CN105888035A - Integral assembly reinforced concrete prefabricated draining inspection well - Google Patents

Integral assembly reinforced concrete prefabricated draining inspection well Download PDF

Info

Publication number
CN105888035A
CN105888035A CN201410557034.0A CN201410557034A CN105888035A CN 105888035 A CN105888035 A CN 105888035A CN 201410557034 A CN201410557034 A CN 201410557034A CN 105888035 A CN105888035 A CN 105888035A
Authority
CN
China
Prior art keywords
well
bell
spigot
inspection well
reinforced concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410557034.0A
Other languages
Chinese (zh)
Inventor
董全枝
董青山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201410557034.0A priority Critical patent/CN105888035A/en
Publication of CN105888035A publication Critical patent/CN105888035A/en
Pending legal-status Critical Current

Links

Landscapes

  • Sewage (AREA)

Abstract

The title of the invention is integral assembly reinforced concrete prefabricated draining inspection well. The invention belongs to the technical field of municipal drainage. By means of the inspection well, the problems that traditional inspection wells have poor integrity and pipeline elevation cannot be adjusted at will are solved. Assembly parts with different heights are assembled by different assembling modes to solve the problem that drain pipes cannot be totally assembled due to their different heights. Assembled by different combination modes, each inspection well can be prefabricated by reinforced concrete.

Description

The overall prefabricated drainage inspection well of assembled armored concrete
Technical field
Town road draining
Background technology
Inspection shaft is used in buried concrete drain pipeline in the range of public building district, plant area, highway etc., the depth of burying is not more than 6m, be generally located at drainage pipeline intersection, turning, caliber or gradient change, at drop etc., for the ease of make regular check on, clean and dredge or down-hole operation inspection with brick become or the well shape structures of concrete block masonry.Being mostly building block inspection shaft in the market, existing precast splice type armored concrete inspection shaft entirety imperfection, the duration is longer.
Summary of the invention
Φ 600 bell and spigot straight line right-angle tee four-way Φ 1000 circular inspection well can be made into several specification, mixes variable-diameter joint and can obtain any elevation of pipeline.Variable-diameter joint flexibly connects with precast concrete pipe, simple installation, and speed is fast.The same day lays pipeline, can backfill the same day, the reduction of erection time.Reduce cost.
Accompanying drawing explanation
Accompanying drawing has Fig. 1 to Figure 24.Fig. 1 well seat can configure straight line well, 90 ° of turning wells, three driftings, four driftings.Well lid selects the heavy ductile cast iron manhole cover of Φ 600.Well bore 690 selected by the crouch mud down-hole portion borehole wall of Fig. 2, and shaft bottom depth capacity is less than or equal to 7 meters.Fig. 3 selects various sizes of well bore assembled according to well height dimension.Fig. 4 passes through to need to select a regulation joint, is adjusted by the height specification of h and caliber reducing regulates joint adjustment and pipeline can be made to obtain any elevation.Be applicable to straight line, 90 degree, threeway, four-way inspection shaft.Fig. 5 is discrepancy in elevation bell and spigot well seat.Straight line, 90 °, threeway, four drifting seat bottom plate arrangements of reinforcement are with reference to Fig. 6.Fig. 7 arrangement of reinforcement is shown in Figure 10.Fig. 8 is unidirectional 600 bell and spigots of well bore.Fig. 9 is well bore arrangement of reinforcement.Figure 10 is well seat arrangement of reinforcement.Figure 11 is well bore 170 and well bore 90 size arrangement of reinforcement.Figure 12 is that part built by laying bricks or stones by C40 concrete brick.Figure 13 is well head arrangement of reinforcement.Figure 14 is 300,400,500 bell and spigot plane graph and sectional drawings.Figure 16 is 600 bell and spigot right angles, threeway, four-way inspection shaft base plane figure and elevation.Figure 15, Figure 20 well bore reinforcing bar ΦR5;Baseplate reinforcing barΦ8.Figure 15, Figure 17, Figure 18, Figure 19 be straight line, 90 °, threeway, four-way inspection shaft well seat arrangement of reinforcement.Bell and spigot oral area arrangement of reinforcement is with reference to Figure 20.Figure 21 is bell and spigot size table.Figure 22, Figure 23 variable-diameter joint protective layer 35mm, 25mm inside thinnest part;Outside 20mm.Spiral bar ΦR5, front two circle tightly around, 3 circle@30 of postponing, rear a few [email protected] bell and spigot size of Figure 24 is with reference to Figure 21.
Detailed description of the invention
Factorial praluction, in-site installation.The thick particle diameter in 10 centimeters of inspection shaft base plate lower berth is less than 10mm aggregate.As required can assembled 300-600 prefabricated reinforced concrete pipe, can be selected for any variable-diameter joint and install, a kind of caliber of choosing connects.The well bore part of different size can be installed in well seat top.Bell and spigot uses rubber ring V-type and O type.May select the assembly of prefabricated two-way linear 300 bell and spigot well bore at receipts water pipe or C40 concrete brick is built by laying bricks or stones.Build more convenient dirt by laying bricks or stones to roll.Mark time bar diameter 16mm, wide 150mm, exposes 100mm, horizontal positioned, bends, vertically anchor 150mm in the borehole wall.
Using 100 years, concrete uses C40.Seepage-resistant grade is S8.Reinforcing bar uses CRB550, HPB300.Cover to reinforcement 35mm;Bell and spigot end reinforcing bar 20mm.Mortar uses M15.
Inspection shaft each part dimension deviation is fit dimension deviation+0.5mm to-0.5mm;Non-fit dimension+2 is to-1.
Assembly form is shown in accompanying drawing 1, Fig. 2, Fig. 3, Fig. 4, and variable-diameter joint is installed and seen accompanying drawing 5.

Claims (9)

1. the overall overall dimensions of whole components of the prefabricated drainage inspection well of assembled armored concrete, manufacturing process, reinforcement manner.
2. well seat, shaft bottom, gutter channel, bell and spigot are compact completely.
3. well bore and bell and spigot reinforcement manner.
4. realize regulating elevation with variable-diameter joint.
5. well head is overall.
6. discrepancy in elevation bell and spigot well seat (straight line, 90 °, threeway, four-way) overall.
7.300,400,500,600 straight line bell and spigot well seat.
8. build geomery and the structure of the brick of use by laying bricks or stones.
9. the anchorage style marked time.
CN201410557034.0A 2014-10-17 2014-10-17 Integral assembly reinforced concrete prefabricated draining inspection well Pending CN105888035A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410557034.0A CN105888035A (en) 2014-10-17 2014-10-17 Integral assembly reinforced concrete prefabricated draining inspection well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410557034.0A CN105888035A (en) 2014-10-17 2014-10-17 Integral assembly reinforced concrete prefabricated draining inspection well

Publications (1)

Publication Number Publication Date
CN105888035A true CN105888035A (en) 2016-08-24

Family

ID=57000375

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410557034.0A Pending CN105888035A (en) 2014-10-17 2014-10-17 Integral assembly reinforced concrete prefabricated draining inspection well

Country Status (1)

Country Link
CN (1) CN105888035A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110847238A (en) * 2019-11-23 2020-02-28 北京市市政二建设工程有限责任公司 Inspection well and construction process thereof
CN115045379A (en) * 2022-07-20 2022-09-13 无锡市政设计研究院有限公司 Assembled rectangular rainwater inspection well and construction method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110847238A (en) * 2019-11-23 2020-02-28 北京市市政二建设工程有限责任公司 Inspection well and construction process thereof
CN115045379A (en) * 2022-07-20 2022-09-13 无锡市政设计研究院有限公司 Assembled rectangular rainwater inspection well and construction method thereof

Similar Documents

Publication Publication Date Title
CN210031914U (en) Assembled inspection shaft
US8425153B1 (en) Arched culvert and method of manufacture
CN106759476A (en) A kind of assembled municipal administration comprehensive pipeline passage and its construction method
KR101674117B1 (en) Apparatus for preventing sewerage pipe subsidence of smooth ground
CN105888035A (en) Integral assembly reinforced concrete prefabricated draining inspection well
CN206529795U (en) A kind of municipal comprehensive pipeline passage of assembled
KR200407625Y1 (en) Hume pipe reinforce structure
CN106498981A (en) A kind of brick type municipal administration comprehensive pipeline passage and its construction method
KR200413251Y1 (en) Pedestal structure for water pipeline used in waterworks and drainage, road, river bank and drainage works
KR100676680B1 (en) Hume pipe reinforce structure
CN204401756U (en) The drop well that reverse construction is set up on original gutter
US8425152B1 (en) Arched culvert and method of manufacture
KR101619330B1 (en) Horizontal Beam Supporting Bracket for Temporary Soil Retaining Work
CN206752632U (en) Plastic reinforcing steel composite construction municipal drainage inspection shaft
JP4679402B2 (en) Outdoor drainage equipment for unequal settlement and its installation method
CN107023061B (en) Assembled plastic municipal drainage inspection well and construction method
CN111335445B (en) Construction method of concrete catch basin by using steel pipe as inner mold
JP2010189990A (en) Construction method for replacing bridge for small river
KR20070076560A (en) Sectional manhole
CN108104158A (en) A kind of assembled underground pipe gallery and assembled in situ method
CN204163178U (en) Push pipe interval combinations manhole
CN113374936B (en) Underpinning protection system for top socket pipeline in bottom-through construction and construction method
CN205688545U (en) A kind of plumbing integration module
CN216999848U (en) Assembled steel corrugated underground pipe gallery
CN210216193U (en) Assembled integral culvert

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20160824