CN105951869B - A kind of construction method of the not reserved construction joint Tower Crane Foundation by Steel Lattice Column of underground garage - Google Patents
A kind of construction method of the not reserved construction joint Tower Crane Foundation by Steel Lattice Column of underground garage Download PDFInfo
- Publication number
- CN105951869B CN105951869B CN201610377020.XA CN201610377020A CN105951869B CN 105951869 B CN105951869 B CN 105951869B CN 201610377020 A CN201610377020 A CN 201610377020A CN 105951869 B CN105951869 B CN 105951869B
- Authority
- CN
- China
- Prior art keywords
- tower crane
- steel
- lattice column
- construction
- steel lattice
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/42—Foundations for poles, masts or chimneys
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/44—Foundations for machines, engines or ordnance
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2250/00—Production methods
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
A kind of construction method of the not reserved construction joint Tower Crane Foundation by Steel Lattice Column of underground garage, including:Determination → deposited reinforced concrete pile and the steel lattice column construction of tower crane arrangement and method for construction → tower crane earth excavation → steel lattice column top concrete cleaning, welding anchor bar → tower crane construction → tower crane installation → underground garage construction of bottom plates → top plate of underground parking garage construction → tower crane are removed.Tower crane earthwork excavated volume of the present invention is few, it goes without doing precipitation and steel sheet pile supporting;Using being translated on SBS modified asphalt waterproof coiled materials on steel lattice column, the gap between steel lattice column and concrete cushion is cut off, 3mm thickness steel plate for sealing water is welded in the border of steel lattice column, solves leakage problems;Underground garage bottom plate and top plate of underground parking garage are in tower crane position without indwelling construction joint, baseplate reinforcing bar, roof steel bar need not be disconnected through steel lattice column, ensure the overall security of structure, save because of indwelling construction joint and caused by cost, shorten the duration, ensure construction quality.
Description
Technical field
The present invention relates to residence building group the realm of building construction, and in particular to a kind of not reserved construction joint steel latticework of underground garage
The construction method of post tower crane.
Background technology
With the rapid development of economic construction of China, surface parking lots can not meet to use needs, high residential building
Housing-group can all set underground garage, and in residence building group building construction process, the determination of tower crane arrangement and method for construction is that whole building is applied
Key construction technology in work, directly influence safety, cost and duration.The position of tower crane can only be seated in underground garage
In, thing followed construction difficult problem is more and more, currently in order to solve such problem increases steel in deposited reinforced concrete pile
Lattice column.
The documents 1 of Application No. 201320123715.7 disclose a kind of lattice pillar tower crane, and cushion cap installs
Between basement bottom board bottom surface and foundation pile, the difficulty of construction of tower crane is reduced, it is ensured that project progress, but tower crane base
Plinth earthwork excavated volume is big, needs to carry out gib.Application No. 201320061784.X documents 2 disclose a kind of steel
The three-back-shaped concrete bearing platform Combined tower crane fundamental mechanism of lattice column, steel lattice column top have poured Back Word type concrete construction and held
Platform, ensure tower crane construction safety, solve the problems, such as that deep foundation pit construction vertical transport is inserted in advance, but basement roof needs
Reserved construction joint.The documents 3 of Application No. 201210065292.8 disclose a kind of concrete-filled tower crane foundation lattice
The pouring construction method of structure post, galvanized steel wire netting is wrapped up and is fixed on lattice column periphery, while poured and fill out in hollow cavity
Full concrete is to stake top, and lattice column construction finished surface is clean, and lattice column bulk strength and rigidity improve, but agent structure be present
Reinforcing bar can not pass through the problem of constructional column.Application No. 201310041910.X documents 4 disclose a kind of steel lattice column
Back Word type concrete bearing platform Combined tower crane foundation structure and construction method, horizontal cross brace and vertical is provided between steel lattice column
Bridging, steel lattice column bottom are inserted in cast-in-situ bored pile, and cast-in-situ bored pile is located under basement bottom board, is solved deep basal pit and is applied
The problem of work vertical transport is inserted in advance, but needing to stay sets construction joint.
The content of the invention
The technical problem to be solved in the present invention is, for deficiencies of the prior art, there is provided a kind of underground garage
The construction method of not reserved construction joint Tower Crane Foundation by Steel Lattice Column, is optimized, working procedure adds to Tower Crane Foundation by Steel Lattice Column
To improve, solve the problems, such as that prior art needs reserved construction joint, meet construction needs, cost-effective, shortening duration.
The present invention is that technical scheme is used by solving above-mentioned technical problem:
The construction method of the not reserved construction joint Tower Crane Foundation by Steel Lattice Column of underground garage, comprises the following steps:
Step S1, the determination of tower crane arrangement and method for construction:Position including tower crane is determined with steel lattice column length L really
It is fixed, wherein, underground garage basis, post-cast strip, difference of height position are avoided in tower crane position;Steel lattice column length L=anchor into reinforcing bar
Thickness+outer open country of the thickness of the height of cast-in-place concrete pile+underground garage bottom plate+underground garage floor height+top plate of underground parking garage
The height of the length of lower shed deckhead+anchor into tower crane;
Step S2, deposited reinforced concrete pile and steel lattice column construction:Bored concrete pile drilling is completed first, then according to design
The size and thickness of drawing requirement, steel reinforcement cage, the steel plate for sealing water of steel lattice column, batten plate, angle steel are made, welding is in place, installs steel
Muscle cage, steel lattice column, according to the tower crane stake bottom absolute altitude concrete perfusion of design, form deposited reinforced concrete pile;
Step S3, tower crane earth excavation:Tower crane bottom absolute altitude(Cushion cap bottom surface absolute altitude)According to the designed elevation earthwork
Cutting depth is that hydraulic backhoe once excavates in place, without precipitation and steel sheet pile supporting within 2m;
Step S4, the cleaning of steel lattice column top concrete, welding anchor bar:Carry out cast-in-situ bored pile pile crown and pick chisel, will
Steel lattice column top concrete is cleaned out, and then welds anchor bar;
Step S5, tower crane is constructed:Including tower crane cushion construction, tower crane reinforcing bar colligation construction, Yi Jita
Base concrete is hung to pour and conserve;
Step S6, tower crane installation, the horizontal support installation of steel lattice column:Tower crane is arranged on tower crane;In steel lattice
Horizontal support is installed on structure post;
Step S7, underground garage construction of bottom plates:Underground garage bottom plate treatment measures are worn in steel lattice column support, and steel lattice column is worn
More the underplate concrete of underground garage bottom plate when, steel lattice column can not premature removal, not indwelling construction joint on underground garage bottom plate,
The border position welding steel plate for sealing water of steel lattice column among underground garage bottom plate, and set SBS to change in the border of steel lattice column
Property asphalt water-proof coiled material;Then base plate steel bar binding construction is carried out, baseplate reinforcing bar does not turn off through steel lattice column, finally carries out bottom
Board concrete is constructed;
Step S8, top plate of underground parking garage is constructed:Not indwelling construction joint on top plate of underground parking garage, among top plate of underground parking garage
The border position welding steel plate for sealing water of steel lattice column;Then roof steel bar colligation construction is carried out, roof steel bar passes through steel lattice column
Do not turn off, finally carry out concrete roof construction;
Step S9, tower crane is removed.
By such scheme, steel lattice column length L is also determined by checking simultaneously in the step S1.
By such scheme, the border for turning over 200mm steel lattice columns in the step S7 on SBS modified asphalt waterproof coiled materials is set
Put.
By such scheme, the steel plate for sealing water welded in step S7, S8 is that 3mm is thick, 200mm is wide.
The operation principle of the present invention:Do not stayed in underground garage work progress and set construction joint, engineering main body at initial stage reinforcing bar mixes
Tower crane arrangement and method for construction is determined during solidifying native filling pile construction, the pile foundation of tower crane is synchronous with main body deposited reinforced concrete pile
Construction;Start earthwork, foundation construction, tower crane installation after the pile foundation intensity of tower crane reaches design requirement, ensure tower crane
Use of the satisfaction when subterranean excavation constructs first of support, underground garage bottom plate and top plate are in tower crane position without indwelling
Construction joint, reinforcing bar need not disconnect, and ensure the overall security of structure.
Compared with prior art, the beneficial effects of the invention are as follows:
1st, tower crane utilizes the combination of cast-in-place concrete pile and lattice column in the inventive method, determines the mark of tower crane
Height is simple structure, convenient construction, safe and reliable on top plate, has preferable economic benefit and social benefit;
2nd, tower crane earthwork excavated volume is few, it goes without doing precipitation and steel sheet pile supporting, solves the tower crane of documents 1
Earthwork excavated volume is big, the problems such as needing gib and top plate to reserve construction joint;
3rd, using being translated on SBS modified asphalt waterproof coiled materials on steel lattice column, cut-out steel lattice column and concrete cushion it
Between gap, steel lattice column border weld 3mm thickness steel plate for sealing water, solve leakage problems;
4th, construction joint need not be reserved at underground garage bottom plate, top plate of underground parking garage, material is saved, saves duration, ground
Reinforcing bar at house bottom plate and top plate of underground parking garage of getting off need not disconnect, and meet structure safety, solve basement in documents 2
Top plate needs the problems such as reserved construction joint, and the construction of constructional column can not be passed through by also solving agent structure reinforcing bar in documents 3
Problem, also solve the problems, such as to need to stay in file 4 to set construction joint;
5th, tower crane is removed and transported outward and be easy for construction on top plate of underground parking garage.
Brief description of the drawings
Fig. 1 is the design drawing of the not reserved construction joint Tower Crane Foundation by Steel Lattice Column of underground garage of the present invention;
Fig. 2 is the assembling structure schematic diagram that steel lattice column coordinates with steel plate for sealing water;
Fig. 3 is the structural representation that steel lattice column coordinates with concrete cushion and SBS modified asphalt waterproofs;
In figure, 1, tower crane, 2, concrete roof, 3, tower crane, 4, underplate concrete, 5, steel lattice column, 6, reinforcing bar mixes
Coagulate native bored concrete pile, 7, horizontal support, 8, roof steel bar, 9, steel plate for sealing water, 10, baseplate reinforcing bar, 11, concrete cushion, 12, SBS
Modified asphalt waterproof.
Embodiment
The present invention is described in detail with reference to the accompanying drawings and examples.
Shown in 1 ~ Fig. 3 of reference picture, underground garage of the present invention does not reserve applying for construction joint Tower Crane Foundation by Steel Lattice Column
Work method, workflow include:Determination → deposited reinforced concrete pile and steel lattice column construction → tower crane of tower crane arrangement and method for construction
Basic earthwork excavation → steel lattice column top concrete cleaning, welding anchor bar → tower crane construction → tower crane installation → ground
House bottom plate construction → top plate of underground parking garage construction → tower crane of getting off is removed.
Step S1, the determination of tower crane arrangement and method for construction:Position including tower crane 3 is determined with the length L of steel lattice column 5 really
It is fixed, wherein, underground garage basis, post-cast strip, difference of height position are avoided in the position of tower crane 3, and tower crane 3 is regioselective good
It is bad to directly influence subsequent construction difficulty and safety guarantee;The height of the length L of steel lattice column 5=anchor into deposited reinforced concrete pile 6
(2.1m)The thickness of+underground garage bottom plate(0.4m)+ underground garage floor height(5.6m)The thickness of+top plate of underground parking garage(0.45m)+
The length of exposed top plate of underground parking garage(0.3m)+ anchor into the height of tower crane 3(0.3m)=9.15m;The length L of steel lattice column 5 is same
When also pass through check determine;
Step S2, deposited reinforced concrete pile 6 and steel lattice column 5 are constructed:Bored concrete pile drilling is completed first, and then basis is set
The size and thickness of drawing requirement are counted, makes steel reinforcement cage, steel plate for sealing water 9, batten plate, the angle steel of steel lattice column 5, welding is in place, peace
Steel reinforcement cage, steel lattice column 5 are filled, according to the tower crane stake bottom absolute altitude concrete perfusion of design, forms deposited reinforced concrete pile 6;
Step S3, the earth excavation of tower crane 3:Tower crane bottom absolute altitude(Cushion cap bottom surface absolute altitude)According to the designed elevation earthwork
Cutting depth is that hydraulic backhoe once excavates in place, it is not necessary to precipitation and steel sheet pile supporting within 2m;
Step S4, the cleaning of steel lattice column top concrete, welding anchor bar:Carry out cast-in-situ bored pile pile crown and pick chisel, will
The top concrete of steel lattice column 5 is cleaned out, and then welds anchor bar;
Step S5, tower crane 3 is constructed:Including the cushion construction of tower crane 3, the reinforcing bar colligation of tower crane 3 is constructed, and
The concreting of tower crane 3 and maintenance;
Step S6, tower crane 1 is installed, the horizontal support of steel lattice column 57 is installed:Tower crane 1 is arranged on tower crane 3,
Horizontal support 7 is installed on steel lattice column 5;
Step S7, underground garage construction of bottom plates:Underground garage bottom plate treatment measures, steel lattice column 5 are worn in the support of steel lattice column 5
When passing through the underplate concrete 4 of underground garage bottom plate, steel lattice column 5 can not premature removal, on underground garage bottom plate not indwelling apply
Work is stitched, the steel plate for sealing water 9 that the border position welding 3mm of steel lattice column 5 is thick among underground garage bottom plate, 200mm is wide, and in steel
The border of lattice column 5 sets SBS modified asphalt waterproof coiled materials 12, and the border that 200mm steel lattice columns 5 are turned on coiled material 12 is set;So
The colligation of baseplate reinforcing bar 10 construction is carried out afterwards, and baseplate reinforcing bar 10 does not turn off through steel lattice column 5, finally carries out underplate concrete 4 and applies
Work;
Step S8, top plate of underground parking garage is constructed:Not indwelling construction joint on top plate of underground parking garage, among top plate of underground parking garage
The border position welding 3mm thickness of steel lattice column 5,200mm wide steel plate for sealing water 9;Then the colligation of roof steel bar 8 construction, top are carried out
Slab muscle 8 does not turn off through steel lattice column 5, finally carries out concrete roof 2 and constructs;
Step S9, tower crane 3 is removed.
The above-described right model for being only presently preferred embodiments of the present invention, the present invention can not being limited with this certainly
Enclose, therefore the equivalence changes made according to scope of the present invention patent, still belong to protection scope of the present invention.
Claims (3)
1. the construction method of the not reserved construction joint Tower Crane Foundation by Steel Lattice Column of a kind of underground garage, it is characterised in that including as follows
Step:
Step S1, the determination of tower crane arrangement and method for construction:Position including tower crane determines and steel lattice column length L determination, its
In, underground garage basis, post-cast strip, difference of height position are avoided in tower crane position;Steel lattice column length L=anchor into reinforced concrete
The thickness of the height of native bored concrete pile+underground garage bottom plate+underground garage floor height+thickness of top plate of underground parking garage+is got off exposedly
The height of the length of storehouse top plate+anchor into tower crane;
Step S2, deposited reinforced concrete pile and steel lattice column construction:Bored concrete pile drilling is completed first, then according to design drawing
It is required that size and thickness, make steel reinforcement cage, the steel plate for sealing water of steel lattice column, batten plate, angle steel, welding is in place, installation steel reinforcement cage,
Steel lattice column, according to the tower crane stake bottom absolute altitude concrete perfusion of design, form deposited reinforced concrete pile;
Step S3, tower crane earth excavation:Tower crane bottom absolute altitude is liquid within 2m according to designed elevation earth excavation depth
Pressure backacter once excavates in place, without precipitation and steel sheet pile supporting;
Step S4, the cleaning of steel lattice column top concrete, welding anchor bar:Carry out cast-in-situ bored pile pile crown and pick chisel, by steel lattice
Structure column top concrete is cleaned out, and then welds anchor bar;
Step S5, tower crane is constructed:Including tower crane cushion construction, tower crane reinforcing bar colligation construction, and tower crane base
Plinth concreting and maintenance;
Step S6, tower crane installation, the horizontal support installation of steel lattice column:Tower crane is arranged on tower crane;In steel lattice column
Upper installation horizontal support;
Step S7, underground garage construction of bottom plates:Underground garage bottom plate treatment measures are worn in steel lattice column support, and steel lattice column passes through ground
Get off house bottom plate underplate concrete when, steel lattice column can not premature removal, not indwelling construction joint on underground garage bottom plate, on ground
Get off the border position welding steel plate for sealing water of steel lattice column among house bottom plate, and set SBS to be modified drip in the border of steel lattice column
Blue or green waterproof roll;Then base plate steel bar binding construction is carried out, baseplate reinforcing bar does not turn off through steel lattice column, finally carries out bottom plate and mixes
Solidifying soil application work;
Step S8, top plate of underground parking garage is constructed:Not indwelling construction joint on top plate of underground parking garage, the steel lattice among top plate of underground parking garage
The border position welding steel plate for sealing water of structure post;Then roof steel bar colligation construction is carried out, roof steel bar is continuous through steel lattice column
Open, finally carry out concrete roof construction;
Step S9, tower crane is removed.
2. the construction method of the not reserved construction joint Tower Crane Foundation by Steel Lattice Column of underground garage according to claim 1, it is special
Sign is that the border for turning over 200mm steel lattice columns in the step S7 on SBS modified asphalt waterproof coiled materials is set.
3. the construction method of the not reserved construction joint Tower Crane Foundation by Steel Lattice Column of underground garage according to claim 1, it is special
Sign is that the steel plate for sealing water welded in step S7, S8 is that 3mm is thick, 200mm is wide.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610377020.XA CN105951869B (en) | 2016-05-31 | 2016-05-31 | A kind of construction method of the not reserved construction joint Tower Crane Foundation by Steel Lattice Column of underground garage |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610377020.XA CN105951869B (en) | 2016-05-31 | 2016-05-31 | A kind of construction method of the not reserved construction joint Tower Crane Foundation by Steel Lattice Column of underground garage |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105951869A CN105951869A (en) | 2016-09-21 |
CN105951869B true CN105951869B (en) | 2017-12-15 |
Family
ID=56908590
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610377020.XA Active CN105951869B (en) | 2016-05-31 | 2016-05-31 | A kind of construction method of the not reserved construction joint Tower Crane Foundation by Steel Lattice Column of underground garage |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105951869B (en) |
Families Citing this family (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106836309A (en) * | 2016-12-30 | 2017-06-13 | 上海建工七建集团有限公司 | In fish belly sill bracing members system in sole plate steel column anti-seepage construction method |
CN110847213A (en) * | 2019-12-12 | 2020-02-28 | 天津天一建设集团有限公司 | Light steel cage type tower crane pedestal and assembly construction method |
CN111042594B (en) * | 2019-12-28 | 2021-09-07 | 山东天齐置业集团股份有限公司 | Construction process of elevator foundation at post-cast strip position of garage top plate settlement |
CN111058473B (en) * | 2019-12-30 | 2021-05-07 | 朱夏武 | Anti-seepage structure for tower crane foundation in basement bottom plate of building and construction method |
CN111364476A (en) * | 2020-03-24 | 2020-07-03 | 中国十七冶集团有限公司 | Waterproof construction method for lattice column penetrating structural slab |
CN114215096A (en) * | 2021-12-13 | 2022-03-22 | 珠海华发人居生活研究院有限公司 | Tower crane lattice column pile foundation bearing platform |
CN114837213A (en) * | 2022-05-23 | 2022-08-02 | 中国二十二冶集团有限公司 | Tower crane foundation structure and construction method thereof |
CN115182340A (en) * | 2022-09-01 | 2022-10-14 | 中国建筑第五工程局有限公司 | Construction method of novel precast pile comprehensive tower crane pile under complex geological condition |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5910623A (en) * | 1982-07-08 | 1984-01-20 | Takenaka Komuten Co Ltd | Foundation structure of selfsupported type stationary crane |
CN100564700C (en) * | 2007-12-26 | 2009-12-02 | 浙江省长城建设集团股份有限公司 | The job practices of lattice type steel column tower crane pedestal |
CN102587407A (en) * | 2012-03-23 | 2012-07-18 | 舜元建设(集团)有限公司 | Construction method for tower crane foundation without bearing platform in deep foundation pit |
CN203034476U (en) * | 2013-02-04 | 2013-07-03 | 中天建设集团有限公司 | Tower crane base structure in type of combination of steel latticework columns and concrete bearing platform shaped like Chinese character 'hui' |
CN203145038U (en) * | 2013-03-19 | 2013-08-21 | 中建保华建筑有限责任公司 | Latticed column type tower crane foundation |
-
2016
- 2016-05-31 CN CN201610377020.XA patent/CN105951869B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN105951869A (en) | 2016-09-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105951869B (en) | A kind of construction method of the not reserved construction joint Tower Crane Foundation by Steel Lattice Column of underground garage | |
CN205742213U (en) | Foundation pit supporting construction | |
CN102162258B (en) | Concrete-filled steel tubular high-pile tower footing structure of tower crane and construction method thereof | |
CN212641473U (en) | Foundation pit supporting structure adjacent to existing building | |
CN111733837B (en) | Rock slope filling and sealing protection system and construction method | |
CN102071698B (en) | Construction method of beddings of foundation downward overturn beam and pile cap | |
CN103306301A (en) | Pile foundation structure and construction method thereof based on fender post and basement baseplate | |
CN106065628B (en) | Based on the major diameter running water pipe security protection construction method faced forever with reference to theory | |
CN111636417A (en) | Grouting type steel pipe pile and construction method thereof | |
CN106480891B (en) | A kind of shaft construction method | |
CN216041201U (en) | Earlier prop and dig double-deck diagonal bracing foundation ditch enclosure system afterwards | |
CN201991013U (en) | High-piled tower footing structure of tower crane concrete-filled steel tube | |
CN107326932B (en) | Quasi-semi-reverse construction method for underground garage | |
CN113697640A (en) | Finished hoistway of integrally assembled elevator added in existing multi-story building and construction method | |
CN111809662B (en) | Subway station underground structure combination construction method | |
CN206477341U (en) | A kind of foundation pit support system | |
CN205742290U (en) | A kind of bottom plate rear pouring tape force transferring structure | |
CN107326924A (en) | Outer wall of underground structure HCMW engineering methods overlap wall and its construction method | |
CN111827349A (en) | Method for quickly constructing underground structure of subway station by adopting combined structure technology | |
CN110820756A (en) | Shield well and vertical shaft deep foundation pit excavation safety construction method | |
CN216339582U (en) | Combined inclined support for foundation pit support | |
CN116464060A (en) | Construction method for accelerating high-span region structure at high-low span position of basement bottom plate | |
CN213709548U (en) | Advanced structure system for positive and negative zero beam plates in deep foundation pit building seat area | |
CN211421139U (en) | Shield constructs well crown beam bearing structure | |
CN210766861U (en) | Portal formula building pile foundation underpins structure under narrow and small space |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |