CN105883336A - Dual taking and blending system and blending method thereof - Google Patents

Dual taking and blending system and blending method thereof Download PDF

Info

Publication number
CN105883336A
CN105883336A CN201610393436.0A CN201610393436A CN105883336A CN 105883336 A CN105883336 A CN 105883336A CN 201610393436 A CN201610393436 A CN 201610393436A CN 105883336 A CN105883336 A CN 105883336A
Authority
CN
China
Prior art keywords
reclaimer
main
host computer
time
feeding amount
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610393436.0A
Other languages
Chinese (zh)
Other versions
CN105883336B (en
Inventor
朱向东
张金丰
范铁彬
杨丰国
张舒琦
李梦楠
蔡淋霖
王虎
周向南
焦超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
QINHUANGDAO PORT CO Ltd
Original Assignee
QINHUANGDAO PORT CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by QINHUANGDAO PORT CO Ltd filed Critical QINHUANGDAO PORT CO Ltd
Priority to CN201610393436.0A priority Critical patent/CN105883336B/en
Publication of CN105883336A publication Critical patent/CN105883336A/en
Application granted granted Critical
Publication of CN105883336B publication Critical patent/CN105883336B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G43/00Control devices, e.g. for safety, warning or fault-correcting
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G63/00Transferring or trans-shipping at storage areas, railway yards or harbours or in opening mining cuts; Marshalling yard installations
    • B65G63/008Transferring or trans-shipping at storage areas, railway yards or harbours or in opening mining cuts; Marshalling yard installations for bulk material
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G2201/00Indexing codes relating to handling devices, e.g. conveyors, characterised by the type of product or load being conveyed or handled
    • B65G2201/04Bulk
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G2203/00Indexing code relating to control or detection of the articles or the load carriers during conveying
    • B65G2203/02Control or detection

Landscapes

  • Control Of Conveyors (AREA)

Abstract

The invention provides a dual taking and blending system. The dual taking and blending system comprises belt conveyors, a center control upper computer, a driving material taking machine, a driving upper computer, a driven material taking machine and a driven upper computer, wherein the center control upper computer, the driving material taking machine, the driving upper computer, the driven material taking machine and the driven upper computer are in communication connection, and the driving material taking machine and the driven material taking machine share working information for realizing simultaneous gathering of material flow of the one-line dual-taking or different-line dual-taking work at the preset time. The dual taking and blending system realizes automation and refinement of the blending work of different bulk materials, can be used for the coal blending work at ports and guarantees that the coal blending quality meets the requirements.

Description

Double take feed proportioning system and distribution thereof
Technical field
The present invention relates to a kind of feed proportioning system and method, take feed proportioning system and dispensing side thereof particularly to a kind of pair Method.
Background technology
In the industrial and mineral production processes such as coal and metallurgy, it is often necessary to the material that two or more is dissipated Carry out dispensing mixing, and the uniformity of guarantee and the accuracy of control proportion scale and dispensing mixing is needs The key issue solved.
Such as, current coal market structure is loose, and easy situation will become a kind of new normality.At this Planting under new normality, dominated by the market price, supply and demand both sides are more and more higher to the requirement of Coal Quality.According to Data statistics shows, coal blending workload accounting sustainable growth coal blending operation has become as a kind of normalization and runs mould Formula.For meeting user's request, need to promote further coal blending quality, it is achieved the Precise control of coal blending.Double Taking coal blending and relate to two reclaimers, only two reclaimers cooperate and just can complete.Two reclaimers How start and stop realize synchronizing, and how to realize joining the seamless of coal blending kind and cross and terminate, how to realize the most equal Even ginseng is joined, and two reclaimers of special circumstances how response etc., these factors, in coal blending operation process, are all Need dynamically control.
Situation with regard to current coal blending operation is seen, whole coal blending dynamically controls to still belong to a most spacious state of comparison. Automatic Coal Blending System seeks to be realized the dynamic control of coal blending by technological means, it is achieved between two reclaimers Real-time, interactive and real-time response, thus the requirement of the coal blending that reaches to become more meticulous.
Summary of the invention
It is an object of the invention to provide a kind of automatization, become more meticulous double take feed proportioning system and double take dispensing side Method.For achieving the above object, the solution of the present invention is as follows:
A kind of pair takes feed proportioning system, for dissipating feeding and the dispensing of material, comprising: belt feeder, middle control Host computer, main reclaimer and main host computer, from reclaimer and from host computer,
Described middle control host computer, main reclaimer and main host computer, from reclaimer and between host computer keep phase Intercommunication connects,
Described main reclaimer and the material stream being taken as industry by the realization pair of shared job information from reclaimer converge simultaneously Collection is to Rendezvous Point.
Further, described job information includes: target feeding amount, main reclaimer and from reclaimer judge, prolong Time after and current accumulative feeding amount, instantaneous delivery, job scheduling percentage ratio, dispensing real-time scale.
Further, described target feeding amount for specify double be taken as in industry main reclaimer and needed for reclaimer feeding Tonnage;
Described main reclaimer and being judged as according to the first reclaimer (21) and the second reclaimer (22) point from reclaimer Distance between other and described Rendezvous Point, it is judged that distant is main reclaimer, and close together be from Reclaimer;
Accumulative feeding amount, instantaneous delivery and job scheduling percentage ratio after described time delay, for according to obtain master, Flow to reach the time difference of Rendezvous Point from reclaimer each material, first by accumulative feeding amount current for main reclaimer, The data of instantaneous delivery and job scheduling percentage ratio carry out storing rather than being transmitted directly to from reclaimer, only Have and just the data of storage are read by the storehouse treatment principle of first in first out after described time difference, and show On the host computer of reclaimer, the speed adjusting feeding in real time according to these data from reclaimer comes close to requirement Proportion scale;
Described current accumulative feeding amount, instantaneous delivery and job scheduling percentage ratio refer to main reclaimer and from feeding Accumulative feeding amount, instantaneous delivery and the job scheduling percentage ratio that machine is the most real-time;
Described dispensing real-time scale is main reclaimer and from reclaimer respective material stream when material stream collects simultaneously Real-time scale, when the first reclaimer (21) is main reclaimer, described dispensing real-time scale is the first feeding The instantaneous delivery that instantaneous delivery after machine (21) time delay is more current than upper second reclaimer (22), or described dispensing Real-time scale is tires out more current than upper second reclaimer (22) of the accumulative feeding amount after the first reclaimer (21) time delay Long-pending feeding amount;When the first reclaimer (21) is from reclaimer, described dispensing real-time scale is the first reclaimer (21) current instantaneous delivery is than the instantaneous delivery after the time delay of upper second reclaimer (22), or described dispensing is real Time ratio be the current accumulative feeding amount of the first reclaimer (21) than after the time delay of upper second reclaimer (22) accumulative Feeding amount.
Further, double take job initiation time, from reclaimer place belt delayed startup, and ensure material stream Collect in Rendezvous Point simultaneously.
Further, described system also includes that alarm device, described main reclaimer job scheduling percentage ratio prolong Time process, when described job scheduling percentage ratio is more than 100%, or
When described dispensing real-time scale and setting ratio exceed ± 10% time, or
When main reclaimer and the job scheduling percentage ratio from reclaimer differ by more than 10%, alarm device sends Report to the police;
Further, described middle control host computer is provided with material variety information, deposit material target buttress position information, Target feeding amount, target bin number, target binning amount and batching mode;
The display unit of described main host computer is located on the instrumental panel panel of described main reclaimer, and shows that it is made Industry information;
The described display unit from host computer is located at described from the instrumental panel panel of reclaimer, and shows that it is made Industry information.
Further, described double it is taken as collinear double take or different line is double takes.
A kind of above-mentioned double feed proportioning system that takes is used to carry out double method taking dispensing, it is characterised in that:
The first step, inputs material variety information at middle control host computer, deposits the target buttress position information of material, mesh Mark feeding amount, target bin number, target binning amount, batching mode, obtain according to the ratio of target feeding amount and set Fixed proportion scale;
Second step, it is judged that main reclaimer and from reclaimer, it is thus achieved that material stream from main reclaimer and from reclaimer to The time difference of Rendezvous Point;
3rd step, the data of its accumulative feeding amount, instantaneous delivery and job scheduling percentage ratio are entered by main reclaimer Row stores, and shows on reclaimer host computer with the described time difference time delay in second step;
4th step, main reclaimer and the job information shown according to its respective host computer from reclaimer carry out phase Answer operation.
Further, when the job scheduling percentage ratio that master and slave reclaimer host computer shows is more than 100%, stop Operation is also sent warning by alarm device;Or
When two reclaimer progresses of operation differ by more than 10%, stop operation and sent report by alarm device Alert.
It is an advantage of the present invention that double feed proportioning system that takes is by arranging master and slave reclaimer and shared mutual Job information, can be to feeding and the accurate control of blending process, especially from reclaimer according to through certain The job information of the main reclaimer after time delay adjusts feeding amount and feeding progress, it is ensured that master and slave take The taken material of material machine collects in the Rendezvous Point specified simultaneously, it is achieved thereby that control proportion scale accurately and It is uniform that dispensing mixes.
Accompanying drawing explanation
Fig. 1 is to utilize the present invention couple to take feed proportioning system to carry out the schematic diagram of coal blending
Fig. 2 is to utilize the present invention couple to take feed proportioning system to carry out the startup journey figure of coal blending
Fig. 3 is to utilize the present invention couple to take feed proportioning system to carry out the operational flow diagram of coal blending
Fig. 4 is to utilize the present invention couple to take feed proportioning system to carry out the stopping flow chart of coal blending
Detailed description of the invention
The double of the present invention take feed proportioning system, and its capital equipment related to is: main reclaimer, from reclaimer, skin Band machine and control device.Scattered material is taken out from stockyard by reclaimer, is transported to specify position by belt feeder, Transporting equipment (such as boats and ships) is sent into again by charging appliance (such as ship loader).Wherein, control device bag Include: middle control host computer, the main host computer of main reclaimer and from reclaimer from host computer, control device is preferred Possess calculating for PLC or industrial computer etc. and process the equipment of function, be used for calculating reclaimer distance, main reclaimer With from reclaimer delay value and storage feeding instantaneous delivery and cumulant etc..Middle control host computer, main reclaimer And main host computer, from reclaimer and keep being in communication with each other connection between host computer, main reclaimer and from feeding Machine realizes collinear double take or the double material stream being taken as industry of different line is pooled to specify at the same time by shared job information Rendezvous Point.The present invention double take feed proportioning system and further relate to following equipment:
1) reclaimer and the position detecting device of charging appliance, generally encoder, Gray bus or GPS Positioners etc., are mainly used in the position detection of reclaimer etc., and then according to position judgment master slave relation and stream Measure the time difference to Rendezvous Point;
2) metering devices such as the real-time weighing-appliance of material, such as belt conveyer scale are dissipated, for monitoring reclaimer feeding Instantaneous delivery and the cumulant in certain time;
3) data transmission set, can use fiber optic communications or wireless telecommunications physical medium, by the feeding of reclaimer Data are transferred mutually by transmitting and receiving device;
4) human-computer interaction device, can be computer or the graphics device of other customizations, for operation Personnel provide current proportion scale information, to adjust flow targetedly.
Should be appreciated that the present invention double take feed proportioning system be applicable to various occasion (such as: harbour, steel mill, Power plant, grain distribution station and feed factory etc.) dispersion stacked or the material deposited (such as: coal, Ore, sand Stone and grain etc.) carry out feeding, dispensing etc..Multiple (second is such as set up from taking from reclaimer by setting up Material machine, the 3rd from reclaimer) can realize feeding and the dispensing of multiple different material, i.e. take dispensing more.
Hereinafter double the taking by harbour to the present invention double, is taken feed proportioning system as a example by coal blending transport and be described further.
In order to realize being mixed the most uniformly by two different kinds of coal, have employed Fig. 1 Shown double taking feed proportioning system, its capital equipment related to is: main reclaimer 21 and from reclaimer 22, skin Band machine 31-36 and control device.Wherein, control device includes middle control host computer, the Your Majesty of main reclaimer Position machine and from reclaimer from host computer.First, reclaimer by two different kinds of coal respectively from stockyard 11 Take out in 12, be delivered to transferring tower 41,42 by belt feeder 31,32 the most respectively, then by belt feeder 33-36 is transported to ship loader 51-54, finally sends into boats and ships.Main reclaimer and being believed by shared operation from reclaimer Breath realizes collinear double take or the double coal stream being taken as industry of different line is pooled to Rendezvous Point simultaneously.
Fig. 2 is to utilize the present invention double to take feed proportioning system to carry out the Booting sequence figure of coal blending.At middle control host computer After upper selected flow process, reclaimer host computer judges whether this reclaimer is main reclaimer, if main reclaimer, First the most main reclaimer starts, if it is determined that this reclaimer is from reclaimer, does not then receive startup from reclaimer Before signal, wait enabling signal.Main reclaimer enters next step after starting and judges whether heavy duty.Take if main Material machine is not heavy duty, then be directly entered process flow operation.If main reclaimer is case of heavy load, at this moment need from Reclaimer dispensing together, then override signal can be sent to from reclaimer after main reclaimer starts, from feeding Machine enters trigger countdown after receiving main reclaimer override signal, and countdown brings into operation after terminating, enters Enter process flow operation, thus realize the flow process of master and slave two reclaimer dispensings together.
Fig. 3 is to utilize the present invention couple to take feed proportioning system to carry out the operational flow diagram of coal blending.In process flow operation process In, main reclaimer shows current accumulative feeding amount, instantaneous delivery and job scheduling percentage ratio, and according to working as Front value carries out coal blending.And need time delay from information such as the instantaneous delivery of reclaimer, accumulative feeding amounts.Time delay After accumulative feeding amount, instantaneous delivery and job scheduling percentage ratio, refer to master and slave take according to calculate Material machine each coal flows to reach ship loader time difference, first main reclaimer is currently added up feeding amount, instantaneous delivery Carry out storing rather than being transmitted directly to from reclaimer with the data of job scheduling percentage ratio, only work as the time After difference, the data of storage are read by side by the storehouse treatment principle of first in first out, and show from reclaimer On host computer, the speed that manipulation personnel adjust feeding in real time according to these data comes close to the chlorine adding ratio required.
Fig. 4 is to utilize the present invention couple to take feed proportioning system to carry out the stopping flow chart of coal blending.In stopping flow process, Main reclaimer first completes feeding task, i.e. can be out of service after completing feeding task, when system judges main taking In the case of material machine completes feeding task and has been zero load, transmission airborne signals is to from reclaimer, from feeding Machine starts countdown, and countdown terminates, then also stop feeding from reclaimer, and i.e. all reclaimer is out of service, Complete feeding task.
Utilize that the present invention is double to be taken feed proportioning system to carry out the concrete operations running of coal blending as follows:
First, in middle control host computer typing production information, i.e. choose corresponding pair and take dispensing flow process, including: Coal information, deposit the target buttress position information of material, target feeding amount, target bin number, target binning amount and Coal blending mode and chlorine adding ratio.
Then, sending the production information of above typing, corresponding two reclaimers all can receive institute's transmission information, And show on host computer, hereafter will will be described in detail.
Middle control host computer flow monitoring include monitor coal blending relevant information, as the job information of reclaimer i.e. pile up neatly position, Coal, target feeding amount, accumulative feeding amount, coal blending real-time scale, reclaimer job scheduling (main reclaimer Do delay process).
Principal and subordinate's reclaimer judges: takes in flow process at different line pair, according to the encoder numerical value of two reclaimers, changes Be counted as the reclaimer transferring tower distance to place belt, concrete, distance between reclaimer and transferring tower with Reclaimer encoder numerical value is corresponding, therefore, it can converse reclaimer according to reclaimer encoder numerical value and arrives The transferring tower distance of place belt, further according to the distance of each transferring tower to transferring tower 41, draws two reclaimers To the distance of transferring tower 41, further according to the encoder numerical value of ship loader, it is converted into ship loader to 41 transferring towers Distance, concrete, the distance between ship loader with transferring tower is corresponding with ship loader encoder numerical value, therefore, Can converse ship loader to transferring tower distance according to ship loader encoder numerical value, finally summation draws each feeding Machine is to the distance of ship loader.
Because reclaimer is different to the distance of ship loader, if two reclaimers start simultaneously at operation, distance is relatively The coal taken of near reclaimer would first, through ship loader, and such coal blending quality is uneven.At the end of flow process, If two reclaimers complete feeding task simultaneously, the part of coal that distant reclaimer is taken will be last By ship loader, such coal blending quality is uneven, the finest, it is impossible to reach the requirement of client.So in order to Ensure becoming more meticulous must be requested that the coal stream of two reclaimers crosses to Rendezvous Point and ties simultaneously simultaneously of coal blending Bundle.
Distance according to reclaimer to ship loader compares and determines close together being set to from reclaimer, and distance Farther out be set to main reclaimer, by being calculated the range difference of two reclaimers and known each belt feeder The speed of service, draw two reclaimers to shipment machine-made egg-shaped or honey-comb coal briquets stream from getting the time difference of dress, and this time difference It is exactly reclaimer with playing the error that the coal stream caused with the stopping time can not collect and terminate.So when main reclaimer is transported During row, collect according to time difference delayed startup, such guarantee coal stream from reclaimer simultaneously.When main feeding When machine completes feeding, completing feeding from reclaimer according to time difference time delay, such guarantee coal stream is with for the moment Between terminate.
Owing to reclaimer driver operation level is inconsistent, it is impossible to ensure that reclaimer brings into operation with regard to feeding, in order to Reducing temporal error, design is when flow startup, and main reclaimer is first begin to feeding, when belt conveyer scale wink Shi Liuliang, more than 300 ton hour lasting more than 5s, determines that main reclaimer is in heavy service, and will weight Information carrying number is sent automatically to from reclaimer, now starts feeding from reclaimer, reduces the most further by mistake Difference.
After flow process brings into operation, will be according to flow and the progress tightly following main reclaimer from reclaimer, it is ensured that The main reclaimer of reclaimer progress infinite approach, when reclaimer is near completion feeding task, and main reclaimer feeding is entered Degree reaches 100% the most out of service, now airborne signals is sent to from reclaimer, receives letter from reclaimer After number, start to stop feeding countdown, need in count down time, complete taking of self from reclaimer driver Material task.Thus whole flow process terminates, coal blending program completes.
Delay process: in reclaimer operation process, reclaimer only shows that the instantaneous delivery of the other side is not anticipate Justice, because needing to follow main reclaimer from reclaimer, if according to the main reclaimer of display from reclaimer Instantaneous delivery carries out with reference to feeding, then the material that the same time is taken from reclaimer and main reclaimer can not be Finally pool together, so this instantaneous delivery for just becoming nonsensical from reclaimer.In order to solve This problem, it is simply that ensure to have used with main reclaimer flows match from the instantaneous delivery of reclaimer State the time difference mentioned, by PLC program, instantaneous delivery each second of main reclaimer stored, So time difference is within several seconds, just to store how many data, then the data stored at first are shown from reclaimer Host computer on, carry out the most successively, the first spilling first stored.Now, reclaimer is with reference to this time difference Instantaneous delivery after time delay carries out feeding, the coal so taken just and display main reclaimer instantaneous delivery After pool together, reflect coal blending quality at that time.
Same reason, if entered according to current accumulative feeding amount and the reclaimer of main reclaimer from reclaimer Degree is followed, then two reclaimers will complete feeding task simultaneously, and the most out of service, then Coal stream can not terminate the same time, so main reclaimer shown from reclaimer adds up feeding amount and takes Material machine progress also operation delay process, processing method is ibid.
Meanwhile, due to from reclaimer starting more late than main reclaimer, therefore, from the point of view of energy-conservation, The time after the belt feeder delayed startup from reclaimer place, the time of time delay and time delay it is provided with in program Unanimously.Thus avoid the long-time zero load from reclaimer place belt feeder.
By above method, four flow monitoring pages at middle control host computer add relevant information, convenient Middle control dispatcher's overall management and monitoring coal blending performance, it is ensured that coal blending quality.
The job information of reclaimer includes: coal blending real-time scale, refers to double take in flow process, the coal of two reclaimers The real-time scale of two kinds of coals at stream Rendezvous Point, as it is shown in figure 1, Rendezvous Point i.e. belt feeder 32 and belt feeder 35 (any one in belt feeder 33-36 can be selected as required, the most only as a example by belt feeder 35) Joint;Accumulative feeding amount, the accumulative feeding amount of the most main reclaimer has done delay process, from reclaimer The feeding amount of display current time.Reclaimer job scheduling shows and includes: add taking of reclaimer 21,22 Material progress, computational methods are that the cumulant of reclaimer is done divided by target feeding amount, the most main reclaimer progress Delay process, when progress is more than 100%, can flash warning.When two reclaimer progresses of operation differ by more than 10%, also can point out warning.
The computational methods of real-time scale are: when reclaimer 21 is main reclaimer, and real-time scale is reclaimer Instantaneous delivery after 21 time delays is than the instantaneous delivery of upper reclaimer 22, or real-time scale is that reclaimer 21 prolongs Accumulative feeding amount time after is than the accumulative feeding amount of upper reclaimer 22;When reclaimer 21 is from reclaimer, Real-time scale be the current instantaneous delivery of reclaimer 21 than the instantaneous delivery after the time delay of upper reclaimer 22, or Real-time scale is that the current accumulative feeding amount of reclaimer 21 is than the accumulative feeding amount after the time delay of upper reclaimer 22. Although instantaneous delivery has certain undulatory property, but from general trend body, can passing ratio size obtain Go out and control the fine degree of coal blending.
Middle control dispatcher just can check real-time coal blending process according to the data shown by the upper page, when During the feeding progress infinite approach of the reclaimer of two reclaimers, illustrate that coal blending quality is the highest.
Reclaimer is as the tool-type equipment of feeding, and its duty is to determine the important composition of coal blending quality Part.Reclaimer become more meticulous now coal blending aspect urgent problem have following some:
(1) duty of the other side's reclaimer cannot be known during reclaimer coal blending operation, between big machine driver more Real-time communication cannot be accomplished, it is difficult to ensure coal blending effect.
The big machine driver of (2) two coal blending operations cannot judge two by the positional information of two reclaimers The relative feeding time difference of big machine, this has resulted in all can there is coal in two stages of flow startup and stopping The situation that stream cannot mix so that coal blending quality declines.
(3) double when taking batch operation, owing to the maximum stream flow sum of two reclaimers is far longer than ground belt Bearing capacity, this damage being possible to cause ground belt.
(4) during reclaimer operation, data that belt claims that what driver paid close attention to most is exactly, and these data are by many The conversion of individual link and transmission, real-time is not enough, has certain time delay.
For with above Railway Project, start with in terms of upper display of reclaimer etc., it transformed.
1. according in control the job instruction provided, carry out logical operations with PLC program, it is judged that whether flow process is Coal blending flow process;Judge the reclaimer numbering of two coal blendings;What so both sides driver just can be real-time Solve handling situations and the progress of the other side's reclaimer, from the beginning of operation until the end of operation, be achieved that Fine-grained management to whole coal blending process.
2., after being extracted data, double ship loader " leading " rank reclaimer farther out of adjusting the distance in blending process is taken Requiring relatively low, he has only to ensure data according to the numerical value of upper " the target instantaneous delivery " calculated as far as possible Feeding amount uniformly.And for distance ship loader close together " from " for rank reclaimer, To be controlled is the most.Because the reclaiming process " leading " rank reclaimer has occurred and that, it is can not Change, this just require " from " rank reclaimer to follow " leading " rank reclaimer always and carry out operation, Coal blending quality is ensured with this.In order to greatest extent convenient " from " operation of rank reclaimer, carry for it Data are the most intuitively supplied.
To " from " for reclaimer, the target instantaneous delivery of oneself reclaimer includes: the mesh of oneself reclaimer Mark instantaneous delivery, draws according to the chlorine adding ratio of two reclaimers.No matter " lead " or " from " reclaimer The workload needing to reach in oneself this flow process will be understood, to reach the highest work by these data Industry efficiency.
The other side's reclaimer is that the work data of " leading " reclaimer includes: the work data of the other side's reclaimer, bag (delay process by being taken now coal stream with oneself to include the other side's instantaneous delivery after the other side's reclaimer numbering, time delay The instantaneous delivery of " leading " reclaimer converged), (delay process is for for the other side's actual feeding amount after time delay " leading " reclaimer integrated flow through converging with oneself taken coal stream) and the target feeding amount etc. of the other side. By these data, " from " reclaimer can be real-time the working condition grasping the other side's reclaimer, the most whole Individual work flow, and by with the other side's time delay after instantaneous delivery ensure that ground belt occurs without overload condition, Ensure that the safety of equipment.
The instantaneous delivery of this reclaimer includes with cumulative amount: the instantaneous delivery of this reclaimer and cumulative amount, helps Driver understands the handling situations of oneself.
The job schedule of both sides' reclaimer includes with real-time chlorine adding ratio: the job schedule of both sides' reclaimer and reality Time chlorine adding ratio, this has also been the major part of coal blending of becoming more meticulous, and " leads " rank feeding in this part Machine can only see the job schedule of oneself, is only its offer and shows intuitively.And " from " rank takes Material machine is necessary for paying close attention in real time the progress of both sides, in operation process, he to ensure as far as possible the progress on both sides without Limiting close, the chlorine adding ratio of display is identical with the chlorine adding ratio of actual requirement in real time, if " from " rank feeding Machine has ensured this state, finally can be realized as optimal coal blending effect.
3. in order to avoid the situation that coal stream cannot mix occurring the two of flow startup and stopping stages, at stream Two stages of Cheng Qidong and stopping show for having carried out animation from rank reclaimer, and driver can pass through this Display starts feeding and stops feeding, ensures that coal stream is in flow startup and two stages of stopping with this Also can guarantee that good mixing." from " rank reclaimer can be according to the animation effect of coal stream flowing with during feeding Between countdown control the time that feeding starts, at the end of feeding countdown, reclaimer just should be Feeding starts, and what upper interface there is also " can be with feeding " flashes prompting.When system detects feeding After machine feeding, flashing prompting will disappear.
When flow process stops taking, upper also having shuts down prompting accordingly.
In conjunction with Fig. 1-4, main reclaimer 21 with carry out coal blending operation, the most main reclaimer 21 from reclaimer 22 The material taken (can be selected in belt feeder 33-36 to belt feeder 35 as required by belt feeder 31 transport Any one, the most only as a example by belt feeder 35), and the material taken from reclaimer 22 passes through belt feeder 32 transports are to belt feeder 35, then arrive ship loader 54 by belt feeder 35 transport.
After middle control chooses this flow process, PLC program calculates main reclaimer 21 automatically, from reclaimer 22, time Between difference for 60s, start to input production information, production information includes: main reclaimer taken coal information, deposit Put the buttress position information of material, target feeding amount, such as 3000 tons;From reclaimer 22 taken coal information, Buttress position information, target feeding amount, such as 3000 tons;The storehouse number of boats and ships corresponding to ship loader 54;Coal blending side Formula, such as " double take ".Target binning amount automatically generates, for example, according to the target feeding amount of principal and subordinate's reclaimer 6000 tons, if the target feeding amount of principal and subordinate's reclaimer is all 3000 tons, then chlorine adding ratio automatically generates, For example, 1:1, selects the berth at boats and ships place, finally sends these production informations above-mentioned.
The data of middle control institute typing have been sent on two reclaimers of operation at once, and middle control starts Booting sequence, First belt feeder 31 brings into operation, and main reclaimer 21 starts feeding, and middle control host computer display belt feeder 5 is opened The countdown of beginning 60s, when main reclaimer 21 reach heavy duty require time, send self from trend from reclaimer 22 Override signal, starts feeding countdown 60s, from reclaimer 22 after 60s from the display of reclaimer 22 host computer Starting feeding, stream acquired by the most main reclaimer 21 should be on belt feeder 31, but along with the fortune of belt feeder OK, the material that main reclaimer 21 is taken by with the material taken from reclaimer 22 at belt feeder 35 and belt feeder 32 Intersection collect the same time.
In operation process, main reclaimer 21 can check the job scheduling percentage ratio from reclaimer 22 at any time, The job scheduling before main reclaimer 60s can be viewed, when from reclaimer 22 feeding progress from reclaimer 22 When differing bigger with main reclaimer 21 feeding progress, preferably differ by more than ± 10% time, middle control host computer, master Reclaimer host computer and warning reminding, reclaimer being adjusted according to own situation from reclaimer host computer Whole.
When flow process closes to an end, first main reclaimer 21 completes feeding task, and main reclaimer 21 stops fortune Airborne signals is also automatically transmitted to from reclaimer 22 by row, starts display and stop from reclaimer 22 host computer Feeding countdown 60s, needs to complete self feeding task in this 60s, from taking after 60s from reclaimer 22 Material machine 22 is out of service, and along with the operation of belt feeder, two-way stream will be at belt feeder 32 and belt feeder 35 Intersection terminate the same time.
By above means, it is possible to allow driver have a relatively accurate feeding and to stop the time taken, thus Being sufficiently mixed of coal stream can be accomplished accurately, improve coal blending quality.
Above, with reference to the accompanying drawings of the present invention and embodiment.And these embodiments are included in the present invention In technological thought described in claim.Further, these embodiments are merely exemplary, do not apply Carry out limited interpretation scope of the presently claimed invention.

Claims (9)

1. double take a feed proportioning system, for dissipating feeding and the dispensing of material, it is characterised in that comprising:
Belt feeder, middle control host computer, main reclaimer and main host computer, from reclaimer and from host computer,
Described middle control host computer, main reclaimer and main host computer, from reclaimer and between host computer keep be in communication with each other connection,
Described main reclaimer and the material stream being taken as industry by the realization pair of shared job information from reclaimer are pooled to Rendezvous Point simultaneously.
2. as claimed in claim 1 pair takes feed proportioning system, it is characterised in that:
Described job information includes: target feeding amount, main reclaimer and judging from reclaimer, after time delay and current accumulative feeding amount, instantaneous delivery, job scheduling percentage ratio, dispensing real-time scale.
3. as claimed in claim 2 pair takes feed proportioning system, it is characterised in that:
Described target feeding amount be specify double be taken as in industry main reclaimer and needed for reclaimer the tonnage of feeding;
Described main reclaimer and be judged as the distance respectively and between described Rendezvous Point according to the first reclaimer (21) and the second reclaimer (22) from reclaimer, it is judged that distant is main reclaimer, and close together be from reclaimer;
Accumulative feeding amount after described time delay, instantaneous delivery and job scheduling percentage ratio, for according to the master obtained, flow to reach the time difference of Rendezvous Point from reclaimer each material, first by accumulative feeding amount current for main reclaimer, the data of instantaneous delivery and job scheduling percentage ratio store, rather than it is transmitted directly to from reclaimer, only just the data of storage are read by the storehouse treatment principle of first in first out after described time difference, and show on the host computer of reclaimer, the speed adjusting feeding in real time according to these data from reclaimer comes close to the proportion scale required;
Described current accumulative feeding amount, instantaneous delivery and job scheduling percentage ratio refer to main reclaimer and from the most real-time accumulative feeding amount, instantaneous delivery and the job scheduling percentage ratio of reclaimer;
Described dispensing real-time scale is main reclaimer and from reclaimer real-time scale of respective material stream when material stream collects simultaneously, when the first reclaimer (21) is main reclaimer, described dispensing real-time scale is the instantaneous delivery that the instantaneous delivery after the first reclaimer (21) time delay is more current than upper second reclaimer (22), or described dispensing real-time scale is the accumulation feeding amount that the accumulative feeding amount after the first reclaimer (21) time delay is more current than upper second reclaimer (22);When the first reclaimer (21) is from reclaimer, described dispensing real-time scale is the current instantaneous delivery of the first reclaimer (21) than the instantaneous delivery after the time delay of upper second reclaimer (22), or described dispensing real-time scale is that the current accumulative feeding amount of the first reclaimer (21) is than the accumulative feeding amount after the time delay of upper second reclaimer (22).
4. as claimed in claim 3 double take feed proportioning system, it is characterised in that: double take job initiation time, from reclaimer place belt delayed startup, and ensure that material stream collects in Rendezvous Point simultaneously.
5. as claimed in claim 3 pair takes feed proportioning system, it is characterised in that: described system also includes alarm device, and described main reclaimer job scheduling percentage ratio has done delay process, when described job scheduling percentage ratio is more than 100%, or
When described dispensing real-time scale and setting ratio exceed ± 10% time, or
When main reclaimer and the job scheduling percentage ratio from reclaimer differ by more than 10%,
Alarm device sends warning.
6. double as described in any one of claim 1-5 take feed proportioning system, it is characterised in that:
Described middle control host computer is provided with material variety information, deposits target buttress position information, target feeding amount, target bin number, target binning amount and the batching mode of material;
The display unit of described main host computer is located on the instrumental panel panel of described main reclaimer, and shows its job information;
The described display unit from host computer is located at described from the instrumental panel panel of reclaimer, and shows its job information.
7. as claimed in claim 6 double take feed proportioning system, it is characterised in that: described double it is taken as collinear double take or different line is double takes.
8. one kind uses double feed proportioning system that takes according to claim 6 to carry out double method taking dispensing, it is characterised in that:
The first step, inputs material variety information at middle control host computer, deposits the target buttress position information of material, target feeding amount, target bin number, target binning amount, batching mode, obtain, according to the ratio of target feeding amount, the proportion scale set;
Second step, it is judged that main reclaimer and from reclaimer, it is thus achieved that material stream is from main reclaimer and the time difference from reclaimer to Rendezvous Point;
3rd step, the data of its accumulative feeding amount, instantaneous delivery and job scheduling percentage ratio are stored by main reclaimer, show on reclaimer host computer with the described time difference time delay in second step;
4th step, main reclaimer and the job information shown according to its respective host computer from reclaimer carry out corresponding operation.
The most according to claim 8 pair takes distribution, it is characterised in that: when the job scheduling percentage ratio that master and slave reclaimer host computer shows is more than 100%, stops operation and sent warning by alarm device;Or
When two reclaimer progresses of operation differ by more than 10%, stop operation and sent warning by alarm device.
CN201610393436.0A 2016-06-03 2016-06-03 It is double to take feed proportioning system and its distribution Active CN105883336B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610393436.0A CN105883336B (en) 2016-06-03 2016-06-03 It is double to take feed proportioning system and its distribution

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610393436.0A CN105883336B (en) 2016-06-03 2016-06-03 It is double to take feed proportioning system and its distribution

Publications (2)

Publication Number Publication Date
CN105883336A true CN105883336A (en) 2016-08-24
CN105883336B CN105883336B (en) 2017-12-29

Family

ID=56710284

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610393436.0A Active CN105883336B (en) 2016-06-03 2016-06-03 It is double to take feed proportioning system and its distribution

Country Status (1)

Country Link
CN (1) CN105883336B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108363353A (en) * 2018-03-12 2018-08-03 唐山曹妃甸实业港务有限公司 The operation quality guarantee of more reclaimer proportioning operating systems and operation quality detection method
CN114476706A (en) * 2021-12-08 2022-05-13 中交水运规划设计院有限公司 Coal blending method
US20220342536A1 (en) * 2021-04-26 2022-10-27 Bushel, Inc. User interface for adjusting component proportions
CN117075479A (en) * 2023-09-15 2023-11-17 秦皇岛燕大滨沅科技发展有限公司 Uniform batching control system and method for bulk cargo port

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11180561A (en) * 1997-12-22 1999-07-06 Kawasaki Heavy Ind Ltd Quantitative dispensation controller for delivering equipment for coal or the like
JP2002234611A (en) * 2001-02-09 2002-08-23 Mitsui Miike Mach Co Ltd Mixed coal delivery control system by reclaimer
KR100752124B1 (en) * 2006-03-27 2007-08-24 주식회사 포스코 Belt conveyor total weighing control apparatus
CN103625936A (en) * 2013-12-18 2014-03-12 泰富重工制造有限公司 Material filing and taking operating line arrangement structure of scattered material storage yard and filing and taking technology
CN103738705A (en) * 2014-01-08 2014-04-23 中国神华能源股份有限公司 Material fetching machine coal blending control method and system
CN203581900U (en) * 2013-12-12 2014-05-07 南京西坝码头有限公司 Coal blending PLC control management system
CN103803278A (en) * 2014-02-10 2014-05-21 中国神华能源股份有限公司 Method, device and system for controlling blended coal flow of double reclaimers

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11180561A (en) * 1997-12-22 1999-07-06 Kawasaki Heavy Ind Ltd Quantitative dispensation controller for delivering equipment for coal or the like
JP2002234611A (en) * 2001-02-09 2002-08-23 Mitsui Miike Mach Co Ltd Mixed coal delivery control system by reclaimer
KR100752124B1 (en) * 2006-03-27 2007-08-24 주식회사 포스코 Belt conveyor total weighing control apparatus
CN203581900U (en) * 2013-12-12 2014-05-07 南京西坝码头有限公司 Coal blending PLC control management system
CN103625936A (en) * 2013-12-18 2014-03-12 泰富重工制造有限公司 Material filing and taking operating line arrangement structure of scattered material storage yard and filing and taking technology
CN103738705A (en) * 2014-01-08 2014-04-23 中国神华能源股份有限公司 Material fetching machine coal blending control method and system
CN103803278A (en) * 2014-02-10 2014-05-21 中国神华能源股份有限公司 Method, device and system for controlling blended coal flow of double reclaimers

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108363353A (en) * 2018-03-12 2018-08-03 唐山曹妃甸实业港务有限公司 The operation quality guarantee of more reclaimer proportioning operating systems and operation quality detection method
CN108363353B (en) * 2018-03-12 2020-07-07 唐山曹妃甸实业港务有限公司 Operation quality guarantee and operation quality detection method for multi-reclaimer proportioning operation system
US20220342536A1 (en) * 2021-04-26 2022-10-27 Bushel, Inc. User interface for adjusting component proportions
US12001664B2 (en) * 2021-04-26 2024-06-04 Bushel, Inc. User interface for adjusting component proportions
CN114476706A (en) * 2021-12-08 2022-05-13 中交水运规划设计院有限公司 Coal blending method
CN117075479A (en) * 2023-09-15 2023-11-17 秦皇岛燕大滨沅科技发展有限公司 Uniform batching control system and method for bulk cargo port
CN117075479B (en) * 2023-09-15 2024-05-03 滨沅国科(秦皇岛)智能科技股份有限公司 Uniform batching control system and method for bulk cargo port

Also Published As

Publication number Publication date
CN105883336B (en) 2017-12-29

Similar Documents

Publication Publication Date Title
CN103276137B (en) Control method used for computer batch charging system of steelmaking converter
CN105883336A (en) Dual taking and blending system and blending method thereof
WO2018149087A1 (en) Intelligent and fully automatic stacker-reclaimer control apparatus
CN205068142U (en) Unmanned on duty joins in marriage fertile station
CN101694576A (en) Stockyard operation dynamic display and real-time management system and management method thereof
CN109100997A (en) A kind of Production Scheduling System and method poured in real time based on concrete
CN103935752A (en) Ore blending system and method in slurry pipeline conveying system
CN102424889A (en) Automatic feeding system for automatic steel smelting converter and control method thereof
CN105259883A (en) Unattended fertilizer preparation station
CN111546503A (en) Torpedo tank master station control system, concrete distribution system and distribution method
CN108453900A (en) A kind of stable native mixing control system
CN112007738B (en) Unmanned mine homogenizing batching system and method
CN204352833U (en) A kind of stirring system
CN106125554A (en) A kind of continuous batching feed bin charging Operating Ratio automatic adjusting method
CN104911291A (en) Blast furnace multiple-material preparation system and method in concentrated weighing mode
CN106017636A (en) Calcium carbide raw material accurate batching control system and method
CN203427160U (en) Automatic dosing system for raw materials of electrically-fused bricks
CN202700444U (en) Automatic burdening system for wooden-plastic material
CN103662722B (en) Coal blending system and process
CN111532805A (en) Short-flow mixed ore processing technology and system
CN115818157A (en) Intelligent stock bin management system and method for blast furnace
CN203581900U (en) Coal blending PLC control management system
CN204658690U (en) Mixing plant proportioning machine aggregate distributor
CN106758689B (en) Bituminous mixing plant selects storehouse system and method
CN209310506U (en) A kind of melting nodulizer automatic blending charging system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant