CN105952148B - Easy-dismount aluminum alloy pattern plate support system and construction method in narrow movement joint - Google Patents

Easy-dismount aluminum alloy pattern plate support system and construction method in narrow movement joint Download PDF

Info

Publication number
CN105952148B
CN105952148B CN201610478145.1A CN201610478145A CN105952148B CN 105952148 B CN105952148 B CN 105952148B CN 201610478145 A CN201610478145 A CN 201610478145A CN 105952148 B CN105952148 B CN 105952148B
Authority
CN
China
Prior art keywords
aluminum alloy
pattern plate
alloy pattern
movement joint
back cord
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610478145.1A
Other languages
Chinese (zh)
Other versions
CN105952148A (en
Inventor
王新泉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Hi Speed Dejian Group Co Ltd
Original Assignee
Hangzhou Jiangrun Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Jiangrun Technology Co Ltd filed Critical Hangzhou Jiangrun Technology Co Ltd
Priority to CN201610478145.1A priority Critical patent/CN105952148B/en
Publication of CN105952148A publication Critical patent/CN105952148A/en
Application granted granted Critical
Publication of CN105952148B publication Critical patent/CN105952148B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G13/00Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The present invention relates to easy-dismount aluminum alloy pattern plate support system in a kind of narrow movement joint, mainly include:Aluminum alloy pattern plate, trapezoid block A, inverted trapezoidal block A, split bolt A, split bolt B and outside aluminum alloy pattern plate on the inside of rigid support, movement joint;Flooring of having constructed is provided with reserving hole, interts steel pipe in reserving hole;Rigid support is fixed together with aluminum alloy pattern plate in movement joint by split bolt A, and bottom is supported on steel pipe;Outside aluminum alloy pattern plate is fixed by split bolt B to drawing.Structure of the present invention has a convenient disassembly, and efficiency of construction is high, the features such as being suitable for different in width movement joint formwork requirement, has preferable economic technology benefit.

Description

Easy-dismount aluminum alloy pattern plate support system and construction method in narrow movement joint
Technical field
The present invention relates to a kind of construction method of narrow movement joint easy-dismount aluminum alloy pattern plate support system, belong to building construction work Journey field, suitable for high-layer shear force wall or frame structure movement joint(Width 80mm ~ 200mm subsiding crack, aseismatic joint, expansion joint) Locate formwork system construction.
Background technology
With the quickening of urbanization process, the build of building becomes increasingly complex, and volume is increasing, to ensure the peace of building Complete to use, many buildings often set the movement joints such as expansion joint, aseismatic joint, subsiding crack in design.For high-layer shear force wall knot The building of structure, due to movement joint relatively narrower, poured after deformation joint wall inner side template install it is very difficult, in the past construction when more adopted Mold method is reinforced with plug flitch in filling cystosepiment or seam, it is easy to causes to stitch interior bulging moding shape, seam inner template can not remove Phenomena such as clean, cause shear wall faulting of slab ends, the problems such as Forming Quality is poor, size is inconsistent up and down, to make the effect of movement joint beat greatly Discount, the normal safe handling of building is had a strong impact on, therefore, after deformation joint pouring the control of shear wall quality turns into a great Shi Work difficult point.Moreover, traditional deformation slit formwork generally use plank sheathing and steel form.The scene processing of plank sheathing needs several wood Work cooperating, narrow field, the difficulty of construction management is increased, and the plank sheathing number of turnover is few, it is costly.And steel form Global formation, can be with Reusability, and cast-in-situ stair section size is accurate, but input cost is big, and punching block turnover rate is low, and punching block Plate is heavier to be inconvenient to lift.
These problems run into for architectural stair in Practical Project, it is necessary to it is high, economic to develop a kind of efficiency of construction Property good movement joint support system construction method, exactly exploitation forms the present invention in this context, applied to actual change Preferable economic and social benefits will be produced in shape seam construction.
The content of the invention
Can not it is an object of the invention to drum moding shape, seam inner template in the movement joint for traditional movement joint formwork construction Phenomena such as clean is removed, causes shear wall faulting of slab ends up and down, the problems such as Forming Quality is poor, size is inconsistent, it is proposed that one kind is narrow Easy-dismount aluminum alloy pattern plate support system construction method in movement joint, this method is by aluminum alloy pattern plate on the inside of the good movement joint of pre-production and just Property support manufacturing it is assembled good after, be placed in integral hoisting to movement joint on steel pipe, treat steel reinforcement cage and outside aluminum alloy pattern plate peace Aluminum alloy pattern plate is fixed by split bolt after dress is in place, then one-piece casting concrete.
In order to realize above-mentioned technical purpose, present invention employs following technical scheme:
Easy-dismount aluminum alloy pattern plate support system in narrow movement joint, it is characterised in that the support system includes:Rigidity branch Aluminum alloy pattern plate, trapezoid block A, inverted trapezoidal block A, split bolt A, split bolt B and outside aluminum alloy pattern plate on the inside of support, movement joint;Construct Complete flooring is provided with reserving hole, interts steel pipe in reserving hole;Rigid support is consolidated with aluminum alloy pattern plate in movement joint by split bolt A It is scheduled on together, bottom is supported on steel pipe;Outside aluminum alloy pattern plate is fixed by split bolt B to drawing.
Further, described rigid support is welded by longitudinal square steel tube and horizontal square steel tube, in longitudinal square steel tube Inverted trapezoidal block A is welded with horizontal square steel tube infall, the bottom welding inverted trapezoidal block B, inverted trapezoidal block B are provided with evagination, longitudinal direction side Steel pipe top prepared screw-bolt hole A, and it is provided with suspension centre A.
Aluminum alloy pattern plate equably sets longitudinal back cord and horizontal back cord, longitudinal back cord and horizontal back cord on the inside of described movement joint Infall welds trapezoid block A, and lowermost layer welding trapezoid block B, trapezoid block B are provided with groove, and longitudinal back cord top opens up bolt hole B, And it is provided with suspension centre B.
Aluminum alloy pattern plate bottom sets leakproof rubber gasket on the inside of described movement joint.
Present invention also offers the construction method of easy-dismount aluminum alloy pattern plate support system in above-mentioned narrow movement joint.
The construction method of easy-dismount aluminum alloy pattern plate support system in narrow movement joint, it is characterised in that comprise the following steps:
Step 1: make aluminum alloy pattern plate on the inside of movement joint:Aluminum alloy pattern plate on the inside of movement joint(10)It is made by a monoblock aluminium sheet, Aluminium sheet equably welds longitudinal back cord(22)With horizontal back cord(23), longitudinal back cord(22)With horizontal back cord(23)Infall is set Trapezoid block A(9), bottom welding trapezoid block B(29), trapezoid block B(29)Provided with groove(27), longitudinal back cord(22)Top opens up Bolt hole B(24)And suspension centre B(25);
Step 2: make rigid support:Rigid support(4)By longitudinal square steel tube(20)With horizontal square steel tube(21)Welding and Into according to trapezoid block A(9)Position correspondence in rigid support(4)Upper longitudinal square steel tube(20)With horizontal square steel tube(21)Intersect Place welding inverted trapezoidal block A(5), bottom welding inverted trapezoidal block B(28), inverted trapezoidal block B(28)Provided with evagination(26), longitudinal square steel Pipe(20)Top opens up bolt hole A(19)And welding suspension centre A(6);
Step 3: aluminum alloy pattern plate and rigid support on the inside of assembling, lifting movement joint:By aluminium on the inside of make 2 pieces of movement joints Template(10)With rigid support(4)It is bolted together, top passes through split bolt A(12)It is fixed together and integral hoisting extremely becomes In shape seam, steel pipe is supported on(3)On;
Step 4: banding steel cage:By the good steel reinforcement cage of colligation(13)It is lifted into specified location, steel reinforcement cage(13)Equably Precast concrete is set to support(14);
Step 5: construction another side template of wallboard:Outside aluminum alloy pattern plate(15)The back side sets vertical keel(16)And hung Specified location is filled to, coordinates split bolt B(18), steel pipe back cord(17)By outside aluminum alloy pattern plate(15)Drawing is fixed together;
Step 6: casting concrete:Concreting pipe is stretched into from top to bottom, side concrete perfusion, side lifting pours Pipe;
Step 7: remove deformation slit formwork and rigid support:After concrete strength reaches collapsible die intensity, first dismounting pair Draw bolt A(12), jack is placed on the wall poured, jack top braces are in support bar(7)On unloaded Power and by rigid support(4)Hang, then carry out aluminum alloy pattern plate on the inside of movement joint(10)Remove.
The invention has the characteristics that and beneficial effect:
(1)Movement joint internal model uses aluminum alloy pattern plate regularization large form, and aluminum alloy pattern plate arrives with integral hoisting after rigid support assembling It is fixed in movement joint, only needs during form removable to remove fixing bolt, then is removed and carry out aluminum alloy pattern plate after rigid support and remove i.e. Can;
(2)The overall structure that aluminum alloy pattern plate regularization large form is welded into by aluminium sheet and back cord, it is integrally firm to greatly improve template Degree and intensity, trapezoidal block structure is uniformly set on aluminum alloy pattern plate back cord, for support shuttering stress point and be easy to the later stage Remove;
(3)The frame structure that rigidity supporting structure is welded into by square steel tube, rigid support tow sides uniformly set Trapezoidal block structure, occlusion structure is formed with the trapezoid block of template, for support shuttering stress point and be easy to the dismounting in later stage.
Brief description of the drawings
Fig. 1 is the longitudinal sectional drawing of easy-dismount aluminum alloy pattern plate support system in narrow movement joint;
Fig. 2 is aluminum alloy pattern plate construction stereogram on the inside of movement joint;
Fig. 3 is rigid support stereogram;
Fig. 4 is aluminum alloy pattern plate bottom detail enlarged detail on the inside of Fig. 2 movement joints;
Fig. 5 is Fig. 3 rigid support portion details enlarged details;
Fig. 6 is construction flow chart of the present invention;
In figure:1. flooring of having constructed, 2. reserving holes, 3. steel pipes, 4. rigid supports, 5. inverted trapezoidal block A, 6. suspension centre A, 7. support bar, 8. template back arris, 9. trapezoid block A, 10. movement joints inner side aluminum alloy pattern plate, 11. leakproof rubber gaskets, 12. split bolts A, 13. steel reinforcement cages, the support of 14. precast concretes, 15. outside aluminum alloy pattern plates, 16. vertical keels, 17. steel pipe back cords, 18. pairs of drawing spiral shells Bolt B, 19. bolt hole A, 20. longitudinal square steel tubes, 21. horizontal square steel tubes, 22. longitudinal back cords, 23. horizontal back cords, 24. bolts hole B, 25. suspension centre B, 26. evaginations, 27. grooves, 28- inverted trapezoidal block B, 29- trapezoid blocks B.
Embodiment
It is described in further detail below in conjunction with the accompanying drawings and by embodiment to the present invention, following examples are to the present invention Explanation be not limited to following examples.
Fig. 1 is the longitudinal sectional drawing of easy-dismount aluminum alloy pattern plate support system in narrow movement joint.Fig. 2 is aluminum dipping form on the inside of movement joint Plate constructs stereogram.Fig. 3 is rigid support stereogram.Fig. 4 is aluminum alloy pattern plate bottom detail enlarged detail on the inside of Fig. 2 movement joints.Fig. 5 It is Fig. 3 rigid support portion details enlarged details.
Easy-dismount aluminum alloy pattern plate support system in narrow movement joint as shown in Figure 1, mainly includes:Rigid support 4, movement joint Inner side aluminum alloy pattern plate 10, split bolt A12, trapezoid block 9, inverted trapezoidal block 5 and outside aluminum alloy pattern plate 15.Flooring 1 of having constructed is provided with pre- Box out hole 2, steel pipe 3 is interted in reserving hole 2, aluminum alloy pattern plate 10 is supported on steel pipe 3 on the inside of rigid support 4 and movement joint.
Certain high-layer shear force wall or frame structure movement joint width are 150mm, and template is made using 5mm thickness aluminium sheet, template Steel pipe back cord uses 20 × 30mm square type pipes, and rigid support is formed from 30 × 30mm square tubes soldering;Trapezoid block is by iron block edge Long side direction is oblique(45 degree)Cutting forms, and iron block is cuboid iron block(A length of 70mm, wide, a height of 30mm).
Fig. 2 is that aluminum alloy pattern plate 10 constructs stereogram on the inside of movement joint, and aluminium sheet is made after template selects 5mm, vertically and horizontally between Longitudinal back cord 22 and horizontal back cord 23 are welded away from 400mm;Longitudinal back cord 22 and horizontal back cord 23 infall welds trapezoid block A9, most Low layer welds trapezoid block B29, and trapezoid block B29 is provided with groove 27, and longitudinal top of back cord 22 opens up bolt hole B24, and is provided with and hangs Point B25.The bottom of aluminum alloy pattern plate 10 sets leakproof rubber gasket 11 on the inside of movement joint.
Fig. 3 is the stereogram of rigid support 4, and rigid support 4 is formed by 30 × 30mm square tubes soldering, longitudinal square steel tube 20 it Between spacing be 400mm, spacing is 400mm between horizontal square steel tube 21,.In longitudinal square steel tube 20 and the infall of horizontal square steel tube 21 Inverted trapezoidal block A5 is welded, the bottom welding inverted trapezoidal block B28, inverted trapezoidal block B28 are provided with evagination 26, and longitudinal top of square steel tube 20 is pre- Bolt hole A19 is stayed, and is provided with suspension centre A6.
The main construction course of easy-dismount aluminum alloy pattern plate support system is as follows in above-mentioned narrow movement joint:
Step 1: make aluminum alloy pattern plate on the inside of movement joint:Aluminum alloy pattern plate 10 is made by a monoblock aluminium sheet on the inside of movement joint, aluminium Plate equably welds longitudinal back cord 22 and horizontal back cord 23, and longitudinal back cord 22 and horizontal back cord 23 infall sets trapezoid block A9, The bottom welds trapezoid block B29, and trapezoid block B29 is provided with groove 27, and longitudinal top of back cord 22 opens up bolt hole B24 and suspension centre B25;
Step 2: make rigid support:Rigid support 4 is welded by longitudinal square steel tube 20 and horizontal square steel tube 21, root According to trapezoid block A9 position correspondences, longitudinal square steel tube 20 and horizontal square steel tube 21 infall welds inverted trapezoidal block in rigid support 4 A5, the bottom welding inverted trapezoidal block B28, inverted trapezoidal block B28 are provided with evagination 26, and longitudinal top of square steel tube 20 opens up bolt hole A19 And welding suspension centre A6;
Step 3: aluminum alloy pattern plate and rigid support on the inside of assembling, lifting movement joint:By aluminium on the inside of make 2 pieces of movement joints Template 10 is bolted together with rigid support 4, and top is fixed together by split bolt A12 and integral hoisting is to movement joint It is interior, it is supported on steel pipe 3;
Step 4: banding steel cage:The good steel reinforcement cage 13 of colligation is lifted into specified location, steel reinforcement cage 13 is equably set Precast concrete support 14;
Step 5: construction another side template of wallboard:The back side of outside aluminum alloy pattern plate 15 set vertical keel 16 and lifted to Specified location, coordinate split bolt B18, steel pipe back cord 17 that outside aluminum alloy pattern plate 15 is fixed together to drawing;
Step 6: casting concrete:Concreting pipe is stretched into from top to bottom, side concrete perfusion, side lifting pours Pipe;
Step 7: remove deformation slit formwork and rigid support:After concrete strength reaches collapsible die intensity, first dismounting pair Bolt A12 is drawn, jack is placed on the wall poured, jack top braces unload power simultaneously on support bar 7 Rigid support 4 is hung, aluminum alloy pattern plate 10 on the inside of movement joint is then carried out and removes.

Claims (3)

1. easy-dismount aluminum alloy pattern plate support system in narrow movement joint, it is characterised in that the support system mainly includes:Rigidity branch Support(4), aluminum alloy pattern plate on the inside of movement joint(10), trapezoid block A(9), inverted trapezoidal block A(5), split bolt A(12), split bolt B (18)With outside aluminum alloy pattern plate(15);Construct flooring(1)Provided with reserving hole(2), reserving hole(2)Interior interspersed steel pipe(3); Rigid support(4)With aluminum alloy pattern plate on the inside of movement joint(10)Pass through split bolt A(12)It is fixed together, bottom is supported on steel pipe (3)On;Outside aluminum alloy pattern plate(15)Pass through split bolt B(18)Fixed to drawing;Described rigid support(4)By longitudinal square steel tube (20)With horizontal square steel tube(21)It is welded, in longitudinal square steel tube(20)With horizontal square steel tube(21)Infall welds inverted trapezoidal Block A(5), bottom welding inverted trapezoidal block B(28), inverted trapezoidal block B(28)Provided with evagination(26), longitudinal square steel tube(20)Top is pre- Stay bolt hole A(19), and it is provided with suspension centre A(6);Aluminum alloy pattern plate on the inside of described movement joint(10)Longitudinal back cord is equably set (22)With horizontal back cord(23), longitudinal back cord(22)With horizontal back cord(23)Infall welding trapezoid block A(9), lowermost layer welding Trapezoid block B(29), trapezoid block B(29)Provided with groove(27), longitudinal back cord(22)Top opens up bolt hole B(24), and be provided with Suspension centre B(25).
2. easy-dismount aluminum alloy pattern plate support system in narrow movement joint according to claim 1, it is characterised in that described change Shape seam inner side aluminum alloy pattern plate(10)Bottom sets leakproof rubber gasket(11).
3. the construction method of easy-dismount aluminum alloy pattern plate support system in narrow movement joint, it is characterised in that comprise the following steps:
Step 1: make aluminum alloy pattern plate on the inside of movement joint:Aluminum alloy pattern plate on the inside of movement joint(10)It is made by a monoblock aluminium sheet, aluminium sheet Equably weld longitudinal back cord(22)With horizontal back cord(23), longitudinal back cord(22)With horizontal back cord(23)Infall sets trapezoidal Block A(9), bottom welding trapezoid block B(29), trapezoid block B(29)Provided with groove(27), longitudinal back cord(22)Top opens up bolt Hole B(24)And suspension centre B(25);
Step 2: make rigid support:Rigid support(4)By longitudinal square steel tube(20)With horizontal square steel tube(21)It is welded, According to trapezoid block A(9)Position correspondence in rigid support(4)Upper longitudinal square steel tube(20)With horizontal square steel tube(21)Infall welds Meet inverted trapezoidal block A(5), bottom welding inverted trapezoidal block B(28), inverted trapezoidal block B(28)Provided with evagination(26), longitudinal square steel tube (20)Top opens up bolt hole A(19)And welding suspension centre A(6);
Step 3: aluminum alloy pattern plate and rigid support on the inside of assembling, lifting movement joint:By aluminum alloy pattern plate on the inside of make 2 pieces of movement joints (10)With rigid support(4)It is bolted together, top passes through split bolt A(12)It is fixed together and integral hoisting is to movement joint It is interior, it is supported on steel pipe(3)On;
Step 4: banding steel cage:By the good steel reinforcement cage of colligation(13)It is lifted into specified location, steel reinforcement cage(13)Equably set Precast concrete supports(14);
Step 5: construction another side template of wallboard:Outside aluminum alloy pattern plate(15)The back side sets vertical keel(16)And lifted to Specified location, coordinate split bolt B(18), steel pipe back cord(17)By outside aluminum alloy pattern plate(15)Drawing is fixed together;
Step 6: casting concrete:Concreting pipe is stretched into from top to bottom, side concrete perfusion, side lifting pours pipe;
Step 7: remove deformation slit formwork and rigid support:After concrete strength reaches collapsible die intensity, first remove to drawing spiral shell Bolt A(12), jack is placed on the wall poured, jack top braces are in support bar(7)On unload power simultaneously By rigid support(4)Hang, then carry out aluminum alloy pattern plate on the inside of movement joint(10)Remove.
CN201610478145.1A 2016-06-23 2016-06-23 Easy-dismount aluminum alloy pattern plate support system and construction method in narrow movement joint Active CN105952148B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610478145.1A CN105952148B (en) 2016-06-23 2016-06-23 Easy-dismount aluminum alloy pattern plate support system and construction method in narrow movement joint

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610478145.1A CN105952148B (en) 2016-06-23 2016-06-23 Easy-dismount aluminum alloy pattern plate support system and construction method in narrow movement joint

Publications (2)

Publication Number Publication Date
CN105952148A CN105952148A (en) 2016-09-21
CN105952148B true CN105952148B (en) 2018-01-16

Family

ID=56904901

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610478145.1A Active CN105952148B (en) 2016-06-23 2016-06-23 Easy-dismount aluminum alloy pattern plate support system and construction method in narrow movement joint

Country Status (1)

Country Link
CN (1) CN105952148B (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106436731B (en) * 2016-11-03 2018-08-17 中国十七冶集团有限公司 Mass concrete alter-pouring strips mould plate installs strengthening construction system and installation method
CN106760498B (en) * 2016-11-28 2019-04-23 中国一冶集团有限公司 Concrete structure deformation joint template reinforcing device and reinforcement means
CN106677537A (en) * 2017-03-13 2017-05-17 中国十七冶集团有限公司 Formwork supporting method for frame beam columns at settlement joint between main building and attached building of civil architecture
CN108951828A (en) * 2018-07-25 2018-12-07 河海大学 A kind of integrated prefabricated structure of the dismountable pool wall of pool of template and its construction method
CN110984562B (en) * 2019-12-18 2022-05-13 核工业西南建设集团有限公司 Double-shear wall long and narrow deformation joint and construction method
CN111472541A (en) * 2020-05-26 2020-07-31 中国二十二冶集团有限公司 Expansion joint template and construction method thereof
CN112681729B (en) * 2020-12-22 2022-09-23 中国建筑第八工程局有限公司 Double-column formwork structure at deformation joint position and construction method thereof
CN114961238A (en) * 2022-05-29 2022-08-30 五冶集团上海有限公司 Formwork supporting system and method for same-layer construction of deformation joint of concrete structure
CN115822256A (en) * 2022-12-09 2023-03-21 山东三箭建设工程管理有限公司 Special formwork reinforcing and supporting device for deformation joint and deformation joint formwork reinforcing method

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07286374A (en) * 1994-04-18 1995-10-31 Toda Constr Co Ltd Construction of expansion joint
CN102296810A (en) * 2011-06-13 2011-12-28 常州市戴溪建筑工程有限公司 Deformation joint template support structure and construction method thereof
CN203247842U (en) * 2013-05-29 2013-10-23 中国十七冶集团有限公司 Reinforcing device of concrete structure expansion joint formwork
CN205000636U (en) * 2015-08-27 2016-01-27 亓洪钊 Reinforcing apparatus of concrete structure expansion joint template
CN105256995B (en) * 2015-09-02 2017-03-08 山东科技大学 A kind of shear wall structure movement joint inner side template bracing means and construction method
CN206205429U (en) * 2016-06-23 2017-05-31 深圳市金世纪工程实业有限公司 Easy-dismount aluminum alloy pattern plate support system in narrow movement joint

Also Published As

Publication number Publication date
CN105952148A (en) 2016-09-21

Similar Documents

Publication Publication Date Title
CN105952148B (en) Easy-dismount aluminum alloy pattern plate support system and construction method in narrow movement joint
CN205653944U (en) Prestressed concrete truss superimposed sheet
CN105971276B (en) Integral aluminum formwork stair one-step continuous pouring forming structure and construction method
CN105804395B (en) Stair continuously poured in one molding construction method based on monoblock type typified form
CN107419802A (en) A kind of Precast Concrete Frame and construction method
CN203213402U (en) Steel pipe column used for concrete pouring
CN104532953A (en) 3D printing based assembly type special-shaped column framework structure and construction method thereof
CN104153579B (en) A kind of formwork for placing structure of non-standard layers structure and construction method
CN103306463B (en) Metal liner concrete air channel construction method
CN204781960U (en) High -rise building shear force wall movement joint department template is propped up and is established and reinforcement system
CN110847050B (en) Large-span prefabricated corrugated steel web composite beam top and bottom plate synchronous pouring template and application method thereof
CN103276895A (en) Reversed-cone-shaped column cap die and die supporting method thereof
CN206205429U (en) Easy-dismount aluminum alloy pattern plate support system in narrow movement joint
CN105484421A (en) Ring beam formwork bricks and building secondary structure filler wall ring beam construction method
CN109356382A (en) Drawing and pulling type deformation joint formwork system and construction method
CN104213728B (en) Oblique beam for grandstand of stadium and construction process for oblique beam
CN108582426A (en) A kind of producing device and production method of stiffened column
CN209260922U (en) Band girder rib laminated floor slab pre-tensioning system connecting joint structure
CN204080844U (en) Assembled steel mould for foundation bearing platform of house building engineering
CN112523503B (en) Disassembly-free supporting system for concrete box girder inner mold and construction method
CN104847090B (en) Construction method of small-section-size ventilating duct
CN108930406A (en) Construction method for large-formwork narrow-space wall based on integral assembly
CN204703499U (en) Wall of High-building deformation joint template
CN209799360U (en) combined movable steel formwork
CN211548353U (en) Exempt from inferior stupefied assembled and protect mould intergral template

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20191115

Address after: 253000 Dongcheng International Building, 38 East Road, Dezhou economic and Technological Development Zone, Shandong

Patentee after: SHANDONG DEJIAN GROUP Co.,Ltd.

Address before: 310015, room 3, unit 3, Gongshu District Wanda Commercial Center, Hangzhou, Zhejiang 1901, China

Patentee before: HANGZHOU JIANGRUN TECHNOLOGY Ltd.

TR01 Transfer of patent right
CP01 Change in the name or title of a patent holder

Address after: 253000 Dongcheng international building, Sanba East Road, Dezhou Economic and Technological Development Zone, Shandong Province

Patentee after: Shandong Expressway Dejian Group Co.,Ltd.

Address before: 253000 Dongcheng international building, Sanba East Road, Dezhou Economic and Technological Development Zone, Shandong Province

Patentee before: SHANDONG DEJIAN GROUP Co.,Ltd.

CP01 Change in the name or title of a patent holder