CN105926462B - A kind of erection method of split type level bridges - Google Patents

A kind of erection method of split type level bridges Download PDF

Info

Publication number
CN105926462B
CN105926462B CN201610472827.1A CN201610472827A CN105926462B CN 105926462 B CN105926462 B CN 105926462B CN 201610472827 A CN201610472827 A CN 201610472827A CN 105926462 B CN105926462 B CN 105926462B
Authority
CN
China
Prior art keywords
pontic
split type
type level
folding
erection method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610472827.1A
Other languages
Chinese (zh)
Other versions
CN105926462A (en
Inventor
吴家骅
张清林
汪立之
梁涛
刘志雄
洗振佳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHONGSHAN HIGHWAY STEEL STRUCTURE MANUFACTURE CO Ltd
Original Assignee
ZHONGSHAN HIGHWAY STEEL STRUCTURE MANUFACTURE CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHONGSHAN HIGHWAY STEEL STRUCTURE MANUFACTURE CO Ltd filed Critical ZHONGSHAN HIGHWAY STEEL STRUCTURE MANUFACTURE CO Ltd
Priority to CN201610472827.1A priority Critical patent/CN105926462B/en
Publication of CN105926462A publication Critical patent/CN105926462A/en
Application granted granted Critical
Publication of CN105926462B publication Critical patent/CN105926462B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a kind of erection method of split type level bridges, comprise the following steps:First, will be holded up in the first pontic of folded state, the center of rotation of the first pontic is above, and the both ends of the first pontic are located at lower section, and one end and the pedestal of the first pontic are rotatably coupled;2nd, the first pontic carries folding-unfolding mechanism, drives the first pontic to deploy by folding-unfolding mechanism, and control the first pontic to be gradually reduced;3rd, the second pontic is pushed on the first pontic for having set up, second pontic in place after, one end of the second pontic is connected with the first pontic, the second pontic carries folding-unfolding mechanism, driven and deployed by folding-unfolding mechanism, the other end of the second pontic of control gradually decreases down to be bonded with the first pontic;4th, the connection between the first pontic and the second pontic is released, the first pontic and the second pontic are pivotally connected in side, are then lifted out the second pontic so that the second pontic rotates relative to the first pontic.The method used in the present invention is very ingenious, has the advantages of low-energy-consumption high-efficiency.

Description

A kind of erection method of split type level bridges
Technical field
The present invention relates to a kind of erection method of split type level bridges.
Background technology
The fast construction bridge on river or gully is in emergency circumstances needed some, now in order to ensure that bridge is quickly taken Build, it is general to solve the problem using split type level bridges are set up, but the erection method of existing split type level bridges is present Some problems, for example, need to be equipped with larger counterweight, power consumption is high, sets up efficiency deficiency etc. other shortcomings, for this, the present invention carries For a kind of erection method of split type level bridges.
The content of the invention
In order to solve the above problems, the present invention provides a kind of erection method of split type level bridges.
The technical solution adopted for the present invention to solve the technical problems is:
A kind of erection method of split type level bridges, the split type level bridges include pedestal, folding first pontic At least one foldable second pontic, it is characterised in that comprise the following steps:
First, being holded up in the first pontic of folded state, the center of rotation of the first pontic is above, and the two of the first pontic End is located at lower section, and one end and the pedestal of the first pontic are rotatably coupled;
2nd, the first pontic carries folding-unfolding mechanism, by folding-unfolding mechanism drive the first pontic deploy, and control the first pontic by Gradually decline, the other end to the first pontic installs;
3rd, the second pontic is pushed on the first pontic for having set up, the second pontic in place after, by one end of the second pontic with First pontic connects, and the second pontic carries folding-unfolding mechanism, is driven and deployed by folding-unfolding mechanism, control the other end of the second pontic by Gradually drop to and be bonded with the first pontic;
4th, the connection between the first pontic and the second pontic is released, the first pontic and the second pontic are pivotally connected in side, so After lift the second pontic so that the second pontic rotates relative to the first pontic, and now the second pontic and the first pontic are in same plane Upper parallel arranged.
Present invention additionally comprises:
Step 5: the connection of the first pontic and pedestal is released, and the pontic of lifting first and the second pontic are so as to thereunder Erection support, complete to set up.
Rotatably arranged with there is a door frame on the pedestal, the first pontic is located on door frame during initial state, the first pontic Door frame is followed to hold up.
The pedestal is provided with winding plant, controls the first pontic to be gradually reduced by winding plant, passes through winding plant Second pontic is pushed on the first pontic for having set up, the other end for controlling the second pontic by winding plant is gradually reduced.
The step of second pontic is also moved into former first pontic present position with 1 between the step 1 and step 2.
In the step 4 after the second pontic has been overturn, the connection of the first pontic and the second pontic is released, by the second bridge Body translates setpoint distance.
The beneficial effects of the invention are as follows:The erection method of above-mentioned split type level bridges sets up efficiency high, makes full use of first The deadweight of pontic and the second pontic, mitigates the requirement to counterweight, by the second pontic and pedestal as counterweight when the first pontic is set up, Second pontic is very low to counterweight requirements when setting up, and the second pontic erection method is very ingenious, has the excellent of low-energy-consumption high-efficiency Point.
Brief description of the drawings
The present invention is further described with reference to the accompanying drawings and examples:
Fig. 1 is the schematic diagram of step 1 in the present invention;
Fig. 2 is the schematic diagram of step 2 in the present invention;
Fig. 3 is the schematic diagram one of step 3 in the present invention;
Fig. 4 is the schematic diagram two of step 3 in the present invention;
Fig. 5 is the schematic diagram of step 4 in the present invention.
Embodiment
1~Fig. 5 of reference picture, the present invention are a kind of erection methods of split type level bridges, and the split type level bridges include base 1, one folding first pontic 4 of seat and at least one foldable second pontic 5, comprise the following steps:
First, will be holded up in the first pontic 4 of folded state, the center of rotation of the first pontic 4 is above, the first pontic 4 Both ends be located at lower section, one end and the pedestal 1 of the first pontic 4 are rotatably coupled;
2nd, the first pontic 4 carries folding-unfolding mechanism, drives the first pontic 4 to deploy by folding-unfolding mechanism, and control the first pontic 4 are gradually reduced, and the other end to the first pontic 4 installs;
3rd, the second pontic 5 is pushed on the first pontic 4 for having set up, the second pontic 5 in place after, by the one of the second pontic 5 End is connected with the first pontic 4, and the second pontic 5 carries folding-unfolding mechanism, is driven and deployed by folding-unfolding mechanism, the second pontic 5 of control The other end gradually decreases down to be bonded with the first pontic 4;
4th, the connection between the first pontic 4 and the second pontic 5 is released, by the first pontic 4 and the second pontic 5 in side pivot Connect, be then lifted out the second pontic 5 so that the second pontic 5 rotates relative to the first pontic 4, now the second pontic 5 and the first pontic 4 In parallel arranged on same plane;
Step 5: the connection of the first pontic 4 and pedestal 1 is released, and lifting the first pontic 4 and the second pontic 5 are so as at it Lower section erection support, complete to set up.Also have one second pontic 5 is moved into the former institute of first pontic 4 between step 1 and step 2 The step of locating position, preferably to regard the second pontic 5 as the counterweight for setting up the first pontic 4;Turned in step 4 in the second pontic 5 After having turned, the connection of the first pontic 4 and the second pontic 5 is released, the second pontic 5 is translated into setpoint distance.Above-mentioned split type steelframe The erection method of bridge sets up efficiency high, makes full use of the deadweight of the first pontic 4 and the second pontic 5, mitigates the requirement to counterweight, the Counterweight is used as by the second pontic 5 and pedestal 1 when one pontic 4 is set up, the second pontic 5 is very low to counterweight requirements when setting up, and second The erection method of pontic 5 is very ingenious, has the advantages of low-energy-consumption high-efficiency.
As Figure 1-Figure 5, on pedestal 1 rotatably arranged with there is a door frame 3, the first pontic 4 is located at door during initial state On frame 3, the first pontic 4 follows door frame 3 to hold up;Pedestal 1 is provided with winding plant 2, and the first pontic 4 is controlled by winding plant 2 It is gradually reduced, second pontic 5 is pushed on the first pontic 4 for having set up by winding plant 2, passes through the control of winding plant 2 the The other end of two pontics 5 is gradually reduced.Certain door frame 3, winding plant 2 can also use other structure to substitute, such as winding plant 2 It can be substituted by the way of oil cylinder is be hinged.
Above-described embodiment is the preferred scheme of the present invention, and the present invention can also have other embodiments.The technology of this area Personnel can also make equivalent variations or replacement on the premise of without prejudice to spirit of the invention, and these equivalent modifications or replacement are wrapped It is contained in the scope set by the application claim.

Claims (6)

1. a kind of erection method of split type level bridges, the split type level bridges include pedestal, folding first pontic and At least one foldable second pontic, it is characterised in that comprise the following steps:
First, will be holded up in the first pontic of folded state, the center of rotation of the first pontic is above, the both ends position of the first pontic In lower section, one end and the pedestal of the first pontic are rotatably coupled;
2nd, under the first pontic carries folding-unfolding mechanism, drives the first pontic to deploy by folding-unfolding mechanism, and the first pontic of control is gradual Drop, the other end to the first pontic install;
3rd, the second pontic is pushed on the first pontic for having set up, the second pontic in place after, by one end of the second pontic and first Pontic connects, and the second pontic carries folding-unfolding mechanism, is driven and deployed by folding-unfolding mechanism, under controlling the other end of the second pontic gradual It is down to and is bonded with the first pontic;
4th, the connection between the first pontic and the second pontic is released, the first pontic and the second pontic are pivotally connected in side, Ran Houti Rise the second pontic so that the second pontic rotates relative to the first pontic, now the second pontic and the first pontic on same plane simultaneously Row arrangement.
2. a kind of erection method of split type level bridges as claimed in claim 1, it is characterised in that it also includes:
Step 5: release the connection of the first pontic and pedestal, and the pontic of lifting first and the second pontic to install thereunder Bearing, complete to set up.
3. a kind of erection method of split type level bridges as claimed in claim 1, it is characterised in that rotatable on the pedestal Ground is provided with a door frame, and the first pontic is located on door frame during initial state, and the first pontic follows door frame to hold up.
4. a kind of erection method of split type level bridges as claimed in claim 1, it is characterised in that the pedestal is provided with volume Device is raised, controls the first pontic to be gradually reduced by winding plant, be pushed into have set up by the second pontic by winding plant the On one pontic, the other end for controlling the second pontic by winding plant is gradually reduced.
5. a kind of erection method of split type level bridges as claimed in claim 1, it is characterised in that the step 1 and step The step of second pontic is also moved into former first pontic present position with 1 between two.
6. a kind of erection method of split type level bridges as claimed in claim 1, it is characterised in that the in the step 4 After two pontics have been overturn, the connection of the first pontic and the second pontic is released, the second pontic is translated into setpoint distance.
CN201610472827.1A 2016-06-20 2016-06-20 A kind of erection method of split type level bridges Active CN105926462B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610472827.1A CN105926462B (en) 2016-06-20 2016-06-20 A kind of erection method of split type level bridges

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610472827.1A CN105926462B (en) 2016-06-20 2016-06-20 A kind of erection method of split type level bridges

Publications (2)

Publication Number Publication Date
CN105926462A CN105926462A (en) 2016-09-07
CN105926462B true CN105926462B (en) 2018-02-13

Family

ID=56828976

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610472827.1A Active CN105926462B (en) 2016-06-20 2016-06-20 A kind of erection method of split type level bridges

Country Status (1)

Country Link
CN (1) CN105926462B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112523091A (en) * 2020-11-12 2021-03-19 中联重科股份有限公司 Erection mechanism, erection device and bridge erecting vehicle

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN200992687Y (en) * 2006-12-30 2007-12-19 中交第二公路工程局有限公司 Slingdevice for suspension bridge steel box beam mounting
CN101195989A (en) * 2008-01-08 2008-06-11 长安大学 Assembly type bridge construction process based on three steel pipe truss sections
KR20080103678A (en) * 2007-05-25 2008-11-28 삼표이앤씨 주식회사 Method for composite girder and bridge construction method composite girder
KR20100099495A (en) * 2009-03-03 2010-09-13 (주)에스앤씨산업 Central connecting apparatus engaged with lattice type steel pipe pile and construction method of assembling slab bridge using the same
CN102817321A (en) * 2012-08-07 2012-12-12 中铁十二局集团有限公司 Bridge girder erection machine set turn-around trolley

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN200992687Y (en) * 2006-12-30 2007-12-19 中交第二公路工程局有限公司 Slingdevice for suspension bridge steel box beam mounting
KR20080103678A (en) * 2007-05-25 2008-11-28 삼표이앤씨 주식회사 Method for composite girder and bridge construction method composite girder
CN101195989A (en) * 2008-01-08 2008-06-11 长安大学 Assembly type bridge construction process based on three steel pipe truss sections
KR20100099495A (en) * 2009-03-03 2010-09-13 (주)에스앤씨산업 Central connecting apparatus engaged with lattice type steel pipe pile and construction method of assembling slab bridge using the same
CN102817321A (en) * 2012-08-07 2012-12-12 中铁十二局集团有限公司 Bridge girder erection machine set turn-around trolley

Also Published As

Publication number Publication date
CN105926462A (en) 2016-09-07

Similar Documents

Publication Publication Date Title
CN203998805U (en) Mobile hydraulic elevating platform
CN101864850B (en) Lifting and swinging upper-layer parking stand device for stereoscopic parking space
CN106586395A (en) Stepless lifting device for scraper conveyor
CN209193464U (en) A kind of aircraft main landing gear disassembly-assembly bracket device
CN107500182A (en) A kind of interior architecture construction lowering or hoisting gear
CN105926462B (en) A kind of erection method of split type level bridges
CN106087776B (en) A kind of second pontic erection method of split type level bridges
CN108394847A (en) It is capable of the aerial work platform and its fast lifting method of fast lifting
CN202403166U (en) Folded outdoor light-emitting diode (LED) lighting device
CN107150979A (en) A kind of lifting machine and its method of work with spinfunction
CN103552572A (en) Mobile vehicle-ride bridge
CN207725577U (en) Stepping on by device between a kind of wind turbine O&M ship and fan platform
CN205755766U (en) A kind of line maintenance insulation cutter
CN202402055U (en) Hydraulic support with bottom lifting device
CN205892576U (en) Fast set up tower crane's jib loading boom turns over a device
CN202604226U (en) Electric lifting bed
CN205472522U (en) Electrical urgent repair frame
CN205777583U (en) Jacking slide device
CN211037983U (en) Portable removes stage
CN206590457U (en) A kind of stepless elevation device of drag conveyor
CN105937201B (en) It is a kind of to set up convenient level bridges
CN209081267U (en) A kind of fast erecting hanger
CN205892554U (en) Fast set up tower crane's body of tower turns over a device
CN207142783U (en) A kind of chute type aerial ladder
CN207215445U (en) Moveable platform

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant