CN105804323B CN201610147073.2A CN201610147073A CN105804323B CN 105804323 B CN105804323 B CN 105804323B CN 201610147073 A CN201610147073 A CN 201610147073A CN 105804323 B CN105804323 B CN 105804323B
Authority
CN
China
Prior art keywords
mesh
cold rolling
construction method
reinforcement
rebar piece
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610147073.2A
Other languages
Chinese (zh)
Other versions
CN105804323A (en
Inventor
王振兴
王卫新
许龙迪
曾辉
黄征
孔涛涛
安然
张皞
彭景祥
焦晨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING URBAN CONSTRUCTION NORTH CONSTRUCTION Co Ltd
Original Assignee
BEIJING URBAN CONSTRUCTION NORTH CONSTRUCTION Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING URBAN CONSTRUCTION NORTH CONSTRUCTION Co Ltd filed Critical BEIJING URBAN CONSTRUCTION NORTH CONSTRUCTION Co Ltd
Priority to CN201610147073.2A priority Critical patent/CN105804323B/en
Publication of CN105804323A publication Critical patent/CN105804323A/en
Application granted granted Critical
Publication of CN105804323B publication Critical patent/CN105804323B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C5/00Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
    • E04C5/01Reinforcing elements of metal, e.g. with non-structural coatings
    • E04C5/02Reinforcing elements of metal, e.g. with non-structural coatings of low bending resistance
    • E04C5/04Mats
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C5/00Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
    • E04C5/01Reinforcing elements of metal, e.g. with non-structural coatings
    • E04C5/02Reinforcing elements of metal, e.g. with non-structural coatings of low bending resistance
    • E04C5/03Reinforcing elements of metal, e.g. with non-structural coatings of low bending resistance with indentations, projections, ribs, or the like, for augmenting the adherence to the concrete

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Reinforcement Elements For Buildings (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a kind of construction method for exempting from assembling reinforcement.The construction method uses Welded Mesh of Cold Rolling Rebar piece, and comprises the following steps:First, the Reinforcement Design figure of Welded Mesh of Cold Rolling Rebar piece is determined;Secondly, the processing of Welded Mesh of Cold Rolling Rebar piece is carried out;Finally, in-site installation is carried out to Welded Mesh of Cold Rolling Rebar piece.The Welded Mesh of Cold Rolling Rebar piece for exempting from the construction method of assembling reinforcement can be used directly at the construction field (site), it is relatively low to the requirement of live steel bar meter and installation requirement, quality easily ensures that speed of application is fast, solves the problems such as traditional binding-type floor takes work consuming, quality is difficult to ensure that.

Description

Exempt from the construction method of assembling reinforcement
Technical field
The present invention relates to the realm of building construction, more particularly to a kind of construction method for exempting from assembling reinforcement.
Background technology
At present, the construction technology that generally uses of conventional floors arrangement of reinforcement construction is after being stretched, cut off using steel-bar scene, Working face is transported to again by the point-by-point carry out colligation of root.
The shortcomings that construction technology, is:Live man-hour consumption is big, and because operating personnel's level is uneven, leakage Tie up, situations such as mistake is tied up and is used inferior materials and turned out substandard goods, is difficult to avoid that, quality is difficult to ensure that, simultaneously because the work period is grown, often results in the duration The continuous accumulation delayed.
The information for being disclosed in the background section is merely intended to understanding of the increase to the general background of the present invention, without answering It has been the prior art well known to persons skilled in the art when being considered as recognizing or implying the information structure in any form.
The content of the invention
It is an object of the invention to provide a kind of construction method for exempting from assembling reinforcement of simple and reasonable steps, and this exempts from colligation steel The Welded Mesh of Cold Rolling Rebar piece of the construction method of muscle can be used directly at the construction field (site), to the requirement of live steel bar meter and pacify Reload request is relatively low, and quality easily ensures, speed of application is fast, solves traditional binding-type floor and take work consuming, quality and be difficult to ensure that etc. to ask Topic.
To achieve the above object, to be adopted according to the invention provides a kind of construction method for exempting from assembling reinforcement, the construction method With Welded Mesh of Cold Rolling Rebar piece, and comprise the following steps:First, the Reinforcement Design of Welded Mesh of Cold Rolling Rebar piece is determined Figure;Secondly, the processing of Welded Mesh of Cold Rolling Rebar piece is carried out;Finally, Welded Mesh of Cold Rolling Rebar piece is showed Field installation.
Preferably, in above-mentioned technical proposal, Welded Mesh of Cold Rolling Rebar piece includes:Transverse steel, longitudinal reinforcement and weldering Point.
Preferably, in above-mentioned technical proposal, longitudinal reinforcement and transverse steel difference spacing arrangement and at a right angle mutually, all Crosspoint forms solder joint together by resistance spot welding.
Preferably, it is suitable according to the installation at scene before Welded Mesh of Cold Rolling Rebar piece in-site installation in above-mentioned technical proposal Sequence, the production sequence of all size Welded Mesh of Cold Rolling Rebar piece and bundling of arranging in pairs or groups are determined, and do listed mark.
Compared with prior art, the present invention has the advantages that:This exempts from the cold rolling strap of the construction method of assembling reinforcement Rib reinforcement welded net be can be used directly at the construction field (site), relatively low to the requirement of live steel bar meter and installation requirement, and quality is easily protected Card, speed of application is fast, solves the problems such as traditional binding-type floor takes work consuming, quality is difficult to ensure that.
Brief description of the drawings
Fig. 1 is the Welded Mesh of Cold Rolling Rebar chip architecture schematic diagram of the construction method for exempting from assembling reinforcement of the present invention.
Embodiment
Below in conjunction with the accompanying drawings, the embodiment of the present invention is described in detail, it is to be understood that the guarantor of the present invention Shield scope is not limited by embodiment.
Explicitly indicated that unless otherwise other, otherwise in entire disclosure and claims, term " comprising " or its change Change such as "comprising" or " including " etc. and will be understood to comprise stated element or part, and do not exclude other members Part or other parts.
Welded Mesh of Cold Rolling Rebar piece is used according to the construction method for exempting from assembling reinforcement of the specific embodiment of the invention (BRC), it is applied to the floor bar construction of multilayer, high level, Super High reinforced concrete structure.
As shown in figure 1, Welded Mesh of Cold Rolling Rebar piece includes:Transverse steel 1, longitudinal reinforcement 2 and solder joint 3.Cold rolling strap Identical or different-diameter transverse steel 1 and longitudinal reinforcement 2 are welded netted by rib reinforcement welded net for welding machine of mesh Reinforcing bar product, longitudinal reinforcement and transverse steel are arranged and at a right angle mutually with a determining deviation respectively, and whole crosspoints are by resistance Formation solder joint 3 spot-welded together, production process is automatically controlled by a computer.
The specific steps for exempting from the construction method of assembling reinforcement include:
Before construction, first, the Reinforcement Design figure of Welded Mesh of Cold Rolling Rebar piece is determined;
The transfer design of steel bar welding deeping is carried out to original structure floor arrangement of reinforcement, the transfer design must be wanted according to design Ask, with reference to conditions such as production and processing, transport, lifting, environment, determine specification, the size and number of reinforced mesh, form bar-mat reinforcement Piece arrangement of reinforcement Deepen Design figure, it can be processed after structure design teacher confirms.Reinforced mesh uses standard specification as far as possible, so as to Produced in batch machining.
Secondly, the processing of Welded Mesh of Cold Rolling Rebar piece is carried out;
According to the drawing through examination & approval, using welding machine of mesh full-automation, intelligent machining reinforced mesh, by the He of transverse steel 1 Longitudinal reinforcement 2 is welded, and transverse and longitudinal reinforcing bar is respectively to design spacing arrangement and mutually at a right angle, and whole crosspoints are by resistance electricity It is welded together, solder joint 3 is formed, is finally completed the processing of steel mesh reinforcement product.
Finally, in-site installation is carried out to Welded Mesh of Cold Rolling Rebar piece.
Before in-site installation, according to the erection sequence at scene, determine the production sequence of all size reinforced mesh and arrange in pairs or groups to beat Bundle, and does listed mark, indicates engineering name, is numbered using position, index drawing number, mesh sheet, size of netting and profile etc., often 1.5t is not to be exceeded in bundle weight.
During in-site installation, pass through numbering dated during processing, position, reinforced mesh is installed, reinforced mesh is taken Spreading degree is no less than 25d and is not less than 25Omm, is tied in lap-joint with iron wire, to ensure the reinforced mesh of lap-joint mixed Coagulating will not unclamp in native casting process.The reinforced mesh anchored in beam must be inserted to both ends, if reinforced mesh longitudinal reinforcement is straight Footpath is smaller, first being bent upwards in the middle part of reinforced mesh, both ends is successively inserted in beam, then paves reinforced mesh.If reinforcing bar Mesh sheet can not be bent, and 1-2 root transverse steels can be reduced in one end of reinforced mesh, first be inserted the end and then move back the slotting other end, use Binding method refill reduction transverse steel.In a word, the present invention has simple in construction, and speed of application is fast, can increase substantially Reinforcement installation quality, construction cost is reduced, is saved labor.It can promote the use of.
To sum up, the Welded Mesh of Cold Rolling Rebar piece of the construction method for exempting from assembling reinforcement can directly make at the construction field (site) With relatively low to the requirement of live steel bar meter and installation requirement, quality easily ensures, speed of application is fast, solves traditional binding-type floor The problems such as time-consuming work consuming, quality are difficult to ensure that.
The description of the foregoing specific illustrative embodiment to the present invention is to illustrate and the purpose of illustration.These descriptions It is not wishing to limit the invention to disclosed precise forms, and it will be apparent that according to above-mentioned teaching, can be much changed And change.The purpose of selecting and describing the exemplary embodiment is that explain that the certain principles of the present invention and its reality should With so that those skilled in the art can realize and utilize the present invention a variety of exemplaries and Various chooses and changes.The scope of the present invention is intended to be limited by claims and its equivalents.

Claims (4)

  1. A kind of 1. construction method for exempting from assembling reinforcement, it is characterised in that the construction method uses Welded Mesh of Cold Rolling Rebar piece, And comprise the following steps:
    First, the Reinforcement Design figure of Welded Mesh of Cold Rolling Rebar piece is determined;
    Secondly, the processing of Welded Mesh of Cold Rolling Rebar piece is carried out;
    Finally, in-site installation is carried out to Welded Mesh of Cold Rolling Rebar piece;Reinforced mesh is tied in lap-joint with iron wire;To both ends The reinforced mesh of anchoring in palpus insertion beam, if the diameter of reinforced mesh longitudinal reinforcement is smaller, is first bent up reinforced mesh middle part Song, both ends is successively inserted in beam, then pave reinforced mesh;If reinforced mesh can not be bent, first the one of reinforced mesh 1-2 root transverse steels are reduced at end, first insert and the end and then move back the slotting other end, with binding method refill reduction transverse steel.
  2. 2. the construction method according to claim 1 for exempting from assembling reinforcement, it is characterised in that the cold rolled reinforcing steel bar with ribs welding Mesh sheet includes:Transverse steel, longitudinal reinforcement and solder joint.
  3. 3. the construction method according to claim 2 for exempting from assembling reinforcement, it is characterised in that the longitudinal reinforcement and horizontal steel Muscle difference spacing arrangement and at a right angle mutually, whole crosspoints form solder joint together by resistance spot welding.
  4. 4. the construction method according to claim 1 for exempting from assembling reinforcement, it is characterised in that the cold rolled reinforcing steel bar with ribs welding Before mesh sheet in-site installation, according to the erection sequence at scene, the production sequence of all size Welded Mesh of Cold Rolling Rebar piece is determined And bundling of arranging in pairs or groups, and do listed mark.
CN201610147073.2A 2016-03-15 2016-03-15 Exempt from the construction method of assembling reinforcement Active CN105804323B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610147073.2A CN105804323B (en) 2016-03-15 2016-03-15 Exempt from the construction method of assembling reinforcement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610147073.2A CN105804323B (en) 2016-03-15 2016-03-15 Exempt from the construction method of assembling reinforcement

Publications (2)

Publication Number Publication Date
CN105804323A CN105804323A (en) 2016-07-27
CN105804323B true CN105804323B (en) 2017-12-12

Family

ID=56468415

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610147073.2A Active CN105804323B (en) 2016-03-15 2016-03-15 Exempt from the construction method of assembling reinforcement

Country Status (1)

Country Link
CN (1) CN105804323B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108625295A (en) * 2018-06-25 2018-10-09 成都市市政工程(集团)有限责任公司 Welded steel fabric deck paving method
CN111530922A (en) * 2020-04-09 2020-08-14 鞍钢建设集团有限公司 Metal truss for wall assembly plate
CN112392188B (en) * 2020-11-25 2024-06-18 浙江中天建筑产业化有限公司 Construction steel bar welding net piece subassembly and floor structure

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
ES2143361B1 (en) * 1997-02-27 2000-12-01 Odriozola Miguel Maria Imaz PREFABRICATED MESH FOR SLABS.
CN201221155Y (en) * 2008-06-05 2009-04-15 杨跃军 Steel bar welding net with rib for building
CN201296996Y (en) * 2008-11-03 2009-08-26 北京邢钢焊网科技发展有限责任公司 Welded steel fabric used in concrete prefabricated components
CN201358549Y (en) * 2009-03-13 2009-12-09 李树堂 Steel bar welded mesh
CN202324352U (en) * 2011-11-11 2012-07-11 江阴市华金交通建材有限公司 Stainless steel welding net
CN204081269U (en) * 2014-09-18 2015-01-07 广东南海国际建筑设计有限公司 A kind of Welded Mesh of Cold Rolling Rebar structure

Also Published As

Publication number Publication date
CN105804323A (en) 2016-07-27

Similar Documents

Publication Publication Date Title
CN105804323B (en) Exempt from the construction method of assembling reinforcement
CN104156544A (en) Automatic beam and column steel bar joint arranging and constructing simulation method based on BIM technology
CN100999913B (en) Node of steel tube concrete pole and steel reinforced concrete beam and processing method thereof
CN206306252U (en) A kind of prefabricated small box girder reinforcing bar colligation moulding bed
CN106381925A (en) Prefabricated reinforced concrete column and column splice joint with sleeves
CN107938837A (en) A kind of steel core concrete column and beam main tendon connecting node and construction method
CN206091003U (en) SC component pre -fabricated steel frame concrete coincide floor
CN105421476B (en) The construction method and mounting structure of tower crane built-in fitting are installed on raft foundation
CN108625489A (en) A kind of steel bar girder edges of boards portion and connection joints of steel structure structure
CN103526930A (en) Multi-directional intersection reinforced bare concrete inclined column construction method
TWI662175B (en) Pre-assembled column of reinforcing bar and method for producing thereof
CN107299764A (en) A kind of concrete apparatus and construction method for being conveniently constructed the positioning of post cage bar
CN207685996U (en) A kind of steel core concrete column and beam main tendon connecting node
US20060185310A1 (en) Arrangement of truss cords
CN206360102U (en) Clod wash multi-cavity steel tube concrete Special-Shaped Column and reinforced concrete floor connecting node
CN205654090U (en) Entrance to a cave strutting arrangement is reserved to floor
CN209243921U (en) The cylindrical cap node of one Zhu Duo beam intersection of concrete
CN201644679U (en) Pile foundation reinforcement cage processing device
CN204825945U (en) A fixture for fixing buried bolt in advance
CN204645318U (en) A kind of overlaid plate type shear wall
TWM538057U (en) Pre-assembled column of reinforcing bar
CN208438547U (en) A kind of precast box beam steel bar colligation mold that difference beam length is general
CN207891905U (en) A kind of new steel structure holder multi-column pier foundation
CN206360211U (en) A kind of clod wash multi-cavity steel tube concrete docks Special-Shaped Column
CN206703815U (en) A kind of industry assembling formula steel construction artificial hillock structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination