CN105888198A - 管道井管道安装结构 - Google Patents

管道井管道安装结构 Download PDF

Info

Publication number
CN105888198A
CN105888198A CN201510009177.2A CN201510009177A CN105888198A CN 105888198 A CN105888198 A CN 105888198A CN 201510009177 A CN201510009177 A CN 201510009177A CN 105888198 A CN105888198 A CN 105888198A
Authority
CN
China
Prior art keywords
building
pipeline
pedestal
piping shaft
height
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510009177.2A
Other languages
English (en)
Inventor
虞和登
胡小川
苏天成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
DALI CONSTRUCTION GROUP Co Ltd
Hangzhou Xing Yao Construction Group Co Ltd
HUAHENG CONSTRUCTION GROUP CO Ltd
Original Assignee
DALI CONSTRUCTION GROUP Co Ltd
Hangzhou Xing Yao Construction Group Co Ltd
HUAHENG CONSTRUCTION GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by DALI CONSTRUCTION GROUP Co Ltd, Hangzhou Xing Yao Construction Group Co Ltd, HUAHENG CONSTRUCTION GROUP CO Ltd filed Critical DALI CONSTRUCTION GROUP Co Ltd
Priority to CN201510009177.2A priority Critical patent/CN105888198A/zh
Publication of CN105888198A publication Critical patent/CN105888198A/zh
Pending legal-status Critical Current

Links

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

本发明涉及一种建筑管道安装结构,尤其是涉及一种管道井管道安装结构。在建筑物施工尚未结束前,管道井并未封顶,利用吊塔将管道吊入管道井内,吊塔的高度对应建筑物的高度,建筑物在建造过程中高度增高,吊塔的高度相同增高。本发明具有结构简单,施工成本较低,安全隐患较小,安装工期较短,管道安装长度受限较小,安装效率较好等特点。

Description

管道井管道安装结构
技术领域
本发明涉及一种建筑管道安装结构,尤其是涉及一种管道井管道安装结构。
背景技术
现代建筑物中,很多管道安装在管道井中,管道井深度较大,截面空间又较为狭窄,管道井内的管道安装需要花费较多的人力和物力。传统建筑物中的管道井管道安装方法由卷扬机作为提升机械,在建筑物施工完成后,将管道先分成可安装入管道井的长度,然后运至地下室的管道井下方,在管道井顶部设置吊钩,将管道拉拽上升后安装。该安装方式有三个缺点,需要花费大量人力物力将管道运输到地下室,需要预留相应的工程,需要在管道井上安装临时提升机械,设临时固定点,拉临时用电线路,安装完成后需要拆除设备,而卷扬机的制动性能稳定性较差,长时间的垂直作业有较大的安全隐患。
发明内容
本发明主要是针对现有技术所存在的安全隐患较大,安装工期较长,管道安装长度受限较大,安装效率较差等的技术问题,提供一种结构简单,施工成本较低,安全隐患较小,安装工期较短,管道安装长度受限较小,安装效率较好的管道井管道安装结构。
本发明的上述技术问题主要是通过下述技术方案得以解决的:在建筑物施工尚未结束前,管道井并未封顶,利用吊塔将管道吊入管道井内,建筑物由地下层和地面上的若干层组成,管道安装在建筑物的管道井内,建筑物中设置有管道井,建筑物外设置有吊塔,建筑物中的每个楼层之间设置有基座,基座固定在管道井上,基座成圆饼状,由两个相同的半圆饼拼装组成,基座上设置有吊装孔,基座外设置有卡锁,吊塔将管道吊装***基座内。吊塔的高度对应建筑物的高度,建筑物在建造过程中高度增高,吊塔的高度相同增高。
当建筑物施工每增加一层即可将管道吊入每一层的管道井中,减少吊塔在高空作业的时间,同时,由于管道由上自下的吊入安装,不受空间影响,无需将每段管道长度减小,同时在基座上的吊装孔可保证管道在吊装入建筑物后的垂直度,吊装完成后,松开基座外的卡锁,基座可方便拆除。
因此,本发明具有结构简单,施工成本较低,安全隐患较小,安装工期较短,管道安装长度受限较小,安装效率较好等特点。
附图说明
附图1是本发明的整体结构示意图;
附图2是本发明的基座结构示意图。
具体实施方式
下面通过实施例,并结合附图,对本发明的技术方案作进一步具体的说明。
实施例1:建筑物4由地下层和地面上的三层组成,建筑物4中设置有一个管道井5,建筑物4外设置有一个吊塔6,建筑物4中的每个楼层之间设置有一个基座1,基座1固定在管道井5上,基座1成圆饼状,由两个相同的半圆饼拼装组成,基座1上设置有三个吊装孔2,吊装孔2沿着拼装线排列,基座1外设置有卡锁3,吊塔6将管道7吊装***基座1内的吊装孔2中,吊装完成后,打开卡锁3,拆除基座1(如图1和2所示)。
建筑物4的高度为三层楼高,吊塔6的高度为五层楼高,当建筑物4的建造高度升到四层楼高时,吊塔6的高度为六层楼高。

Claims (2)

1.一种管道井管道安装结构,建筑物由地下层和地面上的若干层组成,管道安装在建筑物的管道井内,其特征在于所述建筑物(4)中设置有管道井(5),建筑物(4)外设置有吊塔(6),建筑物(4)中的每个楼层之间设置有基座(1),基座(1)固定在管道井(5)上,基座(1)成圆饼状,由两个相同的半圆饼拼装组成,基座(1)上设置有吊装孔(2),基座(1)外设置有卡锁(3),吊塔(6)将管道(7)吊装***基座(1)内。
2.根据权利要求1所述的管道井管道安装结构,其特征在于所述吊塔(6)的高度对应建筑物(4)的高度,建筑物(4)在建造过程中高度增高,吊塔(6)的高度相同增高。
CN201510009177.2A 2015-01-02 2015-01-02 管道井管道安装结构 Pending CN105888198A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510009177.2A CN105888198A (zh) 2015-01-02 2015-01-02 管道井管道安装结构

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510009177.2A CN105888198A (zh) 2015-01-02 2015-01-02 管道井管道安装结构

Publications (1)

Publication Number Publication Date
CN105888198A true CN105888198A (zh) 2016-08-24

Family

ID=56999295

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510009177.2A Pending CN105888198A (zh) 2015-01-02 2015-01-02 管道井管道安装结构

Country Status (1)

Country Link
CN (1) CN105888198A (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110107737A (zh) * 2019-05-10 2019-08-09 中国建筑第八工程局有限公司 与地下室连通的管井用的管道安装方法及其安装装置
CN113137033A (zh) * 2021-04-06 2021-07-20 北京中科中电电力工程管理有限公司 一种电力管井及其施工工艺

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0762884A (ja) * 1993-08-31 1995-03-07 Mitsui Eng & Shipbuild Co Ltd 建物のプレハブ型シャフトユニット
JP2000230272A (ja) * 1999-02-10 2000-08-22 Mk:Kk 建物の水廻り室先組み立て施工法
CN103243926A (zh) * 2013-05-13 2013-08-14 中建五局第三建设有限公司 高层建筑工程管井立管吊装的施工方法
CN103603504A (zh) * 2013-11-26 2014-02-26 中建二局第三建筑工程有限公司 超高层建筑机电大口径立管随主体进度吊装施工的方法
CN103692195A (zh) * 2013-12-20 2014-04-02 中国五冶集团有限公司 一种管道安装方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0762884A (ja) * 1993-08-31 1995-03-07 Mitsui Eng & Shipbuild Co Ltd 建物のプレハブ型シャフトユニット
JP2000230272A (ja) * 1999-02-10 2000-08-22 Mk:Kk 建物の水廻り室先組み立て施工法
CN103243926A (zh) * 2013-05-13 2013-08-14 中建五局第三建设有限公司 高层建筑工程管井立管吊装的施工方法
CN103603504A (zh) * 2013-11-26 2014-02-26 中建二局第三建筑工程有限公司 超高层建筑机电大口径立管随主体进度吊装施工的方法
CN103692195A (zh) * 2013-12-20 2014-04-02 中国五冶集团有限公司 一种管道安装方法

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110107737A (zh) * 2019-05-10 2019-08-09 中国建筑第八工程局有限公司 与地下室连通的管井用的管道安装方法及其安装装置
CN113137033A (zh) * 2021-04-06 2021-07-20 北京中科中电电力工程管理有限公司 一种电力管井及其施工工艺

Similar Documents

Publication Publication Date Title
CN203064994U (zh) 一种用于拆除负环管片的吊装装置
CN204899238U (zh) 一种单元式幕墙板块吊装装置
CN205077878U (zh) 一种单元式幕墙板块吊装装置
CN105888198A (zh) 管道井管道安装结构
CN205637622U (zh) 垂直单元式玻璃幕墙吊装***
CN103993730B (zh) 钢煤斗对接安装施工操作台
CN104358396B (zh) 盘式脚手架立杆与固定盘分体结构
CN202220435U (zh) 逆作地下混凝土结构降模设备
CN203461720U (zh) 简易悬臂吊装机械
CN101660660B (zh) 一种煤气柜的安装方法
CN203889942U (zh) 起吊装置
CN203998724U (zh) 一种塔机用附墙拆装架
CN204435856U (zh) 一种特制钢筋混凝土滑模
CN204199691U (zh) 一种螺旋楼梯的扶手浇筑模板结构
CN203187370U (zh) 内桅杆抬吊装置
CN103121629B (zh) 地下室大型配套设备的吊装方法
CN203361662U (zh) 大型网架短距离提升装置
CN205077879U (zh) 一种单元式幕墙板块吊装装置
CN204174913U (zh) 盘式脚手架立杆与固定盘分体结构
CN202007087U (zh) 超低电动葫芦门式起重机
CN204626459U (zh) 电力电信电缆工作井
CN204199271U (zh) 一种灌注桩钢筋笼吊放固定装置
CN203903876U (zh) 便捷式埋件吊装调节装置
CN205348932U (zh) 一种新型高塔柱扶壁支撑装置
CN203067933U (zh) 吊件托板

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20160824

WD01 Invention patent application deemed withdrawn after publication