CN105947893A - Crane pile lifting system under condition of barging piles at sea and construction method - Google Patents
Crane pile lifting system under condition of barging piles at sea and construction method Download PDFInfo
- Publication number
- CN105947893A CN105947893A CN201610397185.3A CN201610397185A CN105947893A CN 105947893 A CN105947893 A CN 105947893A CN 201610397185 A CN201610397185 A CN 201610397185A CN 105947893 A CN105947893 A CN 105947893A
- Authority
- CN
- China
- Prior art keywords
- pile
- crane
- stake
- dolly
- lifting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C15/00—Safety gear
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D13/00—Accessories for placing or removing piles or bulkheads, e.g. noise attenuating chambers
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65G—TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
- B65G35/00—Mechanical conveyors not otherwise provided for
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Abstract
The invention relates to a crane pile lifting system under the condition of barging piles at sea. The system comprises a crane, a shifting device mounted on a deck for moving a steel pipe pile to be lifted to a pile lifting position, a rail paved in the pile lifting position, a pile delivery trolley arranged on the rail, a traction device connected to the pile delivery trolley, and a sleeper arranged below the rail. According to the crane pile lifting system disclosed by the invention which is assisted by adoption of such devices as the pile delivery trolley under the condition of barging the piles at the sea, as the rail and the pile delivery trolley are arranged, the tail end of the pileisput on the trolleyduring lifting, the trolleymoves on the rail in the lifting process, the tail end of the piledoes not directly rub the deck, and the pressure of the steel pipe pile on the deck acts on the rail to increase the stressed area so as to cause collapse of the deck; and in the lifting process, the condition of transverse displacement of the pile is prevented due to limit by the rail.
Description
Technical field
The present invention relates to a kind of sea side refute deposit stake under the conditions of crane hang a system and method.
Background technology
Stake is hung at current domestic sea, main employing land hoisting, directly contacts with deck hanging a pile tail end, this
Plant technique and be primarily present two shortcomings: 1, stake directly contacts with deck, and deck can be caused to wear and tear, if deck loads is inadequate, also
Deck can be caused to subside;2, during lifting, can there is uncontrollable transverse shift situation in stake, can increase risk factor.
Summary of the invention
The technical problem to be solved in the present invention be to provide a kind of sea side refute deposit stake under the conditions of crane hang stake, and construction method, make
Tail end must be hung during stake not directly and deck, protect deck.
For solve above-mentioned technical problem, the sea side of the present invention refutes crane under the conditions of depositing stake and hangs a system, including crane be arranged on
For steel-pipe pile to be lifted moves to hang the shift unit of a position on deck, hanging laying track on a position, on track
Pile follower dolly is set.
Traction apparatus is connected on described pile follower dolly.
Below described track, sleeper is set.
The sea side of the present invention refutes and deposits crane under the conditions of stake and hang pile construction method and comprise the following steps,
(1) sleeper position is set according to stake is long;
(2) by shift unit steel-pipe pile is rolled into and uniquely hangs a position;
(3) pile follower dolly is inserted steel-pipe pile tail end along track;
(4) crane lifting, during lifting, extracts sleeper, stake tail end contact pile follower dolly out;
(5) lifting by crane along with crane, pile follower dolly, along with steel-pipe pile, slides along the track, until stake departs from dolly;
(6) pile follower dolly, sleeper returns initial position.
Presently disclosed sea side refutes under the conditions of depositing stake and uses the device whiplines such as pile follower dolly to hang a device, owing to being provided with
Track and pile follower dolly, when lifting, stake tail is placed on dolly, and dolly moves the most in orbit, makes the tail will not
Direct friction deck, the pressure on deck is disperseed by steel-pipe pile by track, does not results in deck and subsides;Due to track during lifting
Restriction, stake does not haves transverse shift situation;It is provided with traction apparatus, pile follower dolly can be drawn as required, make pile follower
Dolly arrives the position needed.This apparatus cost is low, it is safe, easy to use to operate, be prevented effectively from deck damages.
Accompanying drawing explanation
The present invention is further detailed explanation with detailed description of the invention below in conjunction with the accompanying drawings.
Fig. 1 is that sea side refutes and deposits crane under the conditions of stake and hang the structural representation of a system.
Detailed description of the invention
The sea side of the present invention of the present invention refutes crane under the conditions of depositing stake and hangs a system, including crane and be arranged on deck 1 for
Moving to hang the shift unit of a position by steel-pipe pile 2 to be lifted, shift unit can be hoist engine 3, is hanging on a position
Lay track 4, track 4 arranges pile follower dolly 5, pile follower dolly connects traction apparatus 6, sleeper 7 is set below track 4.
The sea side of the present invention refutes and deposits crane under the conditions of stake and hang pile construction method and comprise the following steps,
(1) sleeper position is set according to stake is long;
(2) by shift unit steel-pipe pile is rolled into and uniquely hangs a position;
(3) pile follower dolly is inserted steel-pipe pile tail end along track;
(4) crane is in stake suspension centre 8 joint steel pipe stake 2, during lifting, extracts sleeper, stake tail end contact pile follower dolly out;
(5) lifting by crane along with crane, pile follower dolly, along with steel-pipe pile, slides along the track, until stake departs from dolly;
(6) pile follower dolly, sleeper returns initial position.
Claims (4)
1. under the conditions of a sea side refutes and deposits stake, crane hangs a system, it is characterised in that: include crane and install above deck for treating
The steel-pipe pile of lifting moves to hang the shift unit of a position, is hanging laying track on a position, track arranges pile follower dolly.
2. refute crane under the conditions of depositing stake according to the sea side described in claim 1 and hang a system, it is characterised in that: on described pile follower dolly
Connect traction apparatus.
3. refute crane under the conditions of depositing stake according to the sea side described in any one in claim 1 or 2 and hang a system, it is characterised in that:
Below described track, sleeper is set.
4. under the conditions of a sea side refutes and deposits stake, crane hangs pile construction method, it is characterised in that: comprise the following steps,
(1) sleeper position is set according to stake is long;
(2) by shift unit steel-pipe pile is rolled into and uniquely hangs a position;
(3) pile follower dolly is inserted steel-pipe pile tail end along track;
(4) crane lifting, during lifting, extracts sleeper, stake tail end contact pile follower dolly out;
(5) lifting by crane along with crane, pile follower dolly, along with steel-pipe pile, slides along the track, until stake departs from dolly;
(6) pile follower dolly, sleeper returns initial position.
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610397185.3A CN105947893A (en) | 2016-06-03 | 2016-06-03 | Crane pile lifting system under condition of barging piles at sea and construction method |
CN201710362421.2A CN106968253B (en) | 2016-06-03 | 2017-05-22 | Steel pipe pile single-point hoisting system and steel pipe pile single-point hoisting method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610397185.3A CN105947893A (en) | 2016-06-03 | 2016-06-03 | Crane pile lifting system under condition of barging piles at sea and construction method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105947893A true CN105947893A (en) | 2016-09-21 |
Family
ID=56908836
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610397185.3A Pending CN105947893A (en) | 2016-06-03 | 2016-06-03 | Crane pile lifting system under condition of barging piles at sea and construction method |
CN201710362421.2A Active CN106968253B (en) | 2016-06-03 | 2017-05-22 | Steel pipe pile single-point hoisting system and steel pipe pile single-point hoisting method |
Family Applications After (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710362421.2A Active CN106968253B (en) | 2016-06-03 | 2017-05-22 | Steel pipe pile single-point hoisting system and steel pipe pile single-point hoisting method |
Country Status (1)
Country | Link |
---|---|
CN (2) | CN105947893A (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108625377A (en) * | 2018-06-11 | 2018-10-09 | 云南建投基础工程有限责任公司 | A kind of foundation pit diagonal brace pile construction method and its auxiliary tool |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201236117Y (en) * | 2008-07-17 | 2009-05-13 | 上海振华港口机械(集团)股份有限公司 | Pulling crane |
WO2009120406A1 (en) * | 2008-03-26 | 2009-10-01 | Technip France | Pile translating and launching system and method |
CN202358280U (en) * | 2011-11-25 | 2012-08-01 | 天津港航工程有限公司 | Special ship for transporting large-diameter steel pipe piles and assisting in pile hoisting construction |
CN202864750U (en) * | 2012-10-23 | 2013-04-10 | 上海航盛船舶设计有限公司 | Whole transportation and installation device of offshore wind turbines |
US20130243559A1 (en) * | 2009-09-09 | 2013-09-19 | National Oilwell Varco, L.P. | Windmill conveyance system and method for using same |
CN204432946U (en) * | 2014-12-04 | 2015-07-01 | 上海振华重工(集团)股份有限公司 | The transport of foundation pile and lifting device |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN203667954U (en) * | 2013-12-19 | 2014-06-25 | 上海振华重工(集团)股份有限公司 | Turnover and lifting device for tube pile |
CN206941589U (en) * | 2017-05-22 | 2018-01-30 | 中交第一航务工程局有限公司 | Steel-pipe pile single-point Lift-on/Lift-off System |
-
2016
- 2016-06-03 CN CN201610397185.3A patent/CN105947893A/en active Pending
-
2017
- 2017-05-22 CN CN201710362421.2A patent/CN106968253B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2009120406A1 (en) * | 2008-03-26 | 2009-10-01 | Technip France | Pile translating and launching system and method |
CN201236117Y (en) * | 2008-07-17 | 2009-05-13 | 上海振华港口机械(集团)股份有限公司 | Pulling crane |
US20130243559A1 (en) * | 2009-09-09 | 2013-09-19 | National Oilwell Varco, L.P. | Windmill conveyance system and method for using same |
CN202358280U (en) * | 2011-11-25 | 2012-08-01 | 天津港航工程有限公司 | Special ship for transporting large-diameter steel pipe piles and assisting in pile hoisting construction |
CN202864750U (en) * | 2012-10-23 | 2013-04-10 | 上海航盛船舶设计有限公司 | Whole transportation and installation device of offshore wind turbines |
CN204432946U (en) * | 2014-12-04 | 2015-07-01 | 上海振华重工(集团)股份有限公司 | The transport of foundation pile and lifting device |
Also Published As
Publication number | Publication date |
---|---|
CN106968253B (en) | 2022-06-24 |
CN106968253A (en) | 2017-07-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103112505B (en) | The heavy grade Lifting Convey method of flexible transport equipment | |
CN107165046A (en) | A kind of installation method of bridge inspection car | |
CN106151679B (en) | The towed counterpart method in large diameter reinforced concrete pipe road | |
CN205819284U (en) | A kind of pipeline transport carriage | |
CN203129178U (en) | Ultra-large type immersed tube stranded cable undock system | |
CN203570282U (en) | Deepwater underwater on-line piping system | |
CN105947893A (en) | Crane pile lifting system under condition of barging piles at sea and construction method | |
CN205772932U (en) | A kind of dry quenched coke boiler economizer coil installs suspender in place | |
CN206667426U (en) | A kind of device for the installation of spigot-and-socket storm sewer | |
CN204609308U (en) | A kind of passage limited position concrete rail transporter | |
CN204715212U (en) | A kind of guiding device for mobile formwork girder whole lateral moving | |
CN103603275A (en) | System and method for sliding segment steel box beam ashore | |
CN203451055U (en) | Lifting device for large-diameter reinforced concrete pipelines | |
CN201817211U (en) | Movable integrated grab sewage disposal and grating and gate hoisting machine | |
CN202674530U (en) | Cross protection device for seabed pipeline | |
CN103434992B (en) | Bridge crane hydraulic push-type trolley carrying system | |
CN203159060U (en) | Connecting device for immersing barged tube segment | |
CN203754234U (en) | Safety device for lifting hook assembly of pipe lifting machine | |
CN102041755A (en) | Soft rail type mountain pipe transporting method and pipe transporting vehicle thereof | |
CN203845782U (en) | Device for dragging marine oil module in place | |
CN202320302U (en) | Simple people-lifting device of monorail crane | |
CN203740997U (en) | Slip ship system for transversely moving prefabricated beam | |
CN204022373U (en) | For pushing tow temporary supporting part, remove the hanging device of use | |
CN203513204U (en) | Steel coil cargo transfer lifting tool | |
CN103145047B (en) | Lengthening device of girder of crane and method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20160921 |