CN105956738A - Material contract keeping supervision early-warning system - Google Patents

Material contract keeping supervision early-warning system Download PDF

Info

Publication number
CN105956738A
CN105956738A CN201610243780.1A CN201610243780A CN105956738A CN 105956738 A CN105956738 A CN 105956738A CN 201610243780 A CN201610243780 A CN 201610243780A CN 105956738 A CN105956738 A CN 105956738A
Authority
CN
China
Prior art keywords
module
early warning
goods
contract
materials
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610243780.1A
Other languages
Chinese (zh)
Inventor
宗超
秘鹏
吴迎东
张秋生
靳芳
雷丽艳
张雪红
闫海庆
赵爱玲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yangxin County Power Supply Company State Grid Shandong Electric Power Co
Original Assignee
Yangxin County Power Supply Company State Grid Shandong Electric Power Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yangxin County Power Supply Company State Grid Shandong Electric Power Co filed Critical Yangxin County Power Supply Company State Grid Shandong Electric Power Co
Priority to CN201610243780.1A priority Critical patent/CN105956738A/en
Publication of CN105956738A publication Critical patent/CN105956738A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06395Quality analysis or management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/08Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/08Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
    • G06Q10/087Inventory or stock management, e.g. order filling, procurement or balancing against orders
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/109Time management, e.g. calendars, reminders, meetings or time accounting

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • Development Economics (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Marketing (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Educational Administration (AREA)
  • Data Mining & Analysis (AREA)
  • Game Theory and Decision Science (AREA)
  • Accounting & Taxation (AREA)
  • Finance (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention provides a material contract keeping supervision early-warning system which comprises the components of a current date information acquisition module, a delivery date obtaining module, a first early-warning module, a second early-warning module, a storage module and a control module. wherein the control module is connected with other modules. Furthermore the control module calculates the number-of-days n between the current date and the delivery data of each material which is registered in each material contract in the system according to a preset calculating formula based on related information that is acquired by the current date information acquisition module and the delivery date obtaining module. Afterwards the control module compares each calculated number-of-days n with a related threshold of the related material in a corresponding preset related material contract. Furthermore the control module calls the first early-warning module and/or the second early-warning module for performing corresponding monitoring time early-warning. The material contract keeping supervision early-warning system can reduce workload of related personnel and improves supervision efficiency and supervision quality on the material contracts.

Description

A kind of goods and materials contract is honoured an agreement supervision early warning system
Technical field
The present invention relates to the early warning field of honouring an agreement of goods and materials contract, specifically a kind of goods and materials contract is honoured an agreement supervision early warning system, is exclusively used in the supervision early warning of honouring an agreement of electric company's goods and materials contract.
Background technology
In practical work process, the relevant staff of electric company supervises substantial amounts of effective goods and materials contract in the most in the same period, this relevant staff needs to honour an agreement goods and materials involved in above-mentioned each goods and materials contract progress, and such as the most shipped to the goods and materials of clear stipulaties in each goods and materials contract or arrival warehouse-in the most is supervised timely.But before examining the progress of honouring an agreement of goods and materials, first having to which goods and materials in which goods and materials contract clear and definite is that current date needs supervision.
And current, supervision early warning scheme that electric company is the best, relevant staff's related system to be opened, check goods and materials contract one by one, its time limit of honouring an agreement is supervised;But in view of goods and materials contracted quantity is big, it is of a relatively high to omit risk during actually looking at, and the most irregularly has the delivery of corresponding goods and materials and expires with the agreed period put in storage, relevant staff's almost every day or will look into every three days and read through all of goods and materials contract.Therefore, in the prior art, the workload of above-mentioned relevant staff is the biggest, and easily cause visual fatigue, not only work efficiency is relatively low, and error rate is the most of a relatively high, it is unfavorable for goods and materials contract is honoured an agreement the efficient of situation and high-quality supervision, in place of this is the deficiencies in the prior art.
Summary of the invention
The technical problem to be solved is, for the deficiencies in the prior art, it is provided that a kind of goods and materials contract is honoured an agreement supervision early warning system, for reducing the workload of relevant staff, and for improving supervisory efficiency and the supervision quality of situation of honouring an agreement goods and materials contract.
For solving above-mentioned technical problem, the invention provides a kind of goods and materials contract and honour an agreement supervision early warning system, including:
Current date information acquisition module, for gathering current date and time information;
Delivery date, acquisition module, was used for obtaining the delivery date information of the corresponding goods and materials indicated on each relevant supplies contract;
First warning module, for carrying out the delivery supervision time early warning of the corresponding goods and materials indicated on each relevant supplies contract;
Second warning module, for carrying out the warehouse-in supervision time early warning of the corresponding goods and materials indicated on each relevant supplies contract;
Memory module, the information for native system stores, including each relevant supplies contract information;
Control module, current date information acquisition module, acquisition module delivery date, the first warning module, the second warning module and the memory module described in connection, wherein:
Above-mentioned each goods and materials contract information all includes the title of each corresponding goods and materials and the delivery date thereof indicated in the goods and materials Contract NO of corresponding goods and materials contract and each relevant supplies contract;
Control module is based on above-mentioned current date information acquisition module and each relevant information of acquisition module collection delivery date, respectively according to the computing formula pre-set, calculate the natural law n of the delivery date of each goods and materials indicated respectively on each goods and materials contract in the current date distance native system gathered, afterwards by the most corresponding for the above-mentioned each natural law n calculated, the dependent thresholds of the contractual relevant supplies of relevant supplies pre-set compares, and according to comparative result, call the first described warning module and/or the second warning module supervises time early warning accordingly.
Described goods and materials contract honour an agreement supervision early warning system also include:
Automatically generating time limit early warning dialog box module of honouring an agreement, it by the information of each relevant supplies of early warning, automatically generated time limit early warning dialog box of honouring an agreement based on the same day;The information of described relevant supplies includes the corresponding goods and materials contract information that these relevant supplies are corresponding.
The information currently by all of relevant supplies of early warning is included in described time limit early warning dialog box of honouring an agreement.
Described control module connect described in automatically generate time limit early warning dialog box module of honouring an agreement, automatically generate the early warning that time limit early warning dialog box module of honouring an agreement generates described in control and honour an agreement the automatic spring of dialog box.
The computing formula of described natural law n is: n=n1-n2, and wherein, n1 is the delivery date of the corresponding goods and materials described in relevant supplies contract that delivery date, acquisition module gathered, and n2 is the current date that current date information acquisition module gathers.
The described dependent thresholds by the above-mentioned each natural law n the calculated contractual relevant supplies of relevant supplies the most corresponding, that pre-set compare and according to comparative result, call the first described warning module and/or the second warning module is supervised the method for time early warning accordingly and included step:
If the corresponding natural law n=x1 that S1 calculates, then call the first warning module and send the delivery supervision time early warning of the corresponding goods and materials indicated on each relevant supplies contract to relevant staff;If described natural law n=x2 days, then call the first warning module and again send the delivery supervision time early warning of the corresponding goods and materials indicated on each relevant supplies contract to relevant staff;If described natural law n=x3 days, then call the second warning module and send the warehouse-in supervision time early warning of the corresponding goods and materials indicated on each relevant supplies contract for the first time to relevant staff;If described natural law n=x4 days, then call the second warning module second time and send the warehouse-in supervision time early warning of the corresponding goods and materials indicated on each relevant supplies contract to relevant staff;If described natural law n=x5 days, then call the second warning module third time and send the warehouse-in supervision time early warning of the corresponding goods and materials indicated on each relevant supplies contract to relevant staff;Wherein x1 > x2 > 0, x3 > x4 > x5, and described x1, x2, x3, x4 and x5 be the described respective threshold pre-set.
Described goods and materials contract honour an agreement supervision early warning system also include: import module, be connected with described control module, be used for import new goods and materials contract information.
Described goods and materials contract honour an agreement supervision early warning system also include: modified module, be connected with described control module, be used for revise described dependent thresholds set in advance.
Compared with prior art, it is an advantage of the current invention that:
null(1) present invention is provided with the first warning module for the corresponding goods and materials indicated on each relevant supplies contract carry out delivery supervision time early warning and the second warning module for the warehouse-in supervision time early warning to the corresponding goods and materials indicated on each relevant supplies contract,When reaching corresponding early-warning conditions,Control module can be called corresponding warning module automatically and supervise time early warning accordingly,Therefore relevant staff does not worries having the generation omitting phenomenon,And relevant staff can be after above-mentioned corresponding warning module carries out corresponding early warning,Carry out checking of goods and materials contract again,At other times then without checking the goods and materials contract in native system,This can not only be avoided in prior art almost every day or will look into the drawback reading through all of goods and materials contract every three days,And work efficiency can be improved to a great extent、Reduce error rate,Consequently facilitating honour an agreement goods and materials contract, situation efficiently supervises with high-quality,More practical;
(2) present invention additionally comprises and automatically generate time limit early warning dialog box module of honouring an agreement, for automatically generating time limit early warning dialog box of honouring an agreement, for concentrating all information by the relevant supplies of early warning of displaying, consequently facilitating the concentration of relevant staff's all goods and materials contracts that the same day carries out early warning is checked, this is easy to improve supervisory efficiency and the supervision quality that goods and materials contract is honoured an agreement by relevant staff further, more practical;
(3) present invention control module connect described in automatically generate time limit early warning dialog box module of honouring an agreement, automatically generate the early warning that time limit early warning dialog box module of honouring an agreement generates described in control to honour an agreement the automatic spring of dialog box, it is easy to check in time, consequently facilitating reduce the labor intensity of relevant staff and reduce its visual fatigue, therefore relevant staff can be improved further to the supervisory efficiency of goods and materials contract and pipe quality, more practical.
As can be seen here, the present invention compared with prior art, has prominent substantive distinguishing features and significantly progress, and its beneficial effect implemented also is apparent from.
Accompanying drawing explanation
Fig. 1 be goods and materials contract of the present invention honour an agreement supervision early warning system structured flowchart schematic diagram.
Detailed description of the invention
For making technical scheme and advantage clearer, below in conjunction with the accompanying drawing of the present invention, technical scheme is clearly and completely described.
The supervision early warning system as it is shown in figure 1, a kind of goods and materials contract of the present invention is honoured an agreement, including:
Current date information acquisition module, for gathering current date and time information;
Delivery date, acquisition module, was used for obtaining the delivery date information of the corresponding goods and materials indicated on each relevant supplies contract;
First warning module, for carrying out the delivery supervision time early warning of the corresponding goods and materials indicated on each relevant supplies contract;
Second warning module, for carrying out the warehouse-in supervision time early warning of the corresponding goods and materials indicated on each relevant supplies contract;
Memory module, the information for native system stores, including each relevant supplies contract information;
Import module, for importing new goods and materials contract information;
Modified module, for the amendment of native system dependent thresholds;
Control module, current date information acquisition module, acquisition module delivery date, the first warning module, the second warning module, memory module, importing module and the modified module described in connection, for the control of native system, wherein:
Each goods and materials contract information involved in the application all includes the title of each corresponding goods and materials and the delivery date thereof indicated in the goods and materials Contract NO of corresponding goods and materials contract and each relevant supplies contract;
Control module is based on above-mentioned current date information acquisition module and each relevant information of acquisition module collection delivery date, respectively according to the computing formula pre-set, calculate the natural law n of the delivery date of each goods and materials indicated respectively on each goods and materials contract in the current date distance native system gathered, afterwards by the most corresponding for the above-mentioned each natural law n calculated, the dependent thresholds of the contractual relevant supplies of relevant supplies pre-set compares, and according to comparative result, call the first described warning module and/or the second warning module supervises time early warning accordingly.Wherein, the computing formula of described natural law n is: n=n1-n2, and wherein, n1 is the delivery date of the corresponding goods and materials described in relevant supplies contract that delivery date, acquisition module gathered, and n2 is the current date that current date information acquisition module gathers, it is simple to calculate.
During use, when reaching corresponding early-warning conditions, corresponding warning module can be called automatically and carry out corresponding early warning, therefore relevant staff does not worries having the generation omitting phenomenon, and relevant staff can be after above-mentioned corresponding warning module carries out corresponding early warning, carry out checking of goods and materials contract again, not only avoid in prior art almost every day or the drawback reading through all of goods and materials contract will be looked into every three days, and work efficiency can be improved to a great extent, reduce error rate, consequently facilitating honour an agreement goods and materials contract, situation efficiently supervises with high-quality, practical.
Described goods and materials contract honour an agreement supervision early warning system also include automatically generating time limit early warning dialog box module of honouring an agreement, its based on the same day by the information of each relevant supplies of early warning, automatically generate time limit early warning dialog box of honouring an agreement, for concentrating all information by the relevant supplies of early warning of displaying, consequently facilitating the concentration of relevant staff's all goods and materials contracts that the same day carries out early warning is checked, with strong points, it is easy to improve supervisory efficiency and the pipe quality that goods and materials contract is honoured an agreement by relevant staff further, more practical.
Wherein, the information of relevant supplies involved in the application all includes the corresponding goods and materials contract information that these relevant supplies are corresponding, includes the information currently by all of relevant supplies of early warning in described time limit early warning dialog box of honouring an agreement.
In the present invention, described control module connect described in automatically generate time limit early warning dialog box module of honouring an agreement, automatically generate the early warning that time limit early warning dialog box module of honouring an agreement generates described in control and honour an agreement the automatic spring of dialog box.
The described dependent thresholds by the above-mentioned each natural law n the calculated contractual relevant supplies of relevant supplies the most corresponding, that pre-set compare and according to comparative result, call the first described warning module and/or the second warning module is supervised the method for time early warning accordingly and included step:
If the corresponding natural law n=x1 that S1 calculates, then call the first warning module and send the delivery supervision time early warning of the corresponding goods and materials indicated on each relevant supplies contract to relevant staff;If described natural law n=x2 days, then call the first warning module and again send the delivery supervision time early warning of the corresponding goods and materials indicated on each relevant supplies contract to relevant staff;If described natural law n=x3 days, then call the second warning module and send the warehouse-in supervision time early warning of the corresponding goods and materials indicated on each relevant supplies contract for the first time to relevant staff;If described natural law n=x4 days, then call the second warning module second time and send the warehouse-in supervision time early warning of the corresponding goods and materials indicated on each relevant supplies contract to relevant staff;If described natural law n=x5 days, then call the second warning module third time and send the warehouse-in supervision time early warning of the corresponding goods and materials indicated on each relevant supplies contract to relevant staff;Wherein x1 > x2 > 0, x3 > x4 > x5, and described x1, x2, x3, x4 and x5 be the described respective threshold pre-set, its threshold size can be modified by described modified module according to practical situation, uses flexibly.In the present embodiment: x1=30, x2=15, x3=15, x4=7, x5=-3.
In this application, involved each delivery supervision time early warning, when being used to that the delivery date of agreement reaches natural law set in advance in distance goods and materials contract, send the early warning of supervision time to relevant staff, in order to remind its supplier following the tracks of in time relevant supplies to honour an agreement delivery;Involved each warehouse-in supervision time early warning, when the delivery date being used to arrange in distance goods and materials contract reaches natural law set in advance, sends early warning to relevant staff, in order to remind it to follow the tracks of the arrival of having honoured an agreement of relevant supplies in time.
To sum up, the present invention can carry out early warning to the delivery supervision time of each relevant supplies involved in goods and materials contract each in native system and warehouse-in supervision time, so that relevant staff only need to carry out supervising after early warning, the workload of relevant staff can be reduced, improve again supervisory efficiency and supervision quality that goods and materials contract is honoured an agreement by supervision relevant staff, more practical.
Embodiment of above only in order to technical scheme to be described, is not intended to limit;Although the present invention being described in detail with reference to aforementioned embodiments, it will be understood by those within the art that: the technical scheme described in aforementioned each embodiment still can be modified by it, or wherein portion of techniques feature is carried out equivalent;And these amendments or replacement, do not make the essence of appropriate technical solution depart from the scope of the present invention each embodiment technical scheme.

Claims (8)

1. a goods and materials contract is honoured an agreement supervision early warning system, it is characterised in that including:
Current date information acquisition module, for gathering current date and time information;
Delivery date, acquisition module, was used for obtaining the delivery date information of the corresponding goods and materials indicated on each relevant supplies contract;
First warning module, for carrying out the delivery supervision time early warning of the corresponding goods and materials indicated on each relevant supplies contract;
Second warning module, for carrying out the warehouse-in supervision time early warning of the corresponding goods and materials indicated on each relevant supplies contract;
Memory module, the information for native system stores, including each relevant supplies contract information;
Control module, current date information acquisition module, acquisition module delivery date, the first warning module, the second warning module and the memory module described in connection, wherein:
Above-mentioned each goods and materials contract information all includes the title of each corresponding goods and materials and the delivery date thereof indicated in the goods and materials Contract NO of corresponding goods and materials contract and each relevant supplies contract;
Control module is based on above-mentioned current date information acquisition module and each relevant information of acquisition module collection delivery date, respectively according to the computing formula pre-set, calculate the natural law n of the delivery date of each goods and materials indicated respectively on each goods and materials contract in the current date distance native system gathered, afterwards by the most corresponding for the above-mentioned each natural law n calculated, the dependent thresholds of the contractual relevant supplies of relevant supplies pre-set compares, and according to comparative result, call the first described warning module and/or the second warning module supervises time early warning accordingly.
Goods and materials contract the most according to claim 1 is honoured an agreement supervision early warning system, it is characterised in that also include:
Automatically generating time limit early warning dialog box module of honouring an agreement, it by the information of each relevant supplies of early warning, was used for automatically generating time limit early warning dialog box of honouring an agreement based on the same day;The information of described relevant supplies includes the corresponding goods and materials contract information that these relevant supplies are corresponding.
Goods and materials contract the most according to claim 2 is honoured an agreement supervision early warning system, it is characterised in that include the information currently by all of relevant supplies of early warning in described time limit early warning dialog box of honouring an agreement.
Goods and materials contract the most according to claim 2 is honoured an agreement supervision early warning system, it is characterized in that, described control module connect described in automatically generate time limit early warning dialog box module of honouring an agreement, automatically generate the early warning that time limit early warning dialog box module of honouring an agreement generates described in control and honour an agreement the automatic spring of dialog box.
5. honour an agreement supervision early warning system according to the goods and materials contract described in claim 1 or 2 or 3 or 4, it is characterized in that, the computing formula of described natural law n is: n=n1-n2, wherein, n1 is the delivery date of the corresponding goods and materials described in relevant supplies contract that delivery date, acquisition module gathered, and n2 is the current date that current date information acquisition module gathers.
Goods and materials contract the most according to claim 5 is honoured an agreement supervision early warning system, it is characterized in that, the described dependent thresholds by the above-mentioned each natural law n the calculated contractual relevant supplies of relevant supplies the most corresponding, that pre-set compare and according to comparative result, call the first described warning module and/or the second warning module is supervised the method for time early warning accordingly and included step:
If the corresponding natural law n=x1 that S1 calculates, then call the first warning module and send the delivery supervision time early warning of the corresponding goods and materials indicated on each relevant supplies contract to relevant staff;If described natural law n=x2 days, then call the first warning module and again send the delivery supervision time early warning of the corresponding goods and materials indicated on each relevant supplies contract to relevant staff;If described natural law n=x3 days, then call the second warning module and send the warehouse-in supervision time early warning of the corresponding goods and materials indicated on each relevant supplies contract for the first time to relevant staff;If described natural law n=x4 days, then call the second warning module second time and send the warehouse-in supervision time early warning of the corresponding goods and materials indicated on each relevant supplies contract to relevant staff;If described natural law n=x5 days, then call the second warning module third time and send the warehouse-in supervision time early warning of the corresponding goods and materials indicated on each relevant supplies contract to relevant staff;Wherein x1 > x2 > 0, x3 > x4 > x5, and described x1, x2, x3, x4 and x5 be the described respective threshold pre-set.
7. honour an agreement supervision early warning system according to the goods and materials contract described in claim 1 or 2 or 3 or 4, it is characterised in that also include: import module, be connected with described control module, be used for importing new goods and materials contract information.
8. honour an agreement supervision early warning system according to the goods and materials contract described in claim 1 or 2 or 3 or 4, it is characterised in that also include: modified module, be connected with described control module, for revising described dependent thresholds set in advance.
CN201610243780.1A 2016-04-19 2016-04-19 Material contract keeping supervision early-warning system Pending CN105956738A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610243780.1A CN105956738A (en) 2016-04-19 2016-04-19 Material contract keeping supervision early-warning system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610243780.1A CN105956738A (en) 2016-04-19 2016-04-19 Material contract keeping supervision early-warning system

Publications (1)

Publication Number Publication Date
CN105956738A true CN105956738A (en) 2016-09-21

Family

ID=56917698

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610243780.1A Pending CN105956738A (en) 2016-04-19 2016-04-19 Material contract keeping supervision early-warning system

Country Status (1)

Country Link
CN (1) CN105956738A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106815213A (en) * 2016-12-30 2017-06-09 全民互联科技(天津)有限公司 A kind of contract performance clause extraction method and system
CN107146059A (en) * 2017-05-19 2017-09-08 广东电网有限责任公司物流服务中心 A kind of goods and materials contract is honoured an agreement information management-control method
CN108009766A (en) * 2017-10-10 2018-05-08 国家电网公司 A kind of purchase of goods and materials visualization method for early warning and system
CN108876109A (en) * 2018-05-24 2018-11-23 合肥亿腾工程咨询有限公司 A kind of engineering material uses management system
CN109063981A (en) * 2018-07-16 2018-12-21 广东电网有限责任公司 Electric power material supply control method and device and electronic equipment
CN110706067A (en) * 2019-09-23 2020-01-17 江西毕姆工程技术有限公司 Service platform management system based on big data
CN112686418A (en) * 2019-10-18 2021-04-20 北京京东振世信息技术有限公司 Method and device for predicting performance timeliness
CN113807768A (en) * 2021-08-05 2021-12-17 格力电器(武汉)有限公司 Production material delivery cycle joint debugging control method, equipment and storage medium

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103854086A (en) * 2012-11-29 2014-06-11 瀚科科技(大连)有限公司 Enterprise-employee contract early-warning system

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103854086A (en) * 2012-11-29 2014-06-11 瀚科科技(大连)有限公司 Enterprise-employee contract early-warning system

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106815213A (en) * 2016-12-30 2017-06-09 全民互联科技(天津)有限公司 A kind of contract performance clause extraction method and system
CN107146059A (en) * 2017-05-19 2017-09-08 广东电网有限责任公司物流服务中心 A kind of goods and materials contract is honoured an agreement information management-control method
CN108009766A (en) * 2017-10-10 2018-05-08 国家电网公司 A kind of purchase of goods and materials visualization method for early warning and system
CN108876109A (en) * 2018-05-24 2018-11-23 合肥亿腾工程咨询有限公司 A kind of engineering material uses management system
CN109063981A (en) * 2018-07-16 2018-12-21 广东电网有限责任公司 Electric power material supply control method and device and electronic equipment
CN110706067A (en) * 2019-09-23 2020-01-17 江西毕姆工程技术有限公司 Service platform management system based on big data
CN112686418A (en) * 2019-10-18 2021-04-20 北京京东振世信息技术有限公司 Method and device for predicting performance timeliness
CN113807768A (en) * 2021-08-05 2021-12-17 格力电器(武汉)有限公司 Production material delivery cycle joint debugging control method, equipment and storage medium

Similar Documents

Publication Publication Date Title
CN105956738A (en) Material contract keeping supervision early-warning system
US10037502B2 (en) Maintenance schedule optimization method for electric power system including large-scale wind power
Jezzini et al. Effects of predictive maintenance (PdM), Proactive maintenace (PoM) & Preventive maintenance (PM) on minimizing the faults in medical instruments
CN112730938B (en) Electricity larceny user judging method based on electricity utilization acquisition big data
CN103197623B (en) A kind of streamline method for managing and monitoring and device
CN104461809A (en) Fault information management method and system
CN102693465A (en) Enterprise resource planning system
CN106651643A (en) Power security management and control method for whole process based on distribution and adjustment
CN106229969A (en) Electric network element based on cumulative statistics line loss per unit loss abnormality judgment method
CN104574004A (en) Auxiliary distribution network state maintenance system
Xue et al. Adaptive ultra-short-term wind power prediction based on risk assessment
CN104731862A (en) Big data management system based on internet of things
CN104391479B (en) Automatic statistic method of machine tool working condition based on main shaft power monitoring and system thereof
CN105824847B (en) A kind of method for evaluating quality of information integration
CN105761008A (en) Intelligent production management method for signal equipment maintenance
CN104199732B (en) A kind of PGA internal memories overflow intelligent processing method
CN108970918A (en) It is a kind of remind glue to rise again after the method and device that uses in validity period
CN106557986B (en) Photovoltaic power station equipment maintenance method
CN104156785A (en) Generation schedule optimization method taking into consideration thermal power unit-driven coal mill start and stop
CN108599233B (en) Method and device for determining admission capacity of power distribution network with distributed power supply
CN109165874A (en) A kind of work order urgency level analysis method and system based on platform area electricity consumption
CN107194529B (en) Power distribution network reliability economic benefit analysis method and device based on mining technology
CN112800625B (en) Method and system for determining full-clean power supply operation boundary of regional power grid
CN103413249A (en) Transformer substation equipment state assessment method based on computational formula
CN202815553U (en) Abnormal data automatic identification and management unit

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20160921

RJ01 Rejection of invention patent application after publication