CN105887957A CN201510028824.4A CN201510028824A CN105887957A CN 105887957 A CN105887957 A CN 105887957A CN 201510028824 A CN201510028824 A CN 201510028824A CN 105887957 A CN105887957 A CN 105887957A
Authority
CN
China
Prior art keywords
rivers
delivery apparatus
run
river
sediment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510028824.4A
Other languages
Chinese (zh)
Inventor
杨光华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201510028824.4A priority Critical patent/CN105887957A/en
Publication of CN105887957A publication Critical patent/CN105887957A/en
Pending legal-status Critical Current

Links

Landscapes

  • Treatment Of Sludge (AREA)

Abstract

The invention relates to a device and method or removing coastal river deposited sediment 1. The device comprises a dredging device 2 running on a river, a power device 3 and a control device 4. The dredging device 2 runs on a river bed of the river and stirs the deposited sediment 1 on the river bed. The sediment 1 rolls and is mixed into water flow of the ebb tide, the water power of the ebb tide drives the sediment to go away along with the tide and flows into the sea, and the deposited sediment 1 on the river bed of the river is removed. The method for removing the coastal river deposited sediment through the dredging device 2 and the water power of the ebb tide is named as the method for removing the coastal river deposited sediment 1 through a dredging method. The device and method for removing the coastal river deposited sediment 1 have the beneficial effects that during the ebb tide of the coastal river, the sediment dredging device 2 is used for conducting mechanical actions on the river bed, the sediment 1 deposited and sedimentated on the river bed rolls and is mixed into the water flow of the ebb tide of the river, and the sediment 1 retreats into the sea under the effect of the water power of the ebb tide; and the device and the method are low in cost and good in effect, and the river bed can be even and smooth.

Description

Remove the device and method of coastal rivers silt sediment
Technical field
The present invention relates to remove the technology of the silt sediment in coastal rivers riverbed, particularly relate to coastal rivers and utilize hydrodynamic force to go Device and method except rivers river bed deposit silt.
Background technology
Basin, river, river in Zhejiang Province is one of big water system in Zhejiang Province eight, and drainage area 4518km2, by river in Zhejiang Province Jiang Ganliu and Yao Jiang, Feng Huajiang Article two, one-level tributary (hereinafter referred to as " three rivers roads "), and Yao Jiang, Fenghua plain river network composition, basin perimeter relates to District of 9 counties and cities.
Ningbo City's Three Rivers regions meets heavy rain in recent years just waterlogging.
Ningbo City waterlogging wherein has the major reason to be: has built disorderly on Yao Jiang, Feng Huajiang, river, river in Zhejiang Province and has much blocked water Beaten tens of building: Ru great Zha, bridge pier, pier stud, illegal building, newly-built new Jiang Qiao, overhaul spirit bridge the most near water Pier stud and engineering ship are just as barrage despot's interception river course;The sedimentation of decades, makes Yao Jiang, Feng Huajiang, river in Zhejiang Province rivers bed Increase more than 20 rice, flood discharge capacity rapid drawdown.Day dredges on river in Yao Jiang, Feng Huajiang, river in Zhejiang Province frequently with tens dredgers, The silt excavated on riverbed is transported by sludge boat.Dredger sludge boat bustling about, year excavation amount nearly ten million yuan, Still can't resist the sedimentation that tide brings.6 years from now on three river six Yao Jiang, Feng Huajiang, river in Zhejiang Province rivers bed also every year with One copper plate thickness increases.According to " impact that flood disaster risk bank is assessed by channel sediment deposition " works: quantitative analysis Sediment Siltation is on flood frequency and the impact of flood disaster risk. and result shows, it is considered to Sediment Siltation can produce shadow to stagefrequency Ringing, under identical water level, Sediment Siltation can shorten the return period of flood, and water level is the lowest, and frequency changes the most greatly. for same frequency The flood of rate, the alluvial of silt makes water level lifting, and frequency is the least, and SEA LEVEL VARIATION is the least. it addition, Sediment Siltation makes big flood wind Danger increases, and has increased the weight of the loss of big flood.
Must try every possible means to remove the sedimentation layer in three rivers roads!
Coastal rivers mostly exist:
One, it is river course back-siltation.Coastal rivers mouth surrounding waters sea water sediment charge is relatively big, and tidewater is by a large amount of silt bands Entering rivers river course, duration of rise is short, and flow velocity is fast, and silt content is big, at the sediment deposition at ordinary times that rises, is pasted onto on riverbed, and Duration of fall length, flow velocity are slow, be difficult to overcome the viscous force of precipitation silt, and ebb tide is taken back marine silt and is less than flood tide band Enter the quantity of sand and mud of rivers.The particularly dry season, it is less that coastal upper reaches carrys out the water yield, and hydrodynamic force is more weak, sedimentation More, alluvial problem can not solve.
Two, it is that mud steals row and problem toppled over by urban architecture dregs.
Three, it is the image problem of desilting engineering.
Four, it is desilting permanent mechanism Construction Problems.
Five, developing land transportation on coastal rivers, road builds a bridge, and aquatic building is set up in coastal rivers city on rivers, Such as big lock, bridge pier, pier stud, illegal building near water, pile is set.Above-mentioned bridge pier, pier stud and pile be all take root in In the riverbed of coastal rivers, pile is the submerged body in river waterflow, there is submerged body resistance, makes river course water resistance at pile Increasing, hydrodynamic force is weakened, tide silt and upstream sluicing silt, precipitates and is deposited in the riverbed of coastal downstream river, More being deposited at pile, amass the moon riverbed day and build, increase every year, flood carrying capacity is weakened, and Sediment Siltation makes flood disaster risk increase Add, increased the weight of the loss of big flood.
The silt sediment in the riverbed removing coastal rivers is generally to exist and scabrous problem.
Summary of the invention
The technical problem to be solved is to provide a kind of to remove coastal rivers riverbed for the present situation of prior art Precipitation, the device and method of silt sediment.
The present invention solves the technical scheme that above-mentioned technical problem used: a kind of device removing coastal rivers silt sediment And method, it is characterised in that: it is included on rivers the delivery apparatus run, power set and control device, wherein, power Device provides power, controls device and controls traffic direction and the path of delivery apparatus, and delivery apparatus runs on rivers riverbed, Stirring the silt sediment on rivers riverbed, silt rolling is got up, and silt is mixed in the current of ebb tide, the hydrodynamic force of ebb tide, Go with ebb tide with silt, flow into the sea, eliminate the silt sediment on rivers riverbed, use delivery apparatus and ebb tide Hydrodynamic force remove coastal rivers silt sediment method be referred to as Dredging Method remove coastal rivers silt sediment method.
The above-mentioned delivery apparatus run on rivers is a mechanical delivery apparatus that can operate on rivers riverbed, dredges dress Putting and make mechanical action, stir the silt sediment on rivers riverbed, silt rolling is got up, and is mixed in the current of rivers ebb tide, Under the hydrodynamism of ebb tide, silt is retracted into sea.
The above-mentioned delivery apparatus run on rivers is one to be had in the sedimentary clay sand bed that can touch or insert rivers riverbed Toothed wheel apparatus or impeller unit or rake or plough.
The above-mentioned delivery apparatus run on rivers is one and can equalize the delivery apparatus travelled in an orderly manner on rivers, makes fortune Row delivery apparatus equilibrium on rivers riverbed stirs the silt sediment in rivers riverbed in an orderly manner, and described equilibrium is gone in an orderly manner Sail and be: rivers rise flat after, ebb tide starts, and the bank of delivery apparatus effluent road two bank starts to come or reversion is walked, and covers one Stroke, moves to center, river course and moves a step, then a stroke of walking, then shifting moves a step to center, river course ..., step by step to river course Center travels.Delivery apparatus in ebb tide overall process constantly on rivers riverbed run, described " move move a step " step Away from the width being delivery apparatus.
Above-mentioned traveling delivery apparatus on rivers is the ship with delivery apparatus or pulls ship.
Above-mentioned traveling delivery apparatus on rivers is the car with delivery apparatus.
The above-mentioned delivery apparatus run on rivers is an air-driven delivery apparatus.
The above-mentioned delivery apparatus run on rivers is a hydraulic pressure or the delivery apparatus of hydraulic power.
The above-mentioned delivery apparatus run on rivers is an electrically-driven delivery apparatus.
The above-mentioned delivery apparatus run on rivers is the delivery apparatus of a hydraulic.
Compared with prior art, it is an advantage of the current invention that: the rivers in coastal waters, dredge frequently with dredger day, remove tide The sediment deposition brought and deposition, this method cost is the highest, still the difficult constantly raising stopping rivers riverbed silt, and Riverbed is often dug into rugged.When coastal rivers ebb tide, apply silt delivery apparatus, coastal rivers riverbed is carried out Mechanical action, makes precipitation and the silt rolling being deposited on riverbed, is mixed in the current of the ebb tide of rivers, is falling Under tidewater dynamic action, silt is retracted into sea, and this device and method low cost is effective, and riverbed is uniform, gently.
This technology equally utilizes rivers drop hydrodynamic force to remove the device and method of rivers river bed deposit silt.
Accompanying drawing explanation
Fig. 1 is the embodiment of the present invention 1, is the dress of the removal rivers river bed deposit silt that an example is run on coastal rivers riverbed Put;
Fig. 2 is the embodiment of the present invention 2, be another example run on coastal rivers riverbed remove rivers river bed deposit silt Device;
Fig. 3 is the embodiment of the present invention 3, be another example run on coastal rivers riverbed remove rivers river bed deposit silt Device;
Fig. 4 is the embodiment of the present invention 4, is the removal rivers river bed deposit silt that further example is run on coastal rivers riverbed Device.
Below in conjunction with accompanying drawing embodiment, the present invention is described in further detail.
Embodiment one:
As it is shown in figure 1, the device removing rivers river bed deposit silt 1 is included on rivers the delivery apparatus 2 run, power Device 3 and control device 4, the power set of the present embodiment are hydrodynamic apparatus or mechanical driver unit, and delivery apparatus 2 is Wheeled vehicle, controls device 4 and can be manual or motor-driven or surge or pneumatic or automatically control.
Embodiment two:
As in figure 2 it is shown, the device removing rivers river bed deposit silt 1 is included on rivers the delivery apparatus 2 run, power Device 3 and control device 4, the power set of the present embodiment are hydraulic power unit or Pneumatic propelling plant, delivery apparatus 2 Being wheeled vehicle, controlling device 4 is to surge or pneumatic or automatically control.
Embodiment three:
As it is shown on figure 3, the device removing rivers river bed deposit silt 1 is included on rivers the delivery apparatus 2 run, power Device 3 and control device 4, the power set of the present embodiment are mechanical driver unit or hydraulic power unit or Pneumatic pressure power dress Putting, delivery apparatus 2 is wheeled vehicle, controls device 4 and can be manual or motor-driven or surge or pneumatic or automatically control.
Embodiment four:
As shown in Figure 4, the device removing rivers river bed deposit silt 1 is included on rivers the delivery apparatus 2 run, power Device 3 and control device 4, the power set of the present embodiment are power ships 3, and power ship 3 is pulled delivery apparatus 2, dredged dress Putting 2 is wheeled vehicle or plow harrow device, and controlling device 4 is hanger.

Claims (10)

1. the device and method removing coastal rivers silt sediment (1), it is characterised in that: include The delivery apparatus (2) run on rivers, power set (3) and control device (4), wherein, power fills Put (3) and power is provided, control device (4) and control traffic direction and the path of delivery apparatus (4), dredge Device (2) is when rivers ebb tide, and the silt sediment (1) in river riverbed is upper to be run, and stirs rivers river Silt sediment (1) on bed, silt (1) rolls, and silt (1) is mixed in the current of ebb tide, ebb tide Hydrodynamic force go with ebb tide with silt (1), flow into the sea, eliminate the sedimentary clay on rivers riverbed Husky (1), uses the hydrodynamic force of delivery apparatus (2) and ebb tide to remove the side of coastal rivers silt sediment (1) Method is referred to as Dredging Method and removes the silt sediment method of coastal rivers.
The delivery apparatus (2) run on rivers the most according to claim 1 is one and can run Mechanical delivery apparatus (2) on rivers riverbed.
The delivery apparatus (2) run on rivers the most according to claim 1 is one and has energy Touch or insert the toothed wheel apparatus (2) in silt sediment (1) layer in rivers riverbed or impeller unit (2) Or harrow (2) or plough (2).
The delivery apparatus (2) run on rivers the most according to claim 1 is one and can equalize Operate in the delivery apparatus (2) on rivers riverbed in an orderly manner, make to operate in the delivery apparatus on rivers riverbed (2) equilibrium stirs the silt sediment (1) in rivers riverbed in an orderly manner.
The most according to claim 1 on rivers run delivery apparatus (2) be one with dredge Lead the ship of device or pull ship (2).
The most according to claim 1 on rivers run delivery apparatus (2) be one with dredge Lead the car (2) of device.
The delivery apparatus (2) run on rivers the most according to claim 1 is an air pressure transmission Dynamic delivery apparatus (2).
The most according to claim 1 on rivers run delivery apparatus (2) be a hydraulic pressure or The delivery apparatus (2) of hydraulic power.
The delivery apparatus (2) run on rivers the most according to claim 1 is that an electric power passes Dynamic delivery apparatus (2).
The delivery apparatus (2) run on rivers the most according to claim 1 is a water engineer The delivery apparatus (2) of tool.
CN201510028824.4A 2015-01-13 2015-01-13 Device and method for removing coastal river deposited sediment Pending CN105887957A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510028824.4A CN105887957A (en) 2015-01-13 2015-01-13 Device and method for removing coastal river deposited sediment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510028824.4A CN105887957A (en) 2015-01-13 2015-01-13 Device and method for removing coastal river deposited sediment

Publications (1)

Publication Number Publication Date
CN105887957A true CN105887957A (en) 2016-08-24

Family

ID=56999061

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510028824.4A Pending CN105887957A (en) 2015-01-13 2015-01-13 Device and method for removing coastal river deposited sediment

Country Status (1)

Country Link
CN (1) CN105887957A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1045618A (en) * 1989-03-14 1990-09-26 蒋国华 The method that brings the Yellow River under control
CN2167128Y (en) * 1993-01-22 1994-06-01 唐振强 Hydraulic dredger following flowing water during work
CN2425136Y (en) * 2000-04-29 2001-03-28 徐基银 River bed sediment cleaning apparatus
CN201835307U (en) * 2010-04-30 2011-05-18 梁标 Equipment for stirring and blowing sand in river channel

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1045618A (en) * 1989-03-14 1990-09-26 蒋国华 The method that brings the Yellow River under control
CN2167128Y (en) * 1993-01-22 1994-06-01 唐振强 Hydraulic dredger following flowing water during work
CN2425136Y (en) * 2000-04-29 2001-03-28 徐基银 River bed sediment cleaning apparatus
CN201835307U (en) * 2010-04-30 2011-05-18 梁标 Equipment for stirring and blowing sand in river channel

Similar Documents

Publication Publication Date Title
Bruun et al. Natural by-passing of sand at coastal inlets
CN103938591B (en) A kind of method reducing reservoir on hyperconcentration river alluvial
CN102061677B (en) Full-section water wetland purification system suitable for normal water level of river
CN205116250U (en) Sediment removal device of reservoir among hydraulic engineering
CN102733351B (en) Method for treating river entrance
CN102121449A (en) Hydrodynamic machine, and using method and application thereof
Su-Chin et al. Sediment removal efficiency of siphon dredging with wedge-type suction head and float tank
CN105089020A (en) Siltation reduction method for reservoir
CN104018539A (en) Environment-friendly spiral drum type silt remover
CN104652352A (en) System for removing riverbed silt sediments by diverting seawater
US20230030676A1 (en) Method for preventing repeated (tsunami, storm surge, and river) disasters by forces of nature
JP2005030070A (en) Flowing-down promoting dam structure and flowing-down promoting method of deposit sediment in dam water reservoir
CN107587497B (en) A method of improving hydraulic reclamation flatness
CN105887957A (en) Device and method for removing coastal river deposited sediment
JP3823998B2 (en) Flood control and irrigation system using tidal current generating device by "UTSURO"
CN105089006A (en) Siltation reduction system for reservoir
CN100582382C (en) Process for constructing quickly consolidated temperory horizontal platform by picking clay of lake bottom
CN204644954U (en) Remove the dredging ship of coastal rivers silt sediment
Ji et al. A siltation simulation and desiltation measurement study downstream of the Suzhou Creek Sluice, China
CN1206425C (en) Apparatus for stirring silt by stirring and floating and flowing carrying mud to dredge watercourse
Abulnaga et al. De-silting lake Nasser with slurry pipelines
CN114837120B (en) Double-gate regulation and control system with functions of water diversion, tide collection and silt flushing and regulation and control method thereof
Wang et al. Flood defense and water/sediment management—With particular reference to the Yellow River
CN201588242U (en) Piston type earthwork conveying ship
CN202989854U (en) Shunt structure for solving problems of channel storage, flood discharge, deposit, ice run and navigation

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20160824