CN105887941A - Pile foundation pile length measuring and calculating method - Google Patents
Pile foundation pile length measuring and calculating method Download PDFInfo
- Publication number
- CN105887941A CN105887941A CN201510036576.8A CN201510036576A CN105887941A CN 105887941 A CN105887941 A CN 105887941A CN 201510036576 A CN201510036576 A CN 201510036576A CN 105887941 A CN105887941 A CN 105887941A
- Authority
- CN
- China
- Prior art keywords
- stake
- data
- pile
- construction
- long
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Foundations (AREA)
Abstract
The invention relates to pile foundation construction, in particular to a pile foundation pile length measuring and calculating method. Compared with the prior art, the pile foundation pile length measuring and calculating method is mainly characterized in that extraction of specific data is realized through comprehensive application of tool software, and the pile length is measured and calculated through data handling. The pile foundation pile length measuring and calculating method is simple in procedure, scientific, practical and low in cost and brings great convenience to foundation construction work.
Description
Technical field
The present invention relates to pile foundation construction, be specifically related to a kind of long measuring method of pile foundation stake.
Background technology
Nowadays, the foundation construction of a lot of architectural engineerings all uses prefabricated prestressing pipe pile basis.But, prefabricated prestressing pipe pile
Belonging to factory's customed product, must be processed by fixing mould, the specification requirement of product is strict, and prefabricated prestressing pipe pile
Volume is big, quality weight, and transport is got up extremely inconvenient, and supplier is that number one considers, within general one day, supplies once, due to nothing
Method look-ahead construction stake is long, cannot buy prefabricated prestressing pipe pile, work order in practice of construction the most targetedly
Position often occurs because not having the suitable material of specification to use, and the situation that construction cannot continue, claim for eot, efficiency of construction is low
Situation happen occasionally.Due to cannot look-ahead construction stake long, construction also often results in a number of waste of material,
Add the construction cost of enterprise.In a word, the most in advance measuring and calculating pile foundation construction in stake long, lose time, waste of manpower, thing
Power, financial resources, put to no little inconvenience to existing foundation construction work.
Summary of the invention
For solving problem above, the present invention provides a kind of long measuring method of pile foundation stake.Its integrated use tool software, ingenious carries
Take out relevant data and arrange, utilizing the data extracted to carry out the calculation of the length of bored pile.Before construction, predict that construction stake is long,
Unit in charge of construction can carry out capital budgeting, controls fund cost more accurately, and site operation personnel also can carry out material targetedly
Material buying, it is to avoid occur being not suitable for a large amount of waste, claim for eot, the units in charge of construction of the material caused due to pile for prestressed pipe specification
The series of problems that work efficiency is low, this pile foundation stake long measuring method step is simple, science, practical give foundation construction work
Bringing convenience, measuring and calculating cost relatively prior art does not increase, and but fundamentally solves current pile foundation by practical application
The long realistic problem that cannot shift to an earlier date budget of plinth stake, consequent economic benefits, social benefit is huge.
Accompanying drawing explanation
Fig. 1 is pile foundation construction schematic diagram
1 represents plain fill layer, and 2 represent mud, and 3 represent farinose argillic horizon, and 4 represent layer of sand, and 5 represent completely decomposed layer, 6 tables
Showing severely-weathered layer, weathered layer in 7 expressions, 8 represent the part needing to excavate, and 9 represent design stake top marks height, and 10 represent under cushion caps
Bed course, 11 represent foundation platform, and 12 represent prefabricated prestressing pipe pile, and H indicates entry into the degree of depth of strongly weathered sand-rock.12.95M in figure,
9.97M, 7.87M, 5.37M ,-5.5M ,-13.93M ,-15.53M represent the Huanghai Sea elevation of this rock stratum end face.
Fig. 2 is discretization schematic diagram
One round and smooth curve can be formed several discrete point, automatically generates 14 as shown in the figure after a curve discrete by discretization
Individual discrete point.In figure, numeral represents the numbering of discrete point.
Fig. 3 is stake position grid DEM analysis chart
1 position representing stake position, 2 represent the nearest discrete point in distance stake position that elevations are-4, and 3 represent that elevations are-2
The discrete point that distance stake position is nearest, L1 represents the distance of positions distance from No. 2 discrete points, and L2 represents that a distance of positions is discrete from No. 3
The distance of point.
Detailed description of the invention
The invention provides a kind of long measuring method of pile foundation stake, compare with existing technology, this long measuring method of pile foundation stake
Be characterized mainly in that: realized the extraction of particular data by the integrated use of tool software, calculate stake by the arrangement of data
Long.It is as follows that this long measuring method specifically calculates step: the first step, with CAD mapping software by the electronic edition construction drawing of designing institute
Stake position on paper is numbered, and design stake top mark height enters the rock degree of depth plus certain formations after deducting the buried depth of certain formations, its value
Being exactly that construction stake is long, as it is shown in figure 1, the 1-6 rock stratum prefabricated prestressing pipe pile in figure can enter, No. 7 are expressed as apoplexy
Changing rock stratum, prefabricated prestressing pipe pile cannot be introduced into this rock stratum, and the degree of depth that pile tube enters strongly weathered sand-rock is generally fixed value, specifically
Need to carry out comprehensive value according to field apparatus model and design requirement etc., it can be seen that calculate specific rock below every pile accurately
The Huanghai Sea elevation of layer is particularly significant;Second step, extracts the accurate coordinate of each position and the data such as stake top mark is high;3rd step, makes
With Earthwork calculation software, the certain formations equal pitch contour in exploration report is carried out sliding-model control;4th step, by the electronics of designing institute
Version construction stake bitmap is according to coordinate relation, in the certain formations equal pitch contour electronic edition drawing being added in surveying institute's exploration report;
5th step, uses multi-section-line order, is attached in the center of circle of each position, makes the multi-section-line of one or more Guan Bi;
6th step, after adding piling foundation plan according to coordinate relation, can find nearest two discrete point according to coordinate relation, according to stake position
And the position relationship between known elevation discrete point, can obtain the rock stratum buried depth (elevation of stake site) at stake position, such as figure institute
Showing, in elevation H, H=-2+ <-2L2/ (L1+L2) the > figure at stake position, 1 represents the position of stake position, and 2 represent that elevation is the distance of-4
The nearest discrete point in stake position, 3 represent the discrete point that distance stake position that elevations are-2 is nearest, and L1 represents that a distance of positions is from 2
The distance of number discrete point, L2 represents the distance of positions distance from No. 3 discrete points, buries by calculating the rock stratum obtained on each site
Deep data;7th step, extracts the buried depth data that certain formations is relevant;8th step, uses EXCEL software, by the most each
The coordinate figure of stake position determines the buried depth data of the certain formations of each position;9th step, obtains every by data compilation and calculating
The theoretical construction stake of individual stake position is long.
Claims (2)
1. the invention provides a kind of long measuring method of pile foundation stake, be primarily characterized in that: by the integrated use of tool software
Realize the extraction of particular data, calculate stake by the arrangement of data long.
2. according to described in right 1, it is as follows that the long measuring method of this stake specifically calculates step: the first step, will with CAD mapping software
Stake position on the electronic edition construction drawing of designing institute is numbered;Second step, the accurate coordinate and the stake top mark that extract each position are high
Etc. data;3rd step, uses Earthwork calculation software that the certain formations equal pitch contour in exploration report is carried out sliding-model control;4th
Step, by the electronic edition construction stake bitmap of designing institute according to coordinate relation, the certain formations being added in surveying institute's exploration report is contour
In line electronic edition drawing;5th step, uses multi-section-line order, is attached in the center of circle of each position, make one or
The multi-section-line of multiple Guan Bis;6th step, after adding piling foundation plan according to coordinate relation, can find nearest two according to coordinate relation
Individual discrete point, according to the position relationship between stake position and known elevation discrete point, can obtain rock stratum buried depth (the stake position at stake position
Elevation at Dian), by calculating the rock stratum buried depth data obtained on each site;7th step, extracts relevant the burying of certain formations
Deep data;8th step, is used EXCEL software, is determined the certain formations of each position by the coordinate figure of concrete each position
Buried depth data;9th step, the theoretical construction stake being obtained each position by data compilation and calculating is long.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510036576.8A CN105887941A (en) | 2015-01-20 | 2015-01-20 | Pile foundation pile length measuring and calculating method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510036576.8A CN105887941A (en) | 2015-01-20 | 2015-01-20 | Pile foundation pile length measuring and calculating method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105887941A true CN105887941A (en) | 2016-08-24 |
Family
ID=56999633
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510036576.8A Pending CN105887941A (en) | 2015-01-20 | 2015-01-20 | Pile foundation pile length measuring and calculating method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105887941A (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106599477A (en) * | 2016-12-15 | 2017-04-26 | 广州华森建筑与工程设计顾问有限公司 | revit three-dimensional platform-based pile foundation automatic generation and three-dimensional calculation method |
CN108729478A (en) * | 2018-07-18 | 2018-11-02 | 中铁十六局集团第三工程有限公司 | A kind of simulation three-dimensional surface determines the long construction method of CFG stakes |
CN111695181A (en) * | 2020-05-22 | 2020-09-22 | 中国能源建设集团广东省电力设计研究院有限公司 | Novel mountainous area pile foundation pile length calculation method and system |
CN112036631A (en) * | 2020-08-25 | 2020-12-04 | 广州视源电子科技股份有限公司 | Purchasing quantity determination method, device, equipment and storage medium |
CN113653085A (en) * | 2021-08-25 | 2021-11-16 | 中国建筑第八工程局有限公司 | Engineering pile length estimation method and estimation system thereof |
CN117932715A (en) * | 2023-11-15 | 2024-04-26 | 中信建筑设计研究总院有限公司 | Method for determining optimal design control pile length of pressure-bearing engineering pile |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2257563C2 (en) * | 2003-02-19 | 2005-07-27 | Федеральное государственное унитарное научно-производственное предприятие "Геологоразведка" | Method for determining condition of beams and device for realization of said method |
CN102011401A (en) * | 2010-09-09 | 2011-04-13 | 平煤建工集团有限公司 | High-intensity prestressed concrete tubular pile lead hole hammering construction method for soft soil layer |
CN101560778B (en) * | 2009-05-07 | 2011-05-04 | 邓业灿 | Geophysical prospection stress wave detection method for building foundation pile |
CN102587425A (en) * | 2012-03-29 | 2012-07-18 | 温州建设集团有限公司 | Measurement positioning and construction method for foundation piles |
CN103150421A (en) * | 2013-02-02 | 2013-06-12 | 青岛理工大学 | Method for simultaneously determining pile position and critical depth of slide-resistant pile by utilizing displacement monitoring |
CN103215964A (en) * | 2013-05-07 | 2013-07-24 | 张俊峰 | Method of industrial systematic treatment of foundation through prestressed concrete solid pre-formed piles |
CN104060624A (en) * | 2014-06-30 | 2014-09-24 | 温州电力设计有限公司 | Method for arranging pile foundations in complex soft soil foundation |
-
2015
- 2015-01-20 CN CN201510036576.8A patent/CN105887941A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2257563C2 (en) * | 2003-02-19 | 2005-07-27 | Федеральное государственное унитарное научно-производственное предприятие "Геологоразведка" | Method for determining condition of beams and device for realization of said method |
CN101560778B (en) * | 2009-05-07 | 2011-05-04 | 邓业灿 | Geophysical prospection stress wave detection method for building foundation pile |
CN102011401A (en) * | 2010-09-09 | 2011-04-13 | 平煤建工集团有限公司 | High-intensity prestressed concrete tubular pile lead hole hammering construction method for soft soil layer |
CN102587425A (en) * | 2012-03-29 | 2012-07-18 | 温州建设集团有限公司 | Measurement positioning and construction method for foundation piles |
CN103150421A (en) * | 2013-02-02 | 2013-06-12 | 青岛理工大学 | Method for simultaneously determining pile position and critical depth of slide-resistant pile by utilizing displacement monitoring |
CN103215964A (en) * | 2013-05-07 | 2013-07-24 | 张俊峰 | Method of industrial systematic treatment of foundation through prestressed concrete solid pre-formed piles |
CN104060624A (en) * | 2014-06-30 | 2014-09-24 | 温州电力设计有限公司 | Method for arranging pile foundations in complex soft soil foundation |
Non-Patent Citations (2)
Title |
---|
刘政治: "《嵌岩钻孔灌注桩入岩判定》", 《施工技术》 * |
魏成国等: "《Kriging 插值法及其在大型储罐桩基础分析中的应用》", 《建筑结构》 * |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106599477A (en) * | 2016-12-15 | 2017-04-26 | 广州华森建筑与工程设计顾问有限公司 | revit three-dimensional platform-based pile foundation automatic generation and three-dimensional calculation method |
CN108729478A (en) * | 2018-07-18 | 2018-11-02 | 中铁十六局集团第三工程有限公司 | A kind of simulation three-dimensional surface determines the long construction method of CFG stakes |
CN111695181A (en) * | 2020-05-22 | 2020-09-22 | 中国能源建设集团广东省电力设计研究院有限公司 | Novel mountainous area pile foundation pile length calculation method and system |
CN112036631A (en) * | 2020-08-25 | 2020-12-04 | 广州视源电子科技股份有限公司 | Purchasing quantity determination method, device, equipment and storage medium |
CN113653085A (en) * | 2021-08-25 | 2021-11-16 | 中国建筑第八工程局有限公司 | Engineering pile length estimation method and estimation system thereof |
CN113653085B (en) * | 2021-08-25 | 2022-08-30 | 中国建筑第八工程局有限公司 | Engineering pile length estimation method and estimation system thereof |
CN117932715A (en) * | 2023-11-15 | 2024-04-26 | 中信建筑设计研究总院有限公司 | Method for determining optimal design control pile length of pressure-bearing engineering pile |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105887941A (en) | Pile foundation pile length measuring and calculating method | |
CN110298107B (en) | Working face impact risk evaluation method based on incremental stacking | |
CN1952921A (en) | A computational method of anticipated settlement in ground base | |
CN106644206A (en) | Method for calculating surrounding rock pressure of shallow tunnel | |
CN106066920A (en) | The overlapping tunnel shield-tunneling construction numerical analysis method to underpining Influence of Pile Foundation up and down | |
CN105526925A (en) | Method for optimized designing of regional land subsidence level monitoring network | |
CN105971611A (en) | Roadbed settlement control method for subway tunnel passing under existing trunk railway closely | |
CN102967481A (en) | Method for determining action relationship between ground building and underground structure | |
CN104196012B (en) | A kind of karst cave treatment method based on BIM | |
CN106682364A (en) | Method and system for determining the depth of each pile driven into rock layer | |
CN105220718A (en) | Method for pre-determining influence of building construction on adjacent existing tunnel | |
CN106649931A (en) | Calculation method for post-construction ground surface settlement of rectangular jacking pipe tunnel construction | |
CN106638537A (en) | Method for calculating soil pressure of limited soil | |
Mielimąka et al. | Approximation of average course of measured curvatures of mining area with reference to their forecast values by Knothe’s formulas | |
CN104464477B (en) | Tunnel teaching experiment model | |
CN104123454A (en) | Prediction method for surface subsidence of single-joint hard rock underground excavation | |
CN106021959A (en) | Side friction calculation method suitable for rectangle-like municipal pipe-jacking tunnel under deep burial condition | |
Zhang | Achievements and problems of geotechnical engineering investigation in China | |
CN102661741B (en) | Method for monitoring topography and erosion amount of head of small-sized gully | |
Orwat | Verification of Forecasts of Subsidences, Inclinations and Curvatures of Area Caused by Multideposit Mining Conducted by Including Mining Margin–Case Analysis | |
Orwat | Evaluation of forecasts of area deformation caused by multideposit exploitation of hard coal made by the Budryk-Knothe theory–case study | |
Orwat et al. | Causes analysis of building deviation located on mining area and the way of its removal | |
CN109811771A (en) | Make the simple and easy method not bent when anchor bar steel waist rail tensioning | |
Wang et al. | The application of BIM technology in the construction of Hangzhou Zizhi tunnel | |
CN104153341A (en) | Translational soil pressure measuring-mode testing device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20160824 |