CN105862891A - Method for stopping water of clearance between wall board and base plate of bearing plate steel suspension box - Google Patents

Method for stopping water of clearance between wall board and base plate of bearing plate steel suspension box Download PDF

Info

Publication number
CN105862891A
CN105862891A CN201610247563.XA CN201610247563A CN105862891A CN 105862891 A CN105862891 A CN 105862891A CN 201610247563 A CN201610247563 A CN 201610247563A CN 105862891 A CN105862891 A CN 105862891A
Authority
CN
China
Prior art keywords
base plate
steel suspension
suspension box
wallboard
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610247563.XA
Other languages
Chinese (zh)
Inventor
邓志深
谭昌全
刘齐辉
王志红
卢初升
蒋小晖
余涛
张海波
李鸿福
甘健
王越云
魏勇
李超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CRCC Harbour and Channel Engineering Bureau Group Co Ltd
Original Assignee
Road and Bridge Engineering Co Ltd of CRCC Harbour and Channel Engineering Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Road and Bridge Engineering Co Ltd of CRCC Harbour and Channel Engineering Bureau Group Co Ltd filed Critical Road and Bridge Engineering Co Ltd of CRCC Harbour and Channel Engineering Bureau Group Co Ltd
Priority to CN201610247563.XA priority Critical patent/CN105862891A/en
Publication of CN105862891A publication Critical patent/CN105862891A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/02Restraining of open water
    • E02D19/04Restraining of open water by coffer-dams, e.g. made of sheet piles
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The invention discloses a method for stopping water of a clearance between a wall board and a base plate of a bearing plate steel suspension box. The method comprises the following steps of firstly, uniformly mixing cement mortar and plugging agent waterproof glue according to the proportion of 10:1 and stirring; secondly, casting mixing mortar under a dry water environment, slowly pouring the mixing mortar into the clearance between the wall board of the steel suspension box and a precast concrete base plate of the steel suspension box until the elevation of a casting surface is consistent with that of a precast concrete surface; and at the time of 70 to 74 hours after the ending of the casting of the mixed mortar and when the strength of concrete is greater than compressive design strength by 68 to 72 percent, performing an integral sinking procedure of the steel suspension box. The method for stopping water, disclosed by the invention, has the advantages of simplicity in operation, convenience in operation and low cost; in addition, the mixing mortar in which the plugging agent waterproof glue is added has certain ductility and high crack resistance; and in the integral sinking process of the steel suspension box, even if slight vibration or shake occurs, and the water leaking condition is avoided.

Description

Method to pile cap steel box wallboard Yu base plate gap sealing
Technical field
The present invention relates to a kind of method of cushion cap small-gap suture sealing in science of bridge building, a kind of method to the steel lifted trunk wallboard of cushion cap in water Bridge engineering Yu base plate gap sealing.
Background technology
In the bearing platform construction of water Bridge engineering, commonly used steel suspended box cofferdam, for the water-stop technology of steel lifted trunk wallboard Yu end plate interspaces, the most conventional method has two kinds: the first is after steel lifted trunk sinks down into design attitude, pours cushion cap bottom concrete under water;Second method is under solid carbon dioxide environment, clogs rubber peel at steel lifted trunk wallboard with end plate interspaces.For first method, because the universal area of cushion cap is relatively big, bottoming concrete thickness is also universal at more than 1m, so required concrete square amount is relatively big, relatively costly, and bottom concrete deadweight simultaneously is the biggest, adds the burden to steel lifted trunk suspension bracket;For second method, owing to steel lifted trunk makes and assembled reason, and the reason such as the prefabricated precision of steel lifted trunk base plate, space between steel lifted trunk wallboard and base plate is the most not of uniform size, and the thickness of rubber peel is the same, so by filling rubber peel sealing, the space arisen that stoppers, some spaces fail the situation stoppered, and ultimately result in and leak.Additionally, rubber peel needs in the position punching having bolt to pass through, this procedure calls machining accuracy is the highest, constructs the most troublesome.
Summary of the invention
In order to overcome above-mentioned deficiency, present invention aim at providing a kind of method to pile cap steel box wallboard Yu base plate gap sealing, the method easy construction, with low cost, good airproof performance.
For achieving the above object, the technical solution adopted in the present invention is:
Method to pile cap steel box wallboard Yu base plate gap sealing, first by cement mortar and leak stopping king's marine glue with the ratio mixing and stirring of 10:1, then under solid carbon dioxide environment, carry out mixed mortar pour, slowly pour the space between steel lifted trunk wallboard and steel lifted trunk precast concrete base plate into, until it is consistent with precast concrete face absolute altitude to pour face.
Further, behind 70~74 hours when mixed mortar has poured, and concrete strength more than resistance to compression design strength 68%~72% time, carry out the integral hoisting operation of steel lifted trunk.
Further, the space between steel lifted trunk wallboard and base plate is preferably 2~10cm.
Beneficial effects of the present invention: the method adopting this patent sealing, simple to operate, easy construction, with low cost, and the mixing mortar of this addition leak stopping king's marine glue has certain ductility, cracking resistance is strong, during steel lifted trunk integral hoisting, even if occurring slightly shaking or rocking, do not have water leakage situation yet.Additionally, this cement mortar can be watered builds up arbitrary shape, do not differed by pore size between steel lifted trunk wallboard and base plate and affected.
Accompanying drawing explanation
With detailed description of the invention, the present invention is described in further detail below in conjunction with the accompanying drawings:
Fig. 1 is the schematic diagram after the construction of the present invention.
In figure: 1. steel lifted trunk wallboard;2. thrust component;3. steel lifted trunk precast concrete base plate;4. mixing water cement mortar.
Detailed description of the invention
Below in conjunction with the accompanying drawings and the present invention is described in further details by case, these cases are only used for the present invention is described, do not limit its scope.
As it is shown in figure 1, the method to pile cap steel box wallboard Yu base plate gap sealing, its detailed description of the invention is: first that steel lifted trunk wallboard is clean with eliminating impurities in base plate space, and it is moistening to sprinkle water;Then by cement mortar and leak stopping king's marine glue with the ratio mixing and stirring of 10:1;
Under solid carbon dioxide environment, slowly pour the space between steel lifted trunk wallboard and steel lifted trunk precast concrete base plate into, until it is consistent with precast slab face absolute altitude to pour face;
After pouring 72 hours, and concrete strength more than resistance to compression design strength 70% time, the integral hoisting operation of steel lifted trunk can be carried out.
The above is the preferred embodiment of the present invention; certainly the interest field of the present invention can not be limited with this; should be understood that; for those skilled in the art; technical scheme is modified or equivalent, without departure from the protection domain of technical solution of the present invention.

Claims (4)

1. the method to pile cap steel box wallboard Yu base plate gap sealing, it is characterized in that: first by cement mortar and leak stopping king's marine glue with the ratio mixing and stirring of 10:1, then under solid carbon dioxide environment, carry out mixed mortar pour, slowly pour the space between steel lifted trunk wallboard and steel lifted trunk precast concrete base plate into, until it is consistent with precast concrete face absolute altitude to pour face.
Method to pile cap steel box wallboard Yu base plate gap sealing the most according to claim 1, it is characterized in that: behind 70~74 hours when mixed mortar has poured, and concrete strength more than resistance to compression design strength 68%~72% time, carry out the integral hoisting operation of steel lifted trunk.
Method to pile cap steel box wallboard Yu base plate gap sealing the most according to claim 2, it is characterized in that: behind 72 hours when mixed mortar has poured, and concrete strength more than resistance to compression design strength 70% time, carry out the integral hoisting operation of steel lifted trunk.
Method to pile cap steel box wallboard Yu base plate gap sealing the most according to claim 1, it is characterised in that: the space between steel lifted trunk wallboard and base plate is 2~10cm.
CN201610247563.XA 2016-04-20 2016-04-20 Method for stopping water of clearance between wall board and base plate of bearing plate steel suspension box Pending CN105862891A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610247563.XA CN105862891A (en) 2016-04-20 2016-04-20 Method for stopping water of clearance between wall board and base plate of bearing plate steel suspension box

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610247563.XA CN105862891A (en) 2016-04-20 2016-04-20 Method for stopping water of clearance between wall board and base plate of bearing plate steel suspension box

Publications (1)

Publication Number Publication Date
CN105862891A true CN105862891A (en) 2016-08-17

Family

ID=56633274

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610247563.XA Pending CN105862891A (en) 2016-04-20 2016-04-20 Method for stopping water of clearance between wall board and base plate of bearing plate steel suspension box

Country Status (1)

Country Link
CN (1) CN105862891A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110172913A (en) * 2019-05-10 2019-08-27 中国建筑第六工程局有限公司 A kind of device for plugging for steel suspended box cofferdam

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009121184A (en) * 2007-11-16 2009-06-04 Okumura Corp Steel-frame column to be connected to pile of steel-frame building, pile connection part structure for the same, and constructing method of the same
CN101818500A (en) * 2010-05-01 2010-09-01 张锦松 Underwater plugging and water sealing method for bottom plate of concrete pouring jacket without back cover
CN104594373A (en) * 2014-12-19 2015-05-06 中交一航局第三工程有限公司 Construction technology of high-pile water-submerging bearing table steel suspending box of open unshielded sea area bridge
CN104652493A (en) * 2013-11-22 2015-05-27 中冶天工上海十三冶建设有限公司 Deep foundation pit anti-floating anchor cable post-water-proof construction method
CN204491643U (en) * 2015-01-19 2015-07-22 中国建筑第六工程局有限公司 The constructing structure that on a kind of raft plate, dewatering well is closed

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009121184A (en) * 2007-11-16 2009-06-04 Okumura Corp Steel-frame column to be connected to pile of steel-frame building, pile connection part structure for the same, and constructing method of the same
CN101818500A (en) * 2010-05-01 2010-09-01 张锦松 Underwater plugging and water sealing method for bottom plate of concrete pouring jacket without back cover
CN104652493A (en) * 2013-11-22 2015-05-27 中冶天工上海十三冶建设有限公司 Deep foundation pit anti-floating anchor cable post-water-proof construction method
CN104594373A (en) * 2014-12-19 2015-05-06 中交一航局第三工程有限公司 Construction technology of high-pile water-submerging bearing table steel suspending box of open unshielded sea area bridge
CN204491643U (en) * 2015-01-19 2015-07-22 中国建筑第六工程局有限公司 The constructing structure that on a kind of raft plate, dewatering well is closed

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110172913A (en) * 2019-05-10 2019-08-27 中国建筑第六工程局有限公司 A kind of device for plugging for steel suspended box cofferdam

Similar Documents

Publication Publication Date Title
CN106278093A (en) Fast hard Waterproof ceramic tile adhesive agent
CN1187293C (en) Method for sealing porous building materials and building components
CN101418641A (en) Obligate pore construction method for construction floor
CN105777191A (en) Nitrogen foam concrete and preparation method thereof
KR101627811B1 (en) Rapid-set color cement concrete compositions for repairing concrete pavement, manufacturing method thereof and repairing method therewith
KR101466067B1 (en) Water repellent composition for cross section restorations and method for recovering the same thereof
CN105862891A (en) Method for stopping water of clearance between wall board and base plate of bearing plate steel suspension box
CN110092626A (en) A kind of preparation method of Lightweight aggregate concrete
CN107937095B (en) Concrete oily release agent with surface defoaming function
CN105149180B (en) A kind of aluminum dipping form plate surface treatment method
JP4945777B2 (en) Method for producing cellular concrete
CN111205680A (en) Inorganic-organic composite waterproof material suitable for long-term water immersion environment and preparation method thereof
CN103669401B (en) Epoxy resin cement concrete block placement outer wall of basement and construction method thereof
CN114108636B (en) Method for underwater pile casting by using magnetic mixed slurry
CN104895319A (en) Cast-in-place concrete shear wall and frame column template installation elevation positioning device
JP5543723B2 (en) Concrete composite structure and construction method thereof
CN205975645U (en) Prefabricated panel steel overhead bin
CN110530224B (en) Three-section type hole sealing process method for deep hole transient high-pressure gas rock breaking
CN109517589B (en) Oil-gas well cementing dry-method well cementing low-density cement slurry and preparation method thereof
KR101688017B1 (en) Outdoor Floor Cement Mortar Composition and Its Application Method
CN208497319U (en) Prepare the defoaming device of steam pressurized brick
CN103642346A (en) Coating with water resisting function
JP2006282407A (en) Large size container and waste material containing block
JP5234604B2 (en) How to make the base of seismic isolation
KR20150086637A (en) Pc box culvert concrete composition unnecessary for steam aging and manufacturing method for pc box culvert using the same

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20170705

Address after: 519000, room 19, 507 Haihe street, Hengqin Town, Guangdong, Zhuhai

Applicant after: China iron Jian Ganghangju Group Co.,Ltd

Address before: 511442 Guangdong Province, Guangzhou City Southern towns Panyu District Hungnam Avenue No. 118 Building 2, 4 floor Luqiao company

Applicant before: CRCC HARBOUR & CHANNEL ENGINEERING BUREAU GROUP ROAD AND BRIDGE ENGINEERING CO., LTD.

TA01 Transfer of patent application right
RJ01 Rejection of invention patent application after publication

Application publication date: 20160817

RJ01 Rejection of invention patent application after publication