Prior art keywords
construction
styrofoam
construction method
concrete
waterproof
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610385482.6A
Other languages
Chinese (zh)
Other versions
CN105951842B (en
Inventor
赵迎晨
宋宝国
李国宁
陈宝贵
乔学萍
孙健
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NINGXIA CONSTRUCTION ENGINEERING GROUP Co Ltd
Original Assignee
NINGXIA CONSTRUCTION ENGINEERING GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NINGXIA CONSTRUCTION ENGINEERING GROUP Co Ltd filed Critical NINGXIA CONSTRUCTION ENGINEERING GROUP Co Ltd
Priority to CN201610385482.6A priority Critical patent/CN105951842B/en
Publication of CN105951842A publication Critical patent/CN105951842A/en
Application granted granted Critical
Publication of CN105951842B publication Critical patent/CN105951842B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Revetment (AREA)

Abstract

The invention discloses a raft lower reversed beam polystyrene board caul construction method, and belongs to the technical field of building construction. The construction method comprises the procedures of: surveying and setting out, earth excavation, casting of a concrete cushion layer, construction of brick caul around the outer periphery of a foundation and plastering of the inner surface, waterproof construction, construction of a waterproof protecting layer, binding of foundation beam reinforcements, fixation of a finished polystyrene board, binding of foundation raft reinforcements, concrete casting and curing of a foundation beam slab. Compared with a traditional dot type excavation construction mode, the raft lower reversed beam polystyrene board caul construction method is simple and fast, is high in construction efficiency, improves the construction quality, and effectively reduces the construction cost.

Description

Reversed beam styrofoam fetal membrane construction method under raft plate
Technical field
The invention belongs to building engineering construction field, particularly relate to reversed beam styrofoam fetal membrane construction method under a kind of raft plate.
Background technology
In construction at present, the lower reversed beam construction in basis mainly uses point type excavation operation: basis beam slab part is excavated to designed elevation, casting concrete bed course, builds beam brick fetal membrane by laying bricks or stones; plaster, construction waterproof, construction waterproof protective layer; colligation basis beam reinforced steel bar, pours foundation beam board concrete;Point type excavates, concrete cushion pours, brick fetal membrane is built by laying bricks or stones, brick fetal membrane is plastered, waterproof construction difficulty is big, and difficult quality is control.
Summary of the invention
The present invention be directed to the weak point that reversed beam construction under existing basis mainly uses point type excavation operating type to exist, it is provided that reversed beam styrofoam fetal membrane construction method under a kind of raft plate.
The technical scheme is that such: be that absolute altitude at the bottom of following reversed beam bed course is for according to large area earth excavation, a casting concrete bed course; waterproof layer, pea gravel concreten protective layer, successively colligation reversed beam reinforcing bar is done on bed course; doing fetal membrane with solid styrofoam between reversed beam space, casting concrete forms.
Reversed beam styrofoam fetal membrane construction method under raft plate, the operation of this construction method includes: surveying setting-out-earth excavation-casting concrete bed course-build by laying bricks or stones basis periphery brick fetal membrane and inner face plaster-waterproof construction-fish tail and waterproof layer construction-foundation beam reinforcing bar binding-fix finished product styrofoam-Base isolation system reinforcing bar binding-basis beam slab concrete placings and maintenance.
Described earth excavation operation is: pit earthwork uses earthmoving machinery stage excavation, the upper operation in backacter hole, and bottom foundation ditch, to carry out labor cleaning levelling for indwelling 20~30cm soil layer, and the gradient coefficient that excavation slope is specified by soil property kind and specification puts slope.
Described casting concrete bed course operation is: 1, according to axial line control stake by outer side bar axis pilot measurement to foundation ditch bottom surface; bed course outer edge is determined according to outer side bar axis; the determination of bed course outer edge is considered as the revetment thickness of side bar, the thickness of screed-coat, the thickness of waterproof layer, the thickness of fish tail and waterproof layer, and should be greater than surveying outside revetment 100;2, bed course side form uses 100 wide array punching blocks or the flitch of 5 × 10, fixes with the reinforcing bar of ¢ 12, then pours into a mould concrete cushion.
Described build basis periphery brick fetal membrane by laying bricks or stones and inner face plastering process is: after 1, cushion construction is complete, answer pilot measurement control stake axis and carry out the unwrapping wire of revetment;2, the thick brick loose tool revetment of foundation ditch surrounding 240, uses 240*120*90 porous brick, and MU10 masonry of cement mortar, highly with raft plate top mark height;3, use 20 thick 1:2.5 cement mortar screedings inside brick loose tool, at inner corner trim, smear into the circular arc that radius is 5.
Described waterproof construction operation is: 1, require that paving construction temperature is not less than 5 degree;2, coil waterproof layer is constructed by full bonding, long edge lap width cannot be less than 100mm, and the minor face lap of splice cannot be less than 150, if waterproof layer is double-deck, up and down the seam of the adjacent two width coiled materials of two-layer should stagger 1/3 fabric width, and two layers of coiled materials must not be mutually perpendicular to paving.Reserve 300 width at revetment top and be laid in revetment top, and build by laying bricks or stones by dry-laid one layer or low grade mortar, carry out waterproof layer and get rid of the protection of head;3, coil waterproof layer uses 4 SBS waterproof rolls.
Described foundation beam reinforcing bar binding operation is: 1, eject lower reversed beam sideline, basis according to construction drawing;
2, stirrup → wear the main muscle → picture stirrup position line → tied framework → removing supporters skeleton in place is put by the quantity calculated; skeleton upper longitudinal bar uses hitch colligation with stirrup; colligation should firmly, put in place; make skeleton not run-off the straight, loosen; the protective layer cushion block of beam muscle has been padded before vertically and horizontally beam muscles and bones frame is in place; cushion block uses 1:2.5 cement mortar to make, spacing 1000;3, for convenience of beam steel bar colligation, door opening formula temporary support (using steel pipe to set up, interim frame is higher than deck-molding 200) can be set up, after treating beam muscle colligation, remove bracing frame, beam is in place.
Described fixing finished product styrofoam operation is: 1, before styrofoam construction, it is necessary to according to space between in design drawing every piece basic reversed beam, carries out styrofoam length and width, thick design, draws arrangement figure;Propose styrofoam fabrication plan according to arrangement figure, entrust styrofoam processing factory to be processed;2, full coat bonding mucilage on the fish tail and waterproof layer of basis, pastes styrofoam, adjacent styrofoam side also full coat bonding mucilage jam-packed by styrofoam arrangement figure; extrusion rubber cement perching knife strikes off; if reversed beam height is higher, styrofoam should be layered the fissure of displacement and paste, and edge joint position must be closed with rubber cement;3, for strengthen styrofoam intensity also can be with inorganic mortar full coat one time;4, after styrofoam has pasted 24 hours, next process can be carried out.
Described Base isolation system reinforcing bar binding operation is: 1. before colligation sole plate reinforcing bar; wood glue plate is discarded as steel bar horse-shaped bench and the backing plate of cushion block of concrete bar protective layer by the bar shaped that spacing 1000 lay > 300 is wide at styrofoam top; preventing split heads from thrusting in styrofoam, cushion block of concrete bar protective layer is arranged on wood glue plate by spacing 1000 quincunx;2, after colligation complete raft slab muscle, raft slab muscle, reversed beam reinforcing bar and split heads reinforcing bar can be made to form one can be by the space structure of temporary construction load, can be as temporary road after spreading bamboo frame plate, to facilitate the carrying out of subsequent handling.
Described basic beam slab concrete placings and maintenance operation be: after 1, reinforcing bar concealment acceptance and styrofoam loose tool fix acceptance(check), can casting concrete;2, concrete construction uses the construction method of commerical ready-mixed concrete, delivery pump conveying, and the slump of concrete mix is 160mm~180, uses material distributing machine to pour, and poker vibrator and flat vibrator vibrate;3, preferably using 30mm diameter internal vibration rod carefully vibrated concrete at raft plate, basis reversed beam styrofoam loose tool surrounding, vibrating spear inserts spacing 300mm.Must vibrate by prescribed distance, must not leak and shake.When vibrating, vibrating spear must not touch styrofoam, and raft plate top surface application vibration board vibrates and the most levelling;4, concreting should pour along the mode that building longitudinal direction tack advances, when pouring should first beam, raft plate, adjacent beams should pour in symmetrical blanking;5, water seasoning in time in complete 12 hours of concreting, curing time is no less than 14 days, and for guaranteeing concrete quality, scene sets special messenger and carries out the concrete curing of this engineering, prevents concrete dehydration in early days and desciccation crack phenomenon from occurring.
The present invention has a following remarkable result:
1, excavation of foundation pit uses a large area molding, quick construction, efficiently.
2, under styrofoam fetal membrane construction raft plate, reversed beam, owing to using styrofoam (EPS) as lower reversed beam side form and raft plate bed die, reduces construction cost, accelerating construction progress, easy and simple to handle.
3, construction of waterproof layer is easy, and easily control waterproof construction quality, quality of waterproof layer significantly improves.
4, the inventive method finished product styrofoam fixed installation measure is perfect, and styrofoam loose tool displacement when can effectively stop concrete to be poured into a mould, raft foundation Forming Quality is good.
5, reversed beam reinforcing bar under elder generation of the present invention colligation, fetal membrane of constructing afterwards, improve working environment, is effectively improved reinforcing bar binding efficiency, saves artificial, accelerating construction progress, it is ensured that reinforcing bar binding quality.
Accompanying drawing explanation
Fig. 1 is the process flow chart of construction method of the present invention;
Fig. 2 is construction method face structural representation of the present invention;
Fig. 3 is that styrofoam of the present invention installs fixed structure schematic diagram.
As shown in Figure 2 and Figure 3: 1-brick fetal membrane, 2-screed-coat, 3-waterproof layer, 4-fish tail and waterproof layer, 5-rubber cement, 6-waterproof roll, 7-blinding layer, beam steel, 9-styrofoam, 10-sole plate reinforcing bar, 11-cover to reinforcement are turned under 8-.
Detailed description of the invention
The detailed description of the invention of the present invention is elucidated referring to the attached drawing:
As shown in Figure 1: the working procedure of the inventive method is: surveying setting-out-earth excavation-casting concrete bed course-build by laying bricks or stones basis periphery brick fetal membrane and inner face plaster-waterproof construction-fish tail and waterproof layer construction-foundation beam reinforcing bar binding-fix finished product styrofoam-Base isolation system reinforcing bar binding-basis beam slab concrete placings and maintenance.
As shown in Figure 2: construction method face structure of the present invention reflect: brick fetal membrane, screed-coat, waterproof layer, fish tail and waterproof layer, rubber cement, waterproof roll, blinding layer, under turn over beam steel, styrofoam, sole plate reinforcing bar, cover to reinforcement this method construction completion after Specific construction constructional aspect and position.
As shown in Figure 3: styrofoam of the present invention install fixed structure reflect styrofoam, under turn over beam steel and fish tail and waterproof layer this method construction completion after Specific construction constructional aspect and position.
In order to avoid manual site cuts coarse, between plate and plate, gap is uneven, affects bonding uniform and fastness.Before styrofoam construction, it is necessary to according to space between in design drawing every piece basic reversed beam, carry out styrofoam length and width, thick design, draw arrangement figure.Propose styrofoam fabrication plan according to arrangement figure, entrust styrofoam processing factory to be processed.
After styrofoam is transported to scene, to stack respectively according to specification size, and have material mark clearly.Being transported to operating area during stickup again, operating personnel discharges according to arrangement figure, notes handling with care during carrying, does not damage styrofoam.Styrofoam in storage and taping process it should be noted that waterproof fireproofing.
Full coat bonding mucilage on the fish tail and waterproof layer of basis, pastes styrofoam, adjacent styrofoam side also full coat bonding mucilage jam-packed by styrofoam arrangement figure, and extrusion rubber cement perching knife strikes off.If reversed beam height is higher, styrofoam should be layered the fissure of displacement and paste.Edge joint position must be closed with rubber cement.Also can be with inorganic mortar full coat one time for strengthening styrofoam intensity.After styrofoam has pasted 24 hours, next process can be carried out.
Applicant is in new city work of renovating shantytowns Min Hui garden, Ningxia east project (the second stage of) engineering, to 20#, 30#, 34#, 35#, 26#, 37#, 38#, 39#, 40#, 41#, 42#, 43#, 44# building use the inventive method to construct, construction area 160,000 square meter, shear wall structure, base form is cast-in-situ bored pile raft foundation.Excavation of foundation pit uses a large area molding, constructs convenient.Using reversed beam under styrofoam fetal membrane construction raft plate, reduce construction cost, accelerating construction progress, waterproof construction quality significantly improves.

Claims (9)

1. reversed beam styrofoam fetal membrane construction method under raft plate, it is characterised in that the operation of this construction method includes:
Surveying setting-out-earth excavation-casting concrete bed course-build by laying bricks or stones basis periphery brick fetal membrane and inner face plaster-and waterproof construction-fish tail and waterproof layer construction-foundation beam reinforcing bar binding-fix finished product styrofoam-Base isolation system reinforcing bar binding-basis beam slab concrete placings and maintenance.
Construction method the most according to claim 1, it is characterized in that, described earth excavation operation is: pit earthwork uses earthmoving machinery stage excavation, the upper operation in backacter hole, bottom foundation ditch, to carry out labor cleaning levelling for indwelling 20~30cm soil layer, and the gradient coefficient that excavation slope is specified by soil property kind and specification puts slope.
Construction method the most according to claim 1; it is characterized in that; described casting concrete bed course operation is: (1) according to axial line control stake by outer side bar axis pilot measurement to foundation ditch bottom surface; bed course outer edge is determined according to outer side bar axis; the determination of bed course outer edge is considered as the revetment thickness of side bar, the thickness of screed-coat, the thickness of waterproof layer, the thickness of fish tail and waterproof layer, and should be greater than surveying outside revetment 100;(2) bed course side form uses 100 wide array punching blocks or the flitch of 5 × 10, fixes with the reinforcing bar of ¢ 12, then pours into a mould concrete cushion.
Construction method the most according to claim 1, it is characterised in that described build basis periphery brick fetal membrane by laying bricks or stones and inner face plastering process is: answer pilot measurement control stake axis and carry out the unwrapping wire of revetment after (1) cushion construction is complete;(2) the thick brick loose tool revetment of foundation ditch surrounding 240, uses 240*120*90 porous brick, and MU10 masonry of cement mortar, highly with raft plate top mark height;(3) use 20 thick 1:2.5 cement mortar screedings inside brick loose tool, at inner corner trim, smear into the circular arc that radius is 5.
Construction method the most according to claim 1, it is characterised in that described waterproof construction operation is: (1) requires that paving construction temperature is not less than 5 degree;(2) coil waterproof layer is constructed by full bonding; long edge lap width cannot be less than 100mm; the minor face lap of splice cannot be less than 150; if waterproof layer is double-deck; up and down the seam of the adjacent two width coiled materials of two-layer should stagger 1/3 fabric width, and two layers of coiled materials must not be mutually perpendicular to paving, reserves 300 width at revetment top and is laid in revetment top; and build by laying bricks or stones by dry-laid one layer or low grade mortar, carry out waterproof layer and get rid of the protection of head;(3) coil waterproof layer uses 4 SBS waterproof rolls.
Construction method the most according to claim 1, it is characterised in that described foundation beam reinforcing bar binding operation is: (1) ejects lower reversed beam sideline, basis according to construction drawing;(2) stirrup → wear the main muscle → picture stirrup position line → tied framework → removing supporters skeleton in place is put by the quantity calculated; skeleton upper longitudinal bar uses hitch colligation with stirrup; colligation should firmly, put in place; make skeleton not run-off the straight, loosen; the protective layer cushion block of beam muscle has been padded before vertically and horizontally beam muscles and bones frame is in place; cushion block uses 1:2.5 cement mortar to make, spacing 1000.
Construction method the most according to claim 1, it is characterised in that described fixing finished product styrofoam operation is: before the construction of (1) styrofoam, it is necessary to according to space between in design drawing every piece basic reversed beam, carries out styrofoam length and width, thick design, draws arrangement figure;Propose styrofoam fabrication plan according to arrangement figure, entrust styrofoam processing factory to be processed;(2) full coat bonding mucilage on the fish tail and waterproof layer of basis, pastes styrofoam, adjacent styrofoam side also full coat bonding mucilage jam-packed by styrofoam arrangement figure; extrusion rubber cement perching knife strikes off; if reversed beam height is higher, styrofoam should be layered the fissure of displacement and paste, and edge joint position must be closed with rubber cement.
Construction method the most according to claim 1; it is characterized in that; described Base isolation system reinforcing bar binding operation is: before colligation sole plate reinforcing bar; wood glue plate is discarded as steel bar horse-shaped bench and the backing plate of cushion block of concrete bar protective layer by the bar shaped that spacing 1000 lay > 300 is wide at styrofoam top; preventing split heads from thrusting in styrofoam, cushion block of concrete bar protective layer is arranged on wood glue plate by spacing 1000 quincunx.
Construction method the most according to claim 1, it is characterised in that described basic beam slab concrete placings and maintenance operation be: after (1) reinforcing bar concealment acceptance and styrofoam loose tool fix acceptance(check), can casting concrete;(2) concrete construction uses the construction method of commerical ready-mixed concrete, delivery pump conveying, and the slump of concrete mix is 160mm~180, uses material distributing machine to pour, and poker vibrator and flat vibrator vibrate;(3) 30mm diameter internal vibration rod carefully vibrated concrete is preferably used at raft plate, basis reversed beam styrofoam loose tool surrounding, vibrating spear inserts spacing 300mm, must vibrate by prescribed distance, must not leak and shake, when vibrating, vibrating spear must not touch styrofoam, and raft plate top surface application vibration board vibrates and the most levelling;(4) concreting should pour along the mode that building longitudinal direction tack advances, when pouring should first beam, raft plate, adjacent beams should pour in symmetrical blanking;(5) water seasoning in time in complete 12 hours of concreting, curing time is no less than 14 days.
CN201610385482.6A 2016-06-03 2016-06-03 Reversed beam styrofoam fetal membrane construction method under raft plate Expired - Fee Related CN105951842B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610385482.6A CN105951842B (en) 2016-06-03 2016-06-03 Reversed beam styrofoam fetal membrane construction method under raft plate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610385482.6A CN105951842B (en) 2016-06-03 2016-06-03 Reversed beam styrofoam fetal membrane construction method under raft plate

Publications (2)

Publication Number Publication Date
CN105951842A true CN105951842A (en) 2016-09-21
CN105951842B CN105951842B (en) 2018-03-30

Family

ID=56907648

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610385482.6A Expired - Fee Related CN105951842B (en) 2016-06-03 2016-06-03 Reversed beam styrofoam fetal membrane construction method under raft plate

Country Status (1)

Country Link
CN (1) CN105951842B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109958187A (en) * 2019-04-04 2019-07-02 中国十七冶集团有限公司 One kind turning over beam foundation bottom plate Roofing slab construction method
CN110004993A (en) * 2019-04-22 2019-07-12 上海建工一建集团有限公司 A kind of super thick bottom plate surveying setting-out construction method and unwrapping wire platform
CN111719577A (en) * 2020-05-22 2020-09-29 中国建筑第八工程局有限公司 Construction method of building foundation
CN113152882A (en) * 2021-04-29 2021-07-23 中国二十二冶集团有限公司 Mixed construction method for basement exterior wall formwork and hot-laid waterproof coiled material
CN116117975A (en) * 2023-02-23 2023-05-16 中建八局第四建设有限公司 Large-volume high-strength concrete experimental block template supporting, pouring and cooling method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20060260238A1 (en) * 2002-11-18 2006-11-23 SISTEMAS INDUSTRIALIZADOS BARCONS, S.L., Poligono Industrial Las Salinas de Levante Refinement to the construction systems for structures in reinforced concrete or some other material of high-precision intergral modular forms
CN102535493A (en) * 2012-01-12 2012-07-04 江苏省淮海建设集团有限公司 Method for constructing inverted type foundation beam
CN203440967U (en) * 2013-09-05 2014-02-19 江苏南通三建集团有限公司 Large-span cast-in-place prestressed concrete polystyrene board filling body beam and slab structure
CN204626438U (en) * 2015-02-16 2015-09-09 中工国际工程股份有限公司 One is pushed up flat-topped ridge board-like cavity raft foundation component

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20060260238A1 (en) * 2002-11-18 2006-11-23 SISTEMAS INDUSTRIALIZADOS BARCONS, S.L., Poligono Industrial Las Salinas de Levante Refinement to the construction systems for structures in reinforced concrete or some other material of high-precision intergral modular forms
CN102535493A (en) * 2012-01-12 2012-07-04 江苏省淮海建设集团有限公司 Method for constructing inverted type foundation beam
CN203440967U (en) * 2013-09-05 2014-02-19 江苏南通三建集团有限公司 Large-span cast-in-place prestressed concrete polystyrene board filling body beam and slab structure
CN204626438U (en) * 2015-02-16 2015-09-09 中工国际工程股份有限公司 One is pushed up flat-topped ridge board-like cavity raft foundation component

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
将正荣等: "《实用高层建筑施工手册》", 30 October 2003, 中国建筑工业出版社 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109958187A (en) * 2019-04-04 2019-07-02 中国十七冶集团有限公司 One kind turning over beam foundation bottom plate Roofing slab construction method
CN110004993A (en) * 2019-04-22 2019-07-12 上海建工一建集团有限公司 A kind of super thick bottom plate surveying setting-out construction method and unwrapping wire platform
CN110004993B (en) * 2019-04-22 2024-01-02 上海建工一建集团有限公司 Ultra-thick bottom plate measuring paying-off construction method and paying-off platform
CN111719577A (en) * 2020-05-22 2020-09-29 中国建筑第八工程局有限公司 Construction method of building foundation
CN111719577B (en) * 2020-05-22 2021-11-09 中国建筑第八工程局有限公司 Construction method of building foundation
CN113152882A (en) * 2021-04-29 2021-07-23 中国二十二冶集团有限公司 Mixed construction method for basement exterior wall formwork and hot-laid waterproof coiled material
CN116117975A (en) * 2023-02-23 2023-05-16 中建八局第四建设有限公司 Large-volume high-strength concrete experimental block template supporting, pouring and cooling method

Also Published As

Publication number Publication date
CN105951842B (en) 2018-03-30

Similar Documents

Publication Publication Date Title
CN103410332B (en) A kind of concrete hollow block reinforcement wall construction technology
CN105951842B (en) Reversed beam styrofoam fetal membrane construction method under raft plate
CN106592426B (en) The construction method of transverse prestress overall with reinforced concrete bridge deck plate prefab-form system
CN102505709A (en) Concrete-formwork-precast foundation construction method
CN103603359A (en) Deep foundation pit diagonal bracing support structure demolition method
CN103469806A (en) Construction method for replacing brick forming die with prefabricated concrete foundation bearing platform side die
CN103590602A (en) Method for constructing cast-in-site concrete hollow floor systems
CN108330902B (en) Construction method for cast-in-situ lower cross beam of high-pile wharf
CN104295003A (en) Structural column construction method
CN111042569B (en) Construction method for additionally building linear accelerator machine room in limited space of hospital basement
CN112726878A (en) Formwork-erecting-free construction method for masonry filler wall constructional column, prefabricated module and mould
CN209723033U (en) One kind being suitable for the anhydrous layer of sand area upper pipe working well in desert
CN105780992A (en) Construction method of orthogonal and ortho-laid steel concrete vierendeel sandwich plate floor
CN107905609A (en) Underground people's air defense construction method
CN110607805A (en) Cable tunnel construction method
CN110106915A (en) One kind exempts from that support is inverse to make underground engineering construction method and underground construction structure
CN207110214U (en) A kind of prefabricated interior fill concrete wallboard
CN111119219B (en) Reinforced foundation tire membrane structure and construction method thereof
CN208122041U (en) A kind of IPS Cast-in-place concrete shear wall structure of self-heat preservation system system
CN208023601U (en) A kind of prefabricated pile foundation support table side form of mutual buckle type
CN109944265A (en) The method for carrying out foundation construction using concrete light scutum
CN114457846A (en) Road station main body structure construction method
CN107586068B (en) Upright column concrete and construction method of concrete upright column
JPH0579049A (en) Constructing method for beam and slab in underground body construction work
CN109881699A (en) The concrete moulding bed fabrication and installation method of the general raft foundation of assembled tongue and groove Miller type

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180330

CF01 Termination of patent right due to non-payment of annual fee