CN105926395B - A kind of road structure and construction method for eliminating newly-built roadbed consolidation settlement - Google Patents

A kind of road structure and construction method for eliminating newly-built roadbed consolidation settlement Download PDF

Info

Publication number
CN105926395B
CN105926395B CN201610461081.4A CN201610461081A CN105926395B CN 105926395 B CN105926395 B CN 105926395B CN 201610461081 A CN201610461081 A CN 201610461081A CN 105926395 B CN105926395 B CN 105926395B
Authority
CN
China
Prior art keywords
roadbed
heating wire
gsz
newly
humidity sensor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610461081.4A
Other languages
Chinese (zh)
Other versions
CN105926395A (en
Inventor
马林
张军
刘海
赵建斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Province Transport Science Research Institute
Shanxi Jiaoke Highway Survey and Design Institute
Original Assignee
Shanxi Province Transport Science Research Institute
Shanxi Jiaoke Highway Survey and Design Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Province Transport Science Research Institute, Shanxi Jiaoke Highway Survey and Design Institute filed Critical Shanxi Province Transport Science Research Institute
Priority to CN201610461081.4A priority Critical patent/CN105926395B/en
Publication of CN105926395A publication Critical patent/CN105926395A/en
Application granted granted Critical
Publication of CN105926395B publication Critical patent/CN105926395B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C3/00Foundations for pavings
    • E01C3/04Foundations produced by soil stabilisation
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C21/00Apparatus or processes for surface soil stabilisation for road building or like purposes, e.g. mixing local aggregate with binder
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C3/00Foundations for pavings
    • E01C3/06Methods or arrangements for protecting foundations from destructive influences of moisture, frost or vibration

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)

Abstract

The invention belongs to civil engineering groundwork process field, is related to a kind of road structure and construction method for eliminating newly-built roadbed consolidation settlement, wherein, the road structure includes GSZ, heating wire, external power source, tensiometer and humidity sensor;GSZ is tubular structure;Heating wire is placed in inside GSZ;Heating wire and tensiometer are connected with humidity sensor respectively;The display dial of soil moisture value can be reflected by being provided with humidity sensor;Humidity sensor accesses external power source.The invention provides a kind of road structure and construction method for eliminating newly-built roadbed consolidation settlement for effectively improving subgrade strength and bearing capacity and powerful guarantee highway driving safety.

Description

A kind of road structure and construction method for eliminating newly-built roadbed consolidation settlement
Technical field
The invention belongs to civil engineering groundwork process field, is related to a kind of road structure and the construction based on the road structure Method, more particularly to a kind of road structure and construction method for eliminating newly-built roadbed consolidation settlement.
Background technology
Highway transportation industry fast development in recent years, especially in central and west regions, newly-built substantial amounts of loess highway, Local economic development is greatly driven.Yet with the significant structural and strong water sensitivity of newly-built loess and roadbed so that During building and build terminate after there are many problems, such as roadbed consolidation settlement, secondary consolidation settlement, differential settlement, road Base cracking (transverse crack and longitudinal crack) etc., seriously constrain the security and comfortableness of road travel.
Handle at present the technology of newly-built roadbed consolidation settlement mainly have pile foundation reinforcement, change fill out, slip casting etc., wherein pile foundation reinforcement Technology is primarily adapted for use in the public affairs that disposal roadbed moisture content is integrally bigger than normal, subgrade defect regional extent is larger, road traffic amount is less Road;Change the technology of filling out be primarily adapted for use in disposal roadbed it is local overall be immersed in water, moisture content close to saturation, can not meet that roadbed carries The highway of power requirement;Slurry injection technique is primarily adapted for use in disposal roadbed part small range and the diseases such as soil body loosening, cavity, leakiness occurs Harmful highway.Above-mentioned subgrade strengthening technology consolidation effect is good, and use is wide.But it is seen that, above-mentioned technology be Roadbed is disposed after there is disease, and considerable influence is all caused to existing roadbed and road surface normal traffic, and over time The treated region of passage and untreated region junction be likely to occur secondary disaster, cause major economic loss.
Therefore, it is particularly necessary to seek a kind of technology that can just solve newly-built roadbed Common Diseases in process of construction.
The content of the invention
In order to solve above-mentioned technical problem present in background technology, it is strong roadbed can be effectively improved the invention provides one kind The road structure and the construction that eliminate newly-built roadbed consolidation settlement of degree and bearing capacity and powerful guarantee highway driving safety Method.
To achieve the above object, the present invention adopts the following technical scheme that:
A kind of road structure for eliminating newly-built roadbed consolidation settlement, including GSZ, it is characterised in that:It is described to disappear Except the road structure of newly-built roadbed consolidation settlement also includes heating wire, external power source, tensiometer and humidity sensor;Institute It is tubular structure to state GSZ;The heating wire is placed in inside GSZ;Heating wire and the tensiometer difference It is connected with humidity sensor;The display dial of soil moisture value can be reflected by being provided with the humidity sensor;The humidity Sensor accesses external power source.
Preferably, heating wire of the present invention is by the way of annular is laid, laterally lays and/or longitudinally lay It is placed in inside GSZ.
Preferably, the outer wrap of heating wire of the present invention has heat-conducting layer.
Preferably, GSZ of the present invention is one or more layers.
Preferably, when GSZ of the present invention is multilayer, the spacing between adjacent two layers is not more than 2m.
Preferably, the internal diameter of GSZ of the present invention is 2-3cm.
Preferably, tensiometer of the present invention accesses humidity sensor by hygrometer export line;It is described Heating wire accesses humidity sensor by heating wire export line.
Preferably, external power source of the present invention is battery.
A kind of construction method based on the road structure that can eliminate newly-built roadbed consolidation settlement as described above, its feature exist In:It the described method comprises the following steps:
1) leveling processing is carried out to newly-built roadbed place, the filler in every layer of roadbed is 35~40cm, and thickness is after densification 25cm±3cm;
2) core boring sampling in every layer of roadbed, the physical mechanics test of the soil body is carried out, tests the soil body under different water cut Mechanics index of physics, it is determined to meet the soil moisture content value under very heavy traffic effect and the effect of subgrade soil weight stress, That is subgrade soil humidity lower and upper limit;
3) the embedded number of plies of GSZ and tensiometer is determined according to roadbed uniformity when roadbed successively fills, its Middle tensiometer hygrometer export line when embedded is led at roadbed toe by digging ditch groove in this layer of road bed, soil One layer is filled with the tiny rubble of different-grain diameter is very thin after the completion of work grid making, using firm grating as standard, and geotechnological lattice The heating wire export line of heating wire and the hygrometer export line of tensiometer are placed at the toe of the same side in grid;
4) establish base station being placed with the toe of heating wire export line and hygrometer export line, installation humidity sensor with And external power source, heating wire export line and hygrometer export line are accessed into humidity sensor;Humidity sensor accesses external power source;
5) repeat step 3) and step 4) GSZ and tensiometer are embedded in equivalent layer position, until roadbed fills out Build completion;
6) subgrade soil humidity bound is set, opens the controlling switch of heating wire, is heated to subgrade soil, in the soil body Moisture gradually volatilizees, and is slowly discharged from metalling, until reaching subgrade soil humidity lower limit, closes the controlling switch of heating wire, Now the intensity of roadbed has fully met operation roadbed intensity requirement.
It is an advantage of the invention that:
The invention provides a kind of road structure and construction method for eliminating newly-built roadbed consolidation settlement, the wherein roadbed Structure includes GSZ, heating wire, external power source, tensiometer and humidity sensor;GSZ is tubular structure; Heating wire is placed in inside GSZ;Heating wire and tensiometer are connected with humidity sensor respectively;On humidity sensor The display dial of soil moisture value can be reflected by being provided with;Humidity sensor accesses external power source.The present invention utilizes GSZ With the combining structure of heating wire, its bearing capacity is more single, and GSZ is bigger, and the soil body can be effectively increased after being applied in combination Bearing capacity;Meanwhile using the electric-heating-wire-heating soil body in grid, soil moisture content is effectively reduced, roadbed is kept a kind of reason The drying regime thought;Furthermore through channel can be formed using the macadam overlay of different gradation during making GSZ of the present invention, Discharge for vapor in the soil body is provided convenience;In addition, the solar panels heat supply process that the present invention recommends, efficiently solves road Base disease disposes the problem of field energy resource supply for a long time.This road structure provided by the present invention has fully been used for reference in life " paving blanket technology ", has the advantages that energy-conserving and environment-protective, green low consumption.It is to aim at prevention that the system, which eliminates subgrade defect, in disease Evil allows for newly-built subgrade soil before occurring and has reached a high intensity, the state of high-bearing capacity, has also effectively discharged roadbed disease One of harmful arch-criminal-water, it ensure that roadbed can be chronically at the state of safety and stability in terms of two, extending roadbed makes With the life-span, the road-ability of highway is improved, improves the travel safety of highway.The present invention is spread for existing loess subgrade The problems such as rear consolidation time is long, consolidation settlement is big is built, passes through " paving blanket " principle key position " lid " during roadbed filling Layer " blanket ", to reach the purpose for eliminating roadbed consolidation settlement, improving roadbed resistance to overturning.
Brief description of the drawings
Fig. 1 is the structural representation of the road structure provided by the present invention for eliminating newly-built roadbed consolidation settlement;
Fig. 2 is the first laying scheme schematic diagram of grid heating wire of the present invention;
Fig. 3 is second of laying scheme schematic diagram of grid heating wire of the present invention;
Fig. 4 is the third laying scheme schematic diagram of grid heating wire of the present invention;
Wherein:
1- GSZs;2- heating wire;3- heating wire plugs;4- external power sources;7- tensiometers;8- grooves;9- is wet Degree meter export line;10- heating wire export lines;11- display dials;12- warning lamps;13- humidity value settings buttons.
Embodiment
The structure and its construction method of the present invention are done further specifically with specific embodiment below in conjunction with the accompanying drawings It is bright:
Referring to Fig. 1, the invention provides a kind of road structure for eliminating newly-built roadbed consolidation settlement, including GSZ 1, can eliminate the road structure of newly-built roadbed consolidation settlement also includes heating wire 2, external power source 4, tensiometer 7 and humidity Sensor;GSZ 1 is tubular structure;Heating wire 2 is placed in inside GSZ 1;Heating wire 2 and tensiometer 7 divide It is not connected with humidity sensor;Warning lamp 12, humidity value settings button 13, emergent inspection button 14 are provided with humidity sensor And can reflect soil moisture value display dial 11,;Humidity sensor accesses external power source 4.Tensiometer 7 is by soil Humidity value is reflected into humidity value display dial 11, is advantageous to adjust subgrade soil humidity in time.
Referring to Fig. 2, Fig. 3 and Fig. 4, heating wire 2 is put by the way of annular is laid, laterally lays and/or longitudinally lay Inside GSZ 1, its caused heat energy of different laying forms is different, specifically can be depending on roadbed situation.
The outer wrap of heating wire 2 has heat-conducting layer, and the preferably good material of high temperature resistant, thermal conductivity is made.
GSZ 1 is one or more layers;When GSZ 1 is multilayer, the spacing between adjacent two layers is not more than 2m.Soil The internal diameter of work grid 1 is 2-3cm.
Tensiometer 7 accesses humidity sensor by hygrometer export line 9;Heating wire 2 passes through heating wire export line 10 Access humidity sensor.Heating wire plug 3 is directly accessed external power source 4 or access heating wire export line 10.
External power source 4 is battery, can be supplied by solar panels or base station cable line.
A kind of construction method based on the road structure that can eliminate newly-built roadbed consolidation settlement as previously described, this method bag Include following steps:
1) leveling processing is carried out to newly-built roadbed place, the filler in every layer of roadbed is 35~40cm, preferably 40cm, densification Thickness is 25cm ± 3cm afterwards;
2) core boring sampling in every layer of roadbed, the physical mechanics test of the soil body is carried out, tests the soil body under different water cut Mechanics index of physics, it is determined to meet the soil moisture content value under very heavy traffic effect and the effect of subgrade soil weight stress, That is subgrade soil humidity lower and upper limit;Determine that energy subgrade soil humidity lower and upper limit are respectively 4% He in the present embodiment 12%;
3) the embedded number of plies of GSZ 1 and tensiometer 7 is determined according to roadbed uniformity when roadbed successively fills, The wherein hygrometer export line 9 when embedded of tensiometer 7 leads to roadbed toe by digging ditch groove 8 in this layer of road bed Place, one layer is filled with the tiny rubble of different-grain diameter is very thin after the completion of the making of GSZ 1, using firm grating as standard, and The heating wire export line 10 of heating wire 2 is placed on same side slope with the hygrometer export line 9 of tensiometer 7 in GSZ 1 At pin;
4) base station is established being placed with the toe of heating wire export line 10 and hygrometer export line 9, humidity sensor is installed Device and external power source 4, heating wire export line 10 and hygrometer export line 9 are accessed into humidity sensor;Humidity sensor accesses External power source 4;
5) repeat step 3) and step 4) GSZ 1 and tensiometer 7 are embedded in equivalent layer position, until roadbed Fill completion;
6) subgrade soil humidity bound is set, opens the controlling switch of heating wire 2, is heated to subgrade soil, in the soil body Moisture gradually volatilize, slowly discharged from metalling, until reaching subgrade soil humidity lower limit, the control for closing heating wire 2 is opened Close, now the intensity of roadbed has fully met operation roadbed intensity requirement, essentially eliminates the consolidation settlement of newly-built roadbed, solves The problem of roadbed consolidation settlement harm is big.

Claims (9)

1. a kind of road structure for eliminating newly-built roadbed consolidation settlement, including GSZ(1), it is characterised in that:It is described can Eliminating the road structure of newly-built roadbed consolidation settlement also includes heating wire(2), external power source(4), tensiometer(7)It is and wet Spend sensor;The GSZ(1)It is tubular structure;The heating wire(2)It is placed in GSZ(1)It is internal;The electric heating Silk(2)And tensiometer(7)It is connected respectively with humidity sensor;Soil can be reflected by being provided with the humidity sensor The display dial of humidity value(11);The humidity sensor accesses external power source(4).
2. the road structure according to claim 1 for eliminating newly-built roadbed consolidation settlement, it is characterised in that:The electric heating Silk(2)GSZ is placed in by the way of annular is laid, laterally lays and/or longitudinally lay(1)It is internal.
3. the road structure according to claim 2 for eliminating newly-built roadbed consolidation settlement, it is characterised in that:The electric heating Silk(2)Outer wrap have heat-conducting layer.
4. the road structure for eliminating newly-built roadbed consolidation settlement according to claim 1 or 2 or 3, it is characterised in that:Institute State GSZ(1)It is one or more layers.
5. the road structure according to claim 4 for eliminating newly-built roadbed consolidation settlement, it is characterised in that:The geotechnique Grid(1)When being multilayer, the spacing between adjacent two layers is not more than 2m.
6. the road structure according to claim 5 for eliminating newly-built roadbed consolidation settlement, it is characterised in that:The geotechnique Grid(1)Internal diameter be 2-3cm.
7. the road structure according to claim 6 for eliminating newly-built roadbed consolidation settlement, it is characterised in that:The soil Hygrometer(7)Pass through hygrometer export line(9)Access humidity sensor;The heating wire(2)Pass through heating wire export line(10) Access humidity sensor.
8. the road structure according to claim 7 for eliminating newly-built roadbed consolidation settlement, it is characterised in that:The outside Power supply(4)It is battery.
9. a kind of construction method based on the road structure that can eliminate newly-built roadbed consolidation settlement as claimed in claim 8, its It is characterised by:It the described method comprises the following steps:
1)Carry out leveling processing to newly-built roadbed place, the filler in every layer of roadbed is 35~40cm, and thickness is 25cm after densification ±3cm;
2)The core boring sampling in every layer of roadbed, the physical mechanics test of the soil body is carried out, test the physics of the soil body under different water cut Mechanical index, it is determined to meet the soil moisture content value under very heavy traffic effect and the effect of subgrade soil weight stress, i.e. road Base soil body humidity lower and upper limit;
3)GSZ is determined according to roadbed uniformity when roadbed successively fills(1)And tensiometer(7)The embedded number of plies, Wherein tensiometer(7)The hygrometer export line when embedded(9)By digging ditch groove in this layer of road bed(8)Lead to road Ji Pojiaochu, GSZ(1)Fill one layer with the tiny rubble of different-grain diameter is very thin after the completion of making, using firm grating as Standard, and GSZ(1)Middle heating wire(2)Heating wire export line(10)With tensiometer(7)Hygrometer export line (9)It is placed at the toe of the same side;
4)It is being placed with heating wire export line(10)And hygrometer export line(9)Toe at establish base station, humidity sensor is installed Device and external power source(4), by heating wire export line(10)With hygrometer export line(9)Access humidity sensor;Humidity sensor Device accesses external power source(4);
5)Repeat step 3)And step 4)By GSZ(1)And tensiometer(7)Equivalent layer position is embedded in, until roadbed Fill completion;
6)Subgrade soil humidity bound is set, opens heating wire(2)Controlling switch, subgrade soil heating is given, in the soil body Moisture gradually volatilizees, and is slowly discharged from metalling, until reaching subgrade soil humidity lower limit, closes heating wire(2)Control open Close, now the intensity of roadbed has fully met operation roadbed intensity requirement.
CN201610461081.4A 2016-06-22 2016-06-22 A kind of road structure and construction method for eliminating newly-built roadbed consolidation settlement Active CN105926395B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610461081.4A CN105926395B (en) 2016-06-22 2016-06-22 A kind of road structure and construction method for eliminating newly-built roadbed consolidation settlement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610461081.4A CN105926395B (en) 2016-06-22 2016-06-22 A kind of road structure and construction method for eliminating newly-built roadbed consolidation settlement

Publications (2)

Publication Number Publication Date
CN105926395A CN105926395A (en) 2016-09-07
CN105926395B true CN105926395B (en) 2018-01-02

Family

ID=56830451

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610461081.4A Active CN105926395B (en) 2016-06-22 2016-06-22 A kind of road structure and construction method for eliminating newly-built roadbed consolidation settlement

Country Status (1)

Country Link
CN (1) CN105926395B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
BE1025282B1 (en) * 2017-06-02 2019-01-11 Cnh Industrial Belgium Nv Carrying capacity of the ground
CN109577122A (en) * 2018-12-07 2019-04-05 哈尔滨工业大学 A kind of vertical drainage road structure based on electro-osmosis method
CN110983888A (en) * 2019-11-04 2020-04-10 中国科学院武汉岩土力学研究所 Construction method for reinforcing soft rock roadbed by applying geocell and reinforcing effect testing method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003239276A (en) * 2003-01-23 2003-08-27 Dia Consultant:Kk Construction method for road
CN2633952Y (en) * 2003-04-02 2004-08-18 中国科学院寒区旱区环境与工程研究所 Hydraulic automatic temperature control ventilator for road bed
CN102628247A (en) * 2012-04-24 2012-08-08 天津二十冶建设有限公司 Insulation construction method for frozen-earth roadbed
CN203795261U (en) * 2014-03-14 2014-08-27 中国科学院寒区旱区环境与工程研究所 Embankment structure for preventing and treating collapsibility and freeze injury of loess roadbed in seasonally frozen ground region
CN104153269A (en) * 2014-08-22 2014-11-19 东南大学 Conductive-resistant-combined protection method of permafrost under wide subgrade and pavement structure
CN205874869U (en) * 2016-06-22 2017-01-11 山西省交通科学研究院 Can eliminate roadbed structure of newly -built road bed consolidation settlement

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003239276A (en) * 2003-01-23 2003-08-27 Dia Consultant:Kk Construction method for road
CN2633952Y (en) * 2003-04-02 2004-08-18 中国科学院寒区旱区环境与工程研究所 Hydraulic automatic temperature control ventilator for road bed
CN102628247A (en) * 2012-04-24 2012-08-08 天津二十冶建设有限公司 Insulation construction method for frozen-earth roadbed
CN203795261U (en) * 2014-03-14 2014-08-27 中国科学院寒区旱区环境与工程研究所 Embankment structure for preventing and treating collapsibility and freeze injury of loess roadbed in seasonally frozen ground region
CN104153269A (en) * 2014-08-22 2014-11-19 东南大学 Conductive-resistant-combined protection method of permafrost under wide subgrade and pavement structure
CN205874869U (en) * 2016-06-22 2017-01-11 山西省交通科学研究院 Can eliminate roadbed structure of newly -built road bed consolidation settlement

Also Published As

Publication number Publication date
CN105926395A (en) 2016-09-07

Similar Documents

Publication Publication Date Title
CN105926395B (en) A kind of road structure and construction method for eliminating newly-built roadbed consolidation settlement
CN105887604B (en) A kind of operation roadbed disease disposal plant and processing method
Liu et al. Induction healing of porous asphalt
Zheng et al. Highway subgrade construction in expansive soil areas
CN106436596A (en) Construction method for fiberglass reinforced plastic mortar pipe culvert of roads
CN205874869U (en) Can eliminate roadbed structure of newly -built road bed consolidation settlement
WO2024078503A1 (en) Cumulative roadbed deformation simulation test system with full service environment and traffic load action
Ling et al. Laboratory and field study of electroosmosis dewatering for pavement subgrade soil
CN106049412A (en) Construction method of heaping pre-compression soft foundation reinforcement
Wang et al. Three-dimensional micromechanical pavement model development for the study of block cracking
Zheng et al. Diaphragm wall deformation and ground settlement caused by dewatering before excavation in strata with leaky aquifers
CN109082982B (en) Method for processing semi-rigid base asphalt pavement cracking
Wang et al. Characterization of the distress modes and in situ material properties of highway asphalt pavement with long service life
CN205804071U (en) A kind of operation roadbed disease disposal plant
Liu et al. The first engineered self-healing asphalt road: How is it performing?
CN107165017A (en) The permanent composite pavement structure transformed for old asphalt pavement
CN107675693A (en) The soft base comprehensive processing method of road peat soil
CN108385620A (en) A kind of self-healing mould assembly seepage control of dam face layer and preparation method thereof and self-healing method
Godenzoni et al. Instrumented test section for analyzing the curing process of cold-recycled mixtures
CN103149344A (en) Slab combined type capillary water rise test column
CN207003171U (en) Permanent composite pavement structure for old asphalt pavement transformation
Liu et al. Study on cement concrete pavement treatment methods of common damage diseases
CN205529737U (en) Water proof roadbed structure
Hu et al. Study on settlement after construction for the high loess-filled embankment
CN112945663B (en) Method for detecting cohesiveness of hydraulic asphalt concrete and concrete base

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant