CN105891574A - System and method of charging step tariff applied to power user end - Google Patents

System and method of charging step tariff applied to power user end Download PDF

Info

Publication number
CN105891574A
CN105891574A CN201610222098.4A CN201610222098A CN105891574A CN 105891574 A CN105891574 A CN 105891574A CN 201610222098 A CN201610222098 A CN 201610222098A CN 105891574 A CN105891574 A CN 105891574A
Authority
CN
China
Prior art keywords
electricity
month
user
year
stepping
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610222098.4A
Other languages
Chinese (zh)
Inventor
朱娅琳
姜文
崔雪丽
李继东
夏恩云
刘乾元
姜振军
周颖
范风华
王晓燕
周香芹
齐秀芹
秦媛
樊晓丹
刘曼
毛莉莉
朱雪晴
范爱荣
郑岳
胡蔚
姚艳菊
王晓红
韩涛
武翔龙
杨卫红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Jining Power Supply Co of State Grid Shandong Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Jining Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Jining Power Supply Co of State Grid Shandong Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201610222098.4A priority Critical patent/CN105891574A/en
Publication of CN105891574A publication Critical patent/CN105891574A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R11/00Electromechanical arrangements for measuring time integral of electric power or current, e.g. of consumption
    • G01R11/56Special tariff meters
    • G01R11/57Multi-rate meters

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a system and a method of charging step tariff applied to a power user end. Power utilization time and an electric meter code during the power utilization time of a power user are acquired; account cancellation information and a meter reading frequency of the user are recorded, the actual power utilization month number is calculated according to the account cancellation information and the meter reading frequency, and a step electric quantity is further calculated; an annual step electric quantity and a step electric price of the user are determined; the cumulative power utilization quantity last month, power utilization quantity in the current month of the user and the annual step electric quantity by a step electric quantity charging unit are determined, the falling step for the electric quantity which needs to be charged to the user is determined; and according to the step for the electric quantity which needs to be charged to the user, the electric price of the step electric quantity charging unit is called, and the current electric fee in the current month by the user is calculated and displayed. By only acquiring the initial code and the stop code of the electric meter, which step period the current user is in can be known, the electric price of each step can be clearly known, how much electric quantity can be used for each step can be known, and the power utilization condition of the user can be mastered by the user.

Description

A kind of step price charge system being applied to power consumer end and method thereof
Technical field
The present invention relates to a kind of step price charge system being applied to power consumer end and method thereof.
Background technology
In order to promote resource-efficient and environment friendly society construction, gradually reduce electricity price alternative subsidy, guide resident's rational utilization of electricity, using electricity wisely, resident living power utility has been carried out step price system.Resident's step price refers to the Resident Electricity Price of existing single form, changing the electricity segmentation price according to client's consumption into, electricity rates increase the stepped a kind of electricity price pricing mechanism being incremented by step by step with power consumption, but, the charging Dou Shi charge station of this electricity charge is carried out, and has the disadvantage in that
(1) although power supply enterprise can calculate client's ladder electricity and the electricity charge by computer, but for residential customers, oneself calculates not is part simple thing, and power consumer can only view total price when paying the fees at present, it is impossible to that finds oneself uses electrographic recording and the electricity charge of day part;
(2) each user is by inquiring the electricity consumption situation in 1 cycle, less than inquiring details during a cycle to power supply enterprise's inquiry;
(3) electric company performs step price with year for the cycle, and as run into house to let, the electricity consumption time is discontented with the whole year, a upper tenant has used up single order electricity, next tenant can only use 2 rank or 3 rank electricity prices, but for lease both sides, the most correct to calculate the electricity charge particularly important;
(4) checking meter by electric company's each two moon a table, client can not understand the electricity consumption ladder situation of oneself in time, the most just cannot control the power consumption of oneself.
Summary of the invention
The present invention is to solve the problems referred to above, propose a kind of step price charge system being applied to power consumer end and method thereof, the present invention can make electricity consumption user oneself calculate the ladder electricity charge, solves because client will not calculate the ladder electricity charge or needs to calculate the ladder electricity charge problem of current time.
To achieve these goals, the present invention adopts the following technical scheme that
A kind of step price charge system being applied to power consumer end, calculates unit, gradient electric energy tariff unit, identifying unit and disbursement and sattlement unit, wherein including acquisition module, year stepping coulant meter:
Described acquisition module, the electric energy meter code in the electricity consumption time of collection power consumer and this electricity consumption time;
Described year stepping coulant meter calculation unit, storage has the cancellation information of user and frequency of checking meter, according to cancellation information and frequency calculating actual electricity consumption moon number of checking meter, calculating stepping electricity then;
Described gradient electric energy tariff unit, storage has year ladder electricity and an electricity price;
Described identifying unit, determine the upper month to date power consumption of user, of that month electricity and gradient electric energy tariff unit year ladder electricity size, determine that what user answered alternating current amount falls into stepping;
Described disbursement and sattlement unit, answers the stepping of alternating current amount according to user, transfers the electricity price of gradient electric energy tariff unit, and the of that month electricity charge of user are calculated and be shown.
Described electric energy meter code is obtained by long-distance meter-reading system.
A kind of step price charging method being applied to power consumer end, comprises the following steps:
(1) the electric energy meter code in electricity consumption time of power consumer and this electricity consumption time is gathered;
(2) record the cancellation information of user and frequency of checking meter, according to cancellation information and frequency calculating actual electricity consumption moon number of checking meter, then calculate stepping electricity;
(3) a year ladder electricity and point step price of user is determined;
(4) determine the upper month to date power consumption of user, of that month electricity and gradient electric energy tariff unit year ladder electricity size, determine that what user answered alternating current amount falls into stepping;
(5) answer the stepping of alternating current amount according to user, transfer the electricity price of gradient electric energy tariff unit, the of that month electricity charge of user are calculated and be shown.
In described step (1), when power consumer occurs that tenant changes, redefine electricity consumption input time and table code.
In described step (2), when frequency of checking meter is bimonthly checking meter and time the time of checking meter is the odd number moon, user the actual electricity consumption moon number computational methods be: N=m+1+x, wherein, N is actual electricity consumption moon number, and m is cancellation month, takes-1 or 0, and x is coefficient of checking meter.
Further, in described step (2), transfer day before check meter example day or the day of freezing, x=0, check meter example day or the day of freezing and after, x=1.
In described step (2), be this month of checking meter when the cancellation date, and be later than when checking meter example day, m=-1, be positioned at non-check meter month time, m=0.
In described step (2), when frequency of checking meter is bimonthly checking meter and time the time of checking meter is the even number moon, user the actual electricity consumption moon number computational methods be: N=m+x, wherein, N is actual electricity consumption moon number, and m is cancellation month, taking-1 or 0, x is shared electricity moon number after cancellation.
In described step (2), the computational methods of stepping electricity include two grades, first grade of stepping electricity=a*N, and second works as stepping electricity=b*N, and wherein, N is actual electricity consumption moon number, and a, b are specified stepping power, and b > a.
In described step (3), execution existing electricity stepping standard and electricity price standard according to local Utilities Electric Co. determine year ladder electricity and point step price.
In described step (4), concrete grammar includes:
(4-1) the affiliated electricity stepping scope by upper month to date power consumption is determined;
(4-2) of that month electricity and the described electricity stepping scope by upper month to date power consumption sum are determined;
(4-3) according to the upper limit and the of that month electricity of stepping, the of that month electricity charge are determined according to every grade of electric standard.
Concrete, in described step (4), if the upper month to date power consumption of cut-off < year first grade of electric standard, and month to date power consumption in of that month electricity+cut-off≤year first grade electric standard, the electricity charge in this month=this month first grade of electricity charge standard univalent of electricity *.
If < the year first grade of electric standard of month to date power consumption in cut-off, and first grade of electric standard of year < the upper month to date power consumption of of that month electricity+cut-off≤year second gear electric standard, this month the electricity charge=(month to date power consumption in first grade of electric standard-cut-off of year) × first grade of electricity charge standard univalent+[electricity-(month to date power consumption in first grade of electric standard-cut-off of year) in this month] × second gear electricity charge standard univalent.
If<the year first grade of electric standard of month to date power consumption in cut-off, and the of that month upper month to date power consumption of electricity+cut-off>year second gear electric standard time, this month the electricity charge=(month to date power consumption in first grade of electric standard-cut-off of year) × first grade electricity charge standard univalent+(year second gear electric standard-year first grade electric standard) × second gear electricity charge standard univalent+[electricity-(year second gear electric standard-cut-off on month to date power consumption) in this month] × third gear electricity charge standard univalent.
If month to date power consumption in cut-off>=year first grade electric standard, and first grade of electric standard of year<month to date power consumption in of that month electricity+cut-off≤year second gear electric standard, then: the electricity charge in this month=this month electricity × second gear electricity charge standard univalent.
If<the year second gear electric standard of month to date power consumption in first grade of electric standard≤cut-off of year, the upper month to date power consumption of of that month electricity+cut-off>=year second gear electric standard, then: the electricity charge in this month=(year second gear electric standard-cut-off on month to date power consumption) × second gear electricity charge standard univalent+[electricity-(year second gear electric standard-cut-off on month to date power consumption) in this month] × third gear electricity charge standard univalent.
If month to date power consumption in cut-off >=year second gear electric standard, and month to date power consumption in of that month electricity+cut-off > year second gear electric standard, then the electricity charge in this month=this month electricity × third gear electricity charge standard univalent.
The invention have the benefit that
(1) the application present invention, when electricity consumption user gets ammeter at least with only code, i.e. it is appreciated that this family current is in which ladder period, and the electricity price height of each ladder can be apparent from, each shelves also have how many electricity to use, and facilitate client to control the electricity consumption situation of oneself;
(2) when the situations such as tenant's change occur, only need to be by input time voluntarily and table code (table code can also obtain automatically), i.e. can calculate electricity and the electricity charge in this stage, will not have electricity cost omission, situation about calculating more, effectively avoid confusion.
Detailed description of the invention:
Below in conjunction with embodiment, the invention will be further described.
A kind of step price charge system being applied to power consumer end, calculates unit, gradient electric energy tariff unit, identifying unit and disbursement and sattlement unit, wherein including acquisition module, year stepping coulant meter:
Acquisition module, the electric energy meter code in the electricity consumption time of collection power consumer and this electricity consumption time;
Year, unit calculated by stepping coulant meter, and storage has the cancellation information of user and frequency of checking meter, and according to cancellation information and frequency calculating actual electricity consumption moon number of checking meter, then calculated stepping electricity;
Gradient electric energy tariff unit, storage has year ladder electricity and an electricity price;
Identifying unit, determine the upper month to date power consumption of user, of that month electricity and gradient electric energy tariff unit year ladder electricity size, determine that what user answered alternating current amount falls into stepping;
Disbursement and sattlement unit, answers the stepping of alternating current amount according to user, transfers the electricity price of gradient electric energy tariff unit, and the of that month electricity charge of user are calculated and be shown.
Electric energy meter code is obtained by long-distance meter-reading system.
A kind of step price charging method being applied to power consumer end, comprises the following steps:
(1) the electric energy meter code in electricity consumption time of power consumer and this electricity consumption time is gathered;
(2) record the cancellation information of user and frequency of checking meter, according to cancellation information and frequency calculating actual electricity consumption moon number of checking meter, then calculate stepping electricity;
(3) a year ladder electricity and point step price of user is determined;
(4) determine the upper month to date power consumption of user, of that month electricity and gradient electric energy tariff unit year ladder electricity size, determine that what user answered alternating current amount falls into stepping;
(5) answer the stepping of alternating current amount according to user, transfer the electricity price of gradient electric energy tariff unit, the of that month electricity charge of user are calculated and be shown.
In step (1), when power consumer occurs that tenant changes, redefine electricity consumption input time and table code.
In step (2), when frequency of checking meter is bimonthly checking meter and time the time of checking meter is the odd number moon, user the actual electricity consumption moon number computational methods be: N=m+1+x, wherein, N is actual electricity consumption moon number, and m is cancellation month, takes-1 or 0, coefficient x:, before check meter example day or the day of freezing, numerical value takes " 0 " to tear table day (old family of transferring ownership, adjust old valency, change class old valency part) open;Check meter example day or the day of freezing and after, numerical value takes " 1 ".In step (2), be this month of checking meter when the cancellation date, and be later than when checking meter example day, m=-1, be positioned at non-check meter month time, m=0.
In step (2), when frequency of checking meter is bimonthly checking meter and time the time of checking meter is the even number moon, user the actual electricity consumption moon number computational methods be: N=m+x, wherein, N is actual electricity consumption moon number, and m is cancellation month, takes-1 or 0, and x is to share electricity moon number after cancellation.
In step (2), the computational methods of stepping electricity include two grades, first grade of stepping electricity=a*N, and second works as stepping electricity=b*N, and wherein, N is actual electricity consumption moon number, and a, b are specified stepping power, and b > a.
In step (3), execution existing electricity stepping standard and electricity price standard according to local Utilities Electric Co. determine year ladder electricity and point step price.
In step (4), concrete grammar includes:
(4-1) the affiliated electricity stepping scope by upper month to date power consumption is determined;
(4-2) of that month electricity and the described electricity stepping scope by upper month to date power consumption sum are determined;
(4-3) according to the upper limit and the of that month electricity of stepping, the of that month electricity charge are determined according to every grade of electric standard.
Concrete, in described step (4), if the upper month to date power consumption of cut-off < year first grade of electric standard, and month to date power consumption in of that month electricity+cut-off≤year first grade electric standard, the electricity charge in this month=this month first grade of electricity charge standard univalent of electricity *.
If < the year first grade of electric standard of month to date power consumption in cut-off, and first grade of electric standard of year < the upper month to date power consumption of of that month electricity+cut-off≤year second gear electric standard, this month the electricity charge=(month to date power consumption in first grade of electric standard-cut-off of year) × first grade of electricity charge standard univalent+[electricity-(month to date power consumption in first grade of electric standard-cut-off of year) in this month] × second gear electricity charge standard univalent.
If<the year first grade of electric standard of month to date power consumption in cut-off, and the of that month upper month to date power consumption of electricity+cut-off>year second gear electric standard time, this month the electricity charge=(month to date power consumption in first grade of electric standard-cut-off of year) × first grade electricity charge standard univalent+(year second gear electric standard-year first grade electric standard) × second gear electricity charge standard univalent+[electricity-(year second gear electric standard-cut-off on month to date power consumption) in this month] × third gear electricity charge standard univalent.
If month to date power consumption in cut-off>=year first grade electric standard, and first grade of electric standard of year<month to date power consumption in of that month electricity+cut-off≤year second gear electric standard, then: the electricity charge in this month=this month electricity × second gear electricity charge standard univalent.
If<the year second gear electric standard of month to date power consumption in first grade of electric standard≤cut-off of year, the upper month to date power consumption of of that month electricity+cut-off>=year second gear electric standard, then: the electricity charge in this month=(year second gear electric standard-cut-off on month to date power consumption) × second gear electricity charge standard univalent+[electricity-(year second gear electric standard-cut-off on month to date power consumption) in this month] × third gear electricity charge standard univalent.
If month to date power consumption in cut-off >=year second gear electric standard, and month to date power consumption in of that month electricity+cut-off > year second gear electric standard, then the electricity charge in this month=this month electricity × third gear electricity charge standard univalent.
Embodiment one:
Special circumstances such as residential customers transfer electricity charge computation paradigm
Certain " Every household has an ammeter " resident, multiplying power is 1, and Dan Yue checks meter, and example of checking meter day is 7.Total registration of checking meter on August 7th, 2012 is 1000, has counted and has added up ladder clearing electricity 530 kilowatt hour year, and within 2012, JIUYUE handles transfer transaction on 2nd, will be undertaken the electricity charge by new family after transfer, and transfer registration of checking meter the same day is 1600.(electricity price standard is shown in Table 1) should be paid tariff before calculating the transfer of this family.
(1) year stepping coulant meter is calculated
Owing to transfer day is 2, check meter example day (7 days) in the past, coefficient x value of checking meter, take 0;
The actual electricity consumption moon number=9-6+0=3;
Year first grade of electric standard=210 × 3=630 kilowatt hour;
Year second gear electric standard=400 × 3=1200 kilowatt hour;
(2) moon electricity charge calculate
It is to calculate the electricity charge according to ladder electricity stepping half a year because adding up ladder clearing power consumption 530 kilowatt hour year, correspondence collects charges for electricity=530 × 0.5469=289.86 unit;
Calculate by practical month during transfer and recalculate a year stepping electricity, carry out electricity charge clearance.
Add up electricity=530+ (1600-1000) × 1=1130 kilowatt hour this year
This month residential electricity consumption should collect charges for electricity=630 × 0.5469+ (1130-630) × 0.5969-289.86=353.14 unit.
The computing function of ladder electricity
" Every household has an ammeter " residential customers cycle of checking meter normally pays the electricity charge by Utilities Electric Co., year power consumption 2520 kilowatt hour and perform 0.5469 yuan/kilowatt hour of current electricity price with lower part;2520-4800 kilowatt hour part performs second gear electricity price markup standard, is 0.5969 yuan/kilowatt hour;Perform third gear electricity price markup standard more than 4800 kilowatt hour parts, be 0.8469 yuan/kilowatt hour.Input year ladder electricity and electricity price in systems, as shown in table 1:
Table 1
1) if:
< the year first grade of electric standard of month to date power consumption in cut-off;
Month to date power consumption in of that month electricity+cut-off≤year first grade electric standard;
Then:
The of that month electricity charge=this month electricity × 0.5469 yuan/kilowatt.
2) if:
< the year first grade of electric standard of month to date power consumption in cut-off;
Year first grade electric standard < month to date power consumption in of that month electricity+cut-off≤year second gear electric standard;
Then:
The of that month electricity charge=(month to date power consumption in first grade of electric standard-cut-off of year) × 0.5469 yuan/kilowatt hour+[of that month electricity-(month to date power consumption in first grade of electric standard-cut-off of year)] × 0.5969 yuan/kilowatt hour.
3) if:
< the year first grade of electric standard of month to date power consumption in cut-off;
Month to date power consumption in of that month electricity+cut-off > year second gear electric standard;
Then:
The of that month electricity charge=(month to date power consumption in first grade of electric standard-cut-off of year) × 0.5469 yuan/kilowatt hour+(year second gear electric standard-year first grade electric standard) × 0.5969 yuan/kilowatt hour+[electricity-(year second gear electric standard-cut-off on month to date power consumption) in this month] × 0.8469 yuan/kilowatt hour.
4) if:
Month to date power consumption in cut-off >=year first grade electric standard;
Year first grade electric standard < month to date power consumption in of that month electricity+cut-off≤year second gear electric standard;
Then:
The of that month electricity charge=this month electricity × 0.5969 yuan/kilowatt.
5) if:
< the year second gear electric standard of month to date power consumption in year first grade of electric standard≤cut-off
Month to date power consumption in of that month electricity+cut-off >=year second gear electric standard
Then:
The of that month electricity charge=(year second gear electric standard-cut-off on month to date power consumption) × 0.5969 yuan/kilowatt hour+[electricity-(year second gear electric standard-cut-off on month to date power consumption) in this month] × 0.8469 yuan/kilowatt hour.
6) if:
Month to date power consumption in cut-off >=year second gear electric standard;
Month to date power consumption in of that month electricity+cut-off > year second gear electric standard;
Then: the of that month electricity charge=this month electricity × 0.8469 yuan/kilowatt hour.
Embodiment one:
1. normal year Dan Yue check meter resident's electricity charge calculate
Assuming that party A-subscriber is " Every household has an ammeter " resident, the cycle of checking meter is that Dan Yue checks meter, and performs step price, and monthly electricity is 450 kilowatt hours, year power consumption 5400 kilowatt hour, calculate and monthly should pay tariff in this client year.
1.1.1.1 (1) year stepping coulant meter is calculated
Year first grade of electric standard=210 kilowatt hour × 12=2520 kilowatt hour;
Year second gear electric standard=400 kilowatt hour × 12=4800 kilowatt hour.
1.1.1.2 (2) moon electricity charge calculate
January: 450 kilowatt hour × 0.5469 yuan/kilowatt hour=246.11 yuan;
February: 450 kilowatt hour × 0.5469 yuan/kilowatt hour=246.11 yuan;
March: 450 kilowatt hour × 0.5469 yuan/kilowatt hour=246.11 yuan;
April: 450 kilowatt hour × 0.5469 yuan/kilowatt hour=246.11 yuan;
May: 450 kilowatt hour × 0.5469 yuan/kilowatt hour=246.11 yuan;
June: this month 450 kilowatt hour adds 5 month to date electricity (2250 kilowatt hour) of going forward and adds up to 2700 kilowatt hours, more than first grade of electricity (210*12=2520 kilowatt hour) of year.Then:
First grade of electricity charge: (2520-2250) × 0.5469 yuan/kilowatt hour=147.66 yuan;
The second gear electricity charge: (2700-2520) × 0.5969 yuan/kilowatt hour=107.44 yuan;
The total electricity charge: 147.66 yuan+107.44 yuan=255.10 yuan.
July: 450 kilowatt hour × 0.5969 yuan/kilowatt hour=268.61 yuan;
August: 450 kilowatt hour × 0.5969 yuan/kilowatt hour=268.61 yuan;
JIUYUE: 450 kilowatt hour × 0.5969 yuan/kilowatt hour=268.61 yuan;
October: 450 kilowatt hour × 0.5969 yuan/kilowatt hour=268.61 yuan;
November: this month 450 kilowatt hour adds 10 month to date electricity (4500 kilowatt hour) of going forward and adds up to 4950 kilowatt hours, more than year second gear electricity (400*12=4800 kilowatt hour).Then:
The second gear electricity charge: (4800-4500) × 0.5969 yuan/kilowatt hour=179.07 yuan;
The third gear electricity charge: (4950-4800) × 0.8469 yuan/kilowatt hour=127.04 yuan;
Add up to the electricity charge: 179.07+127.04=306.11 unit;
December: 450 kilowatt hour × 0.8469 yuan/kilowatt hour=381.11 yuan.
2. normal year bimonthly (the even number moon) resident's electricity charge computation paradigm of checking meter
Assuming that party B-subscriber is bimonthly " Every household has an ammeter " resident checked meter, within two months, copies and see that total electricity is 900 kilowatt hours, annual electricity 5400 kilowatt hour, calculate and should pay tariff in this client year.(electricity price standard is shown in Table 2)
(1) year stepping coulant meter is calculated
Year first grade of electric standard=210 kilowatt hour × 12=2520 kilowatt hour;
Year second gear electric standard=400 kilowatt hour × 12=4800 kilowatt hour.
(2) moon electricity charge calculate
February: 900 kilowatt hour × 0.5469 yuan/kilowatt hour=492.21 yuan;
April: 900 kilowatt hour × 0.5469 yuan/kilowatt hour=492.21 yuan;
In June: copy and see electricity 900 kilowatt hour, add 4 month to date electricity (1800 kilowatt hour) of going forward and add up to 2700 kilowatt hours, more than first grade of electricity (210*12=2520 kilowatt hour) of year.Then:
First grade of electricity charge: (2520-1800) × 0.5469 yuan/kilowatt hour=393.77 yuan;
The second gear electricity charge: (2700-2520) × 0.5969 yuan/kilowatt hour=107.44 yuan;
The total electricity charge: 393.77 yuan+107.44 yuan=501.21 yuan;
August: 900 kilowatt hour × 0.5969 yuan/kilowatt hour=537.21 yuan;
October: 900 kilowatt hour × 0.5969 yuan/kilowatt hour=537.21 yuan.
December: copy and see that electricity 900 kilowatt hour adds 10 month to date electricity (4500 kilowatt hour) of going forward and adds up to 5400 kilowatt hours, more than year second gear electricity (400*12=4800 kilowatt hour).Then:
The second gear electricity charge: (4800-4500) × 0.5969 yuan/kilowatt hour=179.07 yuan;
The third gear electricity charge: (5400-4800) × 0.8469 yuan/kilowatt hour=508.14 yuan;
Add up to the electricity charge: 179.07+508.14=687.21 unit.
Although the above-mentioned detailed description of the invention to the present invention is described; but not limiting the scope of the invention; one of ordinary skill in the art should be understood that; on the basis of technical scheme, those skilled in the art need not to pay various amendments or deformation that creative work can make still within protection scope of the present invention.

Claims (10)

1. be applied to a step price charge system for power consumer end, it is characterized in that: include acquisition module, Year stepping coulant meter calculation unit, gradient electric energy tariff unit, identifying unit and disbursement and sattlement unit, wherein:
Described acquisition module, the electric energy meter code in the electricity consumption time of collection power consumer and this electricity consumption time;
Described year stepping coulant meter calculation unit, storage has the cancellation information of user and frequency of checking meter, believes according to cancellation Breath and frequency calculating actual electricity consumption moon number of checking meter, calculate stepping electricity then;
Described gradient electric energy tariff unit, storage has year ladder electricity and an electricity price;
Described identifying unit, determines the upper month to date power consumption of user, of that month electricity and gradient electric energy tariff unit Year ladder electricity size, determine that what user answered alternating current amount falls into stepping;
Described disbursement and sattlement unit, answers the stepping of alternating current amount according to user, transfers the electricity of gradient electric energy tariff unit Valency, is calculated and be shown the of that month electricity charge of user.
A kind of step price charge system being applied to power consumer end, it is special Levy and be: described electric energy meter code is obtained by long-distance meter-reading system.
3. it is applied to a step price charging method for power consumer end, it is characterized in that: comprise the following steps:
(1) the electric energy meter code in electricity consumption time of power consumer and this electricity consumption time is gathered;
(2) record the cancellation information of user and frequency of checking meter, calculate reality according to cancellation information and frequency of checking meter The electricity consumption moon number, then calculate stepping electricity;
(3) a year ladder electricity and point step price of user is determined;
(4) the year ladder of the upper month to date power consumption of user, of that month electricity and gradient electric energy tariff unit is determined The size of electricity, determines that what user answered alternating current amount falls into stepping;
(5) answer the stepping of alternating current amount according to user, transfer the electricity price of gradient electric energy tariff unit, calculate and show Show the of that month electricity charge of user.
A kind of step price charging method being applied to power consumer end, it is special Levy and be: in described step (1), when power consumer occurs that tenant changes, redefine electricity consumption input time With table code.
A kind of step price charging method being applied to power consumer end, it is special Levy and be: in described step (2), when frequency of checking meter is bimonthly checking meter and time the time of checking meter is the odd number moon, user The actual electricity consumption moon number computational methods be: N=m+1+x, wherein, N is actual electricity consumption moon number, and m is pin In family month, taking-1 or 0, x is coefficient of checking meter.
In described step (2), it is this month of checking meter when the cancellation date, and is later than when checking meter example day, m=-1, position In non-check meter month time, m=0.
A kind of step price charging method being applied to power consumer end, it is special Levy and be: in described step (2), when frequency of checking meter is bimonthly checking meter and time the time of checking meter is the even number moon, user The actual electricity consumption moon number computational methods be: N=m+x, wherein, N is actual electricity consumption moon number, and m is cancellation In month, taking-1 or 0, x is shared electricity moon number after cancellation.
A kind of step price charging method being applied to power consumer end, it is special Levying and be: in described step (2), the computational methods of stepping electricity include two grades, first grade of stepping electricity=a*N, Second works as stepping electricity=b*N, and wherein, N is actual electricity consumption moon number, and a, b are specified stepping power, and b > a.
A kind of step price charging method being applied to power consumer end, it is special Levy and be: in described step (3), according to execution existing electricity stepping standard and the electricity price mark of local Utilities Electric Co. Accurately determine year ladder electricity and point step price.
A kind of step price charging method being applied to power consumer end, it is special Levy and be: in described step (4), concrete grammar includes:
(4-1) the affiliated electricity stepping scope by upper month to date power consumption is determined;
(4-2) of that month electricity and the described electricity stepping scope by upper month to date power consumption sum are determined;
(4-3) according to the upper limit and the of that month electricity of stepping, the of that month electricity charge are determined according to every grade of electric standard.
A kind of step price charging method being applied to power consumer end, it is special Levy and be: in described step (4), if the upper month to date power consumption of cut-off < year first grade of electric standard, and of that month Month to date power consumption in electricity+cut-off≤year first grade electric standard, the of that month electricity charge=this month first grade of electricity of electricity * Take standard univalent.
CN201610222098.4A 2016-04-11 2016-04-11 System and method of charging step tariff applied to power user end Pending CN105891574A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610222098.4A CN105891574A (en) 2016-04-11 2016-04-11 System and method of charging step tariff applied to power user end

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610222098.4A CN105891574A (en) 2016-04-11 2016-04-11 System and method of charging step tariff applied to power user end

Publications (1)

Publication Number Publication Date
CN105891574A true CN105891574A (en) 2016-08-24

Family

ID=57012887

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610222098.4A Pending CN105891574A (en) 2016-04-11 2016-04-11 System and method of charging step tariff applied to power user end

Country Status (1)

Country Link
CN (1) CN105891574A (en)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106771451A (en) * 2016-11-18 2017-05-31 国网山东省电力公司济南供电公司 A kind of new residential customers Intelligent electricity consumption management terminal
CN108416926A (en) * 2018-03-08 2018-08-17 万帮充电设备有限公司 The charging method and device of charging pile
CN108918935A (en) * 2018-06-21 2018-11-30 王开全 A kind of ladder unit price dynamic multi-user control water electric energy meter
CN109064235A (en) * 2018-08-28 2018-12-21 广东电网有限责任公司 The generation method and device of power generation subsidy notification sheet
CN109166245A (en) * 2018-08-17 2019-01-08 云丁智能科技(北京)有限公司 The method and device of the electricity charge amount of money is calculated based on step price
CN109389523A (en) * 2018-10-30 2019-02-26 保定市新大长远民益购售电有限公司 A kind of management method and system of smart grid
CN111192085A (en) * 2019-12-28 2020-05-22 杭州好育信息科技有限公司 Paid price calculation method and device, electronic equipment and computer storage medium
CN112328647A (en) * 2020-09-17 2021-02-05 北京来也网络科技有限公司 RPA and AI combined intelligent power grid stepped electricity price notification method and device
CN112669064A (en) * 2020-12-24 2021-04-16 新疆友通电子科技有限公司 Electric power marketing service management system based on internet of things technology
CN113408847A (en) * 2021-05-10 2021-09-17 国网浙江省电力有限公司杭州供电公司 Electric quantity distribution method and device combining electric power use condition and user credit
CN115018448A (en) * 2022-05-13 2022-09-06 国网河北省电力有限公司保定供电分公司 Price difference calculation method and system for electricity price classification
CN115512488A (en) * 2022-11-24 2022-12-23 国网江苏省电力有限公司营销服务中心 Time-sharing electric charge calculation method and device based on flexible rate electric energy meter
CN116894156A (en) * 2023-09-08 2023-10-17 北京煜邦电力技术股份有限公司 MCMC algorithm-based power acquisition terminal data preprocessing method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201251814Y (en) * 2008-09-12 2009-06-03 北京博纳电气有限公司 Staircase prepaid electric energy meter
CN201369071Y (en) * 2009-02-10 2009-12-23 宁夏隆基宁光仪表有限公司 Electronic step price prepaid energy meter
CN102591276A (en) * 2012-01-18 2012-07-18 山东工商学院 Intelligent electric meter system for residents for intelligent smart grid
CN103490880A (en) * 2013-10-07 2014-01-01 西安电子科技大学 Power counting and charging method with private protection function in intelligent power grid
CN103543309A (en) * 2012-07-16 2014-01-29 青岛海尔空调电子有限公司 Method and device for reminding user of electricity consumption
CN103792422A (en) * 2012-11-02 2014-05-14 苏州工业园区新宏博通讯科技有限公司 Electric energy meter

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201251814Y (en) * 2008-09-12 2009-06-03 北京博纳电气有限公司 Staircase prepaid electric energy meter
CN201369071Y (en) * 2009-02-10 2009-12-23 宁夏隆基宁光仪表有限公司 Electronic step price prepaid energy meter
CN102591276A (en) * 2012-01-18 2012-07-18 山东工商学院 Intelligent electric meter system for residents for intelligent smart grid
CN103543309A (en) * 2012-07-16 2014-01-29 青岛海尔空调电子有限公司 Method and device for reminding user of electricity consumption
CN103792422A (en) * 2012-11-02 2014-05-14 苏州工业园区新宏博通讯科技有限公司 Electric energy meter
CN103490880A (en) * 2013-10-07 2014-01-01 西安电子科技大学 Power counting and charging method with private protection function in intelligent power grid

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
HU62633652: "浙江省居民阶梯电价政策调整须知", 《百度文库》 *

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106771451A (en) * 2016-11-18 2017-05-31 国网山东省电力公司济南供电公司 A kind of new residential customers Intelligent electricity consumption management terminal
CN108416926A (en) * 2018-03-08 2018-08-17 万帮充电设备有限公司 The charging method and device of charging pile
CN108918935A (en) * 2018-06-21 2018-11-30 王开全 A kind of ladder unit price dynamic multi-user control water electric energy meter
CN109166245A (en) * 2018-08-17 2019-01-08 云丁智能科技(北京)有限公司 The method and device of the electricity charge amount of money is calculated based on step price
CN109064235A (en) * 2018-08-28 2018-12-21 广东电网有限责任公司 The generation method and device of power generation subsidy notification sheet
CN109389523A (en) * 2018-10-30 2019-02-26 保定市新大长远民益购售电有限公司 A kind of management method and system of smart grid
CN111192085A (en) * 2019-12-28 2020-05-22 杭州好育信息科技有限公司 Paid price calculation method and device, electronic equipment and computer storage medium
CN112328647A (en) * 2020-09-17 2021-02-05 北京来也网络科技有限公司 RPA and AI combined intelligent power grid stepped electricity price notification method and device
CN112669064A (en) * 2020-12-24 2021-04-16 新疆友通电子科技有限公司 Electric power marketing service management system based on internet of things technology
CN113408847A (en) * 2021-05-10 2021-09-17 国网浙江省电力有限公司杭州供电公司 Electric quantity distribution method and device combining electric power use condition and user credit
CN113408847B (en) * 2021-05-10 2024-02-06 国网浙江省电力有限公司杭州供电公司 Electric quantity distribution method and device combining power use condition and user credit
CN115018448A (en) * 2022-05-13 2022-09-06 国网河北省电力有限公司保定供电分公司 Price difference calculation method and system for electricity price classification
CN115512488A (en) * 2022-11-24 2022-12-23 国网江苏省电力有限公司营销服务中心 Time-sharing electric charge calculation method and device based on flexible rate electric energy meter
CN115512488B (en) * 2022-11-24 2023-04-28 国网江苏省电力有限公司营销服务中心 Time-sharing electricity charge calculation method and device based on flexible rate electric energy meter
CN116894156A (en) * 2023-09-08 2023-10-17 北京煜邦电力技术股份有限公司 MCMC algorithm-based power acquisition terminal data preprocessing method
CN116894156B (en) * 2023-09-08 2023-12-26 北京煜邦电力技术股份有限公司 MCMC algorithm-based power acquisition terminal data preprocessing method

Similar Documents

Publication Publication Date Title
CN105891574A (en) System and method of charging step tariff applied to power user end
US20080091625A1 (en) Billing and payment methods and systems enabling consumer premises equipment
US20080091626A1 (en) Systems, methods and financial instruments for renewable energy consumer premises equipment financing
US20080091590A1 (en) Methods, systems and financial instruments for financing renewable energy consumer premises equipment
US20080091581A1 (en) Systems and methods of reducing financing costs for renewable energy consumer premises equipment
US20080091580A1 (en) Methods for cost reduction and underwriting considerations for financing renewable energy consumer premises equipment (CPE)
CN104899978B (en) Based on the resident&#39;s day electricity charge charging method and system for taking control technology
US20130268311A1 (en) System and Method for Identifying and Upgrading a Transmission Grid
KR20140098369A (en) Apparatus and method for managing real time pricing using smp(system marginal price) of cbp(cost based pool)
JP2012205432A (en) Load estimation method and load estimation system for transformer
CN109685993B (en) Accounting management method for power consumption of charging pile
Chung et al. Transmission reliability cost allocation method based on market participants’ reliability contribution factors
JP7161574B2 (en) Solar power system
CN114820232A (en) Regional energy user electricity charge accounting method, system, computing device and storage medium
Bompard et al. Reactive load modeling impacts on nodal prices in pool model electricity markets
Bresler et al. Smarter demand response in RTO markets: The evolution toward price responsive demand in PJM
Peters Transmission service outside of ISO footprints: inefficient spot prices, illiquid secondary markets and misguided planning
Kubert et al. State Support for Clean Energy Deployment: Lessons Learned for Potential Future Policy
JP4102017B2 (en) Billing system
Cazalet Transactional energy market information exchange (TeMIX)
JP6117529B2 (en) Electricity trading system
CN104346660A (en) Automatic charging calculation method based on contract management
Price et al. Understanding Your Utility Bills: Electricity
Benshoff et al. Retail Net Metering: It's Time to Get It Right for All Customers
Hazelton WC/WDM cost recovery: budgets, tariff design, reading meters, billing and non-recovered revenue reduction

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20160824