CN105886700B - Utilize the method for the direct alloy smelting variety steel of prepurging steel - Google Patents

Utilize the method for the direct alloy smelting variety steel of prepurging steel Download PDF

Info

Publication number
CN105886700B
CN105886700B CN201610472103.7A CN201610472103A CN105886700B CN 105886700 B CN105886700 B CN 105886700B CN 201610472103 A CN201610472103 A CN 201610472103A CN 105886700 B CN105886700 B CN 105886700B
Authority
CN
China
Prior art keywords
steel
vacuum
electric furnace
heater
slag
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610472103.7A
Other languages
Chinese (zh)
Other versions
CN105886700A (en
Inventor
***
胡茂会
黄国玖
冯文全
王西江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Pangang Group Chengdu Steel and Vanadium Co Ltd
Original Assignee
Pangang Group Chengdu Steel and Vanadium Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Pangang Group Chengdu Steel and Vanadium Co Ltd filed Critical Pangang Group Chengdu Steel and Vanadium Co Ltd
Priority to CN201610472103.7A priority Critical patent/CN105886700B/en
Publication of CN105886700A publication Critical patent/CN105886700A/en
Application granted granted Critical
Publication of CN105886700B publication Critical patent/CN105886700B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21CPROCESSING OF PIG-IRON, e.g. REFINING, MANUFACTURE OF WROUGHT-IRON OR STEEL; TREATMENT IN MOLTEN STATE OF FERROUS ALLOYS
    • C21C5/00Manufacture of carbon-steel, e.g. plain mild steel, medium carbon steel or cast steel or stainless steel
    • C21C5/52Manufacture of steel in electric furnaces
    • C21C5/54Processes yielding slags of special composition
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21CPROCESSING OF PIG-IRON, e.g. REFINING, MANUFACTURE OF WROUGHT-IRON OR STEEL; TREATMENT IN MOLTEN STATE OF FERROUS ALLOYS
    • C21C7/00Treating molten ferrous alloys, e.g. steel, not covered by groups C21C1/00 - C21C5/00
    • C21C7/04Removing impurities by adding a treating agent
    • C21C7/072Treatment with gases
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21CPROCESSING OF PIG-IRON, e.g. REFINING, MANUFACTURE OF WROUGHT-IRON OR STEEL; TREATMENT IN MOLTEN STATE OF FERROUS ALLOYS
    • C21C7/00Treating molten ferrous alloys, e.g. steel, not covered by groups C21C1/00 - C21C5/00
    • C21C7/10Handling in a vacuum

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Manufacturing & Machinery (AREA)
  • Treatment Of Steel In Its Molten State (AREA)

Abstract

The method that the present invention relates to the use of the direct alloy smelting variety steel of prepurging steel, belongs to EAF steelmaking technology field.The technical problem that this method solves is to provide the method using the direct alloy smelting variety steel of prepurging steel, this method includes electric furnace steel making, LF refining and VD applications of vacuum, wherein, the electric furnace steel making controls out content of MgO≤3.5% in slag, and the LF refining time is 60~80min;VD vacuum processing times 15~20min, VD application of vacuum terminates that rear molten steel is quiet to blow the time >=12min.Using the inventive method, it can newly repair body of heater in electric furnace or change the direct alloy smelting variety steel of the 1st~3 stove steel of slag line body of heater smelting, both be suitable for steel enterprise breed structure readjustment needs, and can is that enterprise brings preferable benefit.

Description

Utilize the method for the direct alloy smelting variety steel of prepurging steel
Technical field
The method that the present invention relates to the use of the direct alloy smelting variety steel of prepurging steel, and in particular to electric furnace is newly repaiied body of heater or changed Slag line body of heater smelts the control of prepurging steel purity of steel, belongs to EAF steelmaking technology field.
Background technology
The most common Wear mechanism of electric furnace body refractory material is to corrode, wash away, melting, peeling off and aquation, this five kinds because Most importantly corrode and wash away in element.The carbon component of refractory material is etched due to iron oxide or oxygen, is occurred following anti- Should:FeO+C=Fe+CO, O2+ 2C=2CO.Graphite or tar/resin reaction in the hot face of iron oxide and bricking in slag, or Oxygen corrodes the graphite or carbon binding agent of bricking huyashi-chuuka (cold chinese-style noodles).Now the surface strength of refractory brick reduces and causes to peel off.And wash away be by In molten steel or slag flow through refractory surface and physically wear or wash away furnace lining and result in physics damage.
When electric furnace newly repaiies body of heater or changes slag line body of heater and begin to use, because refractory material contacts with molten steel or clinker for the first time When, CaO, SiO in clinker2, Fe, Si, Al, Mn, C in FeO and molten steel etc. penetrate into the capillary channel of refractory material, therefore By rapid etching, the refractory surface being then etched forms one layer of fine and close sinter layer, hinders on refractory material top layer Molten steel or clinker further permeate into the capillary channel of refractory material, and etch rate decreases.Therefore electric furnace newly repaiies body of heater Or change the smelting of slag line body of heater the probability that is polluted by refractory material of the 1st stove molten steel it is higher.In addition, in initial stage fire resisting material of furnace body Moisture is also absorbed by molten steel, the hydrogen content increase of molten steel.Therefore, all regulation electric furnace newly repaiies body of heater or changes slag line substantially for domestic steel enterprise The 1st~3 stove steel (common name " prepurging steel ") that body of heater is smelted can only produce low-end product (such as straight carbon steel), and reason is exactly to produce " to wash The refractory material being etched during stove steel " is difficult to be removed after entering molten steel, causes the hydrogen in steel, oxygen content and B, D, Ds class to be mingled with Thing is higher, and purity of steel is poor.We were once sampled to " prepurging steel ", found hydrogen content >=4.5 × 10 in steel-6, oxygen Content >=38 × 10-6, the grading of B, D, Ds type impurity is higher more than 2.5 grades of probability, does not possess production alloy variety steel Condition.
As steel market in recent years is weak and the impact of bof process low cost steel billet, electric furnace can only using alloy variety steel as Developing direction, when electric furnace newly repaiies body of heater or changes slag line body of heater, often it is forced loss of capital production low-end product (such as straight carbon steel).Cause This, if the non-metallic inclusion and gas content of energy stability contorting " prepurging steel ", can newly repair body of heater in electric furnace or change slag line stove Direct alloy smelting variety steel during body.
In terms of current existing technology, do not find electric furnace newly repair body of heater or change the smelting of slag line body of heater the 1st~3 stove steel it is straight Connect the relevant report of alloy smelting variety steel.
The content of the invention
The technical problem that this method solves is to provide the method using the direct alloy smelting variety steel of prepurging steel, using the party Method, it can newly repair body of heater in electric furnace or change the 1st~3 stove steel of slag line body of heater smelting with regard to direct alloy smelting variety steel.
The method that the present invention utilizes the direct alloy smelting variety steel of prepurging steel, including electric furnace steel making, LF refining and VD vacuum Processing, wherein, the electric furnace steel making controls out content of MgO≤3.5wt% in slag, and the LF refining time is 60~80min;VD Vacuum processing time 15~20min, VD application of vacuum terminates that rear molten steel is quiet to blow the time >=12min.
Preferably, vacuum≤67Pa of VD applications of vacuum.
Further, after VD applications of vacuum terminate, preferably molten steel is kept under conditions of 40~80Nl/min of argon flow amount It is quiet to blow.
Heretofore described prepurging steel is preferably the 1st~3 stove steel that electric furnace newly repaiies body of heater or changes the smelting of slag line body of heater.
Preferably, it is 2.5~3.4wt% that the electric furnace steel making, which controls out the content of MgO in slag, during LF refining Between be 62~78min;VD 16~18min of vacuum processing time, vacuum are 37~65Pa, and it is quiet that VD applications of vacuum terminate rear molten steel Blow 13~17min of time.
Using the inventive method, it can newly repair body of heater at electric furnace or change the 1st~3 stove steel that slag line body of heater is smelted and directly smelt conjunction Golden variety steel, had both been suitable for steel enterprise breed structure readjustment needs, and and can is that enterprise brings preferable benefit.With prior art phase Than the present invention has the advantages that:
1st, this method can newly repair body of heater in electric furnace or change the direct alloy smelting kind of the 1st~3 stove steel of slag line body of heater smelting Steel.
2nd, it at electric furnace can newly repair body of heater by this method or change the 1st~3 stove steel that slag line body of heater is smelted and produce [H] < 2 ×10-6, [O] < 25 × 10-6Continuous casting billet, nonmetallic inclusionsin steel rating result meet standard requirement.
Embodiment
The method that the present invention utilizes the direct alloy smelting variety steel of prepurging steel, including electric furnace steel making, LF refining and VD vacuum Processing, wherein, the electric furnace steel making controls out content of MgO≤3.5% in slag, and the LF refining time is 60~80min;VD is true Empty 15~20min of processing time, VD applications of vacuum terminate that rear molten steel is quiet to blow the time >=12min.
Electric furnace newly repaiies body of heater or changes (mainly magnesia carbon refractory) when slag line body of heater begins to use, and smelts the 1st~3 stove 1~3 times of heat after the etch rate of refractory material is about during steel, wherein larger-size MgO particles are entered by floating In slag, MgO particles roll up in slag.And about 2800 DEG C of MgO fusing point, fusing point are higher, with MgO increase, slag Mobility be deteriorated therewith, delay the chemical reaction between slag steel, reduce the ability of slag dross inclusion adsorption.And size is less Then the long period is suspended in molten steel MgO particles, and is combined into complex inclusion with Al2O3, SiO2 of steel grade etc..Therefore must be strict Control electric furnace steel tapping when slag in MgO content.All it is mainly by stove from current control electric furnace steel tapping slag in terms of MgO technology Content of MgO in slag is controlled 5~12%, and furnace life is improved with this.When electric furnace newly repaiies body of heater or changes slag line body of heater and begin to use, by Do not form one layer of fine and close sinter layer also in refractory surface, though by the content of MgO control in clinker 5~ 12%, the etch of refractory material at initial stage can not be slowed down, therefore should be to control field trash as main purpose.Electric furnace smelting is taken on one side Slag charge is supplemented, flows the operator scheme of slag on one side, body of heater will be newly repaiied or changes refractory material that slag line body of heater is etched initial stage with clinker Outflow.Found through lot of experiments, content of MgO≤3.5% can repair body of heater or change slag line stove as new in clinker using before electric furnace steel tapping The foundation that the refractory material that body is etched initial stage is excluded substantially.
It is in increase trend to the field trash in molten steel that electric furnace, which is newly repaiied body of heater or changed when slag line body of heater smelts the 1st~3 stove steel, quilt After the refractory material of etch enters molten steel, larger-size to be removed soon by floating, size is less, needs longer Time could float removal.Therefore extend the time of LF refining furnace, then fully float and inhaled beneficial to the field trash in molten steel Attached removal.Through experiment, within LF refining furnace time 80min, the field trash in molten steel increases with refining time and gradually reduced, From not only ensure purity of steel but also do not influence rhythm of production consider, by LF refining furnace time control be 60~80min be suitable.
When electric furnace newly repaiies body of heater or changes slag line body of heater and begin to use, because puzzle joint material and refractory brick have all remained part water in itself Part (H2O), therefore electric furnace newly repaiies body of heater or changes the 1st~3 stove steel capital of slag line body of heater smelting and the problem of hydrogenation be present.Take molten steel vacuum The measure of (i.e. vacuum dehydrogenation) is handled, effectively prevent molten steel hydrogenation.By it was verified that VD vacuum drying ovens vacuum≤ During 67Pa, the molten steel vacuum retention time ensures that hydrogen content≤2.0ppm in steel more than 15min.But the vacuum retention time is unsuitable Long, overlong time then increases energy consumption and production cost.Therefore 15~20min of molten steel vacuum processing time is preferably to select.
In molten steel VD applications of vacuum, because molten steel is stirred vigorously, part slag is inevitably involved in molten steel, therefore Need to remove indrawn slag by quiet blow of molten steel.It was verified that protected under conditions of 40~80Nl/min of argon flow amount Hold that molten steel is quiet to be blown more than time 12min, can effective cleaning molten steel.
Prepurging steel of the present invention is that electric furnace newly repaiies body of heater or changes the 1st~3 stove steel of slag line body of heater smelting.
Preferably, it is 2.5~3.4% that the electric furnace steel making, which controls out the content of MgO in slag, the LF refining time For 62~78min;VD 16~18min of vacuum processing time, vacuum are 37~65Pa, and VD applications of vacuum terminate that rear molten steel is quiet to be blown 13~17min of time.
The steel-making step do not mentioned in the present invention is prior art, be will not be described here.
The embodiment of the present invention is further described with reference to embodiment, therefore not limited the present invention System is among described scope of embodiments.
The new stove of body of heater the 1st of the electric furnace of embodiment 1 smelts 27MnCr production technology
The new stove of body of heater the 1st of electric furnace smelts 27MnCr steel, controls following parameter:
[1] electric furnace steel tapping [C]=0.06%, (MgO)=2.7% in slag, 1634 DEG C of tapping temperature.
[2] LF refining furnace time 75min, 1647 DEG C of tapping temperature.
[3] the vacuum 65Pa of molten steel VD stoves application of vacuum, processing time 17min.
[4] VD applications of vacuum terminate that rear molten steel is quiet to blow time 13min, argon flow amount 65Nl/min.
[5] it is cast into ∮ 280mm continuous casting billets, sampling analysis, as a result:[H]=1.1 × 10-6, [O]=20 × 10-6
[6] non-metallic inclusion rating result is shown in Table 1 after continuous casting billet tube rolling.
The new stove of body of heater the 3rd of the electric furnace of embodiment 2 smelts 37Mn2 production technology
The new stove of body of heater the 3rd of electric furnace smelts 37Mn2 steel, controls following parameter:
[1] electric furnace steel tapping [C]=0.09%, (MgO)=3.2% in slag, 1628 DEG C of tapping temperature.
[2] LF refining furnace time 62min, 1643 DEG C of tapping temperature.
[3] the vacuum 41Pa of molten steel VD stoves application of vacuum, processing time 16min.
[4] VD applications of vacuum terminate that rear molten steel is quiet to blow time 16min, argon flow amount 60Nl/min.
[5] ∮ 350mm continuous casting billet sampling results are cast into:[H]=0.6 × 10-6, [O]=17 × 10-6
[6] non-metallic inclusion rating result is shown in Table 1 after continuous casting billet tube rolling.
The electric furnace of embodiment 3 changes the production technology that the stove of slag line body of heater the 1st smelts X42 steel
Electric furnace changes the stove of slag line body of heater the 1st and smelts X42 steel, controls following parameter:
[1] electric furnace steel tapping [C]=0.04%, (MgO)=2.5% in slag, 1651 DEG C of tapping temperature.
[2] LF refining furnace time 67min, 1655 DEG C of tapping temperature.
[3] the vacuum 37Pa of molten steel VD stoves application of vacuum, processing time 18min.
[4] VD applications of vacuum terminate that rear molten steel is quiet to blow time 17min, argon flow amount 40Nl/min.
[5] ∮ 200mm continuous casting billet sampling results are cast into:[H]=0.8 × 10-6, [O]=24 × 10-6
[6] non-metallic inclusion rating result is shown in Table 1 after continuous casting billet tube rolling.
The electric furnace of embodiment 4 changes the production technology that the stove of slag line body of heater the 2nd smelts L245N
Electric furnace changes the stove of slag line body of heater the 2nd and smelts L245N steel, controls following parameter:
[1] electric furnace steel tapping [C]=0.04%, (MgO)=3.4% in slag, 1649 DEG C of tapping temperature.
[2] LF refining furnace time 78min, 1657 DEG C of tapping temperature.
[3] the vacuum 52Pa of molten steel VD stoves application of vacuum, processing time 16min.
[4] VD applications of vacuum terminate that rear molten steel is quiet to blow time 13min, argon flow amount 80Nl/min.
[5] ∮ 200mm continuous casting billet sampling results are cast into:[H]=0.6 × 10-6, [O]=23 × 10-6
[6] non-metallic inclusion rating result is shown in Table 1 after continuous casting billet tube rolling.
The new stove of body of heater the 1st of the electric furnace of embodiment 5 smelts 30Mn production technology
The new stove of body of heater the 1st of electric furnace smelts 30Mn steel, controls following parameter:
[1] electric furnace steel tapping [C]=0.06%, (MgO)=3.1% in slag, 1644 DEG C of tapping temperature.
[2] LF refining furnace time 65min, 1645 DEG C of tapping temperature.
[3] the vacuum 45Pa of molten steel VD stoves application of vacuum, processing time 17min.
[4] VD applications of vacuum terminate that rear molten steel is quiet to blow time 15min, argon flow amount 50Nl/min.
[5] ∮ 200mm continuous casting billet sampling results are cast into:[H]=0.9 × 10-6, [O]=19 × 10-6
[6] non-metallic inclusion rating result is shown in Table 1 after continuous casting billet tube rolling.
The non-metallic inclusion rating result of table 1

Claims (3)

1. using the method for the direct alloy smelting variety steel of prepurging steel, including electric furnace steel making, LF refining and VD applications of vacuum, it is special Sign is:
The electric furnace steel making controls out content of MgO≤3.5wt% in slag, and the LF refining time is 60~80min;At VD vacuum Vacuum≤67Pa of reason, after VD vacuum processing times 15~20min, VD application of vacuum terminates, in 40~80Nl/ of argon flow amount Keep that molten steel is quiet blows under conditions of min, molten steel is quiet to blow the time >=12min.
2. the method according to claim 1 using the direct alloy smelting variety steel of prepurging steel, it is characterised in that:It is described to wash Stove steel is that electric furnace newly repaiies body of heater or changes the 1st~3 stove steel of slag line body of heater smelting.
3. the method according to claim 1 using the direct alloy smelting variety steel of prepurging steel, it is characterised in that:The electricity It is 2.5~3.4wt% that stove steel-making, which controls out the content of MgO in slag, and the LF refining time is 62~78min;During VD applications of vacuum Between 16~18min, vacuum is 37~65Pa, and VD applications of vacuum terminate that rear molten steel is quiet to blow 13~17min of time.
CN201610472103.7A 2016-06-24 2016-06-24 Utilize the method for the direct alloy smelting variety steel of prepurging steel Active CN105886700B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610472103.7A CN105886700B (en) 2016-06-24 2016-06-24 Utilize the method for the direct alloy smelting variety steel of prepurging steel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610472103.7A CN105886700B (en) 2016-06-24 2016-06-24 Utilize the method for the direct alloy smelting variety steel of prepurging steel

Publications (2)

Publication Number Publication Date
CN105886700A CN105886700A (en) 2016-08-24
CN105886700B true CN105886700B (en) 2017-11-10

Family

ID=56718474

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610472103.7A Active CN105886700B (en) 2016-06-24 2016-06-24 Utilize the method for the direct alloy smelting variety steel of prepurging steel

Country Status (1)

Country Link
CN (1) CN105886700B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113584259B (en) * 2021-08-03 2022-11-22 攀钢集团西昌钢钒有限公司 Method for washing RH furnace

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102021269A (en) * 2010-11-25 2011-04-20 攀钢集团钢铁钒钛股份有限公司 First furnace smelting method for new electric arc furnace
CN104178698A (en) * 2014-09-01 2014-12-03 山东钢铁股份有限公司 Method for preparing bearing steel
EP2876171A1 (en) * 2012-07-19 2015-05-27 Institute of Metal Research Chinese Academy of Sciences Method for controlling a segregation of steel ingots by purification of molten steel
CN104878297A (en) * 2015-05-19 2015-09-02 本钢板材股份有限公司 Production method of low-titanium bearing steel GCr15
CN105063474A (en) * 2015-08-26 2015-11-18 江苏省沙钢钢铁研究院有限公司 Electric furnace smelting method of steel for welding wires
CN105219919A (en) * 2015-09-25 2016-01-06 宝钢不锈钢有限公司 A kind of profit useless type stainless steel electric furnace foaming slag former and using method thereof
CN105483504A (en) * 2015-12-07 2016-04-13 攀钢集团成都钢钒有限公司 Production method for tube blank steel for -195 DEG C ultra-low temperature seamless steel tube

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102021269A (en) * 2010-11-25 2011-04-20 攀钢集团钢铁钒钛股份有限公司 First furnace smelting method for new electric arc furnace
EP2876171A1 (en) * 2012-07-19 2015-05-27 Institute of Metal Research Chinese Academy of Sciences Method for controlling a segregation of steel ingots by purification of molten steel
CN104178698A (en) * 2014-09-01 2014-12-03 山东钢铁股份有限公司 Method for preparing bearing steel
CN104878297A (en) * 2015-05-19 2015-09-02 本钢板材股份有限公司 Production method of low-titanium bearing steel GCr15
CN105063474A (en) * 2015-08-26 2015-11-18 江苏省沙钢钢铁研究院有限公司 Electric furnace smelting method of steel for welding wires
CN105219919A (en) * 2015-09-25 2016-01-06 宝钢不锈钢有限公司 A kind of profit useless type stainless steel electric furnace foaming slag former and using method thereof
CN105483504A (en) * 2015-12-07 2016-04-13 攀钢集团成都钢钒有限公司 Production method for tube blank steel for -195 DEG C ultra-low temperature seamless steel tube

Also Published As

Publication number Publication date
CN105886700A (en) 2016-08-24

Similar Documents

Publication Publication Date Title
CN100453657C (en) Mono-slag converter process for producing high carbon low-phosphorus molten steel
CN105671248B (en) A kind of smelting process of converter high efficiency dephosphorating
CN104878297A (en) Production method of low-titanium bearing steel GCr15
CN105420446A (en) Light treatment smelting method for ladle furnace (LF)
CN101096715A (en) Electric furnace smelting method for low-carbon low-silicon steel
CN104673960B (en) A kind of method of splashing slag in converter
CN105154623A (en) Efficient alloying method for smelting 38CrMoAl steel
CN112760550A (en) Production method of nickel-free copper-phosphorus weathering steel casting blank
CN106367553B (en) Titanium slag furnace by-product smelting low carbon ingot iron and its method
CN107058679A (en) A kind of method for stablizing half steel quality
CN104152632A (en) Extra furnace dephosphorization method for smelting by intermediate frequency furnace
CN105886700B (en) Utilize the method for the direct alloy smelting variety steel of prepurging steel
CN103484599B (en) Smelting method of high-manganese wear-resistant steel
WO2008009178A1 (en) Dephosphorization method in the process of smelting ni-cr pig iron from a nickel oxide ore
CN104988270A (en) Method for smelting pipeline steel with low cost
CN103205522B (en) Method for smelting plain carbon steel from semi-steel
CN111961791A (en) Method for producing low-phosphorus steel by smelting high-phosphorus high-titanium molten iron in converter
CN104046882B (en) The method that magnesia-calcium brick smelts austenitic stainless steel is discarded in a kind of AOD of utilization converter
CN103225034B (en) Method for improving yielding rate of ultra pure ferrite stainless steel titanium
CN106086287B (en) The method that semi-steel making improves aim carbon rear converter terminal residue adjustment
CN104745761B (en) The method of semisteel smelting converter terminal residue adjustment
CN108251598A (en) A kind of carburetting control nitrogen production process of middle carbon high-alloy steel
CN114472825A (en) Continuous casting method for non-calcium treated low-carbon aluminum killed phosphorus-containing steel
CN106191368A (en) A kind of production method of high alumina ultralow titanium molten steel
CN106811573A (en) Improve the manufacture method of the steel of molten steel casting properties

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant