CN105926455B - 一种箱梁底模整体拆除方法 - Google Patents
一种箱梁底模整体拆除方法 Download PDFInfo
- Publication number
- CN105926455B CN105926455B CN201610355645.6A CN201610355645A CN105926455B CN 105926455 B CN105926455 B CN 105926455B CN 201610355645 A CN201610355645 A CN 201610355645A CN 105926455 B CN105926455 B CN 105926455B
- Authority
- CN
- China
- Prior art keywords
- box
- top plate
- wearing
- bottom die
- removal hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D2/00—Bridges characterised by the cross-section of their bearing spanning structure
- E01D2/04—Bridges characterised by the cross-section of their bearing spanning structure of the box-girder type
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
一种箱梁底模整体拆除方法,其步骤为:(1)预埋拆模孔:顶板浇筑前预埋80mm拆模孔,使顶板和底模的预埋管处于同一竖直位置,向预埋管中穿入铁链;(2)对穿螺栓加固:顶板浇筑完成后,箱梁底模和顶板采用对穿螺栓加固;(3)箱梁底模整体拆除:拆除箱梁底部的脚手架后,采用电动吊架通过铁链将底模下放至箱梁下部的板车上,运走后修补拆模孔。本发明方法具有优势有:(1)模板整体分段拆除工艺不占用大型起重设备,电动吊架操作简单快捷,加固方式稳固;(2)施工效率高,机械作业、材料使用成本低,安全风险系数低。
Description
技术领域
本发明涉及工程建设领域的箱梁工程技术领域,尤其涉及一种箱梁底模整体拆除方法。
背景技术
在铁路、城市道路和公路的桥梁工程施工中底板模板的拆除一直以来都是工程的难点和重点,在以往的箱梁工程底模拆除施工中,传统的方法是采用人工拆除模板,采用这种方法拆除高大的模板或者钢制模板效率低,且施工危险系数较高,同时拆除下来的模板再次使用时,需要进行拼装,拼装时需要对模板进行筛选,耗费大量人力财力,对施工单位造成巨大的进度压力和成本压力。
如何将箱梁底模的整体性,机械的特性,拆除的安全性,三者结合起来是项目面临的严峻考验。本发明采用预埋拆模孔,拆模吊架从箱梁顶板吊装起重作业,平板车倒运的形式进行施工。
发明内容
本发明为解决上述问题提供了一种箱梁底模整体拆除方法。
本发明所采取的技术方案:
一种箱梁底模整体拆除方法,其步骤为:
(1)预埋拆模孔:顶板浇筑前预埋80mm拆模孔,使顶板用于设置拆模孔的预埋管处于同一竖直位置,向预埋管中穿入铁链;
(2)对穿螺栓加固:顶板浇筑完成后,箱梁底模和顶板采用对穿螺栓加固,顶板与对穿螺栓接触位置垫有“凹形”对穿垫片;
(3)箱梁底模整体拆除:对穿螺栓加固完毕后,拆除箱梁底部的脚手架,待脚手架拆除完毕后,将电动吊架移动到拆模孔的正上方,采用对穿帽连接对穿螺栓,紧固完成后将铁链提升至紧固状态,拆除对穿螺栓后,启动电动吊架通过铁链将底模下放至箱梁下部的板车上,运走后修补拆模孔,转至其他箱梁底模使用。
本发明的有益效果:
(1)模板整体分段拆除工艺不占用大型起重设备,电动吊架操作简单快捷,加固方式稳固;
(2)安全性高,人员没有高空作业的安全隐患,起重过程不需要人员的辅助;
(3)速度快,效率高,整体拆除同时保证了转运效率,全面缩短机械施工作业周期,节省材料。
附图说明
图1为本发明箱梁底模整体拆除施工示意图。
其中:1-板车;2-底模;3-铁链;4-电动吊架。
具体实施方式
一种箱梁底模整体拆除方法,其步骤为:
(1)预埋拆模孔:顶板浇筑前预埋80mm拆模孔,使顶板用于设置拆模孔的预埋管处于同一竖直位置,向预埋管中穿入铁链;
(2)对穿螺栓加固:顶板浇筑完成后,箱梁底模和顶板采用对穿螺栓加固,顶板与对穿螺栓接触位置垫有“凹形”对穿垫片;
(3)箱梁底模整体拆除:对穿螺栓加固完毕后,拆除箱梁底部的脚手架,待脚手架拆除完毕后,将电动吊架移动到拆模孔的正上方,采用对穿帽连接对穿螺栓,紧固完成后将铁链提升至紧固状态,拆除对穿螺栓后,启动电动吊架通过铁链将底模下放至箱梁下部的板车上,运走后修补拆模孔,转至其他箱梁底模使用。
以上对本发明的一个实施例进行了详细说明,但所述内容仅为本发明的较佳实施例,不能被认为用于限定本发明的实施范围。凡依本发明申请范围所作的均等变化与改进等,均应仍归属于本发明的专利涵盖范围之内。
Claims (1)
1.一种箱梁底模整体拆除方法,其特征在于,其步骤为:
(1)预埋拆模孔:顶板浇筑前预埋80mm拆模孔,使顶板用于设置拆模孔的预埋管和底模的预埋管处于同一竖直位置,向预埋管中穿入铁链;
(2)对穿螺栓加固:顶板浇筑完成后,箱梁底模和顶板采用对穿螺栓加固,顶板与对穿螺栓接触位置垫有“凹形”对穿垫片;
(3)箱梁底模整体拆除:对穿螺栓加固完毕后,拆除箱梁底部的脚手架,待脚手架拆除完毕后,将电动吊架移动到拆模孔的正上方,采用对穿帽连接对穿螺栓,紧固完成后将铁链提升至紧固状态,拆除对穿螺栓后,启动电动吊架通过铁链将底模下放至箱梁下部的板车上,运走后修补拆模孔,转至其他箱梁底模使用。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610355645.6A CN105926455B (zh) | 2016-05-25 | 2016-05-25 | 一种箱梁底模整体拆除方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610355645.6A CN105926455B (zh) | 2016-05-25 | 2016-05-25 | 一种箱梁底模整体拆除方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105926455A CN105926455A (zh) | 2016-09-07 |
CN105926455B true CN105926455B (zh) | 2018-10-09 |
Family
ID=56841161
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610355645.6A Active CN105926455B (zh) | 2016-05-25 | 2016-05-25 | 一种箱梁底模整体拆除方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105926455B (zh) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111364365A (zh) * | 2020-03-23 | 2020-07-03 | 中国十九冶集团有限公司 | 螺旋钢管桩组合支架拆除方法 |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100382277B1 (ko) * | 2000-05-22 | 2003-05-01 | 현대산업개발 주식회사 | 콘크리트 빔 사이의 크로스빔 시공방법 |
CN101391438A (zh) * | 2008-10-27 | 2009-03-25 | 上海市建筑构件制品有限公司 | 薄壁u型梁整拆整装整体滑移大模板 |
CN201785704U (zh) * | 2010-09-19 | 2011-04-06 | 中铁十二局集团有限公司 | 连续箱梁合拢段施工的挂篮装置 |
CN202644407U (zh) * | 2012-06-12 | 2013-01-02 | 甘肃路桥建设集团有限公司 | 抱箍法施工盖梁底板托架脱模装置 |
CN103469736B (zh) * | 2013-10-11 | 2015-06-03 | 中铁十九局集团第六工程有限公司 | T形梁桥面系横隔板支模拆模方法 |
CN204959606U (zh) * | 2015-03-23 | 2016-01-13 | 修林岩 | 一种挂蓝吊带预留孔封堵装置 |
CN204690596U (zh) * | 2015-05-21 | 2015-10-07 | 上海市政建设有限公司 | 高架桥盖梁定型底模支架 |
-
2016
- 2016-05-25 CN CN201610355645.6A patent/CN105926455B/zh active Active
Also Published As
Publication number | Publication date |
---|---|
CN105926455A (zh) | 2016-09-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203979647U (zh) | 一种可拆卸重复利用导轨穿管器 | |
CN203834373U (zh) | 一种箱涵侧墙模板吊装移动运模台车 | |
CN105926455B (zh) | 一种箱梁底模整体拆除方法 | |
CN204324736U (zh) | 水泥盖板吊装装置 | |
CN201580891U (zh) | 一种辅助翻转离心模具的吊具 | |
CN103419279A (zh) | T梁模板整体拆除及纵向滑移施工方法 | |
CN205999796U (zh) | 一种梁柱式支架模板整体卸落装置 | |
CN211444835U (zh) | 塔式起重机塔身抱瓦安拆装置 | |
CN202644407U (zh) | 抱箍法施工盖梁底板托架脱模装置 | |
CN204023414U (zh) | 一种新型大型少支点支架整体落架装置 | |
CN209262658U (zh) | 一种煤气柜活塞***悬挂拆除时的连接加固结构 | |
CN206104558U (zh) | 一种用于更换宽厚板轧机液压agc缸的装置 | |
CN206952094U (zh) | 一种重型柴油机外型模具底板 | |
CN206913060U (zh) | 一种销轴拔出装置 | |
CN201786013U (zh) | 可重复使用的悬挑脚手架用锚件 | |
CN205709577U (zh) | 一种施工现场多功能搬运机 | |
CN205772813U (zh) | 用于40吨门机的内藏式减速器的拆卸安装一体吊具 | |
CN202399217U (zh) | 轴承拆卸装置 | |
CN204676431U (zh) | 公路防撞墙施工模板安装小车 | |
CN203256596U (zh) | 一种桥梁临时支座 | |
CN203944693U (zh) | 止水铜片加工装置 | |
CN210177978U (zh) | 一种大楼转换桁架钢骨整体提升装置 | |
CN104164879B (zh) | 一种墙基及基坑支护拆除装置 | |
CN110817726B (zh) | 塔式起重机塔身抱瓦安拆装置及安装拆卸方法 | |
CN102527930A (zh) | 振动落砂破碎再生除尘发送组合装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |