CN105821874A - 螺旋筒形基础施工法 - Google Patents

螺旋筒形基础施工法 Download PDF

Info

Publication number
CN105821874A
CN105821874A CN201610181122.4A CN201610181122A CN105821874A CN 105821874 A CN105821874 A CN 105821874A CN 201610181122 A CN201610181122 A CN 201610181122A CN 105821874 A CN105821874 A CN 105821874A
Authority
CN
China
Prior art keywords
spiral
foundation
helical blade
cylindrical foundation
spiral cylindrical
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610181122.4A
Other languages
English (en)
Inventor
王燏斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201610181122.4A priority Critical patent/CN105821874A/zh
Publication of CN105821874A publication Critical patent/CN105821874A/zh
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/56Screw piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D7/00Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
    • E02D7/22Placing by screwing down

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

本发明是螺旋筒形基础施工法,包括如下步骤:1)预制螺旋筒形基础1,其筒体2的内外壁设有螺旋叶片3,且底部开口;2)螺旋筒形基础1在设定位置竖起;3)在动力作用下将螺旋筒形基础1旋转,并逐渐下降至设定位置。本发明的优点:预制螺旋筒形基础在设定位置竖起并在动力作用下旋转逐渐下降至设定位置。下降过程中仅切削环形区域内的岩土,开挖面积小,能缩短施工周期,减轻劳动强度。

Description

螺旋筒形基础施工法
技术领域
本发明涉及的是一种螺旋筒形基础施工法,属于土木工程基础施工技术领域。
背景技术
现有基础施工,采用整体开挖施工方式,施工周期长、劳动强度大、工作环境安全度差。
现有筒形基础原理是通过内腔的负压和顶部的水压把其压入土体的,仅适用于水下软土基,当有孤石时不能适用。
发明内容
本发明提出的是一种螺旋筒形基础施工法,其目的旨在克服现有技术存在的缺陷。螺旋筒形基础旋转下降过程中仅切削环形区域内的岩土,开挖面积小,能缩短施工周期,减轻劳动强度。
本发明的技术方案:螺旋筒形基础施工法,包括如下步骤:
1)预制螺旋筒形基础1,其筒体2的内外壁设有螺旋叶片3,且底部开口;
2)螺旋筒形基础1在设定位置竖起;
3)在动力作用下将螺旋筒形基础1旋转,并逐渐下降至设定位置。
本发明的优点:预制螺旋筒形基础在设定位置竖起并在动力作用下旋转逐渐下降至设定位置。下降过程中仅切削环形区域内的岩土,开挖面积小,能缩短施工周期,减轻劳动强度。
附图说明
图1是螺旋筒形基础1的示意图。
图2是图1的A向视图。
图3是图1的Ⅰ处局部放大图。
图4是图1的B向展开图。
图5是螺旋筒形基础1在设定位置竖起的示意图。
图6是螺旋筒形基础旋转下降过程的示意图。
图7是螺旋筒形基础1封顶的示意图。
图8是螺旋筒形基础1内浇筑钢筋混凝土的示意图。
图9是螺旋叶片3底部切削岩土的结构示意图。
图10是图9的C向视图。
图11是图9的Ⅱ处局部放大图。
图12是图1的Ⅰ处第二种结构局部放大图。
图13是图9的Ⅱ处第二种结构局部放大图。
图14是图1的Ⅰ处第三种结构局部放大图。
图15是图1的Ⅰ处第四种结构局部放大图。
图16是图9的Ⅱ处第三种结构局部放大图。
图中的1是螺旋筒形基础;2是筒体;3是螺旋叶片;4是刀具;5是喷嘴。
具体实施方式
螺旋筒形基础施工法,包括如下步骤:
1)预制螺旋筒形基础1,其筒体2的内外壁设有螺旋叶片3,且底部开口;
2)螺旋筒形基础1在设定位置竖起;
3)在动力作用下将螺旋筒形基础1旋转,并逐渐下降至设定位置。
所述的螺旋叶片3为多牙结构。
所述的螺旋叶片3间断和/或部分间断布置在筒体2上。
所述的螺旋叶片3的底部能切削螺旋叶片3底部所对应的环形区域内的岩土。
所述的螺旋筒形基础1的底部设有环形间隔分布的若干刀具4,在下降过程中刀具4只切削其底部所对应的环形区域内的岩土。
所述的刀具4为自磨结构。
所述的螺旋筒形基础1设有若干喷嘴5。
所述的喷嘴5在螺旋筒形基础1下降过程中喷注具有减小阻力的流体。
所述的喷嘴5在螺旋筒形基础1下降到设定深度后灌注具有增大承载力的流体。
所述的螺旋筒形基础1下降到设定深度后进行封顶作业,用于增大承载力。
所述的螺旋筒形基础1下降到设定深度后,挖除筒体2内的岩土并浇筑钢筋混凝土。
实施例:
如图1-图4所示,预制螺旋筒形基础1。其由筒体2、螺旋叶片3、刀具4和喷嘴5等组成。筒体2底部开口,内外壁设有螺旋叶片3,螺旋叶片3可为多牙结构且能间断或部分间断布置;螺旋筒形基础1底部设有刀具4,刀具4为自磨结构环形布置在螺旋筒形基础1的底部。
如图5所示,在设定位置将螺旋筒形基础1竖起;
如图6所示,在动力作用下将螺旋筒形基础1旋转,底部刀具4在旋转过程中切削刀具4底部所对应的环形区域内的岩土,多余的岩土由螺旋叶片3输出;在软土基环境下也可没有刀具4直接由螺旋叶片3底部切削螺旋叶片3底部所对应的环形区域内的岩土,如图9-图11所示;喷嘴5在下降过程中喷注具有减小阻力的流体。
当螺旋筒形基础1下降到设定深度后,喷嘴5灌注具有增大承载力的流体。然后如图7所示进行封顶作业,或如图8所示挖除筒体2内的岩土并浇筑钢筋混凝土。
螺旋筒形基础1底部也可采用如图12-图16所示结构。
如图14所示,螺旋叶片3底部是自磨结构刀,筒体底部无刀。
如图15所示,螺旋叶片3底部是自磨结构刀,筒体底部是齿形刀。

Claims (11)

1.螺旋筒形基础施工法,其特征是该方法包括如下步骤:
1)预制螺旋筒形基础(1),其筒体(2)的内外壁设有螺旋叶片(3),且底部开口;
2)螺旋筒形基础(1)在设定位置竖起;
3)在动力作用下将螺旋筒形基础(1)旋转,并逐渐下降至设定位置。
2.根据权利要求1所述的螺旋筒形基础施工法,其特征在于所述的螺旋叶片(3)为多牙结构。
3.根据权利要求1所述的螺旋筒形基础施工法,其特征在于所述的螺旋叶片(3)间断和/或部分间断布置在筒体(2)上。
4.根据权利要求1所述的螺旋筒形基础施工法,其特征在于所述的螺旋叶片(3)的底部能切削螺旋叶片(3)底部所对应的环形区域内的岩土。
5.根据权利要求1所述的螺旋筒形基础施工法,其特征在于所述的螺旋筒形基础(1)的底部设有环形间隔分布的若干刀具(4),在下降过程中刀具(4)只切削其底部所对应的环形区域内的岩土。
6.根据权利要求5所述的螺旋筒形基础施工法,其特征在于所述的刀具(4)为自磨结构。
7.根据权利要求1所述的螺旋筒形基础施工法,其特征在于所述的螺旋筒形基础(1)设有若干喷嘴(5)。
8.根据权利要求7所述的螺旋筒形基础施工法,其特征在于所述的喷嘴(5)在螺旋筒形基础(1)下降过程中喷注具有减小阻力的流体。
9.根据权利要求7所述的螺旋筒形基础施工法,其特征在于所述的喷嘴(5)在螺旋筒形基础(1)下降到设定深度后灌注具有增大承载力的流体。
10.根据权利要求1所述的螺旋筒形基础施工法,其特征在于所述的螺旋筒形基础(1)下降到设定深度后进行封顶作业,用于增大承载力。
11.根据权利要求1所述的螺旋筒形基础施工法,其特征在于所述的螺旋筒形基础(1)下降到设定深度后,挖除筒体(2)内的岩土并浇筑钢筋混凝土。
CN201610181122.4A 2016-03-28 2016-03-28 螺旋筒形基础施工法 Pending CN105821874A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610181122.4A CN105821874A (zh) 2016-03-28 2016-03-28 螺旋筒形基础施工法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610181122.4A CN105821874A (zh) 2016-03-28 2016-03-28 螺旋筒形基础施工法

Publications (1)

Publication Number Publication Date
CN105821874A true CN105821874A (zh) 2016-08-03

Family

ID=56525318

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610181122.4A Pending CN105821874A (zh) 2016-03-28 2016-03-28 螺旋筒形基础施工法

Country Status (1)

Country Link
CN (1) CN105821874A (zh)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106522256A (zh) * 2016-10-31 2017-03-22 王燏斌 一种螺旋凹槽筒形基础及制造方法和施工方法
CN106522255A (zh) * 2016-10-31 2017-03-22 王燏斌 底部带刀的单壁螺旋筒形基础及其施工法
CN106758861A (zh) * 2017-03-17 2017-05-31 王燏斌 一种造桥装置及其施工法
CN106759460A (zh) * 2017-03-17 2017-05-31 王燏斌 一种用于岸边基础的施工装置及其施工法
CN106759106A (zh) * 2017-03-17 2017-05-31 王燏斌 一种用于驳岸的施工装置及其施工法
CN106801430A (zh) * 2017-03-17 2017-06-06 王燏斌 一种用于水中基础的施工船及其施工法
CN106801435A (zh) * 2017-03-17 2017-06-06 王燏斌 一种深水基础和施工装置及其施工法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6347416A (ja) * 1986-12-17 1988-02-29 Yasuyuki Yoshida 鋼管杭の埋設工法
CN1837501A (zh) * 2005-03-24 2006-09-27 曹兴明 注浆螺纹桩、其施工方法及所采用的注浆装置
CN102369327A (zh) * 2009-04-10 2012-03-07 新日铁工程技术株式会社 钢管桩和钢管桩的施工方法
CN203188200U (zh) * 2013-04-03 2013-09-11 福建岩土工程勘察研究院 一种高压喷射注浆搅拌成桩装置
CN103774646A (zh) * 2014-01-20 2014-05-07 南通东南公路工程有限公司 一种螺旋灌注桩及其使用方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6347416A (ja) * 1986-12-17 1988-02-29 Yasuyuki Yoshida 鋼管杭の埋設工法
CN1837501A (zh) * 2005-03-24 2006-09-27 曹兴明 注浆螺纹桩、其施工方法及所采用的注浆装置
CN102369327A (zh) * 2009-04-10 2012-03-07 新日铁工程技术株式会社 钢管桩和钢管桩的施工方法
CN203188200U (zh) * 2013-04-03 2013-09-11 福建岩土工程勘察研究院 一种高压喷射注浆搅拌成桩装置
CN103774646A (zh) * 2014-01-20 2014-05-07 南通东南公路工程有限公司 一种螺旋灌注桩及其使用方法

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106522256A (zh) * 2016-10-31 2017-03-22 王燏斌 一种螺旋凹槽筒形基础及制造方法和施工方法
CN106522255A (zh) * 2016-10-31 2017-03-22 王燏斌 底部带刀的单壁螺旋筒形基础及其施工法
CN106758861A (zh) * 2017-03-17 2017-05-31 王燏斌 一种造桥装置及其施工法
CN106759460A (zh) * 2017-03-17 2017-05-31 王燏斌 一种用于岸边基础的施工装置及其施工法
CN106759106A (zh) * 2017-03-17 2017-05-31 王燏斌 一种用于驳岸的施工装置及其施工法
CN106801430A (zh) * 2017-03-17 2017-06-06 王燏斌 一种用于水中基础的施工船及其施工法
CN106801435A (zh) * 2017-03-17 2017-06-06 王燏斌 一种深水基础和施工装置及其施工法
WO2018166521A1 (zh) * 2017-03-17 2018-09-20 王燏斌 一种用于岸边基础的施工装置及其施工法
WO2018166522A1 (zh) * 2017-03-17 2018-09-20 王燏斌 一种用于驳岸的施工装置及其施工法
WO2018166520A1 (zh) * 2017-03-17 2018-09-20 王燏斌 一种用于水中基础的施工船及其施工法

Similar Documents

Publication Publication Date Title
CN105821874A (zh) 螺旋筒形基础施工法
CN103806840B (zh) 单向螺旋半挤土钻头及单向螺旋半挤土桩施工工艺
CN101147458A (zh) 竹根挖掘机
CN105862738A (zh) 锁扣l形桩制造装置
CN105862741A (zh) 圆弧锁扣十字桩制造设备
CN105862739A (zh) 插扣l形桩制造装置
CN105756042A (zh) 圆弧插扣t形桩制造设备
CN201107951Y (zh) 筒形竹根挖掘机
CN105804112A (zh) 螺旋筒形基础
CN105735289A (zh) 圆弧插扣梅花桩成桩设施
CN105862751A (zh) 圆弧插合梅花桩成桩设施
CN108890019A (zh) 一种管内切割装置
CN105821838A (zh) 圆弧锁扣t形桩制造设备
CN105735282A (zh) 锁口十字桩制造设备
CN105862752A (zh) 圆弧锁扣梅花桩成桩设施
CN105862737A (zh) 圆弧锁扣人字桩制造设备
CN105862748A (zh) 一种圆弧接合丁字桩
CN105887827A (zh) 一种圆弧接口丁字桩
CN203769662U (zh) 单向螺旋半挤土钻头
CN105804644A (zh) 一种扣合十字桩
CN105756052A (zh) 梅花形接合桩制造装置
CN105887817A (zh) 一种插口桩制造组合
CN105887825A (zh) Y形插口桩制造机具
CN105862827A (zh) 插扣十字桩地基处理机械
CN105887828A (zh) 一种插扣桩制造组合

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20160803