminary quality monitoring, first cohesive process equipment running monitoring and scene, at X-ray inspection X, are chosen in time to producing abnormal strand, according to technological requirement, sentence useless online or enter to cheat slow cooling and process;
Step 3: quickly collect strand, before entrucking, casting blank surface temperature is at 580-620 DEG C, every three strands are sling together, lift in the thermal insulation cover to thermal car, close the most rapidly thermal insulation cover, treat that next lifts fashionable opening, use a car one heat steel to transport, after thermal insulation cover on thermal car is closed, strand is enclosed in the thermal insulation cover on thermal car completely;
Step 4: thermal car transports, after strand entrucking, at once delivers to steel rolling mill and waits that, into heating furnace, running time is less than 45min;To steel rolling mill, unloading in time, load heating furnace, before loading heating furnace, casting blank surface temperature must be more than 480 DEG C, and the shove charge time of simultaneously unloading does not surpasses 50min.
Above example is only the technological thought that the present invention is described, it is impossible to limiting protection scope of the present invention with this, every technological thought proposed according to the present invention, any change done on the basis of technical scheme, within each falling within scope.

Claims (3)

1. the technique of a bloom strand hot delivery and hot charging, it is characterised in that: this technique sequentially includes the following steps:
Step one: enter at strand and need to add thermal insulation cover on the roller-way before withdrawal straightening machine, go out withdrawal straightening machine to fire cut between roller-way need to add thermal insulation cover and be incubated;When needing first to confirm power house ventilation situation wind condition before strand entrucking, need first to close the doors and windows, convection current wind must not be had to occur in hot charging region;
Step 2: when, after strand to cold bed, the thermal car of transport strand must arrive entrucking position in advance, and thermal car must have fire resistant heat preserving ability;Then carrying out preliminary quality monitoring, first cohesive process equipment running monitoring and scene, at X-ray inspection X, are chosen in time to producing abnormal strand, according to technological requirement, sentence useless online or enter to cheat slow cooling and process;
Step 3: quickly collect strand, before entrucking, casting blank surface temperature is at 555-625 DEG C, every three strands are sling together, lift in the thermal insulation cover to thermal car, close the most rapidly thermal insulation cover, treat that next lifts fashionable opening, use a car one heat steel to transport, after thermal insulation cover on thermal car is closed, strand is enclosed in the thermal insulation cover on thermal car completely;
Step 4: thermal car transports, after strand entrucking, at once delivers to steel rolling mill and waits that, into heating furnace, running time is less than 50min;To steel rolling mill, unloading in time, load heating furnace, before loading heating furnace, casting blank surface temperature must be more than 450 DEG C, and the shove charge time of simultaneously unloading does not surpasses 60min.
The technique of bloom strand hot delivery and hot charging the most according to claim 1, this technique sequentially includes the following steps:
Step one: enter at strand and need to add thermal insulation cover on the roller-way before withdrawal straightening machine, go out withdrawal straightening machine to fire cut between roller-way need to add thermal insulation cover and be incubated;When needing first to confirm power house ventilation situation before strand entrucking, need first to close the doors and windows, convection current wind must not be had to occur in hot charging region;
Step 2: when, after strand to cold bed, the thermal car of transport strand must arrive entrucking position in advance, and thermal car must have fire resistant heat preserving ability;Then carrying out preliminary quality monitoring, first cohesive process equipment running monitoring and scene, at X-ray inspection X, are chosen in time to producing abnormal strand, according to technological requirement, sentence useless online or enter to cheat slow cooling and process;
Step 3: quickly collect strand, before entrucking, casting blank surface temperature is at 555-600 DEG C, every three strands are sling together, lift in the thermal insulation cover to thermal car, close the most rapidly thermal insulation cover, treat that next lifts fashionable opening, use a car one heat steel to transport, after thermal insulation cover on thermal car is closed, strand is enclosed in the thermal insulation cover on thermal car completely;
Step 4: thermal car transports, after strand entrucking, at once delivers to steel rolling mill and waits that, into heating furnace, running time is less than 40min;To steel rolling mill, unloading in time, load heating furnace, before loading heating furnace, casting blank surface temperature must be more than 460 DEG C, and the shove charge time of simultaneously unloading does not surpasses 55min.
The technique of bloom strand hot delivery and hot charging the most according to claim 1, this technique sequentially includes the following steps:
Step one: enter at strand and need to add thermal insulation cover on the roller-way before withdrawal straightening machine, go out withdrawal straightening machine to fire cut between roller-way need to add thermal insulation cover and be incubated;When needing first to confirm power house ventilation situation before strand entrucking, need first to close the doors and windows, convection current wind must not be had to occur in hot charging region;
Step 2: when, after strand to cold bed, the thermal car of transport strand must arrive entrucking position in advance, and thermal car must have fire resistant heat preserving ability;Then carrying out preliminary quality monitoring, first cohesive process equipment running monitoring and scene, at X-ray inspection X, are chosen in time to producing abnormal strand, according to technological requirement, sentence useless online or enter to cheat slow cooling and process;
Step 3: quickly collect strand, before entrucking, casting blank surface temperature is at 580-620 DEG C, every three strands are sling together, lift in the thermal insulation cover to thermal car, close the most rapidly thermal insulation cover, treat that next lifts fashionable opening, use a car one heat steel to transport, after thermal insulation cover on thermal car is closed, strand is enclosed in the thermal insulation cover on thermal car completely;
Step 4: thermal car transports, after strand entrucking, at once delivers to steel rolling mill and waits that, into heating furnace, running time is less than 45min;To steel rolling mill, unloading in time, load heating furnace, before loading heating furnace, casting blank surface temperature must be more than 480 DEG C, and the shove charge time of simultaneously unloading does not surpasses 50min.
CN201610494405.4A 2016-06-30 2016-06-30 A kind of technique of bloom strand hot delivery and hot charging Active CN105964966B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610494405.4A CN105964966B (en) 2016-06-30 2016-06-30 A kind of technique of bloom strand hot delivery and hot charging

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610494405.4A CN105964966B (en) 2016-06-30 2016-06-30 A kind of technique of bloom strand hot delivery and hot charging

Publications (2)

Publication Number Publication Date
CN105964966A true CN105964966A (en) 2016-09-28
CN105964966B CN105964966B (en) 2018-02-02

Family

ID=57020901

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610494405.4A Active CN105964966B (en) 2016-06-30 2016-06-30 A kind of technique of bloom strand hot delivery and hot charging

Country Status (1)

Country Link
CN (1) CN105964966B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111809028A (en) * 2019-04-11 2020-10-23 上海梅山钢铁股份有限公司 Heating process for avoiding surface defects of steel plate
CN113399469A (en) * 2021-06-23 2021-09-17 新疆八一钢铁股份有限公司 Abnormal slab handling method for improving hot charging and hot delivery rate
CN113649537A (en) * 2021-07-05 2021-11-16 包头钢铁(集团)有限责任公司 Hot charging and hot conveying method for wide and thick plate blank
CN114309514A (en) * 2022-01-06 2022-04-12 宝武集团鄂城钢铁有限公司 System and method for hot feeding and hot charging integrated production of continuous casting steel billet
CN115069998A (en) * 2022-07-03 2022-09-20 新疆八一钢铁股份有限公司 Heat-preservation hot charging method for steel rolling medium plate blank

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001137901A (en) * 1999-11-09 2001-05-22 Nkk Corp Rolling method in hot-charge of continuously cast slab
JP2006198649A (en) * 2005-01-19 2006-08-03 Kobe Steel Ltd Method for determining whether or not hot charge rolling (hcr) is applicable
JP2008260022A (en) * 2007-04-10 2008-10-30 Jfe Steel Kk Heat insulation method of slab for temporarily-storing hcr, and device thereof
CN101984093A (en) * 2010-10-28 2011-03-09 中冶京诚工程技术有限公司 Hot charging method and system for continuous casting round billet of hot-rolled steel pipe
CN102861887A (en) * 2012-09-21 2013-01-09 广东韶钢松山股份有限公司 Hot loading method for medium-thick slabs
CN105598406A (en) * 2014-11-13 2016-05-25 张学一 A continuous casting billet hot delivery and hot charging process

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001137901A (en) * 1999-11-09 2001-05-22 Nkk Corp Rolling method in hot-charge of continuously cast slab
JP2006198649A (en) * 2005-01-19 2006-08-03 Kobe Steel Ltd Method for determining whether or not hot charge rolling (hcr) is applicable
JP2008260022A (en) * 2007-04-10 2008-10-30 Jfe Steel Kk Heat insulation method of slab for temporarily-storing hcr, and device thereof
CN101984093A (en) * 2010-10-28 2011-03-09 中冶京诚工程技术有限公司 Hot charging method and system for continuous casting round billet of hot-rolled steel pipe
CN102861887A (en) * 2012-09-21 2013-01-09 广东韶钢松山股份有限公司 Hot loading method for medium-thick slabs
CN105598406A (en) * 2014-11-13 2016-05-25 张学一 A continuous casting billet hot delivery and hot charging process

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111809028A (en) * 2019-04-11 2020-10-23 上海梅山钢铁股份有限公司 Heating process for avoiding surface defects of steel plate
CN111809028B (en) * 2019-04-11 2022-03-15 上海梅山钢铁股份有限公司 Heating process for avoiding surface defects of steel plate
CN113399469A (en) * 2021-06-23 2021-09-17 新疆八一钢铁股份有限公司 Abnormal slab handling method for improving hot charging and hot delivery rate
CN113649537A (en) * 2021-07-05 2021-11-16 包头钢铁(集团)有限责任公司 Hot charging and hot conveying method for wide and thick plate blank
CN114309514A (en) * 2022-01-06 2022-04-12 宝武集团鄂城钢铁有限公司 System and method for hot feeding and hot charging integrated production of continuous casting steel billet
CN114309514B (en) * 2022-01-06 2023-06-02 宝武集团鄂城钢铁有限公司 System and method for continuous casting billet hot delivery and hot charging integrated production
CN115069998A (en) * 2022-07-03 2022-09-20 新疆八一钢铁股份有限公司 Heat-preservation hot charging method for steel rolling medium plate blank

Also Published As

Publication number Publication date
CN105964966B (en) 2018-02-02

Similar Documents

Publication Publication Date Title
CN105964966A (en) Hot delivery and hot charging process for bloom casting blanks
CN101920271B (en) Controlled rolling and controlled cooling production process of HRB400 (Hot-rolled Ribbed-steel Bar 400) steel bar
CN109158558B (en) H13 round steel continuous casting and rolling manufacturing process
CN107385328B (en) The low-alloy super-thick steel plate with superior internal quality, low-temperature impact toughness and anti-lamellar tearing performance of two base laminating productions
CN106367686B (en) Method based on ESP bar strip continuous casting and rolling flow paths production weathering steel
CN108672625B (en) A kind of processing method using diameter forging machine production multi-step cold roll base
CN103029377B (en) A kind of Copper-Aluminum compound metal plate and belt aluminum substrate layer material, strip and processing method thereof
CN106065452B (en) One kind can reduce the netted carbide grade method for distinguishing of bridge Suo Gang
CN107177793B (en) A kind of thick structural steel and iron of low-alloy spy and its manufacturing method of thickness 400-610mm
CN101397627B (en) Fire resistant and weather resistant anti-shock steel and method for producing the same
CN105414428A (en) Forging technique for cake forgings
CN105921514A (en) Method for producing high-strength Q690D steel plate with thickness of 4 mm on wide and thick plate mill
CN105499300A (en) Production technology of copper strip for lock
CN101748264B (en) Heating method of weather-proof sheet billet
CN112143975A (en) Economical high-efficiency X70-grade pipeline steel and manufacturing method thereof
CN113862557A (en) Ferrite pearlite type Q345qD bridge steel extra-thick plate and manufacturing method thereof
CN106282796B (en) Based on ESP thin plates endless rolling production door industry, the method for elevator steel
CN107523749A (en) Based on the method that cutter high-carbon steel is produced completely without head bar strip continuous casting and rolling flow path
CN103212588B (en) Method of reducing defect that slag is clamped under surface when carbon manganese steel is rolled in a hot mode
CN107513649A (en) Automobile heat insulation plate aluminum alloy plate materials and its manufacture method
CN102383050A (en) Cr-Ni based high temperature-resistant oxyaustenitic heat-resistant steel bar and preparation method thereof
CN110195186A (en) Ultra-thick hot-rolled high-alloy hot-work die steel and preparation method thereof
CN106269873A (en) Utilize the method that holding pit and single heating furnace tandem rolling produce hot-rolled orientation silicon steel
CN104726754A (en) Preparation method of high-strength aluminum alloy material for doors/windows
CN110153179A (en) The process of the fiery bearing steel of cooling rolling two

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant