CN105863519B CN201610218163.6A CN201610218163A CN105863519B CN 105863519 B CN105863519 B CN 105863519B CN 201610218163 A CN201610218163 A CN 201610218163A CN 105863519 B CN105863519 B CN 105863519B
Authority
CN
China
Prior art keywords
rig
hydraulic stem
hydraulic
drill
boring rig
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201610218163.6A
Other languages
Chinese (zh)
Other versions
CN105863519A (en
Inventor
罗佑新
文会军
周宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan University of Arts and Science
Original Assignee
Hunan University of Arts and Science
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan University of Arts and Science filed Critical Hunan University of Arts and Science
Priority to CN201610218163.6A priority Critical patent/CN105863519B/en
Publication of CN105863519A publication Critical patent/CN105863519A/en
Application granted granted Critical
Publication of CN105863519B publication Critical patent/CN105863519B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B15/00Supports for the drilling machine, e.g. derricks or masts
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B15/00Supports for the drilling machine, e.g. derricks or masts
    • E21B15/006Means for anchoring the drilling machine to the ground
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/02Drilling rigs characterised by means for land transport with their own drive, e.g. skid mounting or wheel mounting

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Mechanical Engineering (AREA)
  • Earth Drilling (AREA)

Abstract

The invention discloses the stable efficiently hydraulic drill rig servicing unit of one kind,Including drill carriage body,And boring rig,The front end of the drill carriage body is provided with swing arm,The top of the swing arm is provided with fixed cover,Other three face of the fixed cover is respectively provided with hydraulic stem,The hydraulic stem connects three controlling switches respectively,The boring rig plugged and fixed is in fixed cover,Hydraulic stem two is installed at the top of the boring rig,Fixed block is installed inside the boring rig,The bottom of the hydraulic stem two is fixedly installed in the top of fixed block,Casing at the top of the hydraulic drill is fixedly mounted on fixing hole,The stable efficiently hydraulic drill rig servicing unit is on traditional infrastructure,Installation hydraulic stem supporting leg is enclosed in boring rig one to fix,The vibrations effectively gone out produced by control probing,Make probing work more stable,Installation hydraulic stem at the top of boring rig,For the auxiliary propulsion to drill bit,Make probing work more quick,It is more efficient.

Description

The stable efficiently hydraulic drill rig servicing unit of one kind
Technical field
The present invention relates to hydraulic drill rig technical field, is specially a kind of stable efficiently hydraulic drill rig servicing unit.
Background technology
With the continuous development of industry, big machinery has obtained a large amount of uses, and hydraulic drill rig is to oil exploration, coal mining Vital effect is played with mine excavation, these big machineries are general all environment is especially severe, physical features is relatively dangerously steep On mountain or in mine, in these severe working environments, it is desirable to the high stability of hydraulic drill rig, but traditional hydraulic pressure The boring rig of drill carriage is only merely to be fixed by a swing arm, is operated very unstable, usually occurs that drilling deviates, fractures The problems such as drill bit, traditional hydraulic drill use mechanically-propelled more, and operating efficiency is low, and abrasion is big, and very big shadow is brought to probing work Ring, to this, we release a kind of stable efficiently hydraulic drill rig servicing unit.
The content of the invention
It is an object of the invention to provide the stable efficiently hydraulic drill rig servicing unit of one kind, to solve above-mentioned background skill The problem of being proposed in art.
To achieve the above object, the present invention provides following technical scheme:The stable efficiently hydraulic drill rig of one kind is filled with auxiliary Put, including drill carriage body and boring rig, the front end of the drill carriage body are provided with swing arm, the top of the swing arm is provided with fixation Set, the fixed cover is cube structure, and the left side of the fixed cover is provided with fixing groove, and the swing arm is installed on by fixing axle The inner chamber of fixing groove, the right side and front and rear sides of the fixed cover are mounted on hydraulic stem, and the hydraulic stem and fixed cover are downward Into 30-degree angle, each hydraulic stem is respectively connected with controlling switch, and the boring rig fixes the inner chamber for being plugged in fixed cover, institute The middle and upper part that fixed cover is located at boring rig is stated, hydraulic stem two is installed at the top of the boring rig inner chamber, the hydraulic stem two Upper end is installed on the inner chamber upper end of boring rig, and the left and right sides and the inner chamber upper end left and right sides of the boring rig are equipped with chute, Fixed block is installed inside the boring rig, the sliding block to match with chute, the hydraulic stem two are provided with the outside of the fixed block Lower end be fixedly installed on the left of the upper end of fixed block, the right side of the fixed block is provided with fixing hole, the inner chamber of the fixing hole It is installed with hydraulic drill.
Preferably, the sliding block and fixed block are integral type structure.
Preferably, the bottom of the hydraulic stem is provided with shock-proof block.
Compared with prior art, the beneficial effects of the invention are as follows:Efficiently hydraulic drill rig servicing unit is passing the stabilization On the basis of system, boring rig and fixing device are improved, the boring rig of traditional hydraulic drill rig is only merely dynamic by one Arm is fixed, and is operated very unstable, usually occurs that drilling deviates, fracture drill bit the problems such as, traditional hydraulic drill is adopted more With mechanically-propelled, operating efficiency is low, and influence is brought on probing work, and the invention is enclosed installation hydraulic stem supporting leg in boring rig one and come Fixed, hydraulic stem supporting leg is respectively equipped with switch and is separately controlled, and corresponding regulation can be made according to different physical features, and hydraulic stem supports Leg bottom is mounted on shock-proof block, the vibrations effectively gone out produced by control probing, makes probing work more stable, at the top of boring rig Hydraulic stem two is installed, is provided with chute inside boring rig, fixed block is provided with sliding block, and fixed block is installed on boring rig by chute Inside, fixed block is slided up and down in boring rig, the bottom of hydraulic stem two is fixedly installed on fixed block, on fixed block Fixing hole in hydraulic drill is installed, by extend hydraulic stem two promote fixed block, so as to advancing hydraulic pressure bore, make probing work More quick, more efficiently, the invention has the features such as simple in construction, operating efficiency is high.
Brief description of the drawings
Fig. 1 is schematic structural view of the invention;
Fig. 2 is fixed cover structural representation of the present invention;
Fig. 3 is fixed block of the present invention in boring rig inner structure schematic diagram;
Fig. 4 is boring rig structural representation of the present invention.
In figure:1 drill carriage body, 2 swing arms, 3 fixed covers, 4 hydraulic stems, 5 boring rigs, 6 fixing grooves, 7 fixing axles, 51 hydraulic stems 2nd, 52 chutes, 53 fixed blocks, 54 sliding blocks, 55 fixing holes, 56 hydraulic drills.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, rather than whole embodiments.It is based on Embodiment in the present invention, those of ordinary skill in the art are obtained every other under the premise of creative work is not made Embodiment, belong to the scope of protection of the invention.
Fig. 1-4 are referred to, the present invention provides a kind of technical scheme:The stable efficiently hydraulic drill rig servicing unit of one kind, Including drill carriage body 1 and boring rig 5, the front end of the drill carriage body 1 is provided with swing arm 2, and the top of the swing arm 2 is provided with admittedly Surely 3 are covered, the fixed cover 3 is cube structure, and the left side of the fixed cover 3 is provided with fixing groove 6, and the swing arm 2 passes through fixation Axle 7 is installed on the inner chamber of fixing groove 6, and the right side and front and rear sides of the fixed cover 3 are mounted on hydraulic stem 4, the hydraulic stem 4 With fixed cover 3 downwards into 30-degree angle, each hydraulic stem 4 is respectively connected with controlling switch, the bottom installation of the hydraulic stem 4 There is shock-proof block, influence of the caused vibrations to the stability of boring rig 5, the boring rig 5 in drilling process can be avoided to fix grafting In the inner chamber of fixed cover 3, the fixed cover 3 is located at the middle and upper part of boring rig 5, and liquid is provided with the top of the inner chamber of boring rig 5 Depression bar 2 51, the upper end of the hydraulic stem 2 51 are installed on the inner chamber upper end of boring rig 5, the left and right sides of the boring rig 5 with Chute 52 is equipped with left and right sides of the upper end of inner chamber, fixed block 53 is installed inside the boring rig 5, the outside of fixed block 53 is set There is the sliding block 54 to match with chute 52, the sliding block 54 and fixed block 53 are integral type structure, and sliding block 54 is adopted with fixed block 53 With integral structure fixed block 53 can be made to be worked in boring rig more stable, occur the situation hair of interim card when avoiding sliding up and down Raw, the lower end of the hydraulic stem 2 51 is fixedly installed on the left of the upper end of fixed block 53, and the right side of the fixed block 53 is provided with admittedly Determine hole 55, the inner chamber of the fixing hole 55 is installed with hydraulic drill 56.
Operation principle:The front portion of drill carriage body 1 is provided with swing arm 2, and the middle and upper part of boring rig 5 is fixed by socket in fixed cover 3, Fixed cover 3 is installed on swing arm 2 by fixing axle 7, and when needing to carry out probing work, boring rig 5 is erected, and is controlled by switching Hydraulic stem 4 on fixed cover 3 processed stretches out, according to the length of each hydraulic stem 4 of the high high adjustment of physical features, the bottom of hydraulic stem 4 it is shockproof Block is supported in ground, in the case of the out-of-flatness of ground pole is drilled also can normal use, the top of boring rig 5 is provided with hydraulic pressure Bar 2 51, the inside of boring rig 5 are provided with chute 52, and fixed block 53 is provided with sliding block 54, and fixed block 53 is installed on brill by chute 52 The inside of frame 5 is visited, fixed block 53 is slided up and down in boring rig 5, the bottom of hydraulic stem 2 51 is fixedly installed in fixed block On 53, hydraulic drill 56 is installed in the fixing hole 55 on fixed block 53, fixed block 53 is promoted by extending hydraulic stem 2 51, so as to Advancing hydraulic pressure bores 56, and relative to traditional mechanical push structure, the invention has the features such as simple in construction, operating efficiency is high.
Although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with A variety of changes, modification can be carried out to these embodiments, replace without departing from the principles and spirit of the present invention by understanding And modification, the scope of the present invention is defined by the appended.

Claims (3)

1. the stable efficiently hydraulic drill rig servicing unit, including drill carriage body of one kind(1)And boring rig(5), it is characterised in that: The drill carriage body(1)Front end swing arm is installed(2), the swing arm(2)Top fixed cover is installed(3), the fixation Set(3)For cube structure, the fixed cover(3)Left side be provided with fixing groove(6), the swing arm(2)Pass through fixing axle(7)Peace Loaded on fixing groove(6)Inner chamber, the fixed cover(3)Right side and front and rear sides be mounted on hydraulic stem(4), the hydraulic stem (4)With fixed cover(3)Downwards into 30-degree angle, each hydraulic stem(4)It is respectively connected with controlling switch, the boring rig(5) Fixation is plugged in fixed cover(3)Inner chamber, the fixed cover(3)Positioned at boring rig(5)Middle and upper part, the boring rig(5)It is interior Hydraulic stem two is installed at the top of chamber(51), the hydraulic stem two(51)Upper end be installed on boring rig(5)Inner chamber upper end, institute State boring rig(5)The left and right sides and inner chamber both sides be equipped with chute(52), the boring rig(5)Inside is provided with fixed block (53), the fixed block(53)Outside is provided with and chute(52)The sliding block to match(54), the hydraulic stem two(51)Lower end It is fixedly installed in fixed block(53)Upper end on the left of, the fixed block(53)Right side be provided with fixing hole(55), the fixing hole (55)Inner chamber be installed with hydraulic drill(56).
A kind of 2. stable efficiently hydraulic drill rig servicing unit according to claim 1, it is characterised in that:The sliding block (54)With fixed block(53)For integral type structure.
A kind of 3. stable efficiently hydraulic drill rig servicing unit according to claim 1, it is characterised in that:The hydraulic pressure Bar(4)Bottom shock-proof block is installed.
CN201610218163.6A 2016-04-11 2016-04-11 The stable efficiently hydraulic drill rig servicing unit of one kind Expired - Fee Related CN105863519B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610218163.6A CN105863519B (en) 2016-04-11 2016-04-11 The stable efficiently hydraulic drill rig servicing unit of one kind

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610218163.6A CN105863519B (en) 2016-04-11 2016-04-11 The stable efficiently hydraulic drill rig servicing unit of one kind

Publications (2)

Publication Number Publication Date
CN105863519A CN105863519A (en) 2016-08-17
CN105863519B true CN105863519B (en) 2018-04-03

Family

ID=56636787

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610218163.6A Expired - Fee Related CN105863519B (en) 2016-04-11 2016-04-11 The stable efficiently hydraulic drill rig servicing unit of one kind

Country Status (1)

Country Link
CN (1) CN105863519B (en)

Family Cites Families (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2108167U (en) * 1991-12-25 1992-06-24 冶金部山东地质勘查局一队 Four-pole derrick
JPH08121070A (en) * 1994-10-26 1996-05-14 J R Tokai Kensetsu Kk Vertical hole drilling machine, and forming method of vertical hole by use thereof
CN2271608Y (en) * 1996-05-14 1997-12-31 镇江市第二建筑工程公司金属构件厂 Bottom supporting structure of derrick
ITPC20060022A1 (en) * 2006-04-14 2007-10-15 Egtechnology Srl IMPROVED DRILLING MACHINE
CN201567965U (en) * 2009-12-16 2010-09-01 中国石油天然气集团公司 Mast-type derrick with hydraulic support
CN101892812B (en) * 2010-08-04 2013-01-16 中太建设集团股份有限公司 Reciprocating drill or electric drill support
CN201883950U (en) * 2010-10-20 2011-06-29 广东省科达水利电力岩土工程公司 Foldable telescopic chassis of sampling drilling rig
KR101232637B1 (en) * 2010-11-17 2013-02-13 이계원 Dual Mast Multi-Drill Machine
CN104314475A (en) * 2014-10-10 2015-01-28 潞安职业技术学院 Lifting coal drill rack
CN204148564U (en) * 2014-10-17 2015-02-11 四川祥昇建设工程有限公司 A kind of electric drill bores top special stand
CN104481415B (en) * 2014-11-11 2017-11-03 山东科技大学 A kind of light-weight handheld rock drill shock bracket

Also Published As

Publication number Publication date
CN105863519A (en) 2016-08-17

Similar Documents

Publication Publication Date Title
CN1804374B (en) Method for preventing and controlling impact geopressure in longwall face gate of coal mine
CN207920523U (en) A kind of geotechnical investigation drilling equipment
CN104929517B (en) Full-hydraulic drill type pressure relieving equipment with double drill bits and pressure relieving method
CN207701075U (en) A kind of geotechnical engineering investigation drilling rig
CN110242300A (en) Splitting mechanism and tunneling equipment
CN101644155B (en) Hydraulic drill loader
CN203978303U (en) Expansion drill boom assembly
CN105863519B (en) The stable efficiently hydraulic drill rig servicing unit of one kind
CN103075153A (en) Open-air drilling coal cutter
FI20030115A (en) Hydraulic system for quarrying equipment and method for adjusting rock drill power
CN204476303U (en) A kind of drilling assembly
CN206860119U (en) A kind of tipping bucket type drill rod box
CN205000894U (en) Mine inside groove basement rock excavating equipment that takes shape
CN107514237A (en) A kind of supporting structure for oil drilling
CN204163628U (en) The short rig in novel crawler-type tunnel
CN217356161U (en) Mining machinery operation supporting platform
CN203066963U (en) Drilling type coal mining machine for open air
CN105275390A (en) Single-arm double-drill hydraulic drill carriage
CN204691670U (en) The built-in cylinder apparatus of rig
CN206899170U (en) A kind of architectural engineering drilling equipment
CN218716571U (en) Drilling device for preventing and treating water in coal mine geological engineering
CN205025354U (en) All -hydraulic rig that digs soon suitable for mining industry exploitation
CN214887041U (en) Coal mining machine with super-large mining height
CN214007145U (en) A entry driving device for colliery is operation in pit
CN103603634A (en) Double-well pumping unit balancing device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20180302

Address after: No. 3150 road 415000 Changde city of Hunan Province in Wuling District

Applicant after: Hunan University of Arts and Science

Address before: 415001 Yongfeng City, Changde Province Economic and Technological Development Zone, Changde Town, a group of Hunan neighborhood committee

Applicant before: Hunan is permanent in rock drilling Science and Technology Co., Ltd.

GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180403