CN105926564A - Composite foundation load detection method - Google Patents

Composite foundation load detection method Download PDF

Info

Publication number
CN105926564A
CN105926564A CN201610266241.XA CN201610266241A CN105926564A CN 105926564 A CN105926564 A CN 105926564A CN 201610266241 A CN201610266241 A CN 201610266241A CN 105926564 A CN105926564 A CN 105926564A
Authority
CN
China
Prior art keywords
mixing pile
cement mixing
way cement
detection
load
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610266241.XA
Other languages
Chinese (zh)
Other versions
CN105926564B (en
Inventor
刘学应
徐振兴
金芳方
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wenzhou Oufei Economic Development Investment Co Ltd
Original Assignee
Zhejiang University of Water Resources and Electric Power
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang University of Water Resources and Electric Power filed Critical Zhejiang University of Water Resources and Electric Power
Priority to CN201610266241.XA priority Critical patent/CN105926564B/en
Publication of CN105926564A publication Critical patent/CN105926564A/en
Application granted granted Critical
Publication of CN105926564B publication Critical patent/CN105926564B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D1/00Investigation of foundation soil in situ
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D1/00Investigation of foundation soil in situ
    • E02D1/08Investigation of foundation soil in situ after finishing the foundation structure
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D33/00Testing foundations or foundation structures

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Analytical Chemistry (AREA)
  • Soil Sciences (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The invention discloses a composite foundation load detection method. The composite foundation load detection method includes the following steps that (a), site clearing is performed; (b), two-way cement stirring piles are selected; (c), load detection is performed; and (d), the two-way cement stirring piles are analyzed. According to the method, the selected two-way cement stirring piles are subjected to number marking, repeated detection of loads of the two-way cement stirring piles is prevented, the construction period can be shortened, and cost can be reduced. According to the method, the average value of test data corresponding to lime powder detection points of the two-way cement stirring piles is obtained, the average load at the positions of the two-way cement stirring piles is acquired, influences caused by the fact that the load measured through a single lime powder detection point is too high or too low are eliminated, the deviation arrange of the obtained composite foundation load and the actual load is small, the acquired test data are high in precision, extremely high reference value is achieved, the cement stirring piles and tidal marsh mud around the piles can form a composite foundation jointly, and therefore the bearing capacity of the foundation is improved; and meanwhile, by means of the method, the detection stability of a detection device can be improved, and load detection is wide in application range.

Description

A kind of composite foundation loading testing method
Technical field
The invention belongs to two-way Construction Techniques for Cement Mixing Pile field, be specifically related to a kind of composite foundation load inspection Survey method.
Background technology
Along with investment on water conservancy in recent years and construction are flourish, investment more than hundred million yuan easily, hydraulic engineering Based process design and construction uses cement mixing pile more and more universal.The work efficiency of marine deep layer bidirectional stirring pile Doubling than unidirectional mixing pile, bi-directional cement soil stake cement earth pile more unidirectional than same diameter is more closely knit, and bearing capacity is more High.
Two-way cement mixing pile means and utilizes 42.5# ordinary cement to make firming agent, by the Bidirectional agitator of patent Tool, below ground blotter operating platform, tidal land mud and cement hardener action of forced stirring are merged by original place, By producing physics and the polyreaction of chemistry between firming agent and tidal land mud, tidal land mud is made to condense into some strength Cement mixing method.Cement mixing pile forms composite foundation together with stake week tidal land mud, thus improves ground and hold Load power, reduces settlement of foundation and lateral displacement amount.Explored by the construction of two-way cement mixing pile, improve, Mature and stable and successful Application, embodies bi-directional cement soil mixing pile than unidirectional cement-soil stirring pile construction speed Comparatively fast, pile quality higher, operation is relatively flexible, and security performance, to adapt to ability stronger.Marine 20m Deep following deep layer bi-directional cement soil mixing pile construction is the most ripe, can guarantee that soil cement quality and ground are steady Qualitative, it is that a kind of operation is simple, practicable construction method, there is bigger promotional value.After construction Two-way cement mixing pile need to carry out composite foundation load detection work, the bearing capacity of detection construction area, Judge the two-way cement mixing pile constructed whether conformance with standard.But the work of composite foundation load detection at present Two-way cement mixing pile of opposing detects one by one, long construction period, and cost is high, and the detection taked The data precision that method obtains is low, and reference value is low.
Summary of the invention
Present invention aim at solving above-mentioned technical problem present in prior art, it is provided that a kind of composite foundation Loading testing method, can shorten construction period, reduces cost, can improve detection stability simultaneously, obtains double Average load at cement mixing pile, obtained composite foundation load is less with real load deviation range, Obtained data testing accuracy is high, has high reference value.
In order to solve above-mentioned technical problem, the present invention adopts the following technical scheme that
A kind of composite foundation loading testing method, it is characterised in that comprise the steps:
(a) site clearing;
B () chooses two-way cement mixing pile: choose two-way cement mixing pile sum 1/3 conduct constructed Load detection target, the stake position of selected two-way cement mixing pile is distributed as triangle, then to choosing Two-way cement mixing pile carries out label 1~N, then in each two-way cement mixing pile periphery detection chosen On ground, 4~6 pulverized limestone test points are set with pulverized limestone, then on the two-way cement mixing pile chosen are Upper safety line;
C () load detects: first detect No. 1 two-way cement mixing pile, stir at No. 1 two-way cement Mix mounting and fixing bracket on the ground of stake, then on fixed support, fix support platform, then in support platform Upper installation sliding support, then installation detecting device on sliding support, then pass through sliding support and detection filled Put the pulverized limestone test point moving to No. 1 two-way cement mixing pile, detect device with gripping means grips, and use Safety line ties down detection device, then holes at pulverized limestone test point, is vertically screwed into by bearing plate The following desired depth of soil layer, buries according to entering a pitch under every revolution, then pacifies at sliding support Dress hydraulic jack and counterforce device, then the dial gauge surveying reading bearing plate displacement is installed, by force cell even Wiring is connected with data display instrument and adjustment is correct, then pressurizes bearing plate classification with hydraulic jack, reads Take test data, then unclamp clamping device mobile sliding support, detection device is moved to No. 1 two-way water Another pulverized limestone test point of mud mixing pile, it then follows a upper pulverized limestone test point same steps carries out load Detect, and data, then the pulverized limestone test point pair to No. 1 two-way cement mixing pile are tested in reading accordingly The test data answered obtain meansigma methods, and meansigma methods is as the load of No. 1 two-way cement mixing pile, then by 1 Number two-way cement mixing pile periphery is removed, finally by No. 1 two-way cement mixing pile for the device detecting work On safety rope untie, complete No. 1 two-way cement mixing pile load detection work, then two-way to 2~No. N Cement mixing pile carries out load detection work respectively, 2~No. N two-way cement mixing pile load detection work with The load detection work of No. 1 two-way cement mixing pile is consistent;
(d) two-way cement mixing pile analysis: the load data of 1~No. N two-way cement mixing pile is plotted to On curve chart, contrast the difference between the load data of each two-way cement mixing pile, find out existing defects Two-way cement mixing pile, then scene carries out overall structure detection to this two-way cement mixing pile, it is judged that this pair To the quality problems of cement mixing pile, then according to this two-way cement mixing pile is repaired by regulation.
Further, the construction that the work of step (a) site clearing is specially at two-way cement mixing pile periphery is discarded Thing is collected, and to the construction waste collected according to rubble garbage, recovering discarded material, harmful Garbage three major types is stacked, then for construction waste, by job site director carry out arrange and Supervision, the rubble garbage that each two-way cement mixing pile periphery is stacked is transported to appointed place by truck and enters Row processes, and the recovering discarded material that each two-way cement mixing pile periphery is stacked is born by ministry of materials's material group Duty reclaims, and the bazardous waste that each two-way cement mixing pile periphery is stacked is transported to appointed place and destroys.
Further, in the detection of step (c) load, bearing plate is vertically being screwed into the following desired depth of soil layer Before, use cloth to wipe with and wipe bearing plate, wiping process coordinates hydraulic giant be carried out.
Further, in the detection of step (c) load, with shoveling instrument by bottom the pulverized limestone test point after pore-forming Hack remove, then plank periphery is destroyed soil leveling be compacted.
Further, in the detection of step (c) load, when bearing plate is vertically screwed into soil layer following desired depth, Remain a constant speed screw-in, screws in speed 1~2mm/s, screws in continuously.
Further, in the detection of step (c) load, bearing plate is vertically screwed in the following desired depth of soil layer, Bearing plate need to be watched attentively and screw in situation, vertically screw in process produced problem for bearing plate and take to solve accordingly Scheme.
Due to the fact that and have employed technique scheme, have the advantages that
1, the stake position of the two-way cement mixing pile selected by the present invention is distributed as triangle, and so selected 1/3 The load detection of two-way cement mixing pile represents the load detection of all two-way cement mixing piles, and to choosing Two-way cement mixing pile carry out label, prevent the duplicate detection of two-way cement mixing pile load, can shorten and execute In the work cycle, reduce cost;
2, the present invention is arranged with pulverized limestone on the ground of each two-way cement mixing pile periphery detection chosen 4~6 pulverized limestone test points, and all pulverized limestone test points of this two-way cement mixing pile are carried out load inspection Survey, and the test data that the pulverized limestone test point of this two-way cement mixing pile is corresponding are obtained meansigma methods, averagely It is worth the load as this two-way cement mixing pile, so can obtain the average load at two-way cement mixing pile, Get rid of the impact that load that single ashes test point records is too high or too low, obtained composite foundation load Less with real load deviation range, obtained data testing accuracy is high, has high reference value, So contrast the difference between the load data of each two-way cement mixing pile, find out the two-way water of existing defects Mud mixing pile, then scene carries out overall structure detection to this two-way cement mixing pile, it is judged that this two-way cement The quality problems of mixing pile, then according to this two-way cement mixing pile is repaired by regulation so that cement stirs Mix stake and form composite foundation together with stake week tidal land mud, thus improve foundation bearing capacity, reduce settlement of foundation and Lateral displacement amount;
3, the present invention when carrying out load detection to ashes test point, by support platform to whole detection device It is supported acting on, then passes through clamping action and the safety line fastening effect of clamping device, detection can be improved The stability of device detection, and slided in support platform by sliding support, ashes detection can be clicked on Row conversion, it is not necessary to mounting and fixing bracket, support platform and detection device repeatedly, accelerates detection speed;
4, in concrete load detects, use bearing plate to be vertically screwed into the following desired depth of soil layer, use oil pressure Jack pair bearing plate classification is pressurizeed, read test data, and obtained data testing accuracy is high, Er Qiezai Lotus detection is applied widely;
5, after the load detection to each two-way cement mixing pile, need will be arranged on two-way cement mixing pile Safety rope untie, be so not provided with safety rope two-way cement mixing pile explanation be complete detection work, The two-way cement mixing pile arranging safety rope is also not fully complete detection work, and person in overall is very clear, for existing Field situation arranges workmen, accelerates detection job schedule.
Accompanying drawing explanation
The invention will be further described below in conjunction with the accompanying drawings:
Fig. 1 is the construction process figure of the present invention a kind of composite foundation loading testing method;
Fig. 2 is the site plan that in the present invention, two-way cement mixing pile is chosen;
Fig. 3 is the structural representation of load detection construction in the present invention.
Detailed description of the invention
The scope of application of the present invention: be applicable to the sea wall mixing pile degree of depth less than 20m sea mud soil, land soft The mixing pile pile foundation construction of soil, uses two-way cement mixing pile driving construction the most practical, and the suitability is wide.
As shown in Figure 1 to Figure 3, a kind of composite foundation loading testing method, comprise the steps:
(a) site clearing: the construction waste at two-way cement mixing pile 1 periphery is collected, and to receipts Collect to construction waste carry out heap according to rubble garbage, recovering discarded material, bazardous waste three major types Put.Then for construction waste, job site director arrange and supervise.Each two-way cement The rubble garbage that mixing pile 1 periphery is stacked is transported to appointed place by truck and processes;Each two-way The recovering discarded material that cement mixing pile 1 periphery is stacked is carried out being responsible for recovery by ministry of materials's material group;Each double Bazardous waste to the stacking of cement mixing pile 1 periphery is transported to appointed place and destroys.
B () chooses two-way cement mixing pile: choose two-way cement mixing pile 1 sum 1/3 constructed and make Detecting target for load, the quantity generally chosen should be less than the 30% of total amount of pile.Selected is double It is distributed as triangle to the stake position of cement mixing pile 1, then the two-way cement mixing pile 1 chosen is marked Number 1~N, N is typically greater than the natural number of 10.Then each two-way cement mixing pile chosen 1 week With pulverized limestone, 4~6 pulverized limestone test points 2 are set, then at the two-way cement chosen on the ground that frontier inspection is surveyed Safety line 3 is fastened on mixing pile 1.
C () load detects: first detect No. 1 two-way cement mixing pile, stir at No. 1 two-way cement Mix mounting and fixing bracket 4 on the ground of stake, then on fixed support 4, fix support platform 5, then supporting Sliding support 6, then installation detecting device 7 on sliding support 6 are installed on platform 5.Then pass through slip Detection device 7 is moved to the pulverized limestone test point 2 of No. 1 two-way cement mixing pile by frame 6, presss from both sides with clamping device 8 Tight detection device 7, and tie down detection device 7 with safety line 3.
Then hole at pulverized limestone test point 2, with shoveling instrument by the pulverized limestone test point 2 after pore-forming The hack of bottom is removed, the soil leveling compacting that then periphery is destroyed by plank.Bearing plate is vertically screwed into soil The following desired depth of layer, before bearing plate is vertically screwed into the following desired depth of soil layer, uses cloth to wipe with to wipe and holds Pressing plate, coordinates hydraulic giant to be carried out, in order to avoid being brought in sleeve pipe by earth in wiping process.According to every revolution Under enter a pitch and bury, when bearing plate is vertically screwed into soil layer following desired depth, remain a constant speed Screw in, screw in speed 1~2mm/s, screw in continuously.Bearing plate is vertically screwed into the following desired depth of soil layer In, bearing plate need to be watched attentively and screw in situation, vertically screw in process produced problem for bearing plate and take accordingly Solution.
Then at sliding support 6, hydraulic jack and counterforce device are installed, suitably in the case of can be selected for corresponding The instruments such as sensor, amplifier, data acquisition unit, record display device, it is simple to obtain data accurately.Again Install and survey the dial gauge reading bearing plate displacement, force cell connecting line is connected with data display instrument and adjustment Correctly.Then with hydraulic jack, bearing plate classification is pressurizeed, read test data.When following situations occurs For the moment, pressurization can be terminated: 1, the lateral extrusion significantly of the soil around bearing plate;2, settling amount is hurried Increase;3, in pressure process, in 24h, the rate of settling can not reach stability criterion;4, settling amount and pressure-bearing Plate width or diameter ratio are more than or equal to 0.06.
Then unclamp clamping device 8 mobile sliding support 6, detection device 7 is moved to No. 1 two-way cement and stirs Mix another pulverized limestone test point 2 of stake, it then follows upper pulverized limestone test point 2 same steps carries out load inspection Survey, and data are tested in reading accordingly, then right to the pulverized limestone test point 2 of No. 1 two-way cement mixing pile The test data answered obtain meansigma methods, and meansigma methods is as the load of No. 1 two-way cement mixing pile, then by 1 Number two-way cement mixing pile periphery is removed, finally by No. 1 two-way cement mixing pile for the device detecting work On safety rope untie, complete No. 1 two-way cement mixing pile load detection work.
Then 2~No. N two-way cement mixing pile are carried out load detection work, 2~No. N two-way cement respectively The load detection work of mixing pile is consistent with the load detection work of No. 1 two-way cement mixing pile.
(d) two-way cement mixing pile analysis: the two-way cement mixing pile in report uses fitting process to calculate carrying The bearing capacity data of 1~No. N two-way cement mixing pile are plotted on curve chart by power, contrast each two-way water Difference between the bearing capacity data of mud mixing pile, finds out the two-way cement mixing pile of existing defects, then existing Field carries out overall structure detection to this two-way cement mixing pile, it is judged that the quality problems of this two-way cement mixing pile, Two-way cement mixing pile is divided into four big classes, is broadly divided into 1, flawless full pile;2, there is slight lacking Fall into, but have substantially no effect on the stake of original design pile structural strength;3, there is open defect, affect original design pile body The stake (can partly utilize or demote use) of structural strength;4, there is the stake (useless stake) of major defect.Then According to the rules this two-way cement mixing pile is repaired.Load testing goal is mainly to two-way cement mixing pile Carry out quality generaI investigation, check pile body integrity, if with the presence of defects such as broken pile, folder mud, isolation, necking downs And basic fixed position.
In actually detected, the preloading of Loading Test of Composite Foundation scene examines 52 two-way cement mixing piles, Assay shows, wherein hopes that tableland bearing capacity is more than 100kPa, city square, Wang Jiao and Macau Fisherman's Wharf Three Regional carrying capacity are more than 85kPa, and indices is satisfied by designing requirement, the two-way cement constructed Mixing pile is the most qualified.
The stake position of the two-way cement mixing pile selected by the present invention is distributed as triangle, so selected 1/3 two-way The load detection of cement mixing pile represents the load detection of all two-way cement mixing piles, and double to choose Carry out label to cement mixing pile, prevent the duplicate detection of two-way cement mixing pile load, construction week can be shortened Phase, reduce cost.The present invention uses Calx on the ground of each two-way cement mixing pile periphery detection chosen Powder arranges 4~6 pulverized limestone test points, and carries out all pulverized limestone test points of this two-way cement mixing pile Load detects, and the test data that the pulverized limestone test point of this two-way cement mixing pile is corresponding are obtained meansigma methods, Meansigma methods is as the load of this two-way cement mixing pile, and so can obtain at two-way cement mixing pile is average Load, gets rid of the impact that load that single ashes test point records is too high or too low, obtained compoundly Base load lotus is less with real load deviation range, and obtained data testing accuracy is high, has high reference It is worth, so contrasts the difference between the load data of each two-way cement mixing pile, find out existing defects Two-way cement mixing pile, then scene carries out overall structure detection to this two-way cement mixing pile, it is judged that this pair To the quality problems of cement mixing pile, then according to this two-way cement mixing pile is repaired by regulation so that Cement mixing pile forms composite foundation together with stake week tidal land mud, thus improves foundation bearing capacity, reduces ground Sedimentation and lateral displacement amount.The present invention when carrying out load detection to ashes test point, by support platform pair Whole detection device is supported acting on, then passes through clamping action and the safety line fastening effect of clamping device, The stability of height detection device detection can be put forward, and slided in support platform by sliding support, can be to ash Powder test point is changed, it is not necessary to mounting and fixing bracket, support platform and detection device repeatedly, accelerates detection Speed.In concrete load detects, use bearing plate to be vertically screwed into the following desired depth of soil layer, use oil pressure Jack pair bearing plate classification is pressurizeed, read test data, and obtained data testing accuracy is high, Er Qiezai Lotus detection is applied widely.After the load detection to each two-way cement mixing pile, need to will be arranged on two-way Safety rope on cement mixing pile is untied, and the two-way cement mixing pile explanation being so not provided with safety rope is the completeest Becoming detection work, the two-way cement mixing pile arranging safety rope is also not fully complete detection work, person in overall one mesh It is clear, arranges workmen for field condition, accelerate detection job schedule.
Load detection points for attention:
1, the unit by having coherent detection qualification carry out load detection instruct work.
2, load detection relates to equipment, accuracy of instrument meets requirement and is carried out in accordance with regulations installation, removes.
3, testing crew enters job site safe wearing cap and the safety protection facility of other necessity.
4, in strict accordance with relevant testing regulations operation, violation operation is forbidden.
5, site operation safety technique for using electricity code and equipment safety regulation for operations are strictly observed.
These are only the specific embodiment of the present invention, but the technical characteristic of the present invention is not limited thereto.Any Based on the present invention, for solving essentially identical technical problem, it is achieved essentially identical technique effect, institute Simple change, equivalent or the modifications etc. made, are all covered by among protection scope of the present invention.

Claims (6)

1. a composite foundation loading testing method, it is characterised in that comprise the steps:
(a) site clearing;
B () chooses two-way cement mixing pile: choose the two-way cement mixing pile sum 1/3 constructed as carrying Lotus detection target, the stake position of selected two-way cement mixing pile is distributed as triangle, then to choosing Two-way cement mixing pile carry out label 1~N, then at each two-way cement mixing pile periphery chosen With pulverized limestone, 4~6 pulverized limestone test points are set, then at the two-way cement chosen on the ground of detection Safety line is fastened on mixing pile;
C () load detects: first detect No. 1 two-way cement mixing pile, at No. 1 two-way cement mixing Mounting and fixing bracket on the ground of stake, then on fixed support, fix support platform, then flat in support Installing sliding support, then installation detecting device on sliding support on platform, then passing through sliding support will Detection device moves to the pulverized limestone test point of No. 1 two-way cement mixing pile, with gripping means grips detection dress Put, and tie down detection device with safety line, then hole at pulverized limestone test point, by pressure-bearing Plate is vertically screwed into the following desired depth of soil layer, buries according to entering a pitch under every revolution, Then at sliding support, hydraulic jack and counterforce device are installed, then install the hundred of survey reading bearing plate displacement Divide table, force cell connecting line is connected with data display instrument and adjustment is correct, then with oil pressure thousand Bearing plate classification is pressurizeed by jin top, read test data, then unclamps clamping device mobile slip Frame, moves to another pulverized limestone test point of No. 1 two-way cement mixing pile, it then follows upper one by detection device Individual pulverized limestone test point same steps carries out load detection, and reading tests data, accordingly then to 1 The test data that the pulverized limestone test point of number two-way cement mixing pile is corresponding obtain meansigma methods, and meansigma methods is made It is the load of No. 1 two-way cement mixing pile, then is used for detecting work by No. 1 two-way cement mixing pile periphery Make device remove, finally the safety rope on No. 1 two-way cement mixing pile is untied, complete No. 1 two-way Then 2~No. N two-way cement mixing pile are carried out load inspection by cement mixing pile load detection work respectively Survey work, 2~the load detection work of No. N two-way cement mixing pile and the load of No. 1 two-way cement mixing pile Lotus detection work is consistent;
(d) two-way cement mixing pile analysis: the load data of 1~No. N two-way cement mixing pile is plotted to song On line chart, contrast the difference between the load data of each two-way cement mixing pile, find out existing defects Two-way cement mixing pile, then on-the-spot this two-way cement mixing pile is carried out overall structure detection, sentences The quality problems of this two-way cement mixing pile disconnected, then according to this two-way cement mixing pile is carried out by regulation Repair.
A kind of composite foundation loading testing method the most according to claim 1, it is characterised in that: step (a) The construction waste that site clearing work is specially at two-way cement mixing pile periphery is collected, and right The construction waste collected is according to rubble garbage, recovering discarded material, bazardous waste three major types Stack, then for construction waste, job site director arrange and supervise, often The rubble garbage that individual two-way cement mixing pile periphery is stacked is transported at appointed place by truck Reason, the recovering discarded material that each two-way cement mixing pile periphery is stacked is born by ministry of materials's material group Duty reclaims, and the bazardous waste that each two-way cement mixing pile periphery is stacked is transported to appointed place to be carried out Destroy.
A kind of composite foundation loading testing method the most according to claim 1, it is characterised in that: step (c) In load detection, before bearing plate is vertically screwed into the following desired depth of soil layer, uses cloth to wipe with to wipe and hold Pressing plate, coordinates hydraulic giant to be carried out in wiping process.
A kind of composite foundation loading testing method the most according to claim 1, it is characterised in that: step (c) In load detection, with shoveling instrument, the hack bottom the pulverized limestone test point after pore-forming is removed, then The soil leveling compacting that periphery is destroyed by plank.
A kind of composite foundation loading testing method the most according to claim 1, it is characterised in that: step (c) In load detection, when bearing plate is vertically screwed into soil layer following desired depth, remain a constant speed screw-in, Screw in speed 1~2mm/s, screw in continuously.
A kind of composite foundation loading testing method the most according to claim 1, it is characterised in that: step (c) In load detection, bearing plate is vertically screwed in the following desired depth of soil layer, bearing plate rotation need to be watched attentively Enter situation, vertically screw in process produced problem for bearing plate and take corresponding solution.
CN201610266241.XA 2016-04-26 2016-04-26 A kind of composite foundation loading testing method Active CN105926564B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610266241.XA CN105926564B (en) 2016-04-26 2016-04-26 A kind of composite foundation loading testing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610266241.XA CN105926564B (en) 2016-04-26 2016-04-26 A kind of composite foundation loading testing method

Publications (2)

Publication Number Publication Date
CN105926564A true CN105926564A (en) 2016-09-07
CN105926564B CN105926564B (en) 2019-08-06

Family

ID=56837287

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610266241.XA Active CN105926564B (en) 2016-04-26 2016-04-26 A kind of composite foundation loading testing method

Country Status (1)

Country Link
CN (1) CN105926564B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112502199A (en) * 2020-11-19 2021-03-16 浙江邦尼建筑检测有限公司 Foundation bearing capacity detection device

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1694775A1 (en) * 1988-12-27 1991-11-30 Войсковая Часть 52953 Device for testing soils by static loads
CN101487273A (en) * 2009-02-26 2009-07-22 建研地基基础工程有限责任公司 Method and equipment for determining bearing capacity of existing building foundation
CN201762737U (en) * 2010-09-07 2011-03-16 石旭东 Shallow plate loading test modified device
CN102493500A (en) * 2011-12-06 2012-06-13 湖北省电力勘测设计院 Foundation base model test device capable of bidirectional loading
CN202830907U (en) * 2012-10-16 2013-03-27 丁鉴群 Improved static probing device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1694775A1 (en) * 1988-12-27 1991-11-30 Войсковая Часть 52953 Device for testing soils by static loads
CN101487273A (en) * 2009-02-26 2009-07-22 建研地基基础工程有限责任公司 Method and equipment for determining bearing capacity of existing building foundation
CN201762737U (en) * 2010-09-07 2011-03-16 石旭东 Shallow plate loading test modified device
CN102493500A (en) * 2011-12-06 2012-06-13 湖北省电力勘测设计院 Foundation base model test device capable of bidirectional loading
CN202830907U (en) * 2012-10-16 2013-03-27 丁鉴群 Improved static probing device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112502199A (en) * 2020-11-19 2021-03-16 浙江邦尼建筑检测有限公司 Foundation bearing capacity detection device

Also Published As

Publication number Publication date
CN105926564B (en) 2019-08-06

Similar Documents

Publication Publication Date Title
CN104807706A (en) Portable soft and weak layer in-situ direct shear tester and testing method thereof
O’Kelly Effective stress strength testing of peat
CN104406568B (en) Device and method for monitoring settlement of ground surface in deep water area
CN105043938A (en) Reusable saturated sand layer permeation grouting test model and applications thereof
CN204575465U (en) Portable soft layer in-situ direct shear tester
CN105804041A (en) Large-area ultra-soft foundation settlement monitoring device and method
CN202430702U (en) Probe based on multifunctional piezocone penetration test
CN102279130A (en) Vehicular compactness tester and test method thereof
CN208254458U (en) Soft base deepwater diking settlement monitoring device
Atkinson Fundamentals of Ground Engineering
CN105926564A (en) Composite foundation load detection method
CN205080013U (en) Coarse -grained soil seepage flow direct shear test device
CN110565707A (en) foundation pit pile-anchor supporting system physical simulation device and method based on similar theory
CN211228632U (en) Foundation pit pile anchor supporting system physical simulation device based on similar theory
CN109797786A (en) Excavation of foundation pit model test apparatus and application method based on earth's surface water penetration
CN205954722U (en) Spiral ground stake counterforce device
Rose Behavior and efficiency of perimeter pile groups
Moug IFCEE 2024: Drilled and Driven Foundations and Innovative and Emerging Approaches for Foundation Engineering
CN104089817A (en) Reference bedding coefficient tester and indoor general testing method thereof
CN215105204U (en) Portable soil matrix compactness detection device
CN202175963U (en) Self-balancing type foundation load test device
Abualshar Evaluation of an equivalent mean grain size diameter to rationally predict the erodibility of fine riverbed soils in Nebraska
Bernstone Automated performance monitoring of concrete dams
Alzaki et al. Effect of cyclic loading on stiffness degradation of Lime cement mixed clays for railway embankment
CN209114520U (en) Counter-force Rock Foundation Test Under Static Pressure device is pressed a kind ofly

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
CB03 Change of inventor or designer information

Inventor after: Liu Xueying

Inventor after: Xu Zhenxing

Inventor after: Jin Fangyi

Inventor before: Liu Xueying

Inventor before: Xu Zhenxing

Inventor before: Jin Fangfang

COR Change of bibliographic data
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Xu Zhenxing

Inventor after: Jin Fangyi

Inventor after: Liu Xueying

Inventor before: Liu Xueying

Inventor before: Xu Zhenxing

Inventor before: Jin Fangyi

CB03 Change of inventor or designer information
TA01 Transfer of patent application right

Effective date of registration: 20190709

Address after: 325025 Room 205, Xuri District, 2180 Binhai Sixth Road, Wenzhou Economic and Technological Development Zone, Zhejiang Province

Applicant after: Wenzhou Oufei Economic Development Investment Company Limited

Address before: 310018 508 Xuefu street, Xiasha Higher Education East District, Hangzhou, Zhejiang

Applicant before: Zhejiang University of Water Resources and Electric Power

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant