CN105932599A - Tool set capable of replacing insulator chain of ultra-high-voltage transmission line under electrified state and use method for tool set - Google Patents

Tool set capable of replacing insulator chain of ultra-high-voltage transmission line under electrified state and use method for tool set Download PDF

Info

Publication number
CN105932599A
CN105932599A CN201610436726.9A CN201610436726A CN105932599A CN 105932599 A CN105932599 A CN 105932599A CN 201610436726 A CN201610436726 A CN 201610436726A CN 105932599 A CN105932599 A CN 105932599A
Authority
CN
China
Prior art keywords
insulator
duplex
card
transmission line
shaped
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610436726.9A
Other languages
Chinese (zh)
Inventor
雷冬云
李金亮
梅文建
曾文远
甄朝晖
郑克全
冯刚
李稳
唐力
刘治国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Taiping Changsheng Electric Appliances Co Ltd
State Grid Corp of China SGCC
State Grid Hunan Electric Power Co Ltd
Live Working Center of State Grid Hunan Electric Power Co
Original Assignee
Hunan Taiping Changsheng Electric Appliances Co Ltd
State Grid Corp of China SGCC
State Grid Hunan Electric Power Co Ltd
Live Working Center of State Grid Hunan Electric Power Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Taiping Changsheng Electric Appliances Co Ltd, State Grid Corp of China SGCC, State Grid Hunan Electric Power Co Ltd, Live Working Center of State Grid Hunan Electric Power Co filed Critical Hunan Taiping Changsheng Electric Appliances Co Ltd
Priority to CN201610436726.9A priority Critical patent/CN105932599A/en
Publication of CN105932599A publication Critical patent/CN105932599A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/02Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables

Landscapes

  • Insulators (AREA)

Abstract

The invention discloses a tool set capable of replacing an insulator chain of an ultra-high-voltage transmission line under an electrified state and a use method for the tool set. The tool set for replacing a duplex L-shaped composite insulator comprises a cross arm side back buckle capable of being mounted on a fitting at the suspension point of the insulator, and a T-shaped large knife buckle capable of being mounted on the fitting at the suspension point of a wire; an adjustable insulating pull rod and a linear wire-tightening device are arranged between the two ends of the cross arm side back buckle and the two ends of the T-shaped large knife buckle; and meanwhile, on the basis of the developed tool set for replacing the duplex L-shaped composite insulator, two inner side through holes of the T-shaped large knife buckle are connected with a wire-tightening screw rod and a half-moon buckle so as to realize an operation of replacing a duplex V-shaped whole insulator chain of the ultra-high-voltage transmission line under the electrified state. By adoption of the tool set, the problem existing in replacing the duplex L-shaped composite insulator and the duplex V-shaped whole insulator chain of the ultra-high-voltage transmission line under the electrified state is overcome; a large-area power failure is avoided; the power supply stability and reliability of the power grid are effectively improved; and obvious economic and social benefits are achieved.

Description

Charged for replacement UHV transmission line insulator chain tool set and using method thereof
Technical field
The present invention relates to a kind of replacing transmission circuit insulator string tool set, particularly relate to one Plant charged for replacement extra high voltage direct current transmission line duplex L-type and duplex V-type bunch of insulator is complete Instrument.The invention still further relates to this charged for replacement extra high voltage direct current transmission line duplex L-type and duplex The using method of V-type bunch of insulator tool set.
Background technology
Along with rapid economic development, building UHV transmission line becomes China's energy and economic society The inevitable requirement that can develop in harmony, global energy internet is with extra-high voltage grid as backbone network simultaneously Frame.And along with the development of extra high voltage line, duplex L-type insulator string is widely used in small angle tower In tower, duplex V-type insulator string is widely used in tangent tower.Operating insulator is not only Bear the effect of operating voltage for a long time, but also to be made by overvoltage such as operation and thunders and lightnings With, dunghill, external force that wire deadweight in addition, wind-force, ice and snow and insulator are adhered to are destroyed Impact etc. reason so that operating insulator will appear from damaging, affects line security and runs. And UHV transmission line transmission capacity is big, once puts into operation, be then difficult to carry out interruption maintenance, Therefore, in order to improve power supply reliability, it is ensured that UHV transmission line safe and stable operation, need Charged for replacement is unsatisfactory for the insulator of service requirement in time.
± 800kV UHV transmission line is the direct current of highest voltage level the most in the world Transmission line of electricity, this is a brand-new field.Associated band charged renewal extra high voltage direct current transmission line Worldwide there is blank in duplex L-type and duplex V-type bunch of insulator Work tool, it is achieved There is huge obstacle in replacing insulator under electrified operation.
Through retrieval, abroad for associated band charged renewal extra high voltage direct current transmission line duplex L-type and The research of duplex V-type bunch of insulator Work tool is still in blank.Domestic carried out few in number Research: Chinese patent CN102693789A, CN203895850U have reported a kind of charged respectively Change the method for 500kV circuit " L " insulator string and for charged for replacement 500kV power transmission line The fixture of road insulator L string, but on the one hand due to leads of ultra-high voltage power transmission lines load relatively superelevation Pressure transmission line is big, on the other hand the type of attachment of UHV transmission line L string gold utensil and superelevation The gold utensil type of attachment of pressure transmission line L string there is also difference, patent CN102693789A, Work tool mechanical strength and design type that CN203895850U develops no longer meet requirement, no It is applicable to UHV transmission line L string.And domestic be only to charged for replacement extra high voltage network L string composite insulator Work tool carried out research, for charged for replacement extra-high voltage direct-current transmission line The research of road L string Work tool is domestic also has no report.
For charged for replacement extra high voltage direct current transmission line duplex V-type bunch of insulator Work tool and Technique study, patent CN104505763A proposes a kind of charged for replacement UHVDC Transmission Lines The method of duplex V string composite insulator, the method program is simple and clear, efficiency is higher, but by In porcelain or glass insulator from great, its method proposed and Work tool used be only capable of charged more Change UHV transmission line composite insulator, to charged for replacement duplex V string porcelain or glass insulation Sub and inapplicable.It is double that patent CN203014262U discloses a kind of compact transmission line V-type Connection glass or porcelain insulator string change fixture, patent CN201956623U devises a kind of use In ± the service kit of 660kV DC power transmission line V-type list insulator string, patent CN102361258B have developed the charged for replacement list V insulator string of a kind of direct current quadripartion circuit Instrument, but the Work tool of above-mentioned patent development is unsatisfactory for wanting due to mechanical strength and design type Ask, be not suitable for charged for replacement extra high voltage direct current transmission line duplex V-type bunch of insulator.
Summary of the invention
It is high, general that first technical problem to be solved by this invention is to provide a kind of production efficiency The charged for replacement UHV transmission line insulator chain tool set that property is strong.
It is defeated that second technical problem to be solved by this invention is to provide this charged for replacement extra-high voltage The using method of electric line insulator chain tool set.
In order to solve above-mentioned first technical problem, the charged for replacement extra-high voltage that the present invention provides is defeated Electric line insulator chain tool set, can be arranged at insulator hanging point on gold utensil including one Card and a T-shaped machete card being arranged on conducting wire hanging point gold utensil after cross-arm side, described After cross-arm side card two ends and the two ends of described T-shaped machete card between be connected have adjustable absolutely Edge pull-rod and straight line turnbuckle.
Described adjusting insulation pull-rod is made up of three joints, and a middle joint is a sleeve, described Sleeve be provided with bolt hole, two ends be two also with the short insulation pull-rod of bolt hole, described Sleeve be fixedly connected by described bolt hole and bolt with described short insulation pull-rod.
A diameter of 14.5mm of the described bolt hole that described adjusting insulation pull-rod is provided with, The thickness of described sleeve and described short insulation pull-rod is 4mm, described short insulation pull-rod External diameter be 32mm, the external diameter of described sleeve is 40mm.
Being filled with foam in described adjusting insulation pull-rod, adjustable-length is 1.5m~2m.
Described T-shaped machete card is assembled by machete card and T-shaped fixture, described T-shaped card It is attached fixing by the way of latch with described machete card end in the middle of tool, described T Being provided with two draw-in grooves outside type fixture, inner side is provided with two through holes, and two described draw-in grooves are with logical Hole the most T-shaped fixture center line is symmetrical.
Block after described T-shaped machete card and described cross-arm side by titanium alloy material making Become.
The two ends of first quarter moon card are all connected by the two ends of thread-tightening lead screw with described T-shaped machete card.
Described first quarter moon card is made by epoxy glass laminate material, in described first quarter moon card Portion becomes semicircle, and semicircle diameter is slightly larger than porcelain or the diameter of glass insulator steel cap, and institute The two ends of the first quarter moon card stated are symmetrical about the semicircular center of circle, middle part, its end be provided with 14.5mm~ The through hole of 15mm.
In order to solve above-mentioned second technical problem, the use charged for replacement that the present invention provides is extra-high The method of pressure transmission line insulator chain tool set, charged for replacement extra high voltage direct current transmission line Duplex L-type composite insulator, comprises the steps:
1. on tower, earth potential and equipotential live line work personnel step on tower in succession to L string composite insulator peace Holding position, on transmission power tool to tower, on tower, earth potential operating personnel will fix after cross-arm side It is scheduled on the right angle link plate of insulator chain cross-arm side to be replaced;
2. on tower, T-shaped machete card is arranged on the yoke plate at conducting wire hanging point by equipotential operating personnel On, and ensure that direction, T-shaped fixture place is vertical with duplex L-type composite insulator place plane;
3. on tower, equipotential operating personnel cooperates with earth potential working personnel, at T-shaped machete Adjusting insulation pull-rod and straight line turnbuckle is installed between card, simultaneously at T after card and cross-arm side Type machete card installs insulation coaster near side of wire, and insulation coaster is connected with pull rope;Lead to again Cross that to tighten up the load transfer that composite insulator string bears by straight line turnbuckle extra-high to charged for replacement On pressure transmission line insulator chain tool set;
4. on tower, the two ends of duplex L-type composite insulator are hung by operating personnel respectively with insulator At Dian, gold utensil and conducting wire hanging point gold utensil depart from, and ground staff starts pulling equipment by insulation coaster On pull rope be replaced after composite insulator string let-down;
5. change another string compound inslation period of the day from 11 p.m. to 1 a.m of duplex L-type composite insulator, before replacing, need root According to duplex L-type composite insulator and the good adjusting insulation pull-rod of length adjustment of connection gold utensil thereof Length.
Charged for replacement extra high voltage direct current transmission line duplex V-type bunch of insulator, including walking as follows Rapid:
1. on tower, equipotential electrician and earth potential electrician put on screening clothing, carry insulating tool and work Utensil, arrives job position, and hangs up properly insulation transmission rope;Ground coordinates personnel to transmit operation work Having to tower, on tower, earth potential operating personnel will fasten after cross-arm side at insulator chain to be replaced On the right angle link plate of cross-arm side;
2. on tower, T-shaped machete card is arranged on the yoke plate at conducting wire hanging point by equipotential operating personnel On, and ensure that direction, T-shaped fixture place is vertical with duplex composite insulator place plane;On tower Equipotential live line work personnel cooperate with earth potential working personnel, at T-shaped machete card and cross-arm side Adjusting insulation pull-rod and straight line turnbuckle is installed between rear card;
3. thread-tightening lead screw one end is connected to the through hole, inner side of T-shaped machete card, and the other end passes through Insulating cord connects first quarter moon card, and first quarter moon card is installed at side of wire insulator steel cap, tightens up tight Filament bar, makes first quarter moon card stress, installs insulation at T-shaped machete card near side of wire sliding simultaneously Car, insulation coaster is connected with pull rope, arranges insulator trailer system, and ground electrician installs Good motor-driven grinding mill;
4. by tightening up the load transfer that duplex V-type bunch of insulator is born by straight line turnbuckle On charged for replacement UHV transmission line insulator chain tool set;Equipotential live line work personnel's handle Insulating cord colligation, on duplex V-type bunch of insulator, is tightened up thread-tightening lead screw and is made the whole string of duplex V-type Insulator hanging point relaxes, and is departed from hardware by duplex V-type bunch of insulator, by traction Rope puts down duplex V-type bunch of insulator so that it is pendency;
5. earth potential working personnel are by insulating cord one end colligation duplex V of card end after cross-arm side On 2nd~3 insulator of type bunch of insulator, insulating cord enters motor-driven strand by corner block Mill;Tightening up motor-driven grinding mill, adjust to correct position, earth potential electrician disconnects bulb, by duplex Ground is reached under V-type bunch of insulator;Motor-driven grinding mill lifts by crane new duplex V-type bunch of insulator, Equipotential live line work personnel and earth potential working personnel install duplex V-type by the reverse order removed Bunch of insulator.
Use the charged for replacement complete work of UHV transmission line insulator chain of technique scheme Tool and using method thereof, utilize gold utensil straight line link plate and side of wire hardware connection at cross-arm hanging point Plate does the fulcrum of instrument, is respectively mounted card and T-shaped machete card after the cross-arm side of supporting development, joins The lotus that after closing cross-arm side, card, T-shaped machete card, straight line turnbuckle and adjusting insulation pull-rod form Carry transfer system (installing thread-tightening lead screw and first quarter moon card additional when changing duplex V string), by duplex L-type The load transfer that composite insulator string or duplex V-type bunch of insulator bear is special to charged for replacement On high-voltage transmission line insulator string tool set, check that charged for replacement UHV transmission line is exhausted The connection of edge substring tool set and stress are good, operating personnel by insulator chain two ends with couple Gold utensil departs from, and ground staff starts pulling equipment and is replaced after insulator chain let-down.
The present invention has a following technical advantage:
1. the present invention is complete by developing charged for replacement duplex L-type and duplex V-type bunch of insulator Instrument, has captured extra-high voltage duplex L-type and duplex V-type bunch of insulator is difficult to charged for replacement A difficult problem.
2. insulation pull-rod uses adjustable design structure, can meet duplex L-type different directions multiple Close the replacing of insulator, highly versatile.
3. the T-shaped machete card of development and design, on the one hand can change the installation of load transfer system Direction, makes load transfer system place in-plane perpendicular with yoke plate place in-plane, side Just composite insulator and the disengaging of yoke plate;It is tight that the outside of the most T-shaped machete card connects straight line Line device, inner side can connect special thread-tightening lead screw, for realizing duplex V-type porcelain or glass insulator Replacing provide support.
In sum, the present invention is the charged for replacement that a kind of security is high, can improve production efficiency UHV transmission line insulator chain tool set and using method thereof.
Accompanying drawing explanation
Fig. 1 is the implementing procedure figure of design of the present invention.
Fig. 2 is ± 800kV DC power transmission line L goes here and there composite insulator layout drawing.
Fig. 3 is L string composite insulator force analysis schematic diagram.
Fig. 4 is the structural representation of adjusting insulation pull-rod.
Fig. 5 is the schematic cross-section of adjusting insulation pull-rod.
Fig. 6 is that charged for replacement extra high voltage direct current transmission line duplex L-type composite insulator is faced Figure.
Fig. 7 is charged for replacement extra high voltage direct current transmission line duplex L-type composite insulator side-looking Figure.
Fig. 8 is straight line turnbuckle structural representation.
Fig. 9 is machete card structure schematic diagram.
Figure 10 is T-shaped fixture structure schematic diagram.
Figure 11 is T-shaped machete card structure schematic diagram.
Figure 12 is card front view after cross-arm side.
Figure 13 is card side view after cross-arm side.
Figure 14 is that L string enters electric-field path schematic diagram.
Figure 15 charged for replacement extra high voltage direct current transmission line duplex V-type bunch of insulator is faced Figure.
Figure 16 charged for replacement extra high voltage direct current transmission line duplex V-type bunch of insulator side-looking Figure.
Figure 17 is special thread-tightening lead screw structural representation.
Figure 18 is first quarter moon card front view.
Figure 19 is first quarter moon card side view.
Detailed description of the invention
The present invention will be further described with example below in conjunction with the accompanying drawings.
The technical program be embodied as flow chart as shown in Figure 1.First determine duplex L-type and The load of duplex V-type insulator chain, carries out adjustable according to the load situation that insulator chain bears Insulation pull-rod and the design of front and back end fixture.Mechanical strength check is carried out after having designed, full Foot formulates, after requiring, the mode entering electric field, and utilizes FInite Element to carry out human body surface electric-field strength Degree calculates, and determines operating personnel's safety prevention measure, carries out the on probation of Work tool the most at the scene.
Embodiment 1: charged for replacement extra high voltage direct current transmission line duplex L-type composite insulator
± 800kV DC power transmission line L string composite insulator 7 deployment scenarios as in figure 2 it is shown, Composite insulator string and the entire length of connected gold utensil thereof that l-shaped is arranged are different, duplex L-type One end of composite insulator 7 is connected to side of wire hardware yoke plate, and the other end is connected to cross-arm Pendant point hardware right-angle link plate, therefore, long for satisfied replacing extra high voltage direct current transmission line difference The duplex L-type composite insulator 7 of degree and the needs of connected gold utensil, the extra-high straightening of charged for replacement Insulation pull-rod in stream transmission line of electricity duplex L-type composite insulator tool set possesses length can The function adjusted.
Duplex L-type composite insulator 7 deployment scenarios according to Fig. 2, its force analysis figure such as figure Shown in 3, choose the wire that calculated weight is 3100kg/km (i.e. 3.2t/km) right for research Pressing 500m as, span to calculate, wire is 6 divisions, then the vertical load of L string be 3100 × 0.5 × 6=9.3t.Vertical direction stress F=9300 × 10=93000N.By Force Calculation, Both direction L string stressing conditions is as shown in formula 1, formula 2.
F1=F × cos30 °=93000 × 1.732/2=80538N (1)
F2=F × sin30 °=93000 × 0.5=46500N (2)
Below as a example by adjusting insulation pull-rod 2, its mechanical strength is checked.By formula 1, Formula 2 calculates the live load understanding adjusting insulation pull-rod 2: T=80538N;
Safety coefficient: K=3.0;
Material selects: epoxy resin;
Ultimate stress limit τj=800N/mm2
Bursting stress allowable [τ]=800/3=266N/mm2
Adjusting insulation pull-rod by insulator chain load T=80538N, its front view such as Fig. 4 institute Showing, sectional dimension is as shown in Figure 5.
Sectional area:
SM=π R2-πr2-1/2 × (LR-Lr)=316.5mm2 (3)
Tensile stress:
σ=T/SM=80538/316.5=254.5N/mm2 (4)
Allowable tensile stress:
&lsqb; &sigma; &rsqb; = &sigma; j / K = 800 / 3 = 266 N / mm 2 &sigma; < &lsqb; &sigma; &rsqb; - - - ( 5 )
Therefore adjusting insulation pull-rod intensity is enough.
After having verified the mechanical strength of instrument, preferably, determine that employing hanging basket method is entered Entering electric field, concrete entrance electric-field path as shown in figure 14, and utilizes FInite Element to its body Table field intensity has carried out computational analysis, it is determined that the safety prevention measure that operating personnel should take, Finally Work tool is carried out on-the-spot on probation.
See Fig. 6 and Fig. 7, the present invention provide for charged for replacement extra-high voltage direct-current transmission line The charged for replacement complete work of UHV transmission line insulator chain of road duplex L-type composite insulator 7 Tool, including card 1 and an energy after a cross-arm side being arranged at insulator hanging point on gold utensil The T-shaped machete card 3 being arranged on conducting wire hanging point gold utensil, blocks two ends and the T of 1 after cross-arm side Connect between the two ends of type machete card 3 and have adjusting insulation pull-rod 2 and straight line turnbuckle 4.
Adjusting insulation pull-rod 2 structural representation as shown in Figure 4, is made up of three joints, middle one Joint is a sleeve 21, and described sleeve 21 is provided with bolt hole 22, and two ends are two and also carry Having the short insulation pull-rod 23 of bolt hole, sleeve 21 and short insulation pull-rod 23 are by bolt hole 22 It is fixedly connected with bolt 24.Preferably, adjusting insulation pull-rod 2 is provided with The a diameter of 14.5mm of bolt hole 22, sleeve 21 and the thickness of short insulation pull-rod 23 connected Degree is 4mm, and the external diameter of short insulation pull-rod 23 is 32mm, and the external diameter of sleeve 21 is 40mm, The adjustable-length of insulation pull-rod is 1.5m~2m.Adjusting insulation is filled with foam in drawing .2.
As shown in figure 11, T-shaped machete card 3 is by machete card 31 (see Fig. 9) and T-shaped fixture 32 (see Figure 10) are assembled, and it is made by titanium alloy material.T-shaped fixture 32 Centre is attached fixing with machete card 31 end by the way of latch, and T-shaped fixture 32 Outside is provided with two draw-in grooves, and inner side is provided with two through holes, and two draw-in grooves are the most relative with through hole T-shaped Fixture 32 center line is symmetrical.
Use charged for replacement UHV transmission line insulator chain tool set charged for replacement extra-high The method of pressure DC power transmission line duplex L-type composite insulator 7, comprises the steps:
1. on tower, earth potential and equipotential live line work personnel step on tower in succession to duplex L-type compound inslation Son 7 installation sites, on transmission power tool to tower, on tower, earth potential operating personnel is by cross-arm side Rear card 1 is fixed on the right angle link plate of insulator chain cross-arm side to be replaced;
2. on tower, T-shaped machete card 3 is arranged on the yoke plate at conducting wire hanging point by equipotential operating personnel On, and ensure that direction, T-shaped fixture 32 place is vertical with duplex composite insulator place plane;
3. on tower, equipotential operating personnel cooperates with earth potential working personnel, at T-shaped machete Block after card 3 and cross-arm side between 1 and install adjusting insulation pull-rod 2 and straight line turnbuckle 4, Install insulation coaster at T-shaped machete card 3 near side of wire simultaneously, insulation coaster is connected with and leads Messenger.Again by tightening up the load that duplex L-type composite insulator 7 is born by straight line turnbuckle 4 Transfer on charged for replacement UHV transmission line insulator chain tool set;
4. on tower, the two ends of duplex L-type composite insulator 7 are hung by operating personnel respectively with insulator At Dian, gold utensil and conducting wire hanging point gold utensil depart from, and ground staff starts pulling equipment by insulation coaster On pull rope be replaced after duplex L-type composite insulator 7 let-down;
5. another string compound inslation period of the day from 11 p.m. to 1 a.m of duplex L-type composite insulator 7 is changed, before replacing Need to be according to duplex L-type composite insulator 7 and the good adjusting insulation of length adjustment connecting gold utensil thereof The length of pull-rod 2.
Embodiment 2: charged for replacement extra high voltage direct current transmission line duplex V-type bunch of insulator 8
See Figure 15 and Figure 16, the charged for replacement extra high voltage direct current transmission line whole string of duplex V-type The insulator 8 i.e. charged for replacement UHV transmission line of duplex V-type porcelain or glass insulator is exhausted Edge substring tool set, is in the charged for replacement extra-high voltage changing duplex L-type composite insulator 7 On the basis of transmission circuit insulator string tool set, by two inner sides of T-shaped machete card 3 Through hole connects thread-tightening lead screw 5 (see Figure 17) and first quarter moon card 6 (see Figure 18-19), and its structure is: Can pacify including card 1 after a cross-arm side being arranged at insulator hanging point on gold utensil and one The T-shaped machete card 3 being contained on conducting wire hanging point gold utensil, after cross-arm side, the two ends of card 1 are with T-shaped Connect between the two ends of machete card 3 and have adjusting insulation pull-rod 2 and straight line turnbuckle 4, first quarter moon The two ends of card 6 are all connected by the two ends of thread-tightening lead screw 5 with T-shaped machete card 3.First quarter moon card 6 It is made by epoxy glass laminate material, in the middle part of first quarter moon card 6, becomes semicircle, round diameter Slightly larger than porcelain or the diameter of glass insulator steel cap, and first quarter moon card 6 two ends are about middle part semicircle The center of circle of shape is symmetrical.Preferably, its end is provided with the through hole of 14.5mm~15mm.
Use charged for replacement UHV transmission line insulator chain tool set charged for replacement extra-high Pressure DC power transmission line duplex V-type bunch of insulator 8 i.e. duplex V-type whole string porcelain or glass is exhausted The method of edge, comprises the steps:
1. on tower, equipotential electrician and earth potential electrician put on screening clothing, carry insulating tool and work Utensil, arrives job position, and hangs up properly insulation transmission rope;Ground coordinates personnel to transmit operation work Having to tower, on tower, earth potential operating personnel is fixed on insulator to be replaced by blocking 1 after cross-arm side On the right angle link plate of string cross-arm side;
2. on tower, T-shaped machete card 3 is arranged on the yoke plate at conducting wire hanging point by equipotential operating personnel On, and ensure direction, T-shaped fixture 32 place and duplex V-type bunch of insulator 8 place plane Vertically;On tower, equipotential operating personnel cooperates with earth potential working personnel, at T-shaped machete Block after card 3 and cross-arm side between 1 and install adjusting insulation pull-rod 2 and straight line turnbuckle 4;
3. thread-tightening lead screw 5 one end is connected to the through hole, inner side of T-shaped machete card 3, the other end Connecting first quarter moon card 6 by insulating cord, first quarter moon card 6 is installed to close side of wire insulator steel cap, Tighten up thread-tightening lead screw 5, make first quarter moon card 6 stress, simultaneously at T-shaped machete card 3 near side of wire Install insulation coaster, insulation coaster be connected with pull rope, arrange insulator trailer system, Ground electrician installs motor-driven grinding mill;
4. the load that duplex V-type bunch of insulator 8 bears is turned by tightening up straight line turnbuckle 4 Move on on charged for replacement UHV transmission line insulator chain tool set;Equipotential live line work personnel Insulating cord colligation on duplex V-type bunch of insulator 8, tighten up thread-tightening lead screw 5 and make duplex V Type bunch of insulator 8 hanging point relaxes, and is departed from hardware by duplex V-type bunch of insulator 8, By pull rope, duplex V-type bunch of insulator 8 is put down so that it is pendency;
5. the colligation of insulating cord one end is blocked duplex V of 1 end after cross-arm side by earth potential working personnel On 2nd~3 insulator of type bunch of insulator 8, insulating cord enters motor-driven by corner block Strand mill;Tightening up motor-driven grinding mill, adjust to correct position, earth potential electrician disconnects bulb, will be double Connection V-type bunch of insulator reaches ground 8 times;Motor-driven grinding mill lifts by crane the whole string insulation of new duplex V-type Son 8, equipotential live line work personnel and earth potential working personnel install duplex by the reverse order removed V-type bunch of insulator 8.
Use the charged for replacement complete work of UHV transmission line insulator chain of technique scheme Tool and using method thereof, utilize gold utensil straight line link plate and side of wire hardware connection at cross-arm hanging point Plate does the fulcrum of instrument, is respectively mounted card 1 and T-shaped machete card 3 after the cross-arm side of supporting development, 1, T-shaped machete card 3, straight line turnbuckle 4 and adjusting insulation pull-rod 2 is blocked after coordinating cross-arm side The charged for replacement UHV transmission line insulator chain i.e. load transfer system of tool set of composition (installing thread-tightening lead screw 5 and first quarter moon card 6 additional when changing duplex V string), by compound for duplex L-type exhausted The load transfer that edge 7 or duplex V-type bunch of insulator 8 bear i.e. carries to load transfer system On charged renewal UHV transmission line insulator chain tool set, check the company of load transfer system Connecing good with stress, insulator chain two ends are departed from by operating personnel with connecting tool, ground staff Start pulling equipment to be replaced after insulator chain let-down.In sum, the present invention is a kind of Security is high, can improve the charged for replacement extra high voltage direct current transmission line duplex L-type of production efficiency With duplex V-type bunch of insulator tool set and using method thereof.
The above, be only presently preferred embodiments of the present invention, not makees the present invention any Pro forma restriction, every any simple modification made according to the technical spirit of the present invention, all Still fall within the range of technical solution of the present invention.

Claims (10)

1. a charged for replacement UHV transmission line insulator chain tool set, is characterized in that: Can pacify including card (1) after a cross-arm side being arranged at insulator hanging point on gold utensil and one The T-shaped machete card (3) being contained on conducting wire hanging point gold utensil, blocks the two of (1) after described cross-arm side Hold be connected between the two ends of described T-shaped machete card (3) have adjusting insulation pull-rod (2) and Straight line turnbuckle (4).
Charged for replacement UHV transmission line insulator the most according to claim 1 conspires to create Set instrument, is characterized in that: described adjusting insulation pull-rod (2) is made up of three joints, middle one Joint is a sleeve (21), and described sleeve (21) is provided with bolt hole (22), and two ends are two Also with the short insulation pull-rod (23) of bolt hole, described sleeve (21) draws with described short insulation Rod (23) is fixedly connected by described bolt hole (22) and bolt (24).
Charged for replacement UHV transmission line insulator the most according to claim 2 conspires to create Set instrument, is characterized in that: the described bolt that described adjusting insulation pull-rod (2) is provided with A diameter of 14.5mm in hole (22), described sleeve (21) and described short insulation pull-rod (23) Thickness be 4mm, the external diameter of described short insulation pull-rod (23) is 32mm, described sleeve (21) external diameter is 40mm.
Charged for replacement UHV transmission line insulator the most according to claim 1 and 2 String tool set, is characterized in that: be filled with foam in described adjusting insulation pull-rod (2), Adjustable-length is 1.5m~2m.
Charged for replacement UHV transmission line insulator the most according to claim 1 and 2 String tool set, is characterized in that: described T-shaped machete card (3) is by machete card (31) and T-shaped Fixture (32) is assembled, with described machete card (31) in the middle of described T-shaped fixture (32) End is attached fixing by the way of latch, and described T-shaped fixture (32) outside is provided with two Individual draw-in groove, inner side is provided with two through holes, two described draw-in groove T-shaped fixtures the most relative with through hole Center line is symmetrical.
Charged for replacement UHV transmission line insulator the most according to claim 1 and 2 String tool set, is characterized in that: block after described T-shaped machete card (3) and described cross-arm side (1) it is made by titanium alloy material.
Charged for replacement UHV transmission line insulator the most according to claim 1 and 2 String tool set, it is characterized in that: the two ends of first quarter moon card (6) all by thread-tightening lead screw (5) with described T-shaped machete card (3) two ends connect.
Charged for replacement UHV transmission line insulator the most according to claim 7 conspires to create Set instrument, is characterized in that: described first quarter moon card (6) made by epoxy glass laminate material and Becoming, described first quarter moon card (6) middle part becomes semicircle, and semicircle diameter is slightly larger than porcelain or glass The diameter of insulator steel cap, and the two ends of described first quarter moon card (6) are about the semicircular circle in middle part The heart is symmetrical, and its end is provided with the through hole of 14.5mm~15mm.
9. use the charged for replacement UHV transmission line insulator described in claim 1 to conspire to create The method of set instrument, charged for replacement extra high voltage direct current transmission line duplex L-type composite insulator, It is characterized in that: comprise the steps:
1. on tower, earth potential and equipotential live line work personnel step on tower in succession to L string composite insulator peace Holding position, on transmission power tool to tower, on tower, earth potential operating personnel will fix after cross-arm side It is scheduled on the right angle link plate of insulator chain cross-arm side to be replaced;
2. on tower, T-shaped machete card is arranged on the yoke plate at conducting wire hanging point by equipotential operating personnel On, and ensure that direction, T-shaped fixture place is vertical with duplex L-type composite insulator place plane;
3. on tower, equipotential operating personnel cooperates with earth potential working personnel, at T-shaped machete Adjusting insulation pull-rod and straight line turnbuckle is installed between card, simultaneously at T after card and cross-arm side Type machete card installs insulation coaster near side of wire, and insulation coaster is connected with pull rope;Lead to again Cross that to tighten up the load transfer that composite insulator string bears by straight line turnbuckle extra-high to charged for replacement On pressure transmission line insulator chain tool set;
4. on tower, the two ends of duplex L-type composite insulator are hung by operating personnel respectively with insulator At Dian, gold utensil and conducting wire hanging point gold utensil depart from, and ground staff starts pulling equipment by insulation coaster On pull rope be replaced after composite insulator string let-down;
5. change another string compound inslation period of the day from 11 p.m. to 1 a.m of duplex L-type composite insulator, before replacing, need root According to duplex L-type composite insulator and the good adjusting insulation pull-rod of length adjustment of connection gold utensil thereof Length.
10. use the charged for replacement UHV transmission line insulator described in claim 1 to conspire to create The method of set instrument, charged for replacement extra high voltage direct current transmission line duplex V-type bunch of insulator, It is characterized in that: comprise the steps:
1. on tower, equipotential electrician and earth potential electrician put on screening clothing, carry insulating tool and work Utensil, arrives job position, and hangs up properly insulation transmission rope;Ground coordinates personnel to transmit operation work Having to tower, on tower, earth potential operating personnel will fasten after cross-arm side at insulator chain to be replaced On the right angle link plate of cross-arm side;
2. on tower, T-shaped machete card is arranged on the yoke plate at conducting wire hanging point by equipotential operating personnel On, and ensure that direction, T-shaped fixture place is vertical with duplex composite insulator place plane;On tower Equipotential live line work personnel cooperate with earth potential working personnel, at T-shaped machete card and cross-arm side Adjusting insulation pull-rod and straight line turnbuckle is installed between rear card;
3. thread-tightening lead screw one end is connected to the through hole, inner side of T-shaped machete card, and the other end passes through Insulating cord connects first quarter moon card, and first quarter moon card is installed at side of wire insulator steel cap, tightens up tight Filament bar, makes first quarter moon card stress, installs insulation at T-shaped machete card near side of wire sliding simultaneously Car, insulation coaster is connected with pull rope, arranges insulator trailer system, and ground electrician installs Good motor-driven grinding mill;
4. by tightening up the load transfer that duplex V-type bunch of insulator is born by straight line turnbuckle On charged for replacement UHV transmission line insulator chain tool set;Equipotential live line work personnel's handle Insulating cord colligation, on duplex V-type bunch of insulator, is tightened up thread-tightening lead screw and is made the whole string of duplex V-type Insulator hanging point relaxes, and is departed from hardware by duplex V-type bunch of insulator, by traction Rope puts down duplex V-type bunch of insulator so that it is pendency;
5. earth potential working personnel are by insulating cord one end colligation duplex V of card end after cross-arm side On 2nd~3 insulator of type bunch of insulator, insulating cord enters motor-driven strand by corner block Mill;Tightening up motor-driven grinding mill, adjust to correct position, earth potential electrician disconnects bulb, by duplex Ground is reached under V-type bunch of insulator;Motor-driven grinding mill lifts by crane new duplex V-type bunch of insulator, Equipotential live line work personnel and earth potential working personnel install duplex V-type by the reverse order removed Bunch of insulator.
CN201610436726.9A 2016-06-17 2016-06-17 Tool set capable of replacing insulator chain of ultra-high-voltage transmission line under electrified state and use method for tool set Pending CN105932599A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610436726.9A CN105932599A (en) 2016-06-17 2016-06-17 Tool set capable of replacing insulator chain of ultra-high-voltage transmission line under electrified state and use method for tool set

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610436726.9A CN105932599A (en) 2016-06-17 2016-06-17 Tool set capable of replacing insulator chain of ultra-high-voltage transmission line under electrified state and use method for tool set

Publications (1)

Publication Number Publication Date
CN105932599A true CN105932599A (en) 2016-09-07

Family

ID=56830990

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610436726.9A Pending CN105932599A (en) 2016-06-17 2016-06-17 Tool set capable of replacing insulator chain of ultra-high-voltage transmission line under electrified state and use method for tool set

Country Status (1)

Country Link
CN (1) CN105932599A (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105244810A (en) * 2015-10-29 2016-01-13 国家电网公司 Clamping fixture for power-failure replacement of 110kV line hydraulic tension wire clamp single-string insulator
CN106451237A (en) * 2016-12-07 2017-02-22 中国南方电网有限责任公司超高压输电公司百色局 Connecting device for in-out operation of strain insulator string of ultra-high voltage transmission line and use method
CN106451214A (en) * 2016-10-28 2017-02-22 国网浙江省电力公司金华供电公司 Combined tool for electrically replacing extra-high voltage same-tower double-circuit tension insulator
CN108462099A (en) * 2018-02-27 2018-08-28 国家电网公司 One kind ± 800kV extra high voltage line double-linkage double-hanging-point pendulous string isolator replacing options
CN108565771A (en) * 2018-02-27 2018-09-21 国家电网公司 One kind ± 800kV extra high voltage line double-linkage double-hanging-point pendulous string isolators more changing device
CN109217170A (en) * 2018-08-01 2019-01-15 国网浙江省电力有限公司金华供电公司 The replacement tool of ground electrode circuit insulator and fitting
CN110011215A (en) * 2019-02-11 2019-07-12 国家电网有限公司 Replace the combination tool and method of direct current grounding pole route suspension string
CN111697487A (en) * 2020-07-08 2020-09-22 国网福建省电力有限公司 Voltage-measurable live-line double-insulator-string replacing device and operation method
CN114362049A (en) * 2022-01-19 2022-04-15 云南电网有限责任公司曲靖供电局 Complete tool for indirectly replacing 10kV line tension insulator in electrified mode and using method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN85204169U (en) * 1985-09-28 1986-07-09 鞍山电业局 Clamping fixture for exchangeing paired gang insulator without opening current
CN201937206U (en) * 2010-12-07 2011-08-17 江西省电力公司超高压分公司 Universal tool for electrically replacing 500kV strain insulator string
CN203456796U (en) * 2013-08-15 2014-02-26 国网浙江省电力公司杭州供电公司 Broadsword fixture for replacing single insulator of duplex insulator string during power failure
CN205791227U (en) * 2016-06-17 2016-12-07 国网湖南省电力公司带电作业中心 Charged for replacement UHV transmission line insulator chain tool set

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN85204169U (en) * 1985-09-28 1986-07-09 鞍山电业局 Clamping fixture for exchangeing paired gang insulator without opening current
CN201937206U (en) * 2010-12-07 2011-08-17 江西省电力公司超高压分公司 Universal tool for electrically replacing 500kV strain insulator string
CN203456796U (en) * 2013-08-15 2014-02-26 国网浙江省电力公司杭州供电公司 Broadsword fixture for replacing single insulator of duplex insulator string during power failure
CN205791227U (en) * 2016-06-17 2016-12-07 国网湖南省电力公司带电作业中心 Charged for replacement UHV transmission line insulator chain tool set

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105244810A (en) * 2015-10-29 2016-01-13 国家电网公司 Clamping fixture for power-failure replacement of 110kV line hydraulic tension wire clamp single-string insulator
CN106451214A (en) * 2016-10-28 2017-02-22 国网浙江省电力公司金华供电公司 Combined tool for electrically replacing extra-high voltage same-tower double-circuit tension insulator
CN106451237A (en) * 2016-12-07 2017-02-22 中国南方电网有限责任公司超高压输电公司百色局 Connecting device for in-out operation of strain insulator string of ultra-high voltage transmission line and use method
CN108462099A (en) * 2018-02-27 2018-08-28 国家电网公司 One kind ± 800kV extra high voltage line double-linkage double-hanging-point pendulous string isolator replacing options
CN108565771A (en) * 2018-02-27 2018-09-21 国家电网公司 One kind ± 800kV extra high voltage line double-linkage double-hanging-point pendulous string isolators more changing device
CN108565771B (en) * 2018-02-27 2021-05-14 国家电网公司 Device for replacing double-linkage double-hanging-point suspension string insulator of +/-800 kV extra-high voltage line
CN109217170A (en) * 2018-08-01 2019-01-15 国网浙江省电力有限公司金华供电公司 The replacement tool of ground electrode circuit insulator and fitting
CN110011215A (en) * 2019-02-11 2019-07-12 国家电网有限公司 Replace the combination tool and method of direct current grounding pole route suspension string
CN111697487A (en) * 2020-07-08 2020-09-22 国网福建省电力有限公司 Voltage-measurable live-line double-insulator-string replacing device and operation method
CN114362049A (en) * 2022-01-19 2022-04-15 云南电网有限责任公司曲靖供电局 Complete tool for indirectly replacing 10kV line tension insulator in electrified mode and using method

Similar Documents

Publication Publication Date Title
CN105932599A (en) Tool set capable of replacing insulator chain of ultra-high-voltage transmission line under electrified state and use method for tool set
CN205791227U (en) Charged for replacement UHV transmission line insulator chain tool set
WO2016023141A1 (en) Process for live replacement of tension hard-tube bus-bar jumper insulator of +/- 800kv ultra-high-voltage dc transmission line
CN104505766A (en) Tool and method for live replacement of 500kV strain insulator strings in substations
CN111884128A (en) 10kV distribution line uninterrupted repair wire device and repair method thereof
CN107700918A (en) A kind of thunderstorm weather is easy to the lightning protection electric pole that service worker repairs
CN207353753U (en) Phase transfer current potential power tool in dry font anchor support
CN203039270U (en) Isolating switch repair protective frame
CN106898467A (en) A kind of power transformation transformer group
CN103840396A (en) Method for replacing lightning conductor on high-voltage iron towers
CN204258160U (en) Change transmission tower insulator instrument
CN203690803U (en) Backup protection device for live replacement of power transmission line tension insulator
CN208280706U (en) A kind of electric pole facilitating climbing
CN208024045U (en) A kind of novel power transmission and distribution electric pole
CN201252365Y (en) Construction charged crossover device of ultra-high and special-high voltage transmission line
CN206575086U (en) Insulate turnbuckle plate pulling device
CN205846571U (en) Overhead transmission line telescopic earth lead hanger bar
CN210111556U (en) High-stability protection hardware fitting for high-voltage power transmission equipment
CN204793832U (en) Join in marriage electrified maintenance in many loop lines of net way and carry lineman&#39;s utensil
CN105749500A (en) Hold hoop for climbing telegraph pole for electric power line maintenance
CN111540549A (en) Three-hanging-point ground wire suspension insulator string
CN103746326B (en) Connecting device for electric high tension lines
CN103441443B (en) Device is recovered in aerial earth wire damper positioning
CN110401163A (en) Three across ADSS optical cable wedge blocks clamp security personnel&#39;s fitting
Burnham et al. High strength polymer post insulators enable economical transmission lines with low environmental impact

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20160907