CN105862860A - Remanufacturing and constructing method of covering layer at deep water region where steel pile casings are tapped - Google Patents

Remanufacturing and constructing method of covering layer at deep water region where steel pile casings are tapped Download PDF

Info

Publication number
CN105862860A
CN105862860A CN201610222400.6A CN201610222400A CN105862860A CN 105862860 A CN105862860 A CN 105862860A CN 201610222400 A CN201610222400 A CN 201610222400A CN 105862860 A CN105862860 A CN 105862860A
Authority
CN
China
Prior art keywords
jet grouting
rotary
curtain
rotary jet
layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610222400.6A
Other languages
Chinese (zh)
Inventor
曾浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CRCC Harbour and Channel Engineering Bureau Group Co Ltd
Original Assignee
CRCC Harbour and Channel Engineering Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CRCC Harbour and Channel Engineering Bureau Group Co Ltd filed Critical CRCC Harbour and Channel Engineering Bureau Group Co Ltd
Priority to CN201610222400.6A priority Critical patent/CN105862860A/en
Publication of CN105862860A publication Critical patent/CN105862860A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D7/00Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/18Bulkheads or similar walls made solely of concrete in situ
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/38Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
    • E02D5/40Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds in open water
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/46Concrete or concrete-like piles cast in position ; Apparatus for making same making in situ by forcing bonding agents into gravel fillings or the soil
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0023Cast, i.e. in situ or in a mold or other formwork
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0061Production methods for working underwater

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses a remanufacturing and constructing method of a covering layer at a deep water region where steel pile casings are tapped. The remanufacturing and constructing method comprises the following steps of (1) putting sand bags; (2) guiding holes; (3) enabling a jet apparatus and a spray rod to extend; (4) performing rotary jet grouting; (5) lifting rotary jet to a predetermined height; (6) forming a first rotary jet grouting pile curtain layer; and (7) forming a second rotary jet grouting pile curtain layer, wherein rotary jet grouting piles of the first rotary jet grouting pile curtain layer and the second rotary jet grouting pile curtain layer are closely bonded to form a curtain ring layer. According to the constructing method, a manner of manually filling the sand bags to increase the buried depth of the steel pile casings and increase the curtain ring layers of the high-pressure rotary jet grouting curtains so as to reinforce and remanufacture the covering layer is adopted, so that the stability of the steel pile casings underwater is guaranteed; besides, the method is simple to operate and good in economic benefits, and the popularization and the application of a technique are facilitated.

Description

A kind of reproduce construction method for the cover layer squeezing into steel pile casting in profundal zone
Technical field
The present invention relates to profundal zone construction technology, a kind of reproduce for the cover layer squeezing into steel pile casting in profundal zone Construction method.
Background technology
Cover layer refers to the covering loosely-packed of the various origin causes of formation on basement rock, deposit, such as sand gravel stratum, sand Layer and the rubble soil body etc. manually filled.And large diameter borehole pile driving construction at sea runs into the several of intectate or shallow overburden Rate is very big, causes occurring during the situation that steel pile casting cannot be squeezed into or driving depth is inadequate, causes and leaks at the bottom of steel pile casting unstability or casing The phenomenons such as slurry have a strong impact on pile foundation construction hole quality and efficiency.If steel pile casting cannot squeeze into basement rock in construction, bore hammer and enter After fine sand layer, it is susceptible to perforation and connects with sea water, cause work progress pore-forming difficulty.
Summary of the invention
In order to overcome the deficiencies in the prior art, the present invention provides a kind of and squeezes into the cover layer of steel pile casting again in profundal zone Make construction method.
The technical solution adopted for the present invention to solve the technical problems is:
A kind of reproduce construction method for the cover layer squeezing into steel pile casting in profundal zone, comprise the following steps:
1), after true fixed pile, hole is drawn to projected depth by drawing drilling machine rig at pre-fixed pile;
2) remove and draw drilling machine, and extend downwardly into ejector, spray boom at the bottom of hole by jet drill rig, connect air deflector;
3) rotary jet grouting is carried out from bottom to top;
4) by predetermined pressure, speed churning is promoted to designing at the desired height position of top, stake position;
5) completing a stake position churning job and form rotary churning pile, the churning that telephone-moving carries out another position to another churning position is executed Work, the rotary churning pile completed becomes a circle to form the first curtain with rotary jet grouting piles layer around steel pile casting position;
6) periphery at the first curtain with rotary jet grouting piles layer proceeds to design stake position rotary-spraying construction, and the rotary churning pile completed is around the first rotation Spray stake curtain layer position becomes a circle to form the second curtain with rotary jet grouting piles layer, described first curtain with rotary jet grouting piles layer and the second curtain with rotary jet grouting piles Tight cementing formation curtain ring layer between each stake of rotary churning pile of layer;
7) throw in sand pocket and form sand pocket cover layer.
As a preference, in described step 5), churning promotes speed 15~18cm/min.
As a preference, described step 1) sand pocket in use sea sand.
As a preference, in described step 4), the pump pressure of rotary jet grouting process is 20~32Mpa, rotating speed be 700~ 900r/min。
As a preference, in described step 4), the whitewashed liquid of rotary jet grouting process is cement mortar, water mixed serum.
As a preference, in described step 4), in the whitewashed liquid of rotary jet grouting process, cement mortar, the ratio of mud of water are 1:1。
As a preference, the slurry flow 70~90L/min of rotary jet grouting process in described step 4).
As a preference, outside each rotary churning pile centre-to-centre spacing steel pile casting of the first curtain with rotary jet grouting piles layer in step 6) 0.10~0.20m, it is evenly arranged along steel pile casting periphery by each rotary churning pile centre-to-centre spacing 0.3~0.5m.
As a preference, outside each rotary churning pile centre-to-centre spacing steel pile casting of the second curtain with rotary jet grouting piles layer in step 6) 0.50~0.60m, it is evenly arranged along the first curtain with rotary jet grouting piles layer periphery by each rotary churning pile centre-to-centre spacing 0.3~0.5m.
As a preference, described step 5) churning process aperture before final set at mend slurry in time to eliminate serosity Shrink sinking situation.
The invention has the beneficial effects as follows: this construction method uses manually fills sand pocket increasing steel pile casting buried depth and high-pressure rotary-spray Grouting curtain curtain ring layer carries out reinforcing the mode reproducing cover layer, it is ensured that the underwater steadiness of steel pile casting, and method behaviour Making simple, economic benefit is good, the beneficially popularization and application of technology.
Accompanying drawing explanation
The present invention is further described with embodiment below in conjunction with the accompanying drawings.
Fig. 1 is the rotary churning pile distribution schematic diagram in the present invention;
Fig. 2 is the jet grouting pile construction schematic diagram in the present invention.
Detailed description of the invention
In order to make the purpose of the application, technical scheme and advantage clearer, below in conjunction with drawings and Examples, right The present invention is further elaborated.For the thorough explanation present invention, following description can relate to some certain detail Joint.And when not having these specific detail, the present invention then may still can realize, i.e. technical staff in art uses herein These describe and statement others skilled in the art in art effectively introduce their work essence.Should be appreciated that Specific embodiment described herein, only in order to explain the application, is not used to limit real protection scope.And for avoiding mixing Confuse the purpose of the present invention, owing to other technology known is not it will be understood that therefore they are described in detail.With reference to figure 1, a kind of of Fig. 2 reproduces construction method for the cover layer squeezing into steel pile casting in profundal zone, comprises the following steps:
1) really hole is drawn to projected depth by drawing drilling machine rig at pre-fixed pile after fixed pile;
2) remove and draw drilling machine, and extend downwardly into ejector, spray boom at the bottom of hole by jet drill rig, connect air deflector;
3) rotary jet grouting is carried out from bottom to top;
4) by predetermined pressure, speed churning is promoted to designing at the desired height position of top, stake position;
5) completing a stake position churning job and form rotary churning pile 1, telephone-moving carries out the churning of another position to another churning position Construction, the rotary churning pile 1 completed becomes a circle to form the first curtain with rotary jet grouting piles layer 3 around steel pile casting 2 position;
6) periphery at the first curtain with rotary jet grouting piles layer proceeds to design stake position rotary-spraying construction, and the rotary churning pile 1 completed is around first Curtain with rotary jet grouting piles layer 3 position becomes a circle to form the second curtain with rotary jet grouting piles layer 4, described first curtain with rotary jet grouting piles layer 3 and the second churning Tight cementing formation curtain ring layer between each stake of rotary churning pile of stake curtain layer 4;
7) throw in sand pocket and form sand pocket cover layer 5.
The really employing of this construction method is manually filled sand pocket increasing steel pile casting buried depth and is tied mutually with high pressure jet grouting curtain Close and carry out reinforcing the process reproducing cover layer, it is desirable to this cover layer construction technology and the supporting enforcement of high pressure jet grouting curtain.? Before construction, to first carry out the survey of stake position and set with true fixed pile position, specifically include, 1. surveying setting-out: executing according to design working drawing Construction axis released by work platform;2. determine position, hole: determine churning stake holes position with axis of constructing and be numbered with pile No., Kong Hao, sequence number, survey Measure each aperture elevation.
Boring procedure can use diameter Ф 91mm drilling tool perforate, uses premium mud retaining wall to creep into, and drilling depth to reach Design requirement, the core barrel length of use should be greater than 2.5m, it is not recommended that uses three-wing bit to draw hole drill and enters.Once rig is in place, Rig main drilling rod alignment position, hole, measures organism level, vertical shaft vertically with horizon rule, and rig to be leveled up steady firm.Want light during boring Press, bore slowly, carry more, it is ensured that become hole perpendicularity.Boring bore should be greater than playpipe external diameter 50mm, normally returns during to ensure injection Slurry, grout.
High-pressure rotary jet grouting pile can use interval to jump the construction of stake method.Boring procedure once has a large amount of spillage or collapse hole, it is impossible to toward hole Inside add drilling rod, it is difficult to when down creeping into, layer and section from top to bottom can be taked successively to whitewash, drill after whitewashing 6~8 hours Rotary churning pile cement induration, continues down drilling construction.
High-pressure rotary jet grouting pile is to utilize high-pressure pump that cement grout is passed through the special shower nozzle of drilling rod termination, sprays into high speed level The soil body, by the impulsive force cutting coating of liquid, drilling rod one side rotates with certain speed simultaneously, and a low speed promotes slowly, Make the soil body and mud be thoroughly mixed solidification, form the cylinder induration with some strength, i.e. rotary churning pile 1, so that ground Base is reinforced.This programme Construction of High Pressure Jet Grouting Pile can use substance tube method.The pump pressure of rotary jet grouting process in described step 3) Being 20~32Mpa, rotating speed is 700~900r/min, to ensure taking into account of efficiency of construction and construction effect.Described step 3) is revolved The whitewashed liquid of preventing slurry injection process is cement mortar, water mixed serum, for example with P.O42.5 level Portland cement, it is ensured that execute Work efficiency fruit, as preference, in described step 3), in the whitewashed liquid of rotary jet grouting process, cement mortar, the ratio of mud of water are 1:1, protect Card rotary churning pile 1 is sufficiently solid.The slurry flow 70~90L/min of rotary jet grouting process in described step 3), it is ensured that rotary jet grouting The efficiency of process.In described step 4), churning promotes speed 15~18cm/min, it is ensured that churning is fully enough to ensure rotary churning pile 1 Firm.
Owing to rotary churning pile requires that geological condition has a preferable coefficient of permeability, therefore it is preferred that, described step 7) Sand pocket in use sea sand, as the backfilling material of man cover layer, utilize sea sand to have the characteristic of good water penetration.Throw in Slack period should be selected in reduce the turbulent water impact for sand pocket placement position as far as possible during sand pocket.Sand pocket can after throwing in Sending diver to detect under water and determine whether man cover layer reaches requirement, if defective part, diver accuses to technician Know particular location in place of defect, platform continues to throwing in sand pocket at this.
It is exactly to arrange that in the outside of steel pile casting 2 two-layer high-pressure rotary jet grouting pile forms curtain, in step 5) in fact that cover layer reproduces Each rotary churning pile 1 centre-to-centre spacing steel pile casting of the first curtain with rotary jet grouting piles layer 3 outside 0.10~0.20m, by each rotary churning pile 1 centre-to-centre spacing 0.3~0.5m is evenly arranged along steel pile casting 2 periphery, to ensure the intensity of the first curtain with rotary jet grouting piles layer 3.The second rotation in step 6) Outside spray each rotary churning pile centre-to-centre spacing steel pile casting 2 of stake curtain layer 4 0.50~0.60m, by each rotary churning pile 1 centre-to-centre spacing 0.3~ 0.5m is evenly arranged along the first curtain with rotary jet grouting piles layer 3 periphery, with the intensity of the second curtain with rotary jet grouting piles layer 4.First curtain with rotary jet grouting piles Tight cementing formation curtain ring layer between layer 3 and the second curtain with rotary jet grouting piles layer 4 each stake of two-layer high-pressure rotary jet grouting pile, forms thickness at stake The degree protective layer not less than 1m, protective layer intensity is not less than 4Mpa.After additionally the construction of two-layer curtain with rotary jet grouting piles terminates, site operation In can draw, according to curtain boring, the practical situation understood in hole and effect that curtain produces be analyzed after decide whether to increase by the again Three layers of curtain are constructed or increase a small amount of rotary churning pile 1 for local defective region.
After completing due to the high pressure jet grouting in each hole, the serosity in hole quickly can produce bleed precipitation, therefore, institute State step 4) churning process aperture before final set at mend slurry in time and shrink sinking situation to eliminate serosity, i.e. should be in time to hole Interior filling is in the milk, until full, till slurry face, aperture no longer sinks.Eventually after spray, filling grouting is a very important job, That recharges good and bad will directly affect the quality of engineering, it is necessary to carries out filling and recharges work, specifically can include, 1. by feed pipe for mortar Inserting below entoplasm face, hole 2m, serosity during input slip casting carries out filling grouting;2. filling grouting need to repeatedly be repeated, The standard of recharging is: until full, till slurry face, aperture no longer sinks;3. should record the time of recharging, number of times, grouting amount, cement use Measure and recharge quality.After the high pressure jet grouting in hole, each position completes, grouting pump and grout pipe line should be cleaned in time, prevent clear Wash the most not thorough serosity deposit clumps in grout pipe line, blocking grout pipe line and nozzle, affect the construction in next hole.
Embodiment 1
" embodiment " the most referred to herein refers to special characteristic, the structure that may be included at least one implementation of the application Or characteristic.Different in this manual local " in the embodiments " occurred not refer both to same embodiment, are not single Or the embodiment the most mutually exclusive with other embodiments.Embodiment includes that the one with reference to Fig. 1, Fig. 2 is at deep water District squeezes into the cover layer of steel pile casting and reproduces construction method, comprises the following steps:
1) really hole is drawn to projected depth by drawing drilling machine rig at pre-fixed pile after fixed pile;
2) remove and draw drilling machine, and extend downwardly into ejector, spray boom at the bottom of hole by jet drill rig, connect air deflector;
3) carrying out rotary jet grouting from bottom to top, the whitewashed liquid of rotary jet grouting process is cement mortar, water mixed serum, cement in serosity Slurry, the ratio of mud of water are 1:1, the slurry flow 70L/min of rotary jet grouting process, are pumped as 20Mpa, and rotating speed is 700r/min;
4), at by predetermined pressure, lifting speed churning to design top, stake position desired height position, churning promotes speed 15cm/ Min, mends slurry in time and shrinks sinking situation to eliminate serosity at the aperture before final set;
5) completing a stake position churning job and form rotary churning pile 1, telephone-moving carries out the churning of another position to another churning position Construction, the rotary churning pile 1 completed becomes a circle to form the first curtain with rotary jet grouting piles layer 3, described first rotary churning pile curtain around steel pile casting 2 position 0.10m outside curtain each rotary churning pile 1 centre-to-centre spacing steel pile casting of layer 3, equal along steel pile casting 2 periphery by each rotary churning pile 1 centre-to-centre spacing 0.3m Even layout;
6) periphery at the first curtain with rotary jet grouting piles layer proceeds to design stake position rotary-spraying construction, and the rotary churning pile 1 completed is around first Curtain with rotary jet grouting piles layer 3 position becomes a circle to form the second curtain with rotary jet grouting piles layer 4, described second each rotary churning pile of curtain with rotary jet grouting piles layer 4 0.50m outside centre-to-centre spacing steel pile casting 2, by each rotary churning pile 1 centre-to-centre spacing 0.3m along the first curtain with rotary jet grouting piles layer 3 uniform cloth of periphery Put, tight cementing formation curtain circle between described first curtain with rotary jet grouting piles layer 3 and each stake of rotary churning pile of the second curtain with rotary jet grouting piles layer 4 Layer;
7) throw in sand pocket formed sand pocket cover layer 5, step 7) sand pocket in use sea sand.
Embodiment 2
A kind of with reference to Fig. 1, Fig. 2 reproduces construction method for the cover layer squeezing into steel pile casting in profundal zone, comprises the following steps:
1) really hole is drawn to projected depth by drawing drilling machine rig at pre-fixed pile after fixed pile;
2) remove and draw drilling machine, and extend downwardly into ejector, spray boom at the bottom of hole by jet drill rig, connect air deflector;
3) carrying out rotary jet grouting from bottom to top, the whitewashed liquid of rotary jet grouting process is cement mortar, water mixed serum, cement in serosity Slurry, the ratio of mud of water are 1:1, the slurry flow 80L/min of rotary jet grouting process, are pumped as 26Mpa, and rotating speed is 800r/min;
4), at by predetermined pressure, lifting speed churning to design top, stake position desired height position, churning promotes speed 16cm/ Min, mends slurry in time and shrinks sinking situation to eliminate serosity at the aperture before final set;
5) completing a stake position churning job and form rotary churning pile 1, telephone-moving carries out the churning of another position to another churning position Construction, the rotary churning pile 1 completed becomes a circle to form the first curtain with rotary jet grouting piles layer 3, described first rotary churning pile curtain around steel pile casting 2 position 0.15m outside curtain each rotary churning pile 1 centre-to-centre spacing steel pile casting of layer 3, equal along steel pile casting 2 periphery by each rotary churning pile 1 centre-to-centre spacing 0.4m Even layout;
6) periphery at the first curtain with rotary jet grouting piles layer proceeds to design stake position rotary-spraying construction, and the rotary churning pile 1 completed is around first Curtain with rotary jet grouting piles layer 3 position becomes a circle to form the second curtain with rotary jet grouting piles layer 4, described second each rotary churning pile of curtain with rotary jet grouting piles layer 4 0.55m outside centre-to-centre spacing steel pile casting 2, by each rotary churning pile 1 centre-to-centre spacing 0.4m along the first curtain with rotary jet grouting piles layer 3 uniform cloth of periphery Put, tight cementing formation curtain circle between described first curtain with rotary jet grouting piles layer 3 and each stake of rotary churning pile of the second curtain with rotary jet grouting piles layer 4 Layer;
7) throw in sand pocket formed sand pocket cover layer 5, step 7) sand pocket in use sea sand.
Embodiment 3
A kind of with reference to Fig. 1, Fig. 2 reproduces construction method for the cover layer squeezing into steel pile casting in profundal zone, comprises the following steps:
1) really hole is drawn to projected depth by drawing drilling machine rig at pre-fixed pile after fixed pile;
2) remove and draw drilling machine, and extend downwardly into ejector, spray boom at the bottom of hole by jet drill rig, connect air deflector;
3) carrying out rotary jet grouting from bottom to top, the whitewashed liquid of rotary jet grouting process is cement mortar, water mixed serum, cement in serosity Slurry, the ratio of mud of water are 1:1, the slurry flow 90L/min of rotary jet grouting process, are pumped as 32Mpa, and rotating speed is 900r/min;
4), at by predetermined pressure, lifting speed churning to design top, stake position desired height position, churning promotes speed 18cm/ Min, mends slurry in time and shrinks sinking situation to eliminate serosity at the aperture before final set;
5) completing a stake position churning job and form rotary churning pile 1, telephone-moving carries out the churning of another position to another churning position Construction, the rotary churning pile 1 completed becomes a circle to form the first curtain with rotary jet grouting piles layer 3, described first rotary churning pile curtain around steel pile casting 2 position 0.20m outside curtain each rotary churning pile 1 centre-to-centre spacing steel pile casting of layer 3, equal along steel pile casting 2 periphery by each rotary churning pile 1 centre-to-centre spacing 0.5m Even layout;
6) periphery at the first curtain with rotary jet grouting piles layer proceeds to design stake position rotary-spraying construction, and the rotary churning pile 1 completed is around first Curtain with rotary jet grouting piles layer 3 position becomes a circle to form the second curtain with rotary jet grouting piles layer 4, described second each rotary churning pile of curtain with rotary jet grouting piles layer 4 0.60m outside centre-to-centre spacing steel pile casting 2, by each rotary churning pile 1 centre-to-centre spacing 0.5m along the first curtain with rotary jet grouting piles layer 3 uniform cloth of periphery Put, tight cementing formation curtain circle between described first curtain with rotary jet grouting piles layer 3 and each stake of rotary churning pile of the second curtain with rotary jet grouting piles layer 4 Layer;
7) throw in sand pocket formed sand pocket cover layer 5, step 7) sand pocket in use sea sand.
According to above-mentioned principle, the present invention can also carry out suitable change and amendment to above-mentioned embodiment.Therefore, this Bright it is not limited to detailed description of the invention disclosed and described above, some modifications and changes of the present invention be should also be as falling into this In the scope of the claims of invention.
Through it was verified that the man cover layer method of sand pocket is filled in curtain grouting anchoring, by practice, it was demonstrated that Method is feasible, is possible not only to effective consolidation pile primitive period and encloses unfavorable geology, solve under severe sea condition and complex geological condition over strait greatly The couch collapse hole that occurs in bridge pier base boring procedure, the difficult problem such as spillage, be greatly improved offshore pile pore-forming efficiency and quality, and relatively The conventional treatment process that in Yu Kong, throwing slabstone, cement, loess etc. process repeatedly and effect is not satisfactory, single stake at least saves About 15 days durations.

Claims (10)

1. one kind is reproduced construction method for the cover layer squeezing into steel pile casting in profundal zone, it is characterised in that comprise the following steps:
1) really hole is drawn to projected depth by drawing drilling machine rig at pre-fixed pile after fixed pile;
2) remove and draw drilling machine, and extend downwardly into ejector, spray boom at the bottom of hole by jet drill rig, connect air deflector;
3) rotary jet grouting is carried out from bottom to top;
4) by predetermined pressure, speed churning is promoted to designing at the desired height position of top, stake position;
5) completing a stake position churning job and form rotary churning pile (1), telephone-moving carries out the rotation of another position to another churning position Spraying construction, the rotary churning pile completed (1) becomes a circle to form the first curtain with rotary jet grouting piles layer (3) around steel pile casting (2) position;
6) periphery at the first curtain with rotary jet grouting piles layer proceeds to design stake position rotary-spraying construction, and the rotary churning pile completed (1) is around the One curtain with rotary jet grouting piles layer (3) position become one circle formed the second curtain with rotary jet grouting piles layer (4), described first curtain with rotary jet grouting piles layer (3) and Tight cementing formation curtain ring layer between each stake of rotary churning pile of the second curtain with rotary jet grouting piles layer (4);
7) throw in sand pocket and form sand pocket cover layer (5).
The most according to claim 1 a kind of reproducing construction method for the cover layer squeezing into steel pile casting in profundal zone, it is special Levy and be: in described step 4), churning promotes speed 15~18cm/min.
The most according to claim 1 a kind of reproducing construction method for the cover layer squeezing into steel pile casting in profundal zone, it is special Levy and be: described step 7) sand pocket in use sea sand.
The most according to claim 1 a kind of reproducing construction method for the cover layer squeezing into steel pile casting in profundal zone, it is special Levying and be: in described step 3), the pump pressure of rotary jet grouting process is 20~32Mpa, rotating speed is 700~900r/min.
The most according to claim 1 a kind of reproducing construction method for the cover layer squeezing into steel pile casting in profundal zone, it is special Levy and be: in described step 3), the whitewashed liquid of rotary jet grouting process is cement mortar, water mixed serum.
The most according to claim 5 a kind of reproducing construction method for the cover layer squeezing into steel pile casting in profundal zone, it is special Levy and be: in described step 3), in the whitewashed liquid of rotary jet grouting process, cement mortar, the ratio of mud of water are 1:1.
The most according to claim 5 a kind of reproducing construction method for the cover layer squeezing into steel pile casting in profundal zone, it is special Levy and be: the slurry flow 70~90L/min of rotary jet grouting process in described step 3).
The most according to claim 1 a kind of reproducing construction method for the cover layer squeezing into steel pile casting in profundal zone, it is special Levy and be: outside the first curtain with rotary jet grouting piles layer (3) each rotary churning pile (1) centre-to-centre spacing steel pile casting in step 5) 0.10~0.20m, It is evenly arranged along steel pile casting (2) periphery by each rotary churning pile (1) centre-to-centre spacing 0.3~0.5m.
The most according to claim 1 a kind of reproducing construction method for the cover layer squeezing into steel pile casting in profundal zone, it is special Levy and be: each rotary churning pile centre-to-centre spacing steel pile casting (2) outside 0.50~0.60m of the second curtain with rotary jet grouting piles layer (4) in step 6), It is evenly arranged along the first curtain with rotary jet grouting piles layer (3) periphery by each rotary churning pile (1) centre-to-centre spacing 0.3~0.5m.
The most according to claim 1 a kind of reproducing construction method for the cover layer squeezing into steel pile casting in profundal zone, it is special Levy and be: described step 4) churning process aperture before final set at mend slurry in time and shrink sinking situation to eliminate serosity.
CN201610222400.6A 2016-04-11 2016-04-11 Remanufacturing and constructing method of covering layer at deep water region where steel pile casings are tapped Pending CN105862860A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610222400.6A CN105862860A (en) 2016-04-11 2016-04-11 Remanufacturing and constructing method of covering layer at deep water region where steel pile casings are tapped

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610222400.6A CN105862860A (en) 2016-04-11 2016-04-11 Remanufacturing and constructing method of covering layer at deep water region where steel pile casings are tapped

Publications (1)

Publication Number Publication Date
CN105862860A true CN105862860A (en) 2016-08-17

Family

ID=56637475

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610222400.6A Pending CN105862860A (en) 2016-04-11 2016-04-11 Remanufacturing and constructing method of covering layer at deep water region where steel pile casings are tapped

Country Status (1)

Country Link
CN (1) CN105862860A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114622552A (en) * 2022-03-17 2022-06-14 广东省交通规划设计研究院集团股份有限公司 Pile foundation construction method for soft ground bridge

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003027461A (en) * 2001-07-16 2003-01-29 Nippon Steel Corp Oblique tie material connection type double-wall cofferdam steel sheet pile wall
CN101205721A (en) * 2007-12-03 2008-06-25 中铁大桥局集团第四工程有限公司 Method for surrounding water by combination of steel cofferdam and heavy-pressure rotary-spraying pile in deep-water low-pile cap construction
CN102363961A (en) * 2011-11-11 2012-02-29 中交四航局第一工程有限公司 Deepwater single-wall steel plate pile cofferdam structure with low buried depth and construction method thereof

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003027461A (en) * 2001-07-16 2003-01-29 Nippon Steel Corp Oblique tie material connection type double-wall cofferdam steel sheet pile wall
CN101205721A (en) * 2007-12-03 2008-06-25 中铁大桥局集团第四工程有限公司 Method for surrounding water by combination of steel cofferdam and heavy-pressure rotary-spraying pile in deep-water low-pile cap construction
CN102363961A (en) * 2011-11-11 2012-02-29 中交四航局第一工程有限公司 Deepwater single-wall steel plate pile cofferdam structure with low buried depth and construction method thereof

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
陈震: ""复杂海况深水区覆盖层再造技术"", 《铁道建筑技术》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114622552A (en) * 2022-03-17 2022-06-14 广东省交通规划设计研究院集团股份有限公司 Pile foundation construction method for soft ground bridge

Similar Documents

Publication Publication Date Title
CN106284313B (en) Long spire based on circulating mud retaining wall is squeezed into rock filling pile construction method
CN106640120B (en) Layered grouting construction method for fixed-point deep holes on earth surface
CN104929114A (en) High pressure jet grouting pile waterproof curtain construction device and method
CN102943466B (en) Construction method for miniature steel pipe concrete pile to penetrate through roadbed layer for reinforcing soft foundation construction
CN205172598U (en) Pipe curtain spouts a supporting construction soon
CN104499479B (en) It is a kind of to pass through the dug pile construction method that sand gravel backfills layer
CN106759297A (en) A kind of construction method of support pile and three pipe high-pressure rotary jet grouting pile deep basal pits
CN111119940B (en) Grouting construction treatment method
CN109594564A (en) A kind of anti-collapse construction method of Metro Deep Excavation open cut
CN102286985A (en) Method for constructing dual high-pressure jet grouting pile waterproof curtain
CN105297741B (en) Upper-soft lower-hard ground explosion causes foundation pit enclosure structure to pierce water burst prevention and controls
CN112392400B (en) Hole forming construction process for slope protection pile in complex geological environment
CN107338789B (en) A kind of construction method of down-the-hole percussion triple-pipe high pressure jet grouting stake
CN105484269B (en) Foundation pit enclosure structure seepage prevention and treatment construction method under blasting condition
CN204753574U (en) High pressure jet grouting pile stagnant water curtain construction equipment
CN103882858A (en) Construction method of micro-piles with diameter of 300 mm
CN108252719A (en) Plastic flow modeling shape red clay layer construction method is worn under a kind of urban shallow tunnel
CN108265706A (en) Engineering pile in karst cave geology and pile forming process
CN111455988A (en) Construction method of high-pressure jet grouting pile
CN114808990A (en) High-pressure pre-filling karst cave pile foundation construction method
CN105714748A (en) Excavating construction method for surge shaft in gravel and sandy soil layer
CN108149682A (en) A kind of slip casting casing device and the pile foundation drilling construction method using the casing device
CN108005662B (en) A kind of processing method of underground water seal cave depot storage cavern area geology crushed zone
CN109252531A (en) The waterproof curtain construction method that mixing pile or rotary churning pile are combined with sleeve valve barrel grouting
CN105604163A (en) Sewage pipeline internal plugging and external grouting construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20160817