CN105887941A - Pile foundation pile length measuring and calculating method - Google Patents

Pile foundation pile length measuring and calculating method Download PDF

Info

Publication number
CN105887941A
CN105887941A CN201510036576.8A CN201510036576A CN105887941A CN 105887941 A CN105887941 A CN 105887941A CN 201510036576 A CN201510036576 A CN 201510036576A CN 105887941 A CN105887941 A CN 105887941A
Authority
CN
China
Prior art keywords
stake
data
pile
construction
long
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510036576.8A
Other languages
Chinese (zh)
Inventor
黄新福
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201510036576.8A priority Critical patent/CN105887941A/en
Publication of CN105887941A publication Critical patent/CN105887941A/en
Pending legal-status Critical Current

Links

Landscapes

  • Foundations (AREA)

Abstract

The invention relates to pile foundation construction, in particular to a pile foundation pile length measuring and calculating method. Compared with the prior art, the pile foundation pile length measuring and calculating method is mainly characterized in that extraction of specific data is realized through comprehensive application of tool software, and the pile length is measured and calculated through data handling. The pile foundation pile length measuring and calculating method is simple in procedure, scientific, practical and low in cost and brings great convenience to foundation construction work.

Description

A kind of long measuring method of pile foundation stake
Technical field
The present invention relates to pile foundation construction, be specifically related to a kind of long measuring method of pile foundation stake.
Background technology
Nowadays, the foundation construction of a lot of architectural engineerings all uses prefabricated prestressing pipe pile basis.But, prefabricated prestressing pipe pile Belonging to factory's customed product, must be processed by fixing mould, the specification requirement of product is strict, and prefabricated prestressing pipe pile Volume is big, quality weight, and transport is got up extremely inconvenient, and supplier is that number one considers, within general one day, supplies once, due to nothing Method look-ahead construction stake is long, cannot buy prefabricated prestressing pipe pile, work order in practice of construction the most targetedly Position often occurs because not having the suitable material of specification to use, and the situation that construction cannot continue, claim for eot, efficiency of construction is low Situation happen occasionally.Due to cannot look-ahead construction stake long, construction also often results in a number of waste of material, Add the construction cost of enterprise.In a word, the most in advance measuring and calculating pile foundation construction in stake long, lose time, waste of manpower, thing Power, financial resources, put to no little inconvenience to existing foundation construction work.
Summary of the invention
For solving problem above, the present invention provides a kind of long measuring method of pile foundation stake.Its integrated use tool software, ingenious carries Take out relevant data and arrange, utilizing the data extracted to carry out the calculation of the length of bored pile.Before construction, predict that construction stake is long, Unit in charge of construction can carry out capital budgeting, controls fund cost more accurately, and site operation personnel also can carry out material targetedly Material buying, it is to avoid occur being not suitable for a large amount of waste, claim for eot, the units in charge of construction of the material caused due to pile for prestressed pipe specification The series of problems that work efficiency is low, this pile foundation stake long measuring method step is simple, science, practical give foundation construction work Bringing convenience, measuring and calculating cost relatively prior art does not increase, and but fundamentally solves current pile foundation by practical application The long realistic problem that cannot shift to an earlier date budget of plinth stake, consequent economic benefits, social benefit is huge.
Accompanying drawing explanation
Fig. 1 is pile foundation construction schematic diagram
1 represents plain fill layer, and 2 represent mud, and 3 represent farinose argillic horizon, and 4 represent layer of sand, and 5 represent completely decomposed layer, 6 tables Showing severely-weathered layer, weathered layer in 7 expressions, 8 represent the part needing to excavate, and 9 represent design stake top marks height, and 10 represent under cushion caps Bed course, 11 represent foundation platform, and 12 represent prefabricated prestressing pipe pile, and H indicates entry into the degree of depth of strongly weathered sand-rock.12.95M in figure, 9.97M, 7.87M, 5.37M ,-5.5M ,-13.93M ,-15.53M represent the Huanghai Sea elevation of this rock stratum end face.
Fig. 2 is discretization schematic diagram
One round and smooth curve can be formed several discrete point, automatically generates 14 as shown in the figure after a curve discrete by discretization Individual discrete point.In figure, numeral represents the numbering of discrete point.
Fig. 3 is stake position grid DEM analysis chart
1 position representing stake position, 2 represent the nearest discrete point in distance stake position that elevations are-4, and 3 represent that elevations are-2 The discrete point that distance stake position is nearest, L1 represents the distance of positions distance from No. 2 discrete points, and L2 represents that a distance of positions is discrete from No. 3 The distance of point.
Detailed description of the invention
The invention provides a kind of long measuring method of pile foundation stake, compare with existing technology, this long measuring method of pile foundation stake Be characterized mainly in that: realized the extraction of particular data by the integrated use of tool software, calculate stake by the arrangement of data Long.It is as follows that this long measuring method specifically calculates step: the first step, with CAD mapping software by the electronic edition construction drawing of designing institute Stake position on paper is numbered, and design stake top mark height enters the rock degree of depth plus certain formations after deducting the buried depth of certain formations, its value Being exactly that construction stake is long, as it is shown in figure 1, the 1-6 rock stratum prefabricated prestressing pipe pile in figure can enter, No. 7 are expressed as apoplexy Changing rock stratum, prefabricated prestressing pipe pile cannot be introduced into this rock stratum, and the degree of depth that pile tube enters strongly weathered sand-rock is generally fixed value, specifically Need to carry out comprehensive value according to field apparatus model and design requirement etc., it can be seen that calculate specific rock below every pile accurately The Huanghai Sea elevation of layer is particularly significant;Second step, extracts the accurate coordinate of each position and the data such as stake top mark is high;3rd step, makes With Earthwork calculation software, the certain formations equal pitch contour in exploration report is carried out sliding-model control;4th step, by the electronics of designing institute Version construction stake bitmap is according to coordinate relation, in the certain formations equal pitch contour electronic edition drawing being added in surveying institute's exploration report; 5th step, uses multi-section-line order, is attached in the center of circle of each position, makes the multi-section-line of one or more Guan Bi; 6th step, after adding piling foundation plan according to coordinate relation, can find nearest two discrete point according to coordinate relation, according to stake position And the position relationship between known elevation discrete point, can obtain the rock stratum buried depth (elevation of stake site) at stake position, such as figure institute Showing, in elevation H, H=-2+ <-2L2/ (L1+L2) the > figure at stake position, 1 represents the position of stake position, and 2 represent that elevation is the distance of-4 The nearest discrete point in stake position, 3 represent the discrete point that distance stake position that elevations are-2 is nearest, and L1 represents that a distance of positions is from 2 The distance of number discrete point, L2 represents the distance of positions distance from No. 3 discrete points, buries by calculating the rock stratum obtained on each site Deep data;7th step, extracts the buried depth data that certain formations is relevant;8th step, uses EXCEL software, by the most each The coordinate figure of stake position determines the buried depth data of the certain formations of each position;9th step, obtains every by data compilation and calculating The theoretical construction stake of individual stake position is long.

Claims (2)

1. the invention provides a kind of long measuring method of pile foundation stake, be primarily characterized in that: by the integrated use of tool software Realize the extraction of particular data, calculate stake by the arrangement of data long.
2. according to described in right 1, it is as follows that the long measuring method of this stake specifically calculates step: the first step, will with CAD mapping software Stake position on the electronic edition construction drawing of designing institute is numbered;Second step, the accurate coordinate and the stake top mark that extract each position are high Etc. data;3rd step, uses Earthwork calculation software that the certain formations equal pitch contour in exploration report is carried out sliding-model control;4th Step, by the electronic edition construction stake bitmap of designing institute according to coordinate relation, the certain formations being added in surveying institute's exploration report is contour In line electronic edition drawing;5th step, uses multi-section-line order, is attached in the center of circle of each position, make one or The multi-section-line of multiple Guan Bis;6th step, after adding piling foundation plan according to coordinate relation, can find nearest two according to coordinate relation Individual discrete point, according to the position relationship between stake position and known elevation discrete point, can obtain rock stratum buried depth (the stake position at stake position Elevation at Dian), by calculating the rock stratum buried depth data obtained on each site;7th step, extracts relevant the burying of certain formations Deep data;8th step, is used EXCEL software, is determined the certain formations of each position by the coordinate figure of concrete each position Buried depth data;9th step, the theoretical construction stake being obtained each position by data compilation and calculating is long.
CN201510036576.8A 2015-01-20 2015-01-20 Pile foundation pile length measuring and calculating method Pending CN105887941A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510036576.8A CN105887941A (en) 2015-01-20 2015-01-20 Pile foundation pile length measuring and calculating method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510036576.8A CN105887941A (en) 2015-01-20 2015-01-20 Pile foundation pile length measuring and calculating method

Publications (1)

Publication Number Publication Date
CN105887941A true CN105887941A (en) 2016-08-24

Family

ID=56999633

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510036576.8A Pending CN105887941A (en) 2015-01-20 2015-01-20 Pile foundation pile length measuring and calculating method

Country Status (1)

Country Link
CN (1) CN105887941A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106599477A (en) * 2016-12-15 2017-04-26 广州华森建筑与工程设计顾问有限公司 revit three-dimensional platform-based pile foundation automatic generation and three-dimensional calculation method
CN108729478A (en) * 2018-07-18 2018-11-02 中铁十六局集团第三工程有限公司 A kind of simulation three-dimensional surface determines the long construction method of CFG stakes
CN111695181A (en) * 2020-05-22 2020-09-22 中国能源建设集团广东省电力设计研究院有限公司 Novel mountainous area pile foundation pile length calculation method and system
CN112036631A (en) * 2020-08-25 2020-12-04 广州视源电子科技股份有限公司 Purchasing quantity determination method, device, equipment and storage medium
CN113653085A (en) * 2021-08-25 2021-11-16 中国建筑第八工程局有限公司 Engineering pile length estimation method and estimation system thereof
CN117932715A (en) * 2023-11-15 2024-04-26 中信建筑设计研究总院有限公司 Method for determining optimal design control pile length of pressure-bearing engineering pile

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2257563C2 (en) * 2003-02-19 2005-07-27 Федеральное государственное унитарное научно-производственное предприятие "Геологоразведка" Method for determining condition of beams and device for realization of said method
CN102011401A (en) * 2010-09-09 2011-04-13 平煤建工集团有限公司 High-intensity prestressed concrete tubular pile lead hole hammering construction method for soft soil layer
CN101560778B (en) * 2009-05-07 2011-05-04 邓业灿 Geophysical prospection stress wave detection method for building foundation pile
CN102587425A (en) * 2012-03-29 2012-07-18 温州建设集团有限公司 Measurement positioning and construction method for foundation piles
CN103150421A (en) * 2013-02-02 2013-06-12 青岛理工大学 Method for simultaneously determining pile position and critical depth of slide-resistant pile by utilizing displacement monitoring
CN103215964A (en) * 2013-05-07 2013-07-24 张俊峰 Method of industrial systematic treatment of foundation through prestressed concrete solid pre-formed piles
CN104060624A (en) * 2014-06-30 2014-09-24 温州电力设计有限公司 Method for arranging pile foundations in complex soft soil foundation

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2257563C2 (en) * 2003-02-19 2005-07-27 Федеральное государственное унитарное научно-производственное предприятие "Геологоразведка" Method for determining condition of beams and device for realization of said method
CN101560778B (en) * 2009-05-07 2011-05-04 邓业灿 Geophysical prospection stress wave detection method for building foundation pile
CN102011401A (en) * 2010-09-09 2011-04-13 平煤建工集团有限公司 High-intensity prestressed concrete tubular pile lead hole hammering construction method for soft soil layer
CN102587425A (en) * 2012-03-29 2012-07-18 温州建设集团有限公司 Measurement positioning and construction method for foundation piles
CN103150421A (en) * 2013-02-02 2013-06-12 青岛理工大学 Method for simultaneously determining pile position and critical depth of slide-resistant pile by utilizing displacement monitoring
CN103215964A (en) * 2013-05-07 2013-07-24 张俊峰 Method of industrial systematic treatment of foundation through prestressed concrete solid pre-formed piles
CN104060624A (en) * 2014-06-30 2014-09-24 温州电力设计有限公司 Method for arranging pile foundations in complex soft soil foundation

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
刘政治: "《嵌岩钻孔灌注桩入岩判定》", 《施工技术》 *
魏成国等: "《Kriging 插值法及其在大型储罐桩基础分析中的应用》", 《建筑结构》 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106599477A (en) * 2016-12-15 2017-04-26 广州华森建筑与工程设计顾问有限公司 revit three-dimensional platform-based pile foundation automatic generation and three-dimensional calculation method
CN108729478A (en) * 2018-07-18 2018-11-02 中铁十六局集团第三工程有限公司 A kind of simulation three-dimensional surface determines the long construction method of CFG stakes
CN111695181A (en) * 2020-05-22 2020-09-22 中国能源建设集团广东省电力设计研究院有限公司 Novel mountainous area pile foundation pile length calculation method and system
CN112036631A (en) * 2020-08-25 2020-12-04 广州视源电子科技股份有限公司 Purchasing quantity determination method, device, equipment and storage medium
CN113653085A (en) * 2021-08-25 2021-11-16 中国建筑第八工程局有限公司 Engineering pile length estimation method and estimation system thereof
CN113653085B (en) * 2021-08-25 2022-08-30 中国建筑第八工程局有限公司 Engineering pile length estimation method and estimation system thereof
CN117932715A (en) * 2023-11-15 2024-04-26 中信建筑设计研究总院有限公司 Method for determining optimal design control pile length of pressure-bearing engineering pile

Similar Documents

Publication Publication Date Title
CN105887941A (en) Pile foundation pile length measuring and calculating method
CN110298107B (en) Working face impact risk evaluation method based on incremental stacking
CN1952921A (en) A computational method of anticipated settlement in ground base
CN106644206A (en) Method for calculating surrounding rock pressure of shallow tunnel
CN106066920A (en) The overlapping tunnel shield-tunneling construction numerical analysis method to underpining Influence of Pile Foundation up and down
CN105526925A (en) Method for optimized designing of regional land subsidence level monitoring network
CN105971611A (en) Roadbed settlement control method for subway tunnel passing under existing trunk railway closely
CN102967481A (en) Method for determining action relationship between ground building and underground structure
CN104196012B (en) A kind of karst cave treatment method based on BIM
CN106682364A (en) Method and system for determining the depth of each pile driven into rock layer
CN105220718A (en) Method for pre-determining influence of building construction on adjacent existing tunnel
CN106649931A (en) Calculation method for post-construction ground surface settlement of rectangular jacking pipe tunnel construction
CN106638537A (en) Method for calculating soil pressure of limited soil
Mielimąka et al. Approximation of average course of measured curvatures of mining area with reference to their forecast values by Knothe’s formulas
CN104464477B (en) Tunnel teaching experiment model
CN104123454A (en) Prediction method for surface subsidence of single-joint hard rock underground excavation
CN106021959A (en) Side friction calculation method suitable for rectangle-like municipal pipe-jacking tunnel under deep burial condition
Zhang Achievements and problems of geotechnical engineering investigation in China
CN102661741B (en) Method for monitoring topography and erosion amount of head of small-sized gully
Orwat Verification of Forecasts of Subsidences, Inclinations and Curvatures of Area Caused by Multideposit Mining Conducted by Including Mining Margin–Case Analysis
Orwat Evaluation of forecasts of area deformation caused by multideposit exploitation of hard coal made by the Budryk-Knothe theory–case study
Orwat et al. Causes analysis of building deviation located on mining area and the way of its removal
CN109811771A (en) Make the simple and easy method not bent when anchor bar steel waist rail tensioning
Wang et al. The application of BIM technology in the construction of Hangzhou Zizhi tunnel
CN104153341A (en) Translational soil pressure measuring-mode testing device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20160824