CN105931132A - Intelligent substation secondary system physical circuit file complete path analysis method - Google Patents

Intelligent substation secondary system physical circuit file complete path analysis method Download PDF

Info

Publication number
CN105931132A
CN105931132A CN201610247465.6A CN201610247465A CN105931132A CN 105931132 A CN105931132 A CN 105931132A CN 201610247465 A CN201610247465 A CN 201610247465A CN 105931132 A CN105931132 A CN 105931132A
Authority
CN
China
Prior art keywords
switch
search
screen cabinet
fibre core
optical cable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610247465.6A
Other languages
Chinese (zh)
Other versions
CN105931132B (en
Inventor
娄悦
李鹏
朱东升
曹卫国
刘战朋
鲁东海
周亚龙
沈涛
沈泓
汤向洋
胡潇月
刘述军
赵智成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NANJING WUCAIZHIDIAN ELECTRIC POWER TECHNOLOGY Co Ltd
China Energy Engineering Group Jiangsu Power Design Institute Co Ltd
Original Assignee
NANJING WUCAIZHIDIAN ELECTRIC POWER TECHNOLOGY Co Ltd
China Energy Engineering Group Jiangsu Power Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NANJING WUCAIZHIDIAN ELECTRIC POWER TECHNOLOGY Co Ltd, China Energy Engineering Group Jiangsu Power Design Institute Co Ltd filed Critical NANJING WUCAIZHIDIAN ELECTRIC POWER TECHNOLOGY Co Ltd
Priority to CN201610247465.6A priority Critical patent/CN105931132B/en
Publication of CN105931132A publication Critical patent/CN105931132A/en
Application granted granted Critical
Publication of CN105931132B publication Critical patent/CN105931132B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply

Landscapes

  • Business, Economics & Management (AREA)
  • Health & Medical Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Human Resources & Organizations (AREA)
  • Marketing (AREA)
  • Primary Health Care (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The invention discloses an intelligent substation secondary system physical circuit file complete path analysis method. The method comprises the steps of (1) importing an SCD file and an SPCD file through a visualization tool, (2) initializing and obtaining an IED logic relation topology and a switch port topology, (3) carrying out analysis which comprises an SPCD level analysis and an SPCD physical circuit analysis. The continuous searching to two sides through a fiber core to find IED equipment can be realized. The theory research of physical circuit model file back end analysis is enriched, a reference is provided for other latter advanced applications of a physical model file, and thus the working efficiency of intelligent substation design, debugging and operation is improved indirectly.

Description

Secondary system of intelligent substation physical loop file fullpath analytic method
Technical field
The present invention relates to a kind of secondary system of intelligent substation physical loop file fullpath analytic method.
Background technology
The secondary circuit of intelligent substation includes logical circuit and physical loop, and logical circuit is mainly Intelligent electric Signal annexation between subset (IED:Intelligent Electronic Device), physics Loop is mainly physical port between equipment and passes through optical cable, stern fast, the annexation of jumping fiber.Logical circuit exists On physical loop transmit, physical loop be the medium realizing logical circuit, logical circuit and physical loop be intelligence The core of energy transformer station secondary system design.International standard IEC61850-6 defines intelligent substation and patrols Collecting the modeling standard in loop, transformer substation system configuration describes SCD (Substation Configuration Description) file is the model tormulation of electrical secondary system logical circuit, and designing unit is complete by SCD file Becoming the design of electrical secondary system logical circuit, engineering construction unit completes electrical secondary system logical circuit according to SCD file Configuration.And physical loop there is no relevant criterion and defines its model, designing unit is by the figure of optical cable contact figure Paper form expresses physical loop design, and engineering construction unit completes electrical secondary system physics according to optical cable contact figure and returns The construction on road.
Publication No. CN104732021A, invention entitled secondary system of intelligent substation physical loop modeling and The Chinese patent of the method that actual situation is corresponding, discloses panorama model file especially physical loop model file SPCD (the Substation Physical Configuration Description) form of file, panorama The design cycle of model file, the actual situation corresponding method of panorama model file.But this patent is the most specifically Bright in the graphic procedure drawing physical loop, how to show the implementation in complete physical path, this patent To grind further based on patent " method that secondary system of intelligent substation physical loop models and actual situation is corresponding " Study carefully the searching method of fullpath in physical loop drawing course.
Elaboration for the ease of follow-up technical method illustrates, the lattice of brief description SPCD file once here Formula requirement, " modeling of secondary system of intelligent substation physical loop and actual situation are corresponding with patent for illustrated content Method " it is consistent.Wherein, SPCD file is physical loop model file, and physical modeling is strict according to thing The membership of reason equipment is modeled, and its membership follows the physical layer level relation of reality.With in Fig. 1 110KV line segregation physical link figure as a example by, its corresponding complete S PCD file is as follows:
Above-mentioned file format illustrates as follows:
1) SPCL root element, represents that the language format of file is that transformer station's physical configuration describes language (Substation Configuration Language)。
2) Substation element, represents transformer station, and a SPCL element comprises only a Substation Element.The attribute of Substation has desc, name:desc to represent the description of transformer station, such as " 220kV Sea rhythm becomes ";Name defaults to sky, wouldn't use.
3) Region element, represents the cell of transformer station, and a Substation element can be containing multiple Region element.The attribute of Region has desc, name:desc to represent the description of transformer station, such as " 220 Cell ", " outdoor " etc.;Name is the mark of cell, is made up of English+numeral, such as R220.
4) Cubicle element, represents screen cabinet, and a Region element can contain multiple Cubicle elements. The attribute of Cubicle has desc, name:desc to represent the description of screen cabinet, such as " line switching convergence control cabinet A " Deng;Name is the mark of screen cabinet, is made up of English+numeral, such as XLG1A.
5) Unit element, represents physical unit itself, and a Cubicle element can be containing multiple Unit unit Element.The attribute of Unit has desc, IEDname, name and type:desc to represent the description of physical unit, Such as " circuit 1 protects A ";IEDname represents the IEDname of physical unit, with the IEDname in SCD file Should be identical, unintelligent device is empty;Name is device numbering in screen cabinet, volume internal with the device in drawing Number identical, such as 1n;Type is type of device, enumerated value is IED, ODF, GS-NET, SV-NET, GS-SV-NET, MMS-NET, IED represent that smart machine, ODF represent that fibre distribution frame, GS-NET represent GOOSE switch, SV-NET represents SV switch, and GS-SV-NET represents GOOSE/SV switch, and MMS-NET represents that MMS hands over Change planes.
6) Board element, represents board, can comprise multiple Board element in a Unit.Board Attribute have desc, slot:desc to represent the description of board, such as NR1102;Slot represents the groove of board Position, enumerated value is 1,2,3 ... 20.It should be noted that ODF and SWI for transverse slat structure, for convenience Indicating, groove position uses enumerated value to be A, B, C ... Z.
7) Port element, represents port, and a Board can comprise multiple Port element.The genus of Port Property have desc, direction, no, plug and type:desc represent port function describe, as MMS, GOOSE/SV, GPS etc.;Direction represents the data flow of port, and enumerated value is Tx, Rx, TxRx, Tx represents that transmission, Rx represent that reception, TxRx represent that transmission receives;No represents that port sorts, and enumerates Value is for A, B, C ... Z, plug represent type of plug, enumerated value is LC, ST, SC, FC, RS485, RS232, RJ45, type represent interface type, and enumerated value is FOC (optical cable), STP (Shielded Twisted Pair), 100BaseT (100,000,000 netting twine).It should be noted that ODF and SWI for transverse slat structure, for convenience of indicating, port is adopted It is 1,2,3 with enumerated value ... 20.
8) IntCore element, represents physical connection in screen, and a Cubicle can comprise multiple IntCore Element.IntCore attribute has PortA, PortB, name, type:PortA to represent physical connection in screen A port, such as " 1n.6.A-Tx ";PortB represents the B port of internal physical line, as “2n.A.02-TxRx”;Name represents physical connection title in screen, such as TX01;Type represents physical connection Type, enumerated value is FJ (jumping fiber), STP (Shielded Twisted Pair), 100BaseT (100,000,000 netting twine).
9) Cable element, represents the physical connection between screen cabinet, and a Substation can comprise multiple Cable element.Cable attribute has coresNum, cubicleA, cubicleB, desc, name, type: CoresNum represents the core number of physical connection, such as 4;CubicleA represents the A screen cabinet of physical connection, as " R220.SWP1A";CubicleB represents the B screen cabinet of physical connection, such as " Outdoor.XLG1A ";desc Table physical connection describes, and name represents physical connection title between screen, such as " SW_GL_183A ";Type represents Physical connection type, enumerated value is FC (optical cable), FT (stern fast), FJ (jumping fiber), STP (shielding multiple twin Line), 100BaseT (100,000,000 netting twine).
10) Core element, represents the inner core of physical connection between screen cabinet, and a Cable can comprise multiple Core Element.Core attribute has no, PortA, PortB:no table sequence number, represents the inner core sequence number of optical cable, PortA Represent the A port of physical connection between screen cabinet, such as " 1n.6.A-Tx ";PortB represents physical connection between screen cabinet, Such as " 2n.A.02-TxRx ".
This patent will be based on patent " method that secondary system of intelligent substation physical loop models and actual situation is corresponding " The searching method of fullpath in research physical loop drawing course further.
Summary of the invention
For the problems referred to above, the present invention provides a kind of complete road of secondary system of intelligent substation physical loop file Footpath analytic method, carries out the complete of secondary system of intelligent substation physical loop based on SCD file, SPCD file Whole path resolves.
Explanation of nouns:
A side: the side being connected with PortA.
B side: the side being connected with PortB.
For realizing above-mentioned technical purpose, reaching above-mentioned technique effect, the present invention is achieved through the following technical solutions:
Secondary system of intelligent substation physical loop file fullpath analytic method, it is characterised in that include Following steps:
Step 1, import SCD file and SPCD file by visualization tool;
Step 2, initialize, including:
Connect by resolving the empty terminal of SCD file, obtain IED logical relation topology;
By resolving the model of switch in SPCD file, obtain switch ports themselves topology;
Step 3, resolve, including:
SPCD level resolves: traversal SPCD file, extracts respective element information, element bag according to click on content Include transformer station, cell, screen cabinet, equipment and optical cable;
SPCD physical loop resolves: according to IED logical relation topology, switch ports themselves topological sum SPCD level Analysis result, carries out SPCD physical loop parsing, resolves including the optical cable annexation between screen cabinet, shields between cabinet The jumping fiber annexation parsing that the inside fibre core annexation of optical cable resolves and shields in cabinet.
Preferably, the optical cable annexation between screen cabinet resolves and specifically includes following steps:
A) central display cabinet to be drawn, i.e. center screen cabinet are selected;
B) traversal Cable element, obtains all optical cable information of transformer station;
C) cubicleA and the cubicleB attribute in Cable element is obtained, it is thus achieved that the both sides of all optical cables Screen cabinet information;
D) information of filter center's screen cabinet, it is thus achieved that the screen cabinet information being connected with center screen cabinet;
E) judge whether the screen cabinet obtained in step d) has identical screen cabinet;
If f) not having, the most automatically drawing optical cable centered by the screen cabinet of Ze Yi center and connecting figure;If having, then merge Automatically optical cable connection figure is drawn centered by the screen cabinet of screen cabinet block diagram Hou Zaiyi center.
Preferably, the jumping fiber annexation in screen cabinet resolves and specifically includes following steps:
A) connect figure interface at optical cable, select the screen cabinet of internal jumping fiber annexation to be resolved;
B) the jumping fiber IntCore element in traversal screen cabinet;
C) PortA and the PortB attribute of IntCore element is obtained, it is thus achieved that two side apparatus letters of all jumping fibers Breath;
D) jumping fiber of IED equipment in extraction PortA and PortB is this screen cabinet.
Preferably, between screen cabinet, the inside fibre core annexation of optical cable resolves and specifically includes following steps:
A) optical cable of internal fibre core annexation to be resolved is selected;
B) the Cable element of this optical cable is resolved;
C) the fibre core Core element information in Cable element is obtained;
D) fibre core Core element is resolved one by one;
E) PortA and the PortB information of Core element is obtained;
F) fibre core automatic search algorithm is called: by the fibre core Core of optical cable Cable as point of penetration, point Constantly do not extend search to A side and B side, finally search the IED equipment of both sides.The useful effect of the present invention Fruit is:
Resolve SPCD file fullpath and be divided into three kinds of situations: between screen cabinet between optical cable, screen cabinet in fibre core, screen cabinet Jumping fiber, devises concrete process of analysis for every kind of situation, especially to fibre core between the most complicated screen cabinet Parsing proposes fibre core automatic search algorithm, it is possible to achieve constantly searched for both sides until finding IED by fibre core Equipment.Enrich the theoretical research that physical loop model file rear end resolves, for the physical model file later stage Other senior application provide reference, thus indirectly improve intelligent substation design, debugging, the work of O&M Make efficiency.
Accompanying drawing explanation
Fig. 1 is the physical link figure of 110KV line segregation;
Fig. 2 is the entirety of secondary system of intelligent substation physical loop file fullpath analytic method of the present invention Flow chart;
Fig. 3 is the flow chart that the present invention obtains IED logical relation topology;
Fig. 4 is the flow chart that the present invention obtains switch ports themselves topology;
Fig. 5 is that the present invention obtains the flow chart of optical cable connection figure between screen cabinet;
Fig. 6 is that the present invention obtains the flow chart of jumping fiber contact between screen cabinet;
Fig. 7 is that the present invention obtains the flow chart of fibre core contact between screen cabinet;
Fig. 8 be A side of the present invention be the fibre core automatic search routine figure of IED equipment;
Fig. 9 be A side of the present invention be the fibre core automatic search routine figure of ODF;
Figure 10 be A side of the present invention be the fibre core automatic search routine figure of switch;
Detailed description of the invention
With specific embodiment, technical solution of the present invention is described in further detail below in conjunction with the accompanying drawings, with Make those skilled in the art can be better understood from the present invention and can be practiced, but illustrated embodiment is not made For limitation of the invention.
Mainly physical equipment level relation, the physical loop of the graphical representation of SPCD file.Physical layer level Displaying relatively simple, the coherent element directly resolved in SPCD file is achieved with, the weight that this patent illustrates Point is the methods of exhibiting of physical loop.Firstly the need of explanation, this patent is drawing physical loop process In, will not use the mode of transformer station's full figure by the way of showing step by step, this is because: resolving inversely Show that time space is limited owing to carrying out software interface at instrument, the most all intercept one or several physical pathway Show;All transformer station shows in a width figure, and the autoplacement drawing to software requires high, transformer station When scale is the biggest, the physical loop of intersection is the most, it is impossible to clearly show that physical loop figure.
Secondary system of intelligent substation physical loop file fullpath analytic method, needs the point according to interface Hitting content real time parsing and real-time drawing function, show compared to hierarchical object, destination object no longer determines that, The physical pathway of whole physical pathway especially fibre core needs software automatically to calculate according to SPCD file. The physical loop resolved is needed to have three kinds by analysis: to include that the optical cable annexation shielding between cabinet resolves, shields cabinet Between the inside fibre core annexation of optical cable resolve and jumping fiber annexation in screen cabinet resolves.
As in figure 2 it is shown, secondary system of intelligent substation physical loop file fullpath analytic method, including Following steps:
Step 1, import SCD file and SPCD file by visualization tool;
Step 2, initialize, initialize mainly to provide for follow-up " fibre core is searched for automatically " and resolve base Plinth, resolves and includes two contents:
(1) by resolving the empty terminal connection of SCD file, the input of each IED and the relation of output are obtained, I.e. IED logical relation topology, the step for be equivalent to obtain forward configuration during infologic relation, It is easy to find, through switch, the opposite side IED equipment that is associated follow-up according to side IED equipment, The most as shown in Figure 3:
A) SCD file is imported;
B) empty terminal link information is resolved;
C) obtain the transmission of each IED and receive logical relation.
(2) by resolving the model of switch in SPCD file, the physical couplings of all switches is obtained (i.e. the physical connection path of each port of switch), obtains switch ports themselves topology.The step for be also For follow-up route searching servicing, when side IED equipment needs to know opposite side IED through switch During equipment, the switch-layer topology relation that this step has been completed can help to complete route searching faster. If switch ports themselves is direct-connected to IED device port, record this physical connection path;If switch end Mouth is connected to light and joins machine and then enter iterative search, until searching IED device port, records this complete Whole physical pathway;If what switch was ultimately connected to is switch, then record cascade port;More than record Three kinds of situations, ultimately form switch ports themselves topology.
The most as shown in Figure 4:
A) traversal each port of switch;
B) physical pathway is resolved piecemeal;
If c) obtain is IED equipment, then obtains IED device end, search for next port.
If that d) obtain is ODF, then continue cycling through search, until searching out IED equipment;
If b) search is less than IED equipment, then it is assumed that is switch, then points out equipment if not switch Type error;
C) if switch then records the port topology of switch.
Step 3, resolve: initialize after terminating, enter the formal flow process resolved, specifically include following merit Energy module:
SPCD level resolves: traversal SPCD file, extracts respective element information, element bag according to click on content Include transformer station, cell, screen cabinet, equipment and optical cable etc.;
SPCD physical loop resolves: according to IED logical relation topology, switch ports themselves topological sum SPCD level Analysis result, carries out SPCD physical loop parsing, resolves including the optical cable annexation between screen cabinet, shields between cabinet The jumping fiber annexation parsing that the inside fibre core annexation of optical cable resolves and shields in cabinet.
Introduce in detail below:
Optical cable annexation between screen cabinet: when clicking on screen cabinet, the light being associated with this screen cabinet should be able to be drawn out Cable information, beginning and end are the screen cabinet of this optical cable, and optical cable can be to need the armored optical cable of welding can also It it is the stern fast that need not welding.Because having special Elements C able to describe this physical connection at SPCD file Relation, software has only to do resolve to extract and is obtained with shielding the optical cable annexation between cabinet, and this step is more Simply, as shown in Figure 5:
Optical cable annexation between screen cabinet resolves and specifically includes following steps:
A) central display cabinet (hereinafter referred to as center screen cabinet) to be drawn can be selected by software interface;
B) traversal Cable element, obtains all optical cable information of transformer station;
C) cubicleA and the cubicleB attribute in Cable element is obtained, it is thus achieved that the both sides of all optical cables Screen cabinet information;
D) information of filter center's screen cabinet, it is thus achieved that the screen cabinet information being connected with center screen cabinet;
E) judge whether the screen cabinet obtained in step d) has identical screen cabinet;
If f) not having, the most automatically drawing optical cable centered by the screen cabinet of Ze Yi center and connecting figure;If having, then merge Automatically optical cable connection figure is drawn centered by the screen cabinet of screen cabinet block diagram Hou Zaiyi center.
The inside fibre core annexation of optical cable between screen cabinet: when clicking on screen cabinet, should be able to draw out screen cabinet inside and jump Fine complete physical loop, screen fullpath within cabinet should simply shield the jumping fiber of cabinet, because in screen cabinet Jumping fiber have partial content be on send screen cabinet between fibre core connect a part, it is contemplated that the complexity of drafting and clear journey Degree, does not search again for fullpath.Jumping fiber in screen cabinet uses Intcore element, it is only necessary to resolve Intcore Just can obtain jumping fiber information in cabinet.Additionally, the jumping depicted during drafting fibre core in department's screen cabinet Fibre, draws clearly in order to more simplify, and the jumping fiber in screen cabinet is only drawn both sides and is IED equipment and entirely exists The physical pathway of screen cabinet, as shown in Figure 6:
Jumping fiber annexation in screen cabinet resolves and specifically includes following steps:
A) connect figure interface at optical cable, select the screen cabinet of internal jumping fiber annexation to be resolved;
B) the jumping fiber IntCore element in traversal screen cabinet;
C) PortA and the PortB attribute of IntCore element is obtained, it is thus achieved that two side apparatus letters of all jumping fibers Breath;
D) jumping fiber of IED equipment in extraction PortA and PortB is this screen cabinet.
Jumping fiber annexation in screen cabinet: when clicking on optical cable, should be able to draw out the complete of all of internal fibre core Whole physical loop, the use of internal fibre core is extremely complex, following points specifically:
A) relate to a lot of intermediate equipment link, as one or more ODF (fibre distribution frame), one or many Individual switch.
B) internal fibre core has the fibre core used, also either with or without the standby core used.
C) point device that rises of all fibre cores of internal fibre core is not necessarily in same screen cabinet, and end device also differs Surely it is in same screen cabinet, causes physical loop to have length to have short, drawing layout difficulty.
D) found by IED equipment, through switch, the most easy-to-look-up next stage equipment, it is desirable to have Corresponding algorithm supports.
E) for same optical cable, it is not necessary to be the beginning and end of equipment, may a plurality of optical cable combination Can constitute complete physical loop, therefore there is the different position of click needs to draw the feelings in same physical loop Condition, in other words, software needs compatible different click location to search same physical loop.
F) physical connection produces contact, but not necessarily inside has logical circuit to contact, such as route protection and intelligence Terminal the most on switches, but both information be all by be directly connected to transmission.
For the problems referred to above, counter-measure is as follows:
A) set up fibre core automatic search algorithm, support containing ODF, the search of the physical loop of switch.
B) software drawing course considers the service condition of standby core, do not have equipment as starting point due to standby core and Terminal, it is contemplated that make standby core at software and indicate.
C) software is drawn needs to consider location problem, supports that the equipment starting point (terminal) of same optical cable does not exists Same screen cabinet.
D) design resolves the initialization procedure of SCD and SPC file, it is provided that the logical relation topology of IED equipment With the port topology of switch, the follow-up lookup through switch.
E) setting up fibre core automatic search algorithm, point situation discusses the searching algorithm of different click location.
F) can not know whether current loop has service connection during drawing, the most all draw out, " actual situation is corresponding " does not has logical circuit associated.
As it is shown in fig. 7, the inside fibre core annexation of optical cable resolves and specifically includes following steps between screen cabinet:
A) optical cable of internal fibre core annexation to be resolved is selected;
B) the Cable element of this optical cable is resolved;
C) the fibre core Core element information in Cable element is obtained;
D) fibre core Core element is resolved one by one;
E) PortA and the PortB information of Core element is obtained;
F) fibre core automatic search algorithm is called: by the fibre core Core of optical cable Cable as point of penetration, point To both sides, i.e. A side (side being connected with PortA) and B side (side being connected with PortB) be not continuous Extend search, finally search the IED equipment of both sides.
The physical equipment in intelligent substation secondary loop mainly includes IED equipment, ODF and switch, wherein, The search of IED equipment and ODF is relatively simple, and the searching algorithm of switch relates to recursive call and convergence problem then Complex, therefore " switch cyclic search is calculated in the research that focuses on of " fibre core automatic search algorithm " Method ".According to the different optical cable positions clicked on, below point three kinds of situations are illustrated:
The first situation: as shown in Figure 8, when A side is IED equipment, fibre core automatic search algorithm is as follows:
A) search of IED equipment-ODF:
A1) B side physical pathway is resolved piecemeal;
A2) if B side is IED equipment, then obtain B side IED equipment and search terminates, under otherwise entering One step a3);
A3) determine whether ODF (fibre distribution frame), if ODF, then return step a1) continue to Next section search (purpose of cyclic search is to prevent the generation of ODF transit case);Otherwise, enter Switch cyclic search algorithm;
B) switch cyclic search algorithm, based on " the switch ports themselves topology " analyzed when initializing and " IED Logical relation topology ", current SWITCH can be judged:
B1) switch is determined whether, if not then reporting an error;If then entering step b2);
B2) switch ports themselves is analyzed, it may be judged whether have switch concatenation;
B3) if it is not, then take current SWITCH port topology and A side protection measurement and control logic relationship topology common factor, obtain All terminate after obtaining all B sides IED equipment;The most then determine whether a switch concatenation;
B4) if only one of which switch concatenation, then obtaining this switch b side IED equipment, this switch is searched Hitch bundle, enters step b2) start the search of next switch;Otherwise enter step b5);
B5) obtaining all B sides IED equipment of this switch, the search of this switch terminates, and simultaneously enters step Rapid b2) the search all switches of next stage.
It should be noted that, if only one of which switch concatenation, being common cascaded switches, if there being two or more Switch concatenation then centered by switch, general, system only one of which center switch and general with several Logical cascaded switches cascade.Center switch, therefore this calculation typically will not be cascaded again in view of center switch Method step b5) in, search only for an all switch of next stage and i.e. terminate.
The second situation: as it is shown in figure 9, when A side is ODF, fibre core automatic search algorithm is as follows:
01) search for A side physical pathway piecemeal, it may be judged whether be IED equipment, the most then perform when A side For fibre core automatic search algorithm during IED equipment;Otherwise determine whether ODF;
02) if ODF is then back to step 01) continue to search for next section, otherwise judge whether it is to hand over Change planes;
03) if not switch then reports an error, otherwise stop the search of A side and start to search for B side;
04) determine whether ODF, if otherwise optical cable connection does not meets actual conditions, otherwise, continue next section Search;
05) judge whether it is IED equipment, the most then obtain B side IED equipment;Otherwise determine whether ODF;
Wherein, if IED equipment, then after obtaining B side IED equipment, it is also possible to start to search for Port A side, Owing to the search of A side stops at switch, then calling " switch cyclic search algorithm " can be by input B Side IED equipment obtains A side IED equipment.
06) if ODF, then continue next section and search for and enter step 05);If not ODF, then judgement is No is switch;
07) if not switch then reports an error, otherwise judge that this fibre core is as cascade fibre core, it is impossible to draw and terminate.
The third situation: as shown in Figure 10, when A side is switch, fibre core automatic search algorithm is as follows:
001) stop the search of A side, start the search of Port B side, resolve piecemeal;
002) judge whether it is IED equipment, the most then perform fibre core automatic search algorithm from Port B side; Otherwise determine whether ODF;
003) if ODF, then step 001 is entered);If not ODF, then judge whether it is switch;
004) if not switch then reports an error, otherwise judge that this fibre core is as cascade fibre core, it is impossible to draw and terminate.
After intelligent substation proposes physics loop model file, its meaning is constantly to open up physical loop model The senior application in rear end, its first step is exactly graphical to resolve physical loop model file, mainly realizes physics Equipment hierarchical relationship is shown, physical loop is shown.The displaying of physical layer level is relatively simple, directly resolves SPCD Coherent element in file is achieved with, and its difficult point is the analytic method of physical loop.This patent fully divides Having analysed the constituted mode of SPCD file, the optical cable in conjunction with transformer station connects present situation, is resolved by optical cable and is divided three classes: Shield fibre core between optical cable between cabinet, screen cabinet, shield jumping fiber in cabinet, and one one have carried out program circuit design to it, especially It is that the parsing of fibre core between the most complicated screen cabinet is proposed fibre core automatic search algorithm, it is possible to achieve by fibre Core is constantly searched for both sides until finding IED equipment.Meaning of the present invention is to enrich physical loop model The theoretical research that file rear end resolves, other the senior application for the physical model file later stage provide reference, Thus indirectly improve intelligent substation design, debugging, the operating efficiency of O&M.
These are only the preferred embodiments of the present invention, not thereby limit the scope of the claims of the present invention, every profit The equivalent structure made by description of the invention and accompanying drawing content or equivalence flow process conversion, or directly or Connect and be used in other relevant technical fields, be the most in like manner included in the scope of patent protection of the present invention.

Claims (9)

1. secondary system of intelligent substation physical loop file fullpath analytic method, it is characterised in that include as Lower step:
Step 1, import SCD file and SPCD file by visualization tool;
Step 2, initialize, including:
Connect by resolving the empty terminal of SCD file, obtain IED logical relation topology;
By resolving the model of switch in SPCD file, obtain switch ports themselves topology;
Step 3, resolve, including:
SPCD level resolves: traversal SPCD file, extracts respective element information, unit according to click on content Element includes transformer station, cell, screen cabinet, equipment and optical cable;
SPCD physical loop resolves: according to IED logical relation topology, switch ports themselves topological sum SPCD Level analysis result, carries out SPCD physical loop parsing, resolve including the optical cable annexation between screen cabinet, The jumping fiber annexation parsing that between screen cabinet, the inside fibre core annexation of optical cable resolves and shields in cabinet.
Secondary system of intelligent substation physical loop file fullpath parsing side the most according to claim 1 Method, it is characterised in that the optical cable annexation between screen cabinet resolves and specifically includes following steps:
A) central display cabinet to be drawn, i.e. center screen cabinet are selected;
B) traversal Cable element, obtains all optical cable information of transformer station;
C) cubicleA and the cubicleB attribute in Cable element is obtained, it is thus achieved that the both sides of all optical cables Screen cabinet information;
D) information of filter center's screen cabinet, it is thus achieved that the screen cabinet information being connected with center screen cabinet;
E) judge whether the screen cabinet obtained in step d) has identical screen cabinet;
If f) not having, the most automatically drawing optical cable centered by the screen cabinet of Ze Yi center and connecting figure;If having, then merge Automatically optical cable connection figure is drawn centered by the screen cabinet of screen cabinet block diagram Hou Zaiyi center.
Secondary system of intelligent substation physical loop file fullpath parsing side the most according to claim 2 Method, it is characterised in that the jumping fiber annexation in screen cabinet resolves and specifically includes following steps:
A) connect figure interface at optical cable, select the screen cabinet of internal jumping fiber annexation to be resolved;
B) the jumping fiber IntCore element in traversal screen cabinet;
C) PortA and the PortB attribute of IntCore element is obtained, it is thus achieved that two side apparatus letters of all jumping fibers Breath;
D) jumping fiber of IED equipment in extraction PortA and PortB is this screen cabinet.
Secondary system of intelligent substation physical loop file fullpath parsing side the most according to claim 2 Method, it is characterised in that between screen cabinet, the inside fibre core annexation of optical cable resolves and specifically includes following steps:
A) optical cable of internal fibre core annexation to be resolved is selected;
B) the Cable element of this optical cable is resolved;
C) the fibre core Core element information in Cable element is obtained;
D) fibre core Core element is resolved one by one;
E) PortA and the PortB information of Core element is obtained;
F) fibre core automatic search algorithm is called: by the fibre core Core of optical cable Cable as point of penetration, respectively Constantly extend search to A side and B side, finally search the IED equipment of both sides.
Secondary system of intelligent substation physical loop file fullpath parsing side the most according to claim 4 Method, it is characterised in that when A side is IED equipment, fibre core automatic search algorithm is as follows:
A) search of IED equipment-ODF:
A1) B side physical pathway is resolved piecemeal;
A2) if B side is IED equipment, then obtain B side IED equipment and search terminates, otherwise enter next Step a3);
A3) determine whether ODF, if ODF, then return step a1) continue to search for next section;No Then, switch cyclic search algorithm is entered;
B) switch cyclic search algorithm:
B1) switch is determined whether, if not then reporting an error;If then entering step b2);
B2) switch ports themselves is analyzed, it may be judged whether have switch concatenation;
B3) if it is not, all terminate after then obtaining all B sides IED equipment;The most then determine whether one Switch concatenation;
B4) if only one of which switch concatenation, then obtaining this switch b side IED equipment, this switch is searched for Terminate, enter step b2) start the search of next switch;Otherwise enter step b5);
B5) obtaining all B sides IED equipment of this switch, the search of this switch terminates, and simultaneously enters step B2) the search all switches of next stage.
Secondary system of intelligent substation physical loop file fullpath parsing side the most according to claim 5 Method, it is characterised in that step b5) in, search only for an all switch of next stage and i.e. terminate.
Secondary system of intelligent substation physical loop file fullpath parsing side the most according to claim 5 Method, it is characterised in that when A side is ODF, fibre core automatic search algorithm is as follows:
01) search for A side physical pathway piecemeal, it may be judged whether be IED equipment, the most then execution is when A side is Fibre core automatic search algorithm during IED equipment;Otherwise determine whether ODF;
02) if ODF is then back to step 01) continue to search for next section, otherwise judge whether it is exchange Machine;
03) if not switch then reports an error, otherwise stop the search of A side and start to search for B side;
04) determine whether ODF, if otherwise optical cable connection does not meets actual conditions, otherwise, continue next section Search;
05) judge whether it is IED equipment, the most then obtain B side IED equipment;Otherwise determine whether ODF;
06) if ODF, then continue next section and search for and enter step 05);If not ODF, then judge whether It it is switch;
07) if not switch then reports an error, otherwise judge that this fibre core is as cascade fibre core, it is impossible to draw and terminate.
Secondary system of intelligent substation physical loop file fullpath parsing side the most according to claim 7 Method, it is characterised in that step 05) in, if IED equipment, then obtain B side IED equipment and start Search A side, it is thus achieved that A side IED equipment.
Secondary system of intelligent substation physical loop file fullpath parsing side the most according to claim 5 Method, it is characterised in that when A side is switch, fibre core automatic search algorithm is as follows:
001) stop the search of A side, start the search of B side, resolve piecemeal;
002) judge whether it is IED equipment, the most then perform fibre core automatic search algorithm from B side;Otherwise Determine whether ODF;
003) if ODF, then step 001 is entered);If not ODF, then judge whether it is switch;
004) if not switch then reports an error, otherwise judge that this fibre core is as cascade fibre core, it is impossible to draw and terminate.
CN201610247465.6A 2016-04-20 2016-04-20 Secondary system of intelligent substation physical loop file fullpath analytic method Active CN105931132B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610247465.6A CN105931132B (en) 2016-04-20 2016-04-20 Secondary system of intelligent substation physical loop file fullpath analytic method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610247465.6A CN105931132B (en) 2016-04-20 2016-04-20 Secondary system of intelligent substation physical loop file fullpath analytic method

Publications (2)

Publication Number Publication Date
CN105931132A true CN105931132A (en) 2016-09-07
CN105931132B CN105931132B (en) 2019-10-15

Family

ID=56839524

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610247465.6A Active CN105931132B (en) 2016-04-20 2016-04-20 Secondary system of intelligent substation physical loop file fullpath analytic method

Country Status (1)

Country Link
CN (1) CN105931132B (en)

Cited By (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106446431A (en) * 2016-09-30 2017-02-22 国网江苏省电力公司电力科学研究院 Secondary visualization method based on extra-high voltage direct current transmission control protection device
CN106533777A (en) * 2016-11-29 2017-03-22 广东工业大学 Intelligent transformer station information flow path determination method based on matrix ranks and system
CN106602729A (en) * 2017-01-16 2017-04-26 中国能源建设集团江苏省电力设计院有限公司 Physical loop fast connection method based on template base
CN106919973A (en) * 2017-01-23 2017-07-04 国网江苏省电力公司技能培训中心 Intelligent label generation and format conversion method based on panorama model file
CN107040413A (en) * 2017-03-31 2017-08-11 国网电力科学研究院武汉南瑞有限责任公司 The method of transformer station process layer communication link failure positioning
CN107342927A (en) * 2017-06-27 2017-11-10 国网江苏省电力公司电力科学研究院 The VLAN method of automatic configuration combined based on empty loop with physical loop
CN108199879A (en) * 2017-12-29 2018-06-22 国网安徽省电力有限公司 The method that intelligent station process-level network topology is formed based on SPCD and SCD
CN108846214A (en) * 2018-06-21 2018-11-20 国网冀北电力有限公司 The complete trails optical fiber cable port node traversal search method and its equipment of substation
CN109102086A (en) * 2018-07-16 2018-12-28 国网冀北电力有限公司 A kind of fiber optic cable physics complete trails recognition methods and its equipment
CN109617746A (en) * 2019-01-17 2019-04-12 广东电网有限责任公司 A kind of SCD network configuration method of calibration based on SPCD file
CN109861860A (en) * 2019-01-31 2019-06-07 国电南瑞科技股份有限公司 A kind of intelligent substation establishes the method and system of actual situation link maps relationship
CN110222320A (en) * 2019-07-04 2019-09-10 国网吉林省电力有限公司 Method based on the processing of SPCD model realization Substation secondary circuit Automatic Drawing
CN110750910A (en) * 2019-10-25 2020-02-04 国网新疆电力有限公司经济技术研究院 Three-dimensional model file of physical loop model and configuration method
CN110782047A (en) * 2019-10-25 2020-02-11 小波科技有限公司 Intelligent label system
CN110795609A (en) * 2019-10-28 2020-02-14 国网新疆电力有限公司经济技术研究院 Three-dimensional visualization method for secondary system of transformer substation
CN110912741A (en) * 2019-11-23 2020-03-24 国网天津市电力公司 Intelligent label generation method and device based on reverse analysis
CN111198974A (en) * 2019-12-13 2020-05-26 中国能源建设集团安徽省电力设计院有限公司 Panoramic model file-based visualization method for information of alternating current sampling cable of in-place protection equipment
CN111783267A (en) * 2020-07-10 2020-10-16 广东电网有限责任公司电力调度控制中心 Communication network visualization method and device and computer readable storage medium
CN111948489A (en) * 2020-07-27 2020-11-17 国网山东省电力公司电力科学研究院 Intelligent substation secondary equipment board card-level abnormal defect diagnosis and positioning method and system
CN112347612A (en) * 2020-10-19 2021-02-09 国网江苏省电力有限公司检修分公司 Direct current converter station secondary system physical loop modeling method and system
CN112578197A (en) * 2020-11-09 2021-03-30 国网江西省电力有限公司检修分公司 Automatic testing system and method for secondary circuit of transformer substation
CN112949066A (en) * 2021-03-04 2021-06-11 扬州浩辰电力设计有限公司 Method for extracting secondary signal loop based on intelligent substation logic model
CN114900239A (en) * 2022-06-07 2022-08-12 国网安徽省电力有限公司滁州供电公司 Intelligent substation optical fiber label analysis and visual display method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103514336A (en) * 2013-10-18 2014-01-15 国家电网公司 Intelligent substation optical cable connection automatic design method based on virtual-true mapping mode
CN104239406A (en) * 2014-07-31 2014-12-24 山东网聪信息科技有限公司 High-visualization display method for secondary device configuration of intelligent substation
CN104732021A (en) * 2015-03-17 2015-06-24 国家电网公司 Secondary system physical loop modeling and void and actuality correspondence method of intelligent substation

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103514336A (en) * 2013-10-18 2014-01-15 国家电网公司 Intelligent substation optical cable connection automatic design method based on virtual-true mapping mode
CN104239406A (en) * 2014-07-31 2014-12-24 山东网聪信息科技有限公司 High-visualization display method for secondary device configuration of intelligent substation
CN104732021A (en) * 2015-03-17 2015-06-24 国家电网公司 Secondary system physical loop modeling and void and actuality correspondence method of intelligent substation

Cited By (36)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106446431A (en) * 2016-09-30 2017-02-22 国网江苏省电力公司电力科学研究院 Secondary visualization method based on extra-high voltage direct current transmission control protection device
CN106446431B (en) * 2016-09-30 2019-10-22 国网江苏省电力公司电力科学研究院 The electrical secondary system method for visualizing of extra-high voltage direct-current transmission control protection equipment
CN106533777A (en) * 2016-11-29 2017-03-22 广东工业大学 Intelligent transformer station information flow path determination method based on matrix ranks and system
CN106533777B (en) * 2016-11-29 2018-08-10 广东工业大学 Method and system are determined based on the intelligent transformer substation information flow path of matrix ranks
CN106602729A (en) * 2017-01-16 2017-04-26 中国能源建设集团江苏省电力设计院有限公司 Physical loop fast connection method based on template base
CN106602729B (en) * 2017-01-16 2019-03-15 中国能源建设集团江苏省电力设计院有限公司 A kind of physical loop quick connecting method based on template library
CN106919973A (en) * 2017-01-23 2017-07-04 国网江苏省电力公司技能培训中心 Intelligent label generation and format conversion method based on panorama model file
CN107040413A (en) * 2017-03-31 2017-08-11 国网电力科学研究院武汉南瑞有限责任公司 The method of transformer station process layer communication link failure positioning
CN107040413B (en) * 2017-03-31 2020-08-04 国网电力科学研究院武汉南瑞有限责任公司 Method for positioning fault of communication link of process layer of intelligent substation
CN107342927A (en) * 2017-06-27 2017-11-10 国网江苏省电力公司电力科学研究院 The VLAN method of automatic configuration combined based on empty loop with physical loop
CN108199879A (en) * 2017-12-29 2018-06-22 国网安徽省电力有限公司 The method that intelligent station process-level network topology is formed based on SPCD and SCD
CN108199879B (en) * 2017-12-29 2021-03-05 国网安徽省电力有限公司 Method for forming intelligent station process layer network topology based on SPCD and SCD
CN108846214A (en) * 2018-06-21 2018-11-20 国网冀北电力有限公司 The complete trails optical fiber cable port node traversal search method and its equipment of substation
CN109102086A (en) * 2018-07-16 2018-12-28 国网冀北电力有限公司 A kind of fiber optic cable physics complete trails recognition methods and its equipment
CN109617746B (en) * 2019-01-17 2021-10-08 广东电网有限责任公司 SCD network configuration verification method based on SPCD file
CN109617746A (en) * 2019-01-17 2019-04-12 广东电网有限责任公司 A kind of SCD network configuration method of calibration based on SPCD file
CN109861860B (en) * 2019-01-31 2021-09-10 国电南瑞科技股份有限公司 Method and system for establishing virtual-real link mapping relationship of intelligent substation
CN109861860A (en) * 2019-01-31 2019-06-07 国电南瑞科技股份有限公司 A kind of intelligent substation establishes the method and system of actual situation link maps relationship
CN110222320A (en) * 2019-07-04 2019-09-10 国网吉林省电力有限公司 Method based on the processing of SPCD model realization Substation secondary circuit Automatic Drawing
CN110782047A (en) * 2019-10-25 2020-02-11 小波科技有限公司 Intelligent label system
CN110750910A (en) * 2019-10-25 2020-02-04 国网新疆电力有限公司经济技术研究院 Three-dimensional model file of physical loop model and configuration method
CN110750910B (en) * 2019-10-25 2023-07-28 国网新疆电力有限公司经济技术研究院 Three-dimensional model file and configuration method of physical loop model
CN110795609A (en) * 2019-10-28 2020-02-14 国网新疆电力有限公司经济技术研究院 Three-dimensional visualization method for secondary system of transformer substation
CN110912741A (en) * 2019-11-23 2020-03-24 国网天津市电力公司 Intelligent label generation method and device based on reverse analysis
CN111198974A (en) * 2019-12-13 2020-05-26 中国能源建设集团安徽省电力设计院有限公司 Panoramic model file-based visualization method for information of alternating current sampling cable of in-place protection equipment
CN111198974B (en) * 2019-12-13 2023-01-24 中国能源建设集团安徽省电力设计院有限公司 Panoramic model file-based visualization method for AC sampling cable information of in-situ protection equipment
CN111783267A (en) * 2020-07-10 2020-10-16 广东电网有限责任公司电力调度控制中心 Communication network visualization method and device and computer readable storage medium
CN111948489B (en) * 2020-07-27 2024-02-02 国网山东省电力公司电力科学研究院 Intelligent substation secondary equipment board card level abnormal defect diagnosis positioning method and system
CN111948489A (en) * 2020-07-27 2020-11-17 国网山东省电力公司电力科学研究院 Intelligent substation secondary equipment board card-level abnormal defect diagnosis and positioning method and system
CN112347612A (en) * 2020-10-19 2021-02-09 国网江苏省电力有限公司检修分公司 Direct current converter station secondary system physical loop modeling method and system
CN112347612B (en) * 2020-10-19 2024-01-23 国网江苏省电力有限公司检修分公司 Modeling method and system for physical loop of secondary system of direct-current converter station
CN112578197A (en) * 2020-11-09 2021-03-30 国网江西省电力有限公司检修分公司 Automatic testing system and method for secondary circuit of transformer substation
CN112578197B (en) * 2020-11-09 2024-02-27 国网江西省电力有限公司检修分公司 Automatic testing system and method for secondary circuit of transformer substation
CN112949066B (en) * 2021-03-04 2023-09-08 扬州浩辰电力设计有限公司 Method for extracting secondary signal loop based on intelligent substation logic model
CN112949066A (en) * 2021-03-04 2021-06-11 扬州浩辰电力设计有限公司 Method for extracting secondary signal loop based on intelligent substation logic model
CN114900239A (en) * 2022-06-07 2022-08-12 国网安徽省电力有限公司滁州供电公司 Intelligent substation optical fiber label analysis and visual display method

Also Published As

Publication number Publication date
CN105931132B (en) 2019-10-15

Similar Documents

Publication Publication Date Title
CN105931132A (en) Intelligent substation secondary system physical circuit file complete path analysis method
CN104732021B (en) Secondary system physical loop modeling and void and actuality correspondence method of intelligent substation
CN110782047A (en) Intelligent label system
CN101614781B (en) Intelligent diagnosis method of radio and television equipment based on spatial rule index
CN104867058A (en) IED visualization method of intelligent transformer substation SCD file
CN112347612B (en) Modeling method and system for physical loop of secondary system of direct-current converter station
CN106446431B (en) The electrical secondary system method for visualizing of extra-high voltage direct-current transmission control protection equipment
CN104184621B (en) The generation method and system of intelligent substation network topological diagram
CN103646091B (en) A kind of generation method and device of grid graph data
CN108549650A (en) A kind of intelligent substation anti-misoperation locking logic rules source configuration method and system
CN105140810B (en) The soft pressing plate of intelligent substation whole station, which is thrown, moves back status check system and method
CN106066888B (en) The source database building method and actual situation corresponding method of transformer station secondary system
CN112148708B (en) Power grid planning-oriented visual application system
CN107786000A (en) The intelligent generation method of digital relay protection tester configuration file
CN106919973A (en) Intelligent label generation and format conversion method based on panorama model file
CN109471961B (en) Loop display method and device for secondary system of intelligent substation
CN105488305A (en) Intelligent substation SCD file configuration method based on graph and template integration
CN105809570A (en) SCD file and AutoCAD drawing mutual verification apparatus and method
CN108199879A (en) The method that intelligent station process-level network topology is formed based on SPCD and SCD
CN109857885A (en) Intelligent substation main wiring diagram automatic generation method based on SCD file
Grabowski et al. The standardization of message sequence charts
CN103713523A (en) Influencing analysis method of whole intelligent substation model
CN105719195A (en) Gradual-type expressing method and system for intelligent-substation event sequence analysis
CN107025329A (en) The empty loop automatic connection method of intelligent substation
CN109583068B (en) Secondary system of intelligent substation rapid modeling system and method based on main wiring diagram

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant