CN105817833A - 一种电铲铲斗修补方法 - Google Patents
一种电铲铲斗修补方法 Download PDFInfo
- Publication number
- CN105817833A CN105817833A CN201610224408.6A CN201610224408A CN105817833A CN 105817833 A CN105817833 A CN 105817833A CN 201610224408 A CN201610224408 A CN 201610224408A CN 105817833 A CN105817833 A CN 105817833A
- Authority
- CN
- China
- Prior art keywords
- welding
- repaired
- welded
- repairing
- scraper bowl
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23P—METAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
- B23P6/00—Restoring or reconditioning objects
- B23P6/04—Repairing fractures or cracked metal parts or products, e.g. castings
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Arc Welding In General (AREA)
Abstract
本发明公开了一种电铲铲斗修补方法,包括以下步骤:1)检查待修补处,清理修补处的泥垢、油垢和铁锈;2)采用焊接焊条电弧焊的方法进行修补,将焊条经300‑350℃高温烘;3)起焊前对焊接部位进行烘烤,预热温度控制在140℃‑160℃;4)对待修补处进行焊接修补,在焊第一层过渡层时焊接分段跳焊、交错焊接;5)第一层过渡层焊接分段焊接,等焊道冷却至100℃以下后,再焊下一段;6)焊完第一层过渡焊缝后,从第二层焊缝开始可连续施焊,焊接的层间温度控制在200℃以下;7)进行检查,合格后进行使用。本发明对磨损后的电铲铲斗进行合理的修补,延长电铲铲斗的使用寿命,值得在一些焊接设备及焊接条件差的企业推广使用。
Description
技术领域
本发明涉及电铲领域,具体涉及一种电铲铲斗修补方法。
背景技术
电铲是露天矿开采的主要设备之一,可用来完成表土的剥离、堆弃(或转载)以及矿物的采掘和装运等项工作。与大型矿用汽车一起共同完成矿石的挖掘、铲装和运输作业。电铲铲斗是电铲的主要工作部件,每年几百万吨矿石的挖掘和铲运都要通过电铲斗来完成。在作业过程中,铲斗受到物料的冲击和强烈磨损,一般铲斗使用2—3年,在铲斗内表面就严重的磨损,经研究发现,针对装卸石料的电铲铲斗在长期使用中,铲齿面近斗门侧的斗体会受到较严重磨损,需要对其更换,给企业造成巨大的经济损失。
发明内容
为了解决上述技术问题,本发明提供一种电铲铲斗修补方法,该方法能够对磨损后的电铲铲斗进行合理的修补,使得修补后的铲斗无需更换,能够继续使用,为企业降低损失。
本发明的目的通过以下技术方案来具体实现:
一种电铲铲斗修补方法,包括以下步骤:
1)检查待修补处,清理修补处的泥垢、油垢和铁锈,针对有起层、裂纹、夹砂、气孔剂缩孔的缺陷,用砂轮或电弧气刨铲除,同时,将待修补的部位用角向磨光机磨去硬化层;
2)采用焊接焊条电弧焊的方法进行修补,将焊条经300-350℃高温烘焙1小时,焊条烘焙后放在保温筒中,随供随用;
3)起焊前用气割具对焊接部位进行烘烤,以便进一步清除杂质,同时也给焊接部位进行焊前预热,以提高t8/5的数值,预热温度控制在140℃-160℃;
4)对待修补处进行焊接修补,在焊第一层过渡层时焊接分段跳焊、交错焊接,采用短弧、窄焊道多层焊,每道焊缝的接头要相互错开;
5)第一层过渡层焊接分段焊接,一段焊接完成后停焊,彻底清除焊渣,并进行锤击焊道,等焊道冷却至100℃以下后,再焊下一段,以消除热应力与防止碳化物析出;
6)焊完第一层过渡焊缝后,从第二层焊缝开始可连续施焊,焊接的层间温度控制在200℃以下,以减少敏感温度区的停留时间,防止硬质钢产生再热裂纹;
7)焊接完成后,首先对焊缝用钢丝刷进行表面清理,将焊件表面的飞溅物清出干净;将焊接完成后的成品放置三天,用肉眼及放大镜对焊缝及焊接热影响区外观进行检查,合格后进行使用。
进一步的,焊接时采用小电流及短弧焊,电流选用范围为90-110A。
进一步的,所述焊条采用A132焊条。
本发明一种电铲铲斗修补方法,在焊接设备及焊接条件差的环境下,较好地解决了大厚度耐磨钢焊接产生的裂纹问题,对磨损后的电铲铲斗进行合理的修补,使得修补后的铲斗无需更换,能够继续使用,且在使用中效果良好,为企业降低损失,延长电铲铲斗的使用寿命,值得在一些焊接设备及焊接条件差的企业推广使用。
具体实施方式
本发明实施例所述的一种电铲铲斗修补方法,包括以下步骤:
1)检查待修补处,清理修补处的泥垢、油垢和铁锈,针对有起层、裂纹、夹砂、气孔剂缩孔的缺陷,用砂轮或电弧气刨铲除,同时,将待修补的部位用角向磨光机磨去硬化层;因为硬化层的金属对裂纹十分敏感,同时将打磨磨损面与母体之间的过渡面时要圆滑过渡或打磨至平滑过渡的一个斜面,并将磨损部位周围10mm范围打磨露出金属光泽;
2)采用焊接焊条电弧焊的方法进行修补,由于焊条电弧焊时熔合比较小,而且操作灵活,不受焊件形状和位置的限制,所以,采用此焊接方法焊接野外作业的铲斗是较为适宜,将焊条经300-350℃之间的任意值高温烘焙1小时,包括300℃及350℃两个端值,焊条烘焙后放在保温筒中,随供随用;
3)起焊前用气割具对焊接部位进行烘烤,以便进一步清除杂质,同时也给焊接部位进行焊前预热,以提高t8/5的数值,预热温度控制在140℃-160℃之间的任意值,包括140℃、160℃两个端值,所说的t8/5为硬质钢不产生冷裂纹的冷却时间;
4)对待修补处进行焊接修补,在焊第一层过渡层时焊接分段跳焊、交错焊接,采用短弧、窄焊道多层焊,每道焊缝的接头要相互错开;
5)第一层过渡层焊接分段焊接,一段焊接完成后停焊,彻底清除焊渣,并进行锤击焊道,等焊道冷却至100℃以下后,再焊下一段,以消除热应力与防止碳化物析出;
6)焊完第一层过渡焊缝后,从第二层焊缝开始可连续施焊,焊接的层间温度控制在200℃以下,以减少敏感温度区的停留时间,防止硬质钢产生再热裂纹;
7)焊接完成后,首先对焊缝用钢丝刷进行表面清理,将焊件表面的飞溅物清出干净;将焊接完成后的成品放置三天,用肉眼及放大镜对焊缝及焊接热影响区外观进行检查,合格后进行使用。
优选的,焊接时采用小电流及短弧焊,电流选用范围为90-110A之间的任意值,包括90A、110A两端值。
为了能利用现有的机具设备,有效地控制焊接冷裂纹和焊缝剥离现象,考虑到硬质钢焊接时,由于碳化物的析出和收缩应力的影响,并防止焊缝有较大的热裂倾向,优选的,焊条采用A132焊条,直径为φ3.2mm。
本发明一种电铲铲斗修补方法,在焊接设备及焊接条件差的环境下,较好地解决了大厚度耐磨钢焊接产生的裂纹问题,对磨损后的电铲铲斗进行合理的修补,使得修补后的铲斗无需更换,能够继续使用,且在使用中效果良好,为企业降低损失,延长电铲铲斗的使用寿命,值得在一些焊接设备及焊接条件差的企业推广使用。
最后应说明的是:以上所述仅为本发明的优选实施例而已,并不用于限制本发明,对于本领域的技术人员来说,其依然可以对前述各实施例所记载的技术方案进行调节,或者对其中部分技术特征进行等同替换,凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。
Claims (3)
1.一种电铲铲斗修补方法,其特征在于包括以下步骤:
1)检查待修补处,清理修补处的泥垢、油垢和铁锈,针对有起层、裂纹、夹砂、气孔剂缩孔的缺陷,用砂轮或电弧气刨铲除,同时,将待修补的部位用角向磨光机磨去硬化层;
2)采用焊接焊条电弧焊的方法进行修补,将焊条经300-350℃高温烘焙1小时,焊条烘焙后放在保温筒中,随供随用;
3)起焊前用气割具对焊接部位进行烘烤,以便进一步清除杂质,同时也给焊接部位进行焊前预热,以提高t8/5的数值,预热温度控制在140℃-160℃;
4)对待修补处进行焊接修补,在焊第一层过渡层时焊接分段跳焊、交错焊接,采用短弧、窄焊道多层焊,每道焊缝的接头要相互错开;
5)第一层过渡层焊接分段焊接,一段焊接完成后停焊,彻底清除焊渣,并进行锤击焊道,等焊道冷却至100℃以下后,再焊下一段,以消除热应力与防止碳化物析出;
6)焊完第一层过渡焊缝后,从第二层焊缝开始可连续施焊,焊接的层间温度控制在200℃以下,以减少敏感温度区的停留时间,防止硬质钢产生再热裂纹;
7)焊接完成后,首先对焊缝用钢丝刷进行表面清理,将焊件表面的飞溅物清出干净;将焊接完成后的成品放置三天,用肉眼及放大镜对焊缝及焊接热影响区外观进行检查,合格后进行安装使用。
2.根据权利要求1所述的一种电铲铲斗修补方法,其特征在于:焊接时采用小电流及短弧焊,电流选用范围为90-110A。
3.根据权利要求1所述的一种电铲铲斗修补方法,其特征在于:所述焊条采用A132焊条。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610224408.6A CN105817833A (zh) | 2016-04-12 | 2016-04-12 | 一种电铲铲斗修补方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610224408.6A CN105817833A (zh) | 2016-04-12 | 2016-04-12 | 一种电铲铲斗修补方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105817833A true CN105817833A (zh) | 2016-08-03 |
Family
ID=56525812
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610224408.6A Pending CN105817833A (zh) | 2016-04-12 | 2016-04-12 | 一种电铲铲斗修补方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105817833A (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108798674A (zh) * | 2018-06-19 | 2018-11-13 | 方晓妹 | 电铲内孔被磨损支轮的修补装置 |
CN109570807A (zh) * | 2019-01-03 | 2019-04-05 | 上海江南船舶管业有限公司 | 精密零件焊接工艺 |
CN111791016A (zh) * | 2020-08-13 | 2020-10-20 | 曹妃甸港集团股份有限公司 | 一种矿石抓斗斗瓣板修补工艺 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN87101288A (zh) * | 1987-12-29 | 1988-11-09 | 中国船舶工业总公司天津修船技术研究所 | 高锰钢泥斗修复工艺 |
US20120030147A1 (en) * | 2010-07-28 | 2012-02-02 | Zeno Joseph R | Monolithic floor for hot slag bucket |
CN104858609A (zh) * | 2015-05-11 | 2015-08-26 | 南京梅山冶金发展有限公司 | 一种铲运机铲斗铲刃修复的方法 |
-
2016
- 2016-04-12 CN CN201610224408.6A patent/CN105817833A/zh active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN87101288A (zh) * | 1987-12-29 | 1988-11-09 | 中国船舶工业总公司天津修船技术研究所 | 高锰钢泥斗修复工艺 |
US20120030147A1 (en) * | 2010-07-28 | 2012-02-02 | Zeno Joseph R | Monolithic floor for hot slag bucket |
CN104858609A (zh) * | 2015-05-11 | 2015-08-26 | 南京梅山冶金发展有限公司 | 一种铲运机铲斗铲刃修复的方法 |
Non-Patent Citations (4)
Title |
---|
伍广文: "PC-600反铲铲斗修复工艺", 《2012年海南省机械工程学会论文集》 * |
张登军等: "WK-20铲斗焊接修复工艺", 《露天采矿技术》 * |
李密等: "矿山WK-2M3电铲铲斗修补焊探讨", 《第五届广西青年学术年会论文集-自然科学篇》 * |
闫明等: "395B铲斗侧壁开裂焊接修复工艺的探讨", 《露天采矿技术》 * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108798674A (zh) * | 2018-06-19 | 2018-11-13 | 方晓妹 | 电铲内孔被磨损支轮的修补装置 |
CN109570807A (zh) * | 2019-01-03 | 2019-04-05 | 上海江南船舶管业有限公司 | 精密零件焊接工艺 |
CN111791016A (zh) * | 2020-08-13 | 2020-10-20 | 曹妃甸港集团股份有限公司 | 一种矿石抓斗斗瓣板修补工艺 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CA3014533C (en) | Robotically-controlled laser cladding process for repair of worn and/or damaged railway structures | |
CN105458476B (zh) | 核电站核岛主蒸汽或主给水管道的焊接方法 | |
US10086462B2 (en) | Hardfacing with low carbon steel electrode | |
CN104816076A (zh) | 一种连续管的管管对接焊工艺方法 | |
CN105817833A (zh) | 一种电铲铲斗修补方法 | |
CN103785924A (zh) | 一种高锰钢铸钢辙叉及钢轨堆焊修复方法 | |
CN101856783A (zh) | 大型铝合金料仓整体制作安装方法 | |
CN103934544A (zh) | 一种防止堆焊密封面产生裂纹的方法 | |
CN104827164A (zh) | 大面积大厚度tu2铜/钢***复合材料及缺陷的修复方法 | |
CN102658417A (zh) | 高铬铸铁的铸造缺陷的焊补工艺 | |
CN105855786A (zh) | 超厚壁管道焊接缺陷的修复方法 | |
CN106835119A (zh) | 一种油田注水用往复式柱塞泵柱塞修复方法 | |
CN105349992B (zh) | 一种针对飞机垂直销、螺栓零件表面的激光熔覆修复方法 | |
CN112496667A (zh) | 一种特棒导板堆焊修复工艺 | |
CN103008966B (zh) | 一种报废泥浆泵缸套修复方法 | |
CN105149727B (zh) | 一种中碳钢铸件缺陷去除方法 | |
CN104498864B (zh) | 一种煤截齿修复再制造方法 | |
Bołoz et al. | Conical Pick Production Process | |
CN103028813A (zh) | G42CrMo4N冷轧轴套局部破损的焊接修复方法 | |
CN103920969A (zh) | 一种磨穿且无通透裂纹磨辊、衬瓦的堆焊方法 | |
KR102009817B1 (ko) | 스카핑 유닛 수리방법 | |
US2329410A (en) | Process of welding manganese steels | |
US2310308A (en) | Alloy | |
CN104827166A (zh) | 一种装载机铲斗主刀板的制备方法 | |
CN108500555B (zh) | 用于链条的焊接修复方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20160803 |
|
RJ01 | Rejection of invention patent application after publication |