CN105804274B - A kind of light block filling wall and frame structure construction technique - Google Patents

A kind of light block filling wall and frame structure construction technique Download PDF

Info

Publication number
CN105804274B
CN105804274B CN201610134983.7A CN201610134983A CN105804274B CN 105804274 B CN105804274 B CN 105804274B CN 201610134983 A CN201610134983 A CN 201610134983A CN 105804274 B CN105804274 B CN 105804274B
Authority
CN
China
Prior art keywords
wall
steel
angle steel
tie
steel tie
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201610134983.7A
Other languages
Chinese (zh)
Other versions
CN105804274A (en
Inventor
刘照球
张飞
荀勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yangcheng Institute of Technology
Original Assignee
Yangcheng Institute of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yangcheng Institute of Technology filed Critical Yangcheng Institute of Technology
Priority to CN201610134983.7A priority Critical patent/CN105804274B/en
Publication of CN105804274A publication Critical patent/CN105804274A/en
Application granted granted Critical
Publication of CN105804274B publication Critical patent/CN105804274B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/56Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/41Connecting devices specially adapted for embedding in concrete or masonry
    • E04B1/4178Masonry wall ties
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/56Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members
    • E04B2002/565Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members with a brick veneer facing

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Load-Bearing And Curtain Walls (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

The invention provides a kind of light block filling wall and frame structure construction technique, belong to the realm of building construction, attachment structure includes wall, the wall both sides are provided with the first angle steel along its short transverse uniform intervals, first angle steel is anchored by chemical bolt and the wall, the equal horizontal connection in both ends of each first angle steel has the first steel tie, and first steel tie inserts the wall and runs through wall;Uniform intervals are provided with the second angle steel along its length at the top of the wall, second angle steel is anchored by chemical bolt and the wall, the both ends of each second angle steel are connected with the second steel tie vertically, second steel tie inserts the wall, and second steel tie positioned at both sides and centre runs through the wall.This structure and technique can play good shock resistance and durability, and heat insulation effect protrudes, and construction technology is easy.

Description

A kind of light block filling wall and frame structure construction technique
Technical field
The present invention relates to the realm of building construction, and wall and frame structure construction are filled in particular to a kind of light block Technique.
Background technology
Wall is different according to its structure stress situation, there is point of load bearing wall, non-load bearing wall.In frame structure, to those Maintenance effect is only played, the wall of not load-bearing commonly referred to as fills wall.It is a kind of masonry structure in itself to fill wall, and its weight is general Undertaken and transmitted by concrete components such as beam, post, plates.It is extremely widespread to fill application of the wall in frame structure, particularly exists In some high-rise, small high-rise residential structures.
At present, several relatively common Filled-wall materials mainly have:Sintered hollow block and sintered perforated brick, steam pressure sand-lime Brick, concrete small size hollow building block, autoclave aerated concrete building block.The main making raw material of sintered hollow block and sintered perforated brick Clay, they have the advantages that sound insulation, it is heat-insulated, insulation, porosity it is big, it is in light weight, be easy to build by laying bricks or stones and paint, be usually used in framework knot The filling wall and non-bearing dividing wall of structure.Hollow brick is only eight ten ten to percent 7 the percent of solid brick in terms of weight, The deadweight of wall can thus be mitigated significantly.In addition, both bricks relatively inexpensive in price, are easily received by owner.
Autoclaved lime-sand brick is a kind of solid brick, and lime and sand are the primary raw materials for making autoclaved lime-sand brick.This kind of brick has Economical and practical, saving clay, do not destroy the advantages that arable land, the building of southern region of China is using more.Concrete small size is hollow Building block is using sandstone as aggregate, using cement as binder materials, by adding the series of processes such as water stirring, vibration pressurization, maintenance to make Form.This kind of building block is in light weight, intensity is high, builds simplicity by laying bricks or stones, and the metope built by laying bricks or stones is more smooth, is easy to paint, and can improve construction Efficiency, reduce construction cost.Sand, flyash, containing siliceous materials such as silicon tailings, and the calcareous material such as lime, cement is steam pressure The main making raw material of air-entrained concrete building block.This kind of building block lighter weight, there is the characteristics such as good sound insulation, insulation, environmental protection, Building block, sheet material and the heat insulating products of all size can also be made according to the actual needs simultaneously.If with autoclaved lime-sand brick and Two kinds of materials for walls of autoclave aerated concrete building block are contrasted, and during masonry panel, the cost of autoclaved lime-sand brick adds than steam pressure Gas concrete segment is lower.
In construction, autoclaved lime-sand brick be the requirement for meeting anti-crack and anti-seepage, it is necessary to whole linked networks, and steam-pressing aero-concrete Building block such as only needs at post junction, wall and beam, door-window opening frame at the linked network at part.Built using steam-pressing aero-concrete This filled wall material of block can be realized with plastering technique and preferably combined, either in terms of masonry quality, or in labor In terms of fatigue resistance, the better than combination of autoclaved lime-sand brick and plastering technique.Further, since steam-pressing aero-concrete is built in quality Block is lighter than autoclaved lime-sand brick, therefore beam, the size of post and amount of reinforcement can be reduced in structure design, can substantially reduce engineering Cost.
Connection as defined in specification between filling wall and frame structure, which can use, is rigidly connected and is flexibly connected two kinds of sides Formula.It is rigidly connected to refer to combine closely on beam, the post of filling wall and frame structure and builds by laying bricks or stones, and the reinforcing bar by being stretched out in beam, post Drawknot is carried out, filling wall is formed a kind of integral connected mode with framework.Sent out for the seimic disaster census after all previous earthquake in China It is existing, often destroyed seriously using rigidly connected filling wall, because filling wall constrains the change of frame structure central sill, post Shape, the shock resistance of beam, post can be weakened when earthquake occurs, meanwhile, also cause its own destruction very serious.
In view of be rigidly connected technology the defects of,《Code for design of masonry strucres (GB50003-2011)》The 6.3.4 articles suggestion: When having requirements for fortification against earthquake, filling wall and the flexible connecting method of framework disengagement are preferably used.But either《Seismic Design of Building is advised Model (GB50011-2010)》、《Code for design of masonry strucres (GB50003-2011)》, still《Concrete Structures of Tall Building skill Art code (JGJ3-2010)》, some structural specificationses have been merely given as, specific design method has not been provided and clearly applies Work scheme.The traditional method of flexible connection is closely connected with pillar using wall, and wall typically reserves 150~200mm sky with beam Gap, and tilt top block with building block and tamp.The wall of flexible connection mode can be caused to fill a drum for wall and held when earthquake occurs Split, crack occurs in filling wall, not only influences its state of appearance, and bearing capacity can be caused low, and poor durability, reducing it makes Use the life-span.
The content of the invention
The invention provides a kind of light block filling wall and frame structure construction technique, it is intended to solves the above problems.
What the present invention was realized in:
A kind of light block filling wall and frame structure construction technique, including step:
Step 1:Embodiment select, material selection and prepare, building block and with number of blocks determine;
Step 2:Determine angle steel layout points and fixation:According to the pillar height and beam span of framework, by the spacing in connection scheme It is required that determining the layout points of angle steel, and the corresponding of post and beam is fixed in the longer edge wall thickness direction of angle steel with chemical bolt In layout points;
Step 3, angle steel fixed position require:Frame column upper and lower ends are required to arrange angle steel, and upper end position requirement is in beam At the 100mm of bottom, lower end is arranged in above floor, and weld horizontal steel tie penetrates cloth along wall total length on the angle steel of post lower end in advance Put, and colligation bar dowel;Vierendeel girder is required to arrange angle steel along end of span portion, and position is at the 70mm of distance post side;
Step 4, masonry panel:Basic unit should be cleared up before building wall, by the laitance at pre- masonry panel, dust Cleaning is rinsed well, and watering moistens basic unit;Horizontal line is first drawn before building a wall, on the position of the line of ink marker is put, by arrangement figure from wall Start to build by laying bricks or stones at body positioning building block;First in the steel tie upper berth sand filling slurry of post bottom insertion, it is desirable to which thin and thick is uniform, then builds by laying bricks or stones Block;
Step 5, steel tie sequence of construction and detailing requiments:Along pillar height whenever building by laying bricks or stones at fixed angle steel, that is, start Steel tie and colligation bar dowel are welded, and fills up mortar, is built steel tie is embedding in horizontal mortar joint;Build by laying bricks or stones apart from beam bottom At 1000mm, weld horizontal steel tie is along the elongated arrangement of wall on the angle steel of two side columns the top, and colligation bar dowel;Simultaneously The vertical steel tie of welding and colligation bar dowel at fixed angle steel on beam, and with the horizontal steel tie steel wire of the top Colligation connects, and vertical steel tie extend into the length 700mm of wall, it is desirable to is arranged along building block hole;
Step 6, mortar joint quality requirement:The mortar joint built by laying bricks or stones will use two-sided jointing, mortar joint should it is smooth vertical and horizontal, mortar is full, It is uniformly closely knit;Wherein full degree of mortar at bed joint, horizontal joint are not less than 90%, and vertical seam is not less than 80%;Gray seam thickness should be uniform, horizontal Gray seam thickness is not preferably greater than 15mm, and vertical mortar joint width cannot be greater than 20mm, and steel tie must be embedded in mortar.
Further, step 7, gap filling are also included after the step 6:Envelope is clogged using the flexible material of insulation Slit is into heat-insulation layer.
Further, the flexible material is blanket of glass wool, mineral wool felt, EPS, XPS or polyurethane foam material.
The beneficial effects of the invention are as follows:The light block filling wall that the present invention is obtained by above-mentioned design is applied with frame structure Work technique, it at least has the following advantages that:
1st, solves the problems of conventional rigid interconnection technique.
There is the problem of restricting beam, post deforms in filling wall, and the filling wall that punches also holds with frame structure using being rigidly connected The generation of " short column " phenomenon is easily caused, weakens the shock resistance of beam, post.The present invention is equal using filling wall and frame structural beam, post Releasably, solve the problems of the technology of being rigidly connected, improve the anti-seismic performance of filling wall.
2nd, the filling wall proposed in current specifications and frame structure flexible connection technology are improved.
Current specifications suggestion fills wall and preferably uses flexible connection with frame structure, but does not provide specific design side Case.Guidance of the present invention according to specification, a kind of flexible connection technical scheme is have devised, and give construction technology.
3rd, to the improvement of existing flexible connection technology.
(1) existing flexible connection technology needs to reserve steel tie in Vierendeel girder or post, and this can not only influence beam, post Component closely knit can not vibrate in casting concrete, and it is inclined easily to cause reserved steel bar position to occur with practice of construction position Difference, some regional spaces are too small, it is not easy to the problems such as constructing.The present invention is connected using angle steel by chemical bolt with beam, post, is drawn Method of the reinforcement welding on angle steel is tied, has the advantages that easy to operate, position is flexible, convenient construction, it is often more important that meet Steel tie detailing requiments as defined in current specifications.
(2) existing flexible connection technology needs to set up reinforced concrete structural column or horizontal binder in wall is filled, by It is different in the temperature expansion coefficient of two kinds of materials of armored concrete and light block, in the two contact area, it is easy to cause wall There is crack in body, so as to reduce the durability of wall.In addition, the constructional column or horizontal binder and frame structure set up in wall The connection construction process cumbersome of beam, post, quality is difficult to ensure that in practice of construction.
The present invention need not set up reinforced concrete structural column or horizontal binder in wall, be ensured by steel tie With out-of-plane strength and stability in its plane, design and construction technology are simple and easy, both consider in practice of construction The difference of filling wall punches the influence of size, it is contemplated that the different influences across high frame plane size, are adapted to all types of Filling wall and frame structural beam, post connection.
4th, the use range to lightweight concrete building block material is improved.
The technical solution adopted by the present invention can solve the problems such as lightweight concrete building block low intensity, poor durability, improve Its use range.Application to promoting green, energy saving building material, saving the energy and resource etc. has great significance.
Brief description of the drawings
, below will be to required use in embodiment in order to illustrate more clearly of the technical scheme of embodiment of the present invention Accompanying drawing be briefly described, it will be appreciated that the following drawings illustrate only certain embodiments of the present invention, therefore be not to be seen as It is the restriction to scope, for those of ordinary skill in the art, on the premise of not paying creative work, can be with root Other related accompanying drawings are obtained according to these accompanying drawings.
Fig. 1 is the structure of light block filling wall and wall in frame structure attachment structure that embodiment of the present invention provides Schematic diagram;
Fig. 2 is the light block filling wall and the structural representation of frame structure attachment structure that embodiment of the present invention provides Figure;
Fig. 3 is the light block filling wall and the structural representation of frame structure attachment structure that embodiment of the present invention provides Figure;
Fig. 4 be in light block filling wall and the frame structure attachment structure that embodiment of the present invention provides the first angle steel with The attachment structure schematic diagram of wall;
Fig. 5 be in light block filling wall and the frame structure attachment structure that embodiment of the present invention provides the second angle steel with The attachment structure schematic diagram of wall;
Fig. 6 is the light block filling wall and the structural representation of frame structure construction technique that embodiment of the present invention provides Figure.
Scheming acceptance of the bid note is respectively:
Wall 101;First angle steel 102;Chemical bolt 103;First steel tie 104;Second angle steel 105;Second drawknot Reinforcing bar 106;Heat-insulation layer 107;Bar dowel 108.
Embodiment
Prior art rigid connection structure is adjacent to frame column in filling wall and built by laying bricks or stones, is connected with beam by tiltedly building the mode of holding out against Connect, this is current conventional way.Studied for a long period of time discovery through inventor, this connected mode there are following features:
(1) holes such as door, window can typically be opened up by filling in wall, and now filling wall can be as the transverse elasticity branch of Vierendeel girder Seat, shortens the effective span of Vierendeel girder, Vierendeel girder is changed into short beam or deep beam.Under the effect of curved scissors repeatedly, diagonal crack is by edge Beam total length extends, so that the ductility of beam and bearing capacity drastically decline, it is difficult to meet the shockproof requirements of " strong shear capacity and weak bending capacity ".
(2) in frame structure for the stress of frame column and damage -form, middle long column is generally belonged to, is occurred Flexure type destroys.However, when adjacent intercolumniation opens up logical window in frame structure, because window skirt wall is made to the lateral confinement of frame column With, significantly shorten the computed altitude of frame column, be allowed to be changed into short column, although specification to the hooping bars layout of short column with axial compression ratio strictly Control, but because the anti-side rigidity of short column is big, the horizontal shear distributed in geological process is often difficult to meet that section is cut pressure ratio and wanted Ask, failure by shear easily occurs, deformability is poor, reduces structural system ductility.
(3) in Practical Project, filling wall is directly built by laying bricks or stones on Vierendeel girder, is formed wall beam by curved combined member, is increased framework Deflection of beam rigidity, the deformation of its sag, while the axial tension outside Vierendeel girder meeting commitment are substantially reduced, to Vierendeel girder pole To be unfavorable, " strong column and weak beam " ductile yield mechanism of frame structure is difficult to be formed.
(4) characteristic that the filling flat in-plane stiffness of wall is big, shearing strength is low that is rigidly connected makes it in geological process midplane Destroy seriously, if occurring that block caves in going out in-plane without reliable drawknot between filling wall and framework, trigger secondary disaster.
Filling the destruction of wall not only influences the use function of building, rehabilitation expense after more increase shake, and serious filling wall is broken It is bad to influence normal emergency evacuation and threat to life safety.Pass through the investigation and analysis to Wenchuan earthquake earthquake in 2008, frame The filling wall that is rigidly connected of frame structure destroys serious as first of anti-vibration defense lines.Substantial amounts of filling wall cracking, can make to people Into huge psychological pressure, directly aggravation to the fear of earthquake, the filling wall that may collapse at any time to the life security of people also Constitute a threat to.Under frequently occurred earthquake, even if after the filling wall destruction that is rigidly connected is not serious, but a large amount of minute cracks of metope are to shake Repair brings great difficulty, and need to expend substantial amounts of human and material resources.In a word, the filling wall that is rigidly connected is difficult to meet now Row earthquake resistant design code is to non-structural element requirements for fortification against earthquake.
In recent years, the traditional method of flexible connection is improved with reference to the suggestion of current specifications, some scholars.Than Such as, (1) sets up constructional column:Reinforced concrete structural column is set at filling wall both ends, constructional column upper and lower ends respectively with Vierendeel girder Connection, consider whether to need to set constructional column again among wall further according to length, the situation of punching of filling wall;(2) using laterally Steel tie:On the basis of conventional flex connection, the post for filling wall and both sides is disengaged, reserves certain gap, and retained Reinforcing bar in wall, the steel tie of intercolumniation or horizontal reinforcement band;(3) vertical and horizontal steel tie combination:Fill wall not only with Frame column disengages, and is also disengaged with the Vierendeel girder in wall top portion, and in wall both sides, correspondence position builds by laying bricks or stones to form vertical small size groove, Then place vertical reinforcement and horizontal steel tie, vertical reinforcement are connected with Vierendeel girder reserved steel bar;(4) constructional column and water are set up Flat binder:Filling wall disengages when building by laying bricks or stones with Vierendeel girder, post, is connected using steel fastener with beam, post, when filling wall is too high, Armored concrete linking beam is set in the horizontal direction, when filling wall is long, reinforced concrete structural column is set in vertical direction.
It is also big without specifically connection because current specifications does not have the concrete scheme and construction technology that provide flexible connection Sample and standard collective drawingses, existing way are that a kind of of flexible connection traditional scheme is improved, generally will be in wall in these methods Reinforced concrete structural column or horizontal binder are set in body, or steel tie is reserved in Vierendeel girder, post.In practice of construction In, often there is the situation of filling wall displacement change so that the frame column or shear wall for originally having pre-buried steel tie are not applied Work fills wall, and frame column or shear wall without pre-buried steel tie need to build filling wall by laying bricks or stones again;Or due to filling walling The reasons such as specification change, the pre-buried position deviation of steel tie, prevent original pre-buried steel tie part from using.At this moment, one As will be remedied using the method for chemically-planted steel bar, but the method quality of chemically-planted steel bar is difficult to control, and can destroy beam, post surface The protective layer of concrete.
Further, since Reinforced Concrete Materials is different from the line temperature expansion coefficient of filled wall material, in ambient temperature The contraction of two kinds of materials is also different during change, and reinforced concrete structural column is set up in wall is filled or horizontal binder easily causes In the crack of two kinds of material junctions.How to handle the crack of junction, existing flexible connection improve in way without reference to. Because ambient temperature change is more frequent, metope will be difficult to effect a radical cure after there is crack.
Therefore, there is the defects of certain in the above flexible connection technology, and it is cumbersome to have plenty of the construction technology past.Such as Method (1), (2), (3) are required to reserve steel tie in Vierendeel girder, post, this not only reserved place of reinforcing bar in practice of construction Put and be difficult to ensure that accurately, and easily cause Vierendeel girder, the post Quality Down when pouring with vibrated concrete.Has plenty of design side Case is complicated in the past, and design requirement is difficult in practice of construction.Such as method (1), (4) need in wall set constructional column or Horizontal binder.Although meeting the requirement of specification, realize that these design requirements are difficult in the limited space of available frame beam, post Operation, and be just more difficult to construct to filling wall near top, construction quality can not be ensured.
To sum up, it can be seen that wall body structure can not effectively act as the effect such as anti-seismic heat-preservation in the prior art, therefore, hair A person of good sense provides a kind of light block filling wall and frame structure construction technique, it is intended to optimizes light block filling wall and framework knot The connection of structure;, improve light block filling wall anti-seismic performance;Improve the durability of light block filling wall;Lightweight is expanded to mix The use range of solidifying earth building blocks material, promotes green, the application of energy saving building material.
To make the purpose, technical scheme and advantage of embodiment of the present invention clearer, implement below in conjunction with the present invention Accompanying drawing in mode, the technical scheme in embodiment of the present invention is clearly and completely described, it is clear that described reality The mode of applying is a part of embodiment of the present invention, rather than whole embodiments.Based on the embodiment in the present invention, ability The every other embodiment that domain those of ordinary skill is obtained under the premise of creative work is not made, belongs to the present invention The scope of protection.Therefore, below the detailed description of the embodiments of the present invention to providing in the accompanying drawings be not intended to limit will The scope of the present invention of protection is sought, but is merely representative of the selected embodiment of the present invention.Based on the embodiment in the present invention, The every other embodiment that those of ordinary skill in the art are obtained under the premise of creative work is not made, belong to this Invent the scope of protection.
In the description of the invention, it is to be understood that the term of indicating position or position relationship is based on shown in accompanying drawing Orientation or position relationship, be for only for ease of the description present invention and simplify description, rather than instruction or imply signified equipment Or element there must be specific orientation, with specific azimuth configuration and operation, therefore it is not considered as limiting the invention.
In the present invention, unless otherwise clearly defined and limited, term " installation ", " connected ", " connection ", " fixation " etc. Term should be interpreted broadly, for example, it may be fixedly connected or be detachably connected, or integrally;Can be that machinery connects Connect or electrically connect;Can be joined directly together, can also be indirectly connected by intermediary, can be in two elements The connection in portion or the interaction relationship of two elements.For the ordinary skill in the art, can be according to specific feelings Condition understands the concrete meaning of above-mentioned term in the present invention.
In the present invention, unless otherwise clearly defined and limited, fisrt feature can be with or below second feature Directly contacted including the first and second features, can also include the first and second features not be direct contact but by them it Between other characterisation contact.Moreover, fisrt feature is on second feature, top and above to include fisrt feature special second Directly over sign and oblique upper, or be merely representative of fisrt feature level height and be higher than second feature.Fisrt feature second feature it Under, lower section and fisrt feature included below are immediately below second feature and obliquely downward, or be merely representative of fisrt feature level height Less than second feature.
Embodiment, refer to Fig. 1-Fig. 6.
Present embodiments provide a kind of light block filling wall and frame structure attachment structure, including wall 101, the wall 101 both sides are provided with the first angle steel 102 along its short transverse uniform intervals, first angle steel 102 by chemical bolt 103 with The wall 101 anchors, and the equal horizontal connection in both ends of each first angle steel 102 has the first steel tie 104, and described One steel tie 104 inserts the wall 101 and runs through wall 101;The top of the wall 101 uniform intervals along its length The second angle steel 105 is provided with, second angle steel 105 is anchored by chemical bolt 103 and the wall 101, described in each The both ends of second angle steel 105 are connected with the second steel tie 106 vertically, and second steel tie 106 inserts the wall 101, second steel tie 106 positioned at both sides and centre runs through the wall 101.
By the setting of each angle steel and steel tie, the purpose of the intensity of reinforcing wall 101 is played.The lightweight of this structure is built Block fills wall and is primarily adapted for use in height more than 4m with frame structure attachment structure, or length is more than the filled wall of twice of floor height 101 embodiment.
Specifically, wall 101 herein is located at including frame structural beam, post and light block filling wall, frame structure Light block fills the periphery of wall.Each angle steel and the beam of frame structure, post are connected by chemical bolt, then by steel tie with Filling wall is attached.
Two the first angle steel 102 are arranged at intervals, and its spacing can be such, adjacent first angle steel of each two Spacing is 400-600mm between 102, and spacing is 1300-1700mm between connected second angle steel 105 of each two, described Chemical bolt 103 is M20 bolts.
For convenience of the setting of each angle steel and the connection of each steel tie, first angle steel 102 and second angle steel 105 It is unequal angle.Unequal angle is width and highly unequal angle steel, for example, the width of first angle steel 102, Height and thickness are respectively 63mm, 40mm and 4mm.The length of angle steel can be selected according to the actual requirements.To ensure wall Cost is saved in the case of the intensity of body 101, spacing is at least between horizontally adjacent two first steel ties 104 40mm.Steel tie plays consolidation effect, and first steel tie 104 runs through wall 101, and the second steel tie 106 is stretched Enter the depth of wall 101 and be not less than 700mm.
To make the first steel tie 104 be preferably connected with wall 101, multiple first steel ties 104 pass through steel Muscle is connected and forms bar-mat reinforcement.
Its Specific construction scheme can be such:
(1), the both sides of wall 101 and frame column junction reserve 20mm gaps, and a piece of angle steel is set along the every 500mm of pillar height (63mm × 40mm × 4mm specifications), depending on angle steel length is according to different wall thicknesses, with M20 chemical bolts 103 by the long limb of angle steel along wall Thick direction is fixed on post;Two diameter 6mm of the parallel welding steel tie on angle steel manomelia, steel tie are complete along filling wall Long insertion arrangement (chance punches wall 101, should be arranged into the edge of hole both sides);The spacing of two steel ties regard wall thickness and Fixed, typically no less than 40mm, for enhancing drawknot effect, along steel tie length direction per 350mm, bar dowel 108 passes through Steel wire lashing forms bar-mat reinforcement.
(2), wall top and beam junction reserve 50mm gaps, and a piece of angle steel, angle steel specification are set per 1500mm along beam span It is and its identical with post with the connected mode of beam;Equally, on angle steel manomelia two diameter 6mm of parallel welding steel tie, Deeply filling is not less than 700mm within the walls, wherein along the steel tie at the every 3000mm of beam span using insertion arrangement (such as hole Mouthful, blocked in hole edge), and be connected with the steel tie of level insertion with steel wire lashing.
A kind of light block filling wall and frame structure construction technique, including step:
Step 1:Embodiment select, material selection and prepare, building block and with number of blocks determine;Its entire protocol can be with It is:
Embodiment selects:The position of Integration Framework structural beams, post, it is determined that filling wall plane approximate size, according to design The wall 101 of drawing requirement punch situation selection embodiment.
Material is selected and prepared:Select suitable lightweight concrete building block and with block model, specification, determine supporting mortar Type, calculate the main material requirements such as reinforcing bar, angle steel.
Building block and with number of blocks determine:According to the construction plane unwrapping wire of wall 101, with reference to the position of the reserved openings such as door, window And size, and floor height, building block and detailing requiments and mortar joint size with block fissure of displacement overlap joint, before every wall 101 is built by laying bricks or stones, Building block and carry out arrangement with block specification on demand and quantity and put, adjust, other required auxiliary materials are built in preparation by laying bricks or stones.
Step 2:Determine angle steel layout points and fixation:According to the pillar height and beam span of framework, by the spacing in connection scheme It is required that determining the layout points of angle steel, and post and beam are fixed in the longer edge wall thickness direction of angle steel with chemical bolt 103 In corresponding layout points;
Step 3, angle steel fixed position require:Frame column upper and lower ends are required to arrange angle steel, and upper end position requirement is in beam At the 100mm of bottom, lower end is arranged in above floor, and weld horizontal steel tie penetrates cloth along wall total length on the angle steel of post lower end in advance Put, and colligation bar dowel 108;Vierendeel girder is required to arrange angle steel along end of span portion, and position is at the 70mm of distance post side;
Step 4, masonry panel 101:Wall 101 should be cleared up basic unit before building by laying bricks or stones, at pre- masonry panel 101 Laitance, dust are cleaned and rinsed well, and watering moistens basic unit;Horizontal line is first drawn before building a wall, on the position of the line of ink marker is put, by row Row figure is built by laying bricks or stones since being positioned at building block wall 101;First in the steel tie upper berth sand filling slurry of post bottom insertion, it is desirable to which thin and thick is equal It is even, then build building block by laying bricks or stones;
Step 5, steel tie sequence of construction and detailing requiments:Along pillar height whenever building by laying bricks or stones at fixed angle steel, that is, start Steel tie and colligation bar dowel 108 are welded, and fills up mortar, is built steel tie is embedding in horizontal mortar joint;Build distance by laying bricks or stones At the 1000mm of beam bottom, weld horizontal steel tie is along the elongated arrangement of wall on the angle steel of two side columns the top, and colligation bar dowel 108;The vertical steel tie of welding and colligation bar dowel 108 at angle steel fixed on beam simultaneously, and drawn with the level of the top Knot reinforcing bar is connected with steel wire lashing, and vertical steel tie extend into the length 700mm of wall 101, it is desirable to is arranged along building block hole;
Step 6, mortar joint quality requirement:The mortar joint built by laying bricks or stones will use two-sided jointing, mortar joint should it is smooth vertical and horizontal, mortar is full, It is uniformly closely knit;Wherein full degree of mortar at bed joint, horizontal joint are not less than 90%, and vertical seam is not less than 80%;Gray seam thickness should be uniform, horizontal Gray seam thickness is not preferably greater than 15mm, and vertical mortar joint width cannot be greater than 20mm, and steel tie must be embedded in mortar.
Continue the following steps afterwards, make perfect technology.
Step 7, gap filling:Clog to form heat-insulation layer 107 using the flexible material of insulation, such as blanket of glass wool, mineral wool Felt, EPS, XPS or polyurethane foam material, and use silicone adhesive or other elaxtic seal joint seals.
Step 8, job site are cleared up and inspected for acceptance.
The requirement that the present invention is connected according to current specifications to light block filling wall with frame structure, designs a kind of company Mode is connect, and provides corresponding construction technology, possesses that connection scheme is simple, and material therefor cost is cheap, is easy to site operation etc. Advantage.Importantly, this connected mode can significantly increase light block filling wall as non-structural element and Vierendeel girder, The overall anti-seismic performance of the structural elements such as post, and its durability in the O&M stage is effectively improved, there is significant society, economy With environmental benefit.
The preferred embodiment of the present invention is the foregoing is only, is not intended to limit the invention, for this area For technical staff, the present invention can have various modifications and variations.Within the spirit and principles of the invention, that is made is any Modification, equivalent substitution, improvement etc., should be included in the scope of the protection.

Claims (1)

1. a kind of light block filling wall and frame structure construction technique, it is characterised in that including step:
Step 1:Embodiment select, material selection and prepare, building block and with number of blocks determine;
Step 2:Determine angle steel layout points and fixation:According to the pillar height and beam span of framework, by the pitch requirements in connection scheme The layout points of angle steel are determined, and the longer edge wall thickness direction of angle steel is fixed on to the corresponding arrangement of post and beam with chemical bolt Point on;
Step 3, angle steel fixed position require:Frame column upper and lower ends are required to arrange angle steel, and upper end position requirement is at beam bottom At 100mm, lower end is arranged in above floor, and weld horizontal steel tie penetrates cloth along wall total length on the angle steel of post lower end in advance Put, and colligation bar dowel;Vierendeel girder is required to arrange angle steel along end of span portion, and position is at the 70mm of distance post side;
Step 4, masonry panel:Basic unit should be cleared up before building wall, the laitance at pre- masonry panel, dust are cleaned Rinse well, and watering moistens basic unit;Horizontal line is first drawn before building a wall, on the position of the line of ink marker is put, is determined by arrangement figure from wall Start to build by laying bricks or stones at the building block of position;First in the steel tie upper berth sand filling slurry of post bottom insertion, it is desirable to which thin and thick is uniform, then builds building block by laying bricks or stones;
Step 5, steel tie sequence of construction and detailing requiments:Along pillar height whenever building by laying bricks or stones at fixed angle steel, that is, start to weld Steel tie and colligation bar dowel, and fill up mortar, build steel tie is embedding in horizontal mortar joint;Build by laying bricks or stones apart from beam bottom At 1000mm, weld horizontal steel tie is along the elongated arrangement of wall on the angle steel of two side columns the top, and colligation bar dowel;Simultaneously The vertical steel tie of welding and colligation bar dowel at fixed angle steel on beam, and with the horizontal steel tie steel wire of the top Colligation connects, and vertical steel tie extend into the length 700mm of wall, it is desirable to is arranged along building block hole;
Step 6, mortar joint quality requirement:The mortar joint built by laying bricks or stones will use two-sided jointing, mortar joint should it is smooth vertical and horizontal, mortar is full, uniform It is closely knit;Wherein full degree of mortar at bed joint, horizontal joint are not less than 90%, and vertical seam is not less than 80%;Gray seam thickness should be uniform, horizontal mortar joint Thickness is not preferably greater than 15mm, and vertical mortar joint width cannot be greater than 20mm, and steel tie must be embedded in mortar.
CN201610134983.7A 2016-03-09 2016-03-09 A kind of light block filling wall and frame structure construction technique Expired - Fee Related CN105804274B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610134983.7A CN105804274B (en) 2016-03-09 2016-03-09 A kind of light block filling wall and frame structure construction technique

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610134983.7A CN105804274B (en) 2016-03-09 2016-03-09 A kind of light block filling wall and frame structure construction technique

Publications (2)

Publication Number Publication Date
CN105804274A CN105804274A (en) 2016-07-27
CN105804274B true CN105804274B (en) 2017-12-12

Family

ID=56467120

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610134983.7A Expired - Fee Related CN105804274B (en) 2016-03-09 2016-03-09 A kind of light block filling wall and frame structure construction technique

Country Status (1)

Country Link
CN (1) CN105804274B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107119908B (en) * 2017-03-22 2019-05-24 天津住宅集团建设工程总承包有限公司 Eaves square steel suspended block construction method on external window of building
US20200318341A1 (en) * 2018-11-06 2020-10-08 ALP Supply, Inc. Concrete embeddable corbel system
CN113605562A (en) * 2021-09-13 2021-11-05 西安五和土木工程新材料有限公司 Reinforced filling wall structure and construction method thereof

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4842755B2 (en) * 2006-10-04 2011-12-21 株式会社竹中工務店 Seismic walls using corrugated steel plates made of ultra high strength steel
CN103556749A (en) * 2013-10-10 2014-02-05 南京工业大学 Suspension type flexible connection for precast concrete infilled wall
CN204435601U (en) * 2014-11-04 2015-07-01 华南理工大学 A kind of damping filled-in panel for frame construction
CN104763081B (en) * 2015-03-31 2017-09-15 四川电力设计咨询有限责任公司 The flexible connecting structure of masonry filler wall and concrete structure
CN204850146U (en) * 2015-06-01 2015-12-09 中国建筑第八工程局有限公司 Gypsum building block infilled wall
CN105064546B (en) * 2015-08-05 2017-10-03 煤炭工业合肥设计研究院 Integral wall and its construction technology

Also Published As

Publication number Publication date
CN105804274A (en) 2016-07-27

Similar Documents

Publication Publication Date Title
CN105780964B (en) A kind of light block filling wall and frame structure construction technique
CN100416010C (en) Joint construction method of prefabricated composite bearing wall structure
CN105297887A (en) Three-dimensional light steel framework composed of bidirectional continuous twin beams
CN102535355B (en) Method for reinforcing bridge structure separated steel-concrete combined truss
CN205894313U (en) Prefabricated assembled steel pipe retrains frame node entirely
CN108797847A (en) A kind of assembled steel frame wall filled with masonry structural system and its construction method
CN103397696A (en) Building adopting aseismatic precasted reinforcing steel truss shear wall composite structure
CN105804274B (en) A kind of light block filling wall and frame structure construction technique
CN103388357A (en) Shock-proof prefabricated steel tube shear wall mixed structural building
CN102140842B (en) Industrial construction method for multistory residence system with clamp die frame core wall self-bearing structure
CN107447901A (en) Anti-seismic prefabricated floor and floor antidetonation splicing construction
CN204940522U (en) The D light Steel Structure that two-way continuous twin beams is formed
CN108301531A (en) Assembled built-in heat insulation layer concrete composite wall-light steel frame-floor connecting node
CN110565974A (en) method for transforming existing building structure
CN114592688B (en) Construction method of oblique reinforced concrete shear wall based on equivalent rod model
CN108589969A (en) A kind of combination assembled shear wall and preparation method thereof of the vertical ECC energy consumptions band of band
CN209620330U (en) A kind of non-dismantling formwork concrete shear wall structure building
CN215211690U (en) Buckling-restrained steel plate shear wall
CN110439291A (en) A kind of assembled production and construction method suitable for low-rise building
CN215106121U (en) One-way superimposed sheet piece department joint construction
CN102776977A (en) Novel heat insulation, fire prevention and earthquake resistance integrated energy-saving wall block for building exterior wall
CN101545287A (en) Multifunctional thermal insulation board
CN108643346A (en) Assembled built-in heat insulation layer foamed concrete composite wall-light steel frame-floor connecting node
CN210767353U (en) Assembled shear force wall node connection structure
CN209194694U (en) A kind of reinforcing concrete drain pipe building

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171212