CN105908976A - Vertical structure column reinforced steel bar preferentially constructed method for reverse building method - Google Patents

Vertical structure column reinforced steel bar preferentially constructed method for reverse building method Download PDF

Info

Publication number
CN105908976A
CN105908976A CN201610292914.9A CN201610292914A CN105908976A CN 105908976 A CN105908976 A CN 105908976A CN 201610292914 A CN201610292914 A CN 201610292914A CN 105908976 A CN105908976 A CN 105908976A
Authority
CN
China
Prior art keywords
bar
vertical structure
column
constructed
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610292914.9A
Other languages
Chinese (zh)
Inventor
李凯阳
章谊
何永顺
刘洲彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Construction No 2 Group Co Ltd
Original Assignee
Shanghai Construction No 2 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Construction No 2 Group Co Ltd filed Critical Shanghai Construction No 2 Group Co Ltd
Priority to CN201610292914.9A priority Critical patent/CN105908976A/en
Publication of CN105908976A publication Critical patent/CN105908976A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/12Mounting of reinforcing inserts; Prestressing

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The invention discloses a vertical structure column reinforced steel bar preferentially constructed method for a reverse building method. The vertical structure column reinforced steel bar preferentially constructed method for the reverse building method includes the following steps that 1, column joint bars are preserved when a first layer of board in a reverse building method project is constructed; 2, when a first underground floor is constructed, a main column bar and the column joint bars are connected through inner threaded sleeves, the main column bar penetrates through the first underground floor to a second underground space, the main column bar is sleeved with column hoops at the same time, the main column bar and the column hoops are connected in a binding mode, and construction of the portion, in the first underground space, of the main column bar is achieved; and 3, the step 1 and the step 2 are carried out repeatedly until an underground base plate is constructed circularly. The vertical structure column reinforced steel bar preferentially constructed method for the reverse building method achieves the effects of reducing steel consumption, reducing workloads and avoiding environmental pollution caused by electric welding operation.

Description

The contrary sequence method vertical structure preferential construction method of post reinforcing bar
Technical field
The present invention relates to technical field of building construction, particularly to a kind of contrary sequence method vertical structure preferential construction party of post reinforcing bar Method.
Background technology
Existing reverse construction carries out after bottom slab concreting completes vertical structure construction again, so every layer of horizontal junction Post joint bar need to be reserved the when of structure construction, stay in and with reinforcing bar, upper and lower two ends joint bar is carried out colligation again when vertical structure starts to construct Overlap joint, stirrup construction, seals mould again and pours, and such sequence of construction not only reinforcing bar use cost is big but also the duration is big.
Summary of the invention
In order to solve at least one problem mentioned in background technology, the present invention provide one can save splice and And can the contrary sequence method vertical structure preferential construction method of post reinforcing bar of reduction of erection time.
To achieve these goals, the invention provides a kind of contrary sequence method vertical structure preferential construction method of post reinforcing bar, bag Include following steps:
Step 1: the first floor plate in contrary working method engineering reserves cylinder joint bar when constructing;
Step 2: when B1 floor slab construction, uses inner thread sleeve to be carried out with described cylinder joint bar by main for cylinder muscle Connect, and by main for cylinder muscle through B1 floor in the sheaf space of underground two, column tie-bar is inserted in the main muscle of cylinder simultaneously, adopts Connect with colligation, to reach the construction of the B1 space main muscle of middle column body;
Step 3: repeat the above steps 1 and step 2, till being recycled to ground lower shoe.
Optionally, it is characterised in that: described cylinder joint bar two ends are provided with external screw thread.
Optionally, the two ends of adjacent described cylinder joint bar are not at sustained height.
Optionally, stagger between a length of 500mm~1000mm in the end of adjacent described cylinder joint bar.
The beneficial effect of the contrary sequence method vertical structure preferential construction method of post reinforcing bar of the present invention: contrary sequence method vertical structure of the present invention The preferential construction method of post reinforcing bar carries out the construction of top vertical structure while construction of bottom plates, uses the post reinforcing bar of one-part form even Connect mode, every layer of single steel bar only with a sleeve, splice can not only be saved and can the reduction of erection time.
Accompanying drawing explanation
Fig. 1 is the constructing structure schematic diagram of the contrary sequence method vertical structure preferential construction method of post reinforcing bar of the present invention.
Detailed description of the invention
For making the object, technical solutions and advantages of the present invention clearer, below in conjunction with the accompanying drawing each reality to the present invention The mode of executing is explained in detail.But, it will be understood by those skilled in the art that in each embodiment of the present invention, In order to make reader be more fully understood that, the application proposes many ins and outs.But, even if there is no these ins and outs and base Many variations and amendment in following embodiment, it is also possible to realize the application each claim technical side required for protection Case.
The present invention solves above-mentioned technical problem, the invention provides a kind of contrary sequence method vertical structure post reinforcing bar and preferentially construct Method, in conjunction with Fig. 1, is described in detail the present embodiment.
Fig. 1 is the constructing structure schematic diagram of the contrary sequence method vertical structure preferential construction method of post reinforcing bar of the present invention, and the present invention carries Supply a kind of contrary sequence method vertical structure preferential construction method of post reinforcing bar, comprised the following steps: step 1: in contrary working method engineering Cylinder joint bar 10,11 is reserved during the construction of first floor plate;Step 2: when B1 floor slab construction, uses inner thread sleeve by cylinder Main muscle is attached with described cylinder joint bar 10,11, and by main for cylinder muscle through B1 floor in the sheaf space of underground two, Column tie-bar 14 is inserted in the main muscle of cylinder simultaneously, uses colligation to connect, to reach the construction of the B1 space main muscle of middle column body;Step Rapid 3: repeat the above steps 1 and step 2, till being recycled to ground lower shoe, described cylinder joint bar 10,11 two ends 12,13 set Having external screw thread, the two ends 12,13 of adjacent described cylinder joint bar are not or not sustained height, the two ends of adjacent described cylinder joint bar 12,13 stagger between a length of 500mm~1000mm.
While B1 horizontal structure is constructed, vertical reinforcement reserved by reinforced column, and length in reserve should meet " concrete structure engineering construction quality accident specification " GB50204-2002 (2011 editions) requirement, constructs at next layer of horizontal structure While, post reinforcing bar and a upper post reserving rib are carried out sleeve connection, and is left to next layer in advance, reach vertical posts with this way The purpose of the one-stop connection of reinforcing bar, column tie-bar of simultaneously constructing in the lump, save the splice that separately construction two joint bar connects With the pillar reinforcement construction cycle, and while construction of bottom plates, carry out pouring of concrete column, thus reach the reduction of erection time and Save the purpose of Financial cost.The form of construction work of vertical reinforcement in above-mentioned contrary sequence method, by using joint bar, sleeve connection, rather than Conventional electric welding connection or colligation connect, and have reached save steel consumption and reduce workload and the ring avoiding electric welding field to produce The effect of environment pollution;The main muscle of cylinder and stirrup are constructed simultaneously and have been reached the effect of reduction of erection time.
It will be understood by those skilled in the art that the respective embodiments described above are to realize the specific embodiment of the present invention, And in actual applications, can to it, various changes can be made in the form and details, without departing from the spirit and scope of the present invention.

Claims (4)

1. the contrary sequence method vertical structure preferential construction method of post reinforcing bar, it is characterised in that comprise the following steps:
Step 1: the first floor plate in contrary working method engineering reserves cylinder joint bar when constructing;
Step 2: when B1 floor slab construction, uses inner thread sleeve main for cylinder muscle and described cylinder joint bar to be carried out even Connect, and by main for cylinder muscle through B1 floor in the sheaf space of underground two, column tie-bar is inserted in the main muscle of cylinder simultaneously, use Colligation connects, to reach the construction of the B1 space main muscle of middle column body;
Step 3: repeat the above steps 1 and step 2, till being recycled to ground lower shoe.
The contrary sequence method vertical structure preferential construction method of post reinforcing bar the most according to claim 1, it is characterised in that: described cylinder Joint bar two ends are provided with external screw thread.
The contrary sequence method vertical structure preferential construction method of post reinforcing bar the most according to claim 1, it is characterised in that: adjacent institute State the two ends of cylinder joint bar not at sustained height.
The contrary sequence method vertical structure preferential construction method of post reinforcing bar the most according to claim 3, it is characterised in that: adjacent institute Stagger between a length of 500mm~1000mm in the end stating cylinder joint bar.
CN201610292914.9A 2016-05-05 2016-05-05 Vertical structure column reinforced steel bar preferentially constructed method for reverse building method Pending CN105908976A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610292914.9A CN105908976A (en) 2016-05-05 2016-05-05 Vertical structure column reinforced steel bar preferentially constructed method for reverse building method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610292914.9A CN105908976A (en) 2016-05-05 2016-05-05 Vertical structure column reinforced steel bar preferentially constructed method for reverse building method

Publications (1)

Publication Number Publication Date
CN105908976A true CN105908976A (en) 2016-08-31

Family

ID=56752541

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610292914.9A Pending CN105908976A (en) 2016-05-05 2016-05-05 Vertical structure column reinforced steel bar preferentially constructed method for reverse building method

Country Status (1)

Country Link
CN (1) CN105908976A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112538932A (en) * 2020-11-24 2021-03-23 上海建工四建集团有限公司 Construction method of vertical steel bar of reverse construction structural column and fixed template

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000073363A (en) * 1998-08-31 2000-03-07 Nippon Steel Corp Structure of joining part of steel underground continuous wall with main reinforcement of reinforced concrete slab
CN202062165U (en) * 2011-03-30 2011-12-07 中国二十冶集团有限公司 Welding joint structure of precast steel ring sleeve at position of concrete pipe pile floorslab in top down construction
CN203049603U (en) * 2013-01-18 2013-07-10 辽宁金帝第二建筑工程有限公司岩土工程分公司 Rebar cage with bottom plate connection rebar meshes
CN103711132A (en) * 2013-12-26 2014-04-09 上海建工二建集团有限公司 Cylindrical reinforcing steel bar connecting method and connecting structure in reverse building method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000073363A (en) * 1998-08-31 2000-03-07 Nippon Steel Corp Structure of joining part of steel underground continuous wall with main reinforcement of reinforced concrete slab
CN202062165U (en) * 2011-03-30 2011-12-07 中国二十冶集团有限公司 Welding joint structure of precast steel ring sleeve at position of concrete pipe pile floorslab in top down construction
CN203049603U (en) * 2013-01-18 2013-07-10 辽宁金帝第二建筑工程有限公司岩土工程分公司 Rebar cage with bottom plate connection rebar meshes
CN103711132A (en) * 2013-12-26 2014-04-09 上海建工二建集团有限公司 Cylindrical reinforcing steel bar connecting method and connecting structure in reverse building method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112538932A (en) * 2020-11-24 2021-03-23 上海建工四建集团有限公司 Construction method of vertical steel bar of reverse construction structural column and fixed template

Similar Documents

Publication Publication Date Title
CN104453014B (en) The method of attachment of 3D printing filled wall and constructional column and attachment structure
CN107254884A (en) A kind of detachable prefabricated assembled concrete-filled steel square tubular column pin node
CN106381925A (en) Prefabricated reinforced concrete column and column splice joint with sleeves
CN205857448U (en) A kind of assembly concrete shear wall structure
CN105735466B (en) Prefabricated wall column one-part form steel bar connecting structure and method
CN106088573A (en) A kind of assembled stretches mould bases
CN104532953B (en) 3D printing based assembly type special-shaped column framework structure and construction method thereof
CN105133791A (en) Construction method for prefabricated thick plate steel rib concrete column variable cross-section transformation node structure
CN103215894B (en) Portable interim prestressed stretch-draw anchor block
CN105908860A (en) Reinforcing structure of 3D printing reinforced masonry shear wall
CN104234192A (en) Prestress concrete groove type plate with bent steel bars at upper part and framework structure system
CN106320704A (en) Steel reinforced concrete structure formwork sleeve threaded rod pulling construction method
CN205046677U (en) Assembled concrete frame nodal connection structure
CN206144032U (en) Mosaic structure of assembled steel core concrete column and post
CN104929278A (en) Assembly type dense column hollow shear wall structure
CN106437032A (en) Assembled concrete filled steel tubular column splicing structure and method
CN207348095U (en) The special bearing diagonal component of piping lane
CN105908976A (en) Vertical structure column reinforced steel bar preferentially constructed method for reverse building method
CN101798856B (en) Steel-concrete combined beam and construction method thereof
CN212984179U (en) Assembled concrete column connecting device based on reinforcement combining
CN107178149A (en) Fork-shaped steel reinforced concrete combining structure and its construction method
CN202181728U (en) Foundation reinforcing bar non-connector construction structure for shear wall and attached-wall column
CN207829168U (en) The prefabricated overlapping side wall of additional corner diagonal bar and overlapping top plate connecting node
CN201411809Y (en) Precast element for concrete floors
CN204826676U (en) Tension structure that has bonding prestressing tendons

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20160831

RJ01 Rejection of invention patent application after publication