CN105800454B - Energy-saving and environment-friendly oil pipeline installs equipment - Google Patents

Energy-saving and environment-friendly oil pipeline installs equipment Download PDF

Info

Publication number
CN105800454B
CN105800454B CN201610384735.8A CN201610384735A CN105800454B CN 105800454 B CN105800454 B CN 105800454B CN 201610384735 A CN201610384735 A CN 201610384735A CN 105800454 B CN105800454 B CN 105800454B
Authority
CN
China
Prior art keywords
cylinder
neonychium
oil pipeline
sunpender
sub bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201610384735.8A
Other languages
Chinese (zh)
Other versions
CN105800454A (en
Inventor
贺昶明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Zhirong Zhichuang Intellectual Property Operation Co ltd
Original Assignee
Chengdu Zhi Rong Chuang Intellectual Property Operation Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Zhi Rong Chuang Intellectual Property Operation Co Ltd filed Critical Chengdu Zhi Rong Chuang Intellectual Property Operation Co Ltd
Priority to CN201610384735.8A priority Critical patent/CN105800454B/en
Publication of CN105800454A publication Critical patent/CN105800454A/en
Application granted granted Critical
Publication of CN105800454B publication Critical patent/CN105800454B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C1/00Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
    • B66C1/10Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
    • B66C1/12Slings comprising chains, wires, ropes, or bands; Nets
    • B66C1/16Slings with load-engaging platforms or frameworks
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C1/00Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
    • B66C1/10Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
    • B66C1/12Slings comprising chains, wires, ropes, or bands; Nets
    • B66C1/122Sling or load protectors
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L1/00Laying or reclaiming pipes; Repairing or joining pipes on or under water
    • F16L1/024Laying or reclaiming pipes on land, e.g. above the ground
    • F16L1/06Accessories therefor, e.g. anchors

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Load-Engaging Elements For Cranes (AREA)
  • Wind Motors (AREA)

Abstract

It include: pedestal the invention discloses energy-saving and environment-friendly oil pipeline installation equipment, sunpender, lifting rope, 2 neonychiums, crane, the sunpender both ends are connect with annulus respectively, it is connect in the middle part of the lifting rope with hanging ring, the lifting rope both ends are connected with the first lock respectively, a cylinder is connected in the middle part of the neonychium, a circular hole is equipped in the middle part of the neonychium, spring stack is equipped in the cylinder, the chassis left side and right side are respectively connected with a guide plate, the guiding plate surface is connected with M pulley, it is reasonable to realize equipment design, convenient for being installed to oil pipeline, and installation effectiveness is higher, easy damaged oil pipeline is not allowed, the higher technical effect of safety.

Description

Energy-saving and environment-friendly oil pipeline installs equipment
Technical field
The present invention relates to petroleum machinery research fields, and in particular, to a kind of energy-saving and environment-friendly oil pipeline installation equipment.
Background technique
Oil pipeline (also referred to as pipeline, pipeline) is made of oil pipe and its attachment, and according to the needs of process flow, is matched Standby corresponding oil pump unit, design are mounted to a complete pipe-line system, unload to complete oil plant and defeated turn task.
Controlling methodology of oil pipeline, i.e., for transporting the pipe-line system of petroleum and oil product, mainly by petroleum pipeline, oil transportation station And other auxiliary phases close equipment composition, are that one of capital equipment of oil movement and storage industry and crude oil and oil product are main Conveying equipment, compared with the railway and highway oil transportation that belong to land transportation mode, pipeline oil transportation has that freight volume is big, airtightness Good, the features such as at low cost and safety coefficient is high.
The tubing of oil pipeline is generally steel pipe, connects equipment using welding and flange etc. and connects into long-distance pipe, and Control is opened and closed using valve and flow is adjusted, oil pipeline mainly has isothermal conveying, heated transportation and sequentially-fed etc. defeated Send technique.
Oil pipeline during installation, generally use crane and lifting rope binding carry out handling installation, during handling by In the friction of lifting rope, it is easy to cause oil pipeline to damage, do not allow so that wear at the port at oil pipeline inner wall and both ends It is easily docked, and when handling is put into bottom surface, needs manually to be adjusted direction to the oil pipeline of handling, avoid misplacing position It sets, efficiency is lower, and there are security risks.
In conclusion present inventor is in realizing the embodiment of the present application during inventive technique scheme, in discovery Technology is stated at least to have the following technical problems:
In the prior art, that there are efficiency is lower for the installation of existing oil pipeline, is easily damaged oil pipeline, safety compared with The technical problem of difference.
Summary of the invention
The present invention provides a kind of energy-saving and environment-friendly oil pipelines to install equipment, solves existing oil pipeline installation and deposits It is lower in efficiency, it is easily damaged oil pipeline, the poor technical problem of safety realizes equipment design rationally, convenient for defeated Oil-piping is installed, and installation effectiveness is higher, it is not easy to damage oil pipeline, the higher technical effect of safety.
In order to solve the above technical problems, the embodiment of the present application provides energy-saving and environment-friendly oil pipeline installation equipment, it is described Equipment includes:
Pedestal, sunpender, lifting rope, 2 neonychiums, cranes, the sunpender both ends are connect with annulus respectively, in the middle part of the lifting rope It is connect with hanging ring, the lifting rope both ends are connected with the first lock respectively, are connected with a cylinder, the protection in the middle part of the neonychium Pad middle part is equipped with a circular hole, and the cylinder both ends are openning shape, and the neonychium and the cylinder are all made of rubber and are made, described Neonychium and the drum surface are tooth form, and for the cylinder inner wall inserted with N root steel bar, the N is whole more than or equal to 5 Number, the neonychium are round neonychium, and the diameter of the neonychium is greater than the outer diameter of oil pipeline, and the outer diameter of the cylinder is small In being equipped with spring stack in the internal diameter of the oil pipeline, the cylinder, spring stack both ends are connect with the inner wall of the cylinder respectively, The spring stack is in compressive state, and the neonychium upper end is connect with one end of the first steel cable, first steel cable it is another End is connected with the second lock, and the neonychium lower end connect with one end of the second steel cable, the other end of second steel cable and the Three lock connections;The sunpender includes: the first sub bar and the second sub bar, and first sub bar is cylindrical shape, first sub bar Both ends are openning shape, and the first sub bar inner wall is shape of threads, and second sub bar outer surface is shape of threads, second sub bar It is inserted into the first sub bar internal screw thread connection and forms the sunpender, the chassis left side and right side are respectively connected with a guide plate, institute It states guiding plate surface and is connected with M pulley, the M is the integer more than or equal to 10;Wherein, the base upper surface is equipped with transmission The motor of band, the transmission belt is connect by control switch with battery, the battery and solar panel and wind-force Electric organ is all connected with.
Wherein, when being installed to oil pipeline, the both ends of oil pipeline are carried out respectively first with 2 neonychiums Protection, specially by neonychium cylinder insertion oil pipeline in, using the spring stack compressive deformation in cylinder to cylinder into Row support so that cylinder be bonded oil pipeline inner wall, it is therefore an objective to be bonded it is easy to carry, generate friction it is not easy to fall off, by cylinder After being inserted into oil pipeline, then the first steel cable of 2 neonychium upper ends is attached by 2 second locks, then by 2 Second steel cable of neonychium lower end is attached by 2 third locks, by steel cable and lock so that between 2 neonychiums in succession It connects, so that neonychium is not easy to fall off during carrying, guarantees safety, 2 end of sunpender is then each passed through 2 protections The circular hole and cylinder of pad, i.e. 2 end of sunpender are each passed through oil pipeline, then latch by first so that sunpender is connect with lifting rope, Then crane catches on hanging ring by suspension hook and is carried, convenient in carrying safety, and good in handling process, can be with using rubber cylinder Oil pipeline inner wall is protected, the power of sunpender is acted on cylinder, prevents sunpender direct friction oil pipeline inner wall, and Neonychium size is bigger than oil pipeline, can use neonychium during handling and protects to the port at oil pipeline both ends Shield is equipped with neonychium, avoids oil pipeline and wear during carrying between sunpender and lifting rope and oil pipeline;
Further, cylinder inner wall can ensure the intensity of cylinder using steel bar inserted with N root steel bar, avoid carrying During huge deformation occur cause to slide, safety is higher, and neonychium and the drum surface are tooth form, utilizes tooth Shape can increase friction, prevent from skidding, guarantee safety;
Further, sunpender includes: the first sub bar and the second sub bar, and the first sub bar is cylindrical shape, and the first sub bar both ends are Openning shape, the first sub bar inner wall are shape of threads, and the second sub bar outer surface is shape of threads, and the second sub bar is inserted into the first sub bar internal screw thread Changing for sunpender entire length may be implemented in connection composition sunpender, the difference for the length being inserted into the first sub bar using the second sub bar Become, the handling to the oil pipeline of different length can be realized, versatility is preferable;
Further, chassis left side and right side are respectively connected with a guide plate, and guiding plate surface connects pulley, hangs in traditional It needs manually to be adjusted the oil pipeline placement direction of handling and position during fortune, in this application, utilizes 2 side of pedestal Guide plate, for crane by oil pipeline handling between guide plate, putting down then as guide plate can be accurately by petroleum pipeline It in road handling to pedestal, does not participate in manually, efficiency and safety are higher, and guide plate is equipped with pulley, are convenient for oil pipeline It slides downward;
Further, base upper surface is equipped with transmission belt, can be carried out to the installation site of oil pipeline using transmission belt Fine tuning, is to sling adjustment again using crane when installation site inaccuracy in tradition, and control switch benefit is opened in this programme It can be adjusted with transmission belt, facilitate efficiency higher, and to charge the battery using solar panel and wind turbine generator power generation, Energy conservation and environmental protection.
Wherein, the sunpender, the annulus, the sunpender are all made of bearing steel and are made, the sunpender, the annulus, institute It states sunpender surface and is coated with antirust paint.Wherein, intensity can be ensured using bearing steel, Tu antirust paint can prevent from getting rusty.
Wherein, the N root steel bar is uniformly inserted in the cylinder inner wall.It is uniformly distributed and is uniformly protected convenient for uniform force deformation Hinder safety.
Wherein, the M pulley is evenly distributed on the guide plate.
Wherein, the pedestal is made of bearing steel, and the pedestal is rectangular-shape, and the susceptor surface is coated with antirust Paint.
Wherein, the length of the cylinder is greater than 0.5 meter less than 1 meter.
Wherein, when the curtailment of cylinder insertion, stress is smaller, is equally easy to damage part oil pipeline inner wall, because The length of this cylinder needs to be greater than 0.5 meter, when insertion depth is too long, be easy to cause and carries constant, higher cost.
One or more technical solutions provided in the embodiments of the present application have at least the following technical effects or advantages:
Energy-saving and environment-friendly oil pipeline installation equipment is designed as including: pedestal, sunpender, lifting rope, 2 guarantors due to using Protection pad, crane, the sunpender both ends are connect with annulus respectively, are connect in the middle part of the lifting rope with hanging ring, the lifting rope both ends difference It is connected with the first lock, a cylinder is connected in the middle part of the neonychium, is equipped with a circular hole, the cylinder two in the middle part of the neonychium End is openning shape, and the neonychium and the cylinder are all made of rubber and are made, and the neonychium and the drum surface are tooth Shape, for the cylinder inner wall inserted with N root steel bar, the N is the integer more than or equal to 5, and the neonychium is round neonychium, institute The diameter for stating neonychium is greater than the outer diameter of oil pipeline, and the outer diameter of the cylinder is less than the internal diameter of the oil pipeline, the circle Spring stack is equipped in cylinder, spring stack both ends are connect with the inner wall of the cylinder respectively, and the spring stack is in compressive state, described Neonychium upper end is connect with one end of the first steel cable, and the other end of first steel cable and the second lock connect, the neonychium Lower end is connect with one end of the second steel cable, and the other end and the third lock of second steel cable connect;The sunpender includes: first Sub bar and the second sub bar, first sub bar are cylindrical shape, and first sub bar both ends are openning shape, the first sub bar inner wall For shape of threads, second sub bar outer surface is shape of threads, and second sub bar is inserted into the first sub bar internal screw thread connection group At the sunpender, the chassis left side and right side are respectively connected with a guide plate, and the guiding plate surface is connected with M pulley, institute Stating M is the integer more than or equal to 10;Wherein, the base upper surface is equipped with transmission belt, and the motor of the transmission belt passes through control System switch is connect with battery, the technical solution that the battery and solar panel and wind turbine generator are all connected with, so, It efficiently solves the installation of existing oil pipeline there are efficiency lower, be easily damaged oil pipeline, the poor technology of safety is asked Topic, and then realize equipment design rationally, convenient for installing to oil pipeline, and installation effectiveness is higher, it is not easy to damage defeated Oil-piping, the higher technical effect of safety.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of energy-saving and environment-friendly oil pipeline installation equipment in the embodiment of the present application one;
Fig. 2 is the structural schematic diagram of one middle hanger of the embodiment of the present application;
Fig. 3 is the schematic side view of cylinder in the embodiment of the present application one;
Fig. 4 is the structural schematic diagram of pedestal in the embodiment of the present application one;
Fig. 5 is the schematic side view of pedestal in the embodiment of the present application one;
Wherein, 1- sunpender, 2- lifting rope, 3- neonychium, 4- annulus, 5- hanging ring, 6- first are latched, 7- cylinder, the first steel of 8- Rope, 9- second are latched, the second steel cable of 10-, 11- third lock, the first sub bar of 12-, the second sub bar of 13-, 14- spring stack, 15- steel Item, 16- oil pipeline, 17- pedestal, 18- guide plate, 19- pulley, 20- transmission belt, 21- motor, 22- battery, 23- is too Positive energy solar panel, 24- wind turbine generator.
Specific embodiment
The present invention provides a kind of energy-saving and environment-friendly oil pipelines to install equipment, solves existing oil pipeline installation and deposits It is lower in efficiency, it is easily damaged oil pipeline, the poor technical problem of safety realizes equipment design rationally, convenient for defeated Oil-piping is installed, and installation effectiveness is higher, it is not easy to damage oil pipeline, the higher technical effect of safety.
Technical solution in the application implementation is to solve above-mentioned technical problem.General thought is as follows:
It is designed as including: pedestal, sunpender, lifting rope, 2 protections using by energy-saving and environment-friendly oil pipeline installation equipment Pad, crane, the sunpender both ends connects with annulus respectively, and the lifting rope middle part is connect with hanging ring, the lifting rope both ends respectively with First lock connection, the neonychium middle part are connected with a cylinder, are equipped with a circular hole, the cylinder both ends in the middle part of the neonychium For openning shape, the neonychium and the cylinder are all made of rubber and are made, and the neonychium and the drum surface are tooth form, The cylinder inner wall is inserted with N root steel bar, and the N is the integer more than or equal to 5, and the neonychium is round neonychium, described The diameter of neonychium is greater than the outer diameter of oil pipeline, and the outer diameter of the cylinder is less than the internal diameter of the oil pipeline, the cylinder Interior to be equipped with spring stack, spring stack both ends are connect with the inner wall of the cylinder respectively, and the spring stack is in compressive state, the guarantor Protection pad upper end is connect with one end of the first steel cable, and the other end of first steel cable and the second lock connect, under the neonychium End is connect with one end of the second steel cable, and the other end and the third lock of second steel cable connect;The sunpender includes: the first son Bar and the second sub bar, first sub bar are cylindrical shape, and first sub bar both ends are openning shape, and the first sub bar inner wall is Shape of threads, second sub bar outer surface are shape of threads, and second sub bar is inserted into the first sub bar internal screw thread connection composition The sunpender, the chassis left side and right side are respectively connected with a guide plate, and the guiding plate surface is connected with M pulley, the M For the integer more than or equal to 10;Wherein, the base upper surface is equipped with transmission belt, and the motor of the transmission belt is opened by control Pass is connect with battery, the technical solution that the battery and solar panel and wind turbine generator are all connected with, so, effectively It solves the installation of existing oil pipeline there are efficiency lower, be easily damaged oil pipeline, the poor technical problem of safety, into And realize equipment design rationally, convenient for installing to oil pipeline, and installation effectiveness is higher, it is not easy to damage petroleum pipeline Road, the higher technical effect of safety.
In order to better understand the above technical scheme, in conjunction with appended figures and specific embodiments to upper Technical solution is stated to be described in detail.
Embodiment one:
In example 1, energy-saving and environment-friendly oil pipeline installation equipment is provided, Fig. 1-Fig. 5, the equipment are please referred to Include:
Pedestal 17, sunpender 1, lifting rope 2,2 neonychiums 3, crane, the sunpender both ends are connect with annulus 4 respectively, described to hang Rope middle part is connect with hanging ring 5, and the lifting rope both ends are connect with the first lock 6 respectively, is connected with a cylinder in the middle part of the neonychium 7, the neonychium middle part is equipped with a circular hole, and the cylinder both ends are openning shape, and the neonychium and the cylinder are all made of rubber Glue is made, and the neonychium and the drum surface are tooth form, and for the cylinder inner wall inserted with N root steel bar 15, the N is big In the integer for being equal to 5, the neonychium is round neonychium, and the diameter of the neonychium is greater than the outer diameter of oil pipeline, described The outer diameter of cylinder is less than the internal diameter of the oil pipeline, is equipped with spring stack 14 in the cylinder, spring stack both ends respectively with it is described The inner wall of cylinder connects, and the spring stack is in compressive state, and the neonychium upper end is connect with one end of the first steel cable 8, institute The other end and the second lock for stating the first steel cable 9 are connect, and the neonychium lower end is connect with one end of the second steel cable 10, and described the The other end of two steel cables is connect with third lock 11;The sunpender includes: the first sub bar 12 and the second sub bar 13, first son Bar is cylindrical shape, and first sub bar both ends are openning shape, and the first sub bar inner wall is shape of threads, the second sub bar appearance Face is shape of threads, and second sub bar is inserted into the first sub bar internal screw thread connection and forms the sunpender, the chassis left side and Right side is respectively connected with a guide plate 18, and the guiding plate surface is connected with M pulley 19, and the M is the integer more than or equal to 10; Wherein, the base upper surface is equipped with transmission belt 20, and the motor 21 of the transmission belt is connected by control switch and battery 22 It connects, the battery is all connected with solar panel 23 and wind turbine generator 24.
Wherein, when being installed to oil pipeline 16, first with 2 neonychiums respectively to the both ends of oil pipeline into Cylinder on neonychium, is specially inserted into oil pipeline, using the spring stack compressive deformation in cylinder to cylinder by row protection Be supported so that cylinder be bonded oil pipeline inner wall, it is therefore an objective to be bonded it is easy to carry, generate friction it is not easy to fall off, will justify After cylinder insertion oil pipeline, then the first steel cable of 2 neonychium upper ends is attached by 2 second locks, then by 2 Second steel cable of a neonychium lower end is attached by 2 third locks, by steel cable and lock so that 2 neonychiums are indirect Connection, so that neonychium is not easy to fall off during carrying, guarantees safety, 2 end of sunpender is then each passed through 2 guarantors The circular hole and cylinder of protection pad, i.e. 2 end of sunpender are each passed through oil pipeline, then latch by first so that sunpender and lifting rope connect It connects, then crane catches on hanging ring by suspension hook and carried, convenient in carrying safety, and good in handling process, utilizes rubber cylinder Oil pipeline inner wall can be protected, the power of sunpender is acted on cylinder, prevented in sunpender direct friction oil pipeline Wall, and neonychium size is bigger than oil pipeline, can use neonychium during handling to the port at oil pipeline both ends It is protected, neonychium is equipped between sunpender and lifting rope and oil pipeline, oil pipeline is avoided and is worn during carrying;
Further, cylinder inner wall can ensure the intensity of cylinder using steel bar inserted with N root steel bar, avoid carrying During huge deformation occur cause to slide, safety is higher, and neonychium and the drum surface are tooth form, utilizes tooth Shape can increase friction, prevent from skidding, guarantee safety;
Further, sunpender includes: the first sub bar and the second sub bar, and the first sub bar is cylindrical shape, and the first sub bar both ends are Openning shape, the first sub bar inner wall are shape of threads, and the second sub bar outer surface is shape of threads, and the second sub bar is inserted into the first sub bar internal screw thread Changing for sunpender entire length may be implemented in connection composition sunpender, the difference for the length being inserted into the first sub bar using the second sub bar Become, the handling to the oil pipeline of different length can be realized, versatility is preferable;
Further, chassis left side and right side are respectively connected with a guide plate, and guiding plate surface connects pulley, hangs in traditional It needs manually to be adjusted the oil pipeline placement direction of handling and position during fortune, in this application, utilizes 2 side of pedestal Guide plate, for crane by oil pipeline handling between guide plate, putting down then as guide plate can be accurately by petroleum pipeline It in road handling to pedestal, does not participate in manually, efficiency and safety are higher, and guide plate is equipped with pulley, are convenient for oil pipeline It slides downward;
Further, base upper surface is equipped with transmission belt, can be carried out to the installation site of oil pipeline using transmission belt Fine tuning, is to sling adjustment again using crane when installation site inaccuracy in tradition, and control switch benefit is opened in this programme It can be adjusted with transmission belt, facilitate efficiency higher, and to charge the battery using solar panel and wind turbine generator power generation, Energy conservation and environmental protection.
Wherein, in the embodiment of the present application, the sunpender, the annulus, the sunpender are all made of bearing steel and are made, described Sunpender, the annulus, the sunpender surface are coated with antirust paint.Wherein, intensity can be ensured using bearing steel, Tu antirust paint can To prevent from getting rusty.
Wherein, in the embodiment of the present application, the N root steel bar is uniformly inserted in the cylinder inner wall.It is uniformly distributed and is convenient for Uniform force deformation uniformly guarantees safety.
Wherein, in the embodiment of the present application, the M pulley is evenly distributed on the guide plate.
Wherein, in the embodiment of the present application, the pedestal is made of bearing steel, and the pedestal is rectangular-shape, described Susceptor surface is coated with antirust paint.
Wherein, in the embodiment of the present application, the length of the cylinder is greater than 0.5 meter less than 1 meter.
Wherein, in the embodiment of the present application, when the curtailment of cylinder insertion, stress is smaller, is equally easy to damage portion Divide oil pipeline inner wall, therefore the length of cylinder needs to be greater than 0.5 meter, when insertion depth is too long, be easy to cause carrying constant, Higher cost.
Technical solution in above-mentioned the embodiment of the present application, at least have the following technical effects or advantages:
Energy-saving and environment-friendly oil pipeline installation equipment is designed as including: pedestal, sunpender, lifting rope, 2 guarantors due to using Protection pad, crane, the sunpender both ends are connect with annulus respectively, are connect in the middle part of the lifting rope with hanging ring, the lifting rope both ends difference It is connected with the first lock, a cylinder is connected in the middle part of the neonychium, is equipped with a circular hole, the cylinder two in the middle part of the neonychium End is openning shape, and the neonychium and the cylinder are all made of rubber and are made, and the neonychium and the drum surface are tooth Shape, for the cylinder inner wall inserted with N root steel bar, the N is the integer more than or equal to 5, and the neonychium is round neonychium, institute The diameter for stating neonychium is greater than the outer diameter of oil pipeline, and the outer diameter of the cylinder is less than the internal diameter of the oil pipeline, the circle Spring stack is equipped in cylinder, spring stack both ends are connect with the inner wall of the cylinder respectively, and the spring stack is in compressive state, described Neonychium upper end is connect with one end of the first steel cable, and the other end of first steel cable and the second lock connect, the neonychium Lower end is connect with one end of the second steel cable, and the other end and the third lock of second steel cable connect;The sunpender includes: first Sub bar and the second sub bar, first sub bar are cylindrical shape, and first sub bar both ends are openning shape, the first sub bar inner wall For shape of threads, second sub bar outer surface is shape of threads, and second sub bar is inserted into the first sub bar internal screw thread connection group At the sunpender, the chassis left side and right side are respectively connected with a guide plate, and the guiding plate surface is connected with M pulley, institute Stating M is the integer more than or equal to 10;Wherein, the base upper surface is equipped with transmission belt, and the motor of the transmission belt passes through control System switch is connect with battery, the technical solution that the battery and solar panel and wind turbine generator are all connected with, so, It efficiently solves the installation of existing oil pipeline there are efficiency lower, be easily damaged oil pipeline, the poor technology of safety is asked Topic, and then realize equipment design rationally, convenient for installing to oil pipeline, and installation effectiveness is higher, it is not easy to damage defeated Oil-piping, the higher technical effect of safety.
Although preferred embodiments of the present invention have been described, it is created once a person skilled in the art knows basic Property concept, then additional changes and modifications may be made to these embodiments.So it includes excellent that the following claims are intended to be interpreted as It selects embodiment and falls into all change and modification of the scope of the invention.
Obviously, various changes and modifications can be made to the invention without departing from essence of the invention by those skilled in the art Mind and range.In this way, if these modifications and changes of the present invention belongs to the range of the claims in the present invention and its equivalent technologies Within, then the present invention is also intended to include these modifications and variations.

Claims (1)

1. energy-saving and environment-friendly oil pipeline installs equipment, which is characterized in that the equipment includes:
Pedestal, sunpender, lifting rope, 2 neonychiums, cranes, the sunpender both ends are connect with annulus respectively, in the middle part of the lifting rope with hang Ring connection, the lifting rope both ends are connected with the first lock respectively, are connected with a cylinder in the middle part of the neonychium, in the neonychium Portion is equipped with a circular hole, and the cylinder both ends are openning shape, and the neonychium and the cylinder are all made of rubber and are made, the protection Pad and the drum surface are tooth form, and for the cylinder inner wall inserted with N root steel bar, the N is the integer more than or equal to 5, institute Neonychium is stated as round neonychium, the diameter of the neonychium is greater than the outer diameter of oil pipeline, and the outer diameter of the cylinder is less than institute The internal diameter of oil pipeline is stated, is equipped with spring stack in the cylinder, spring stack both ends are connect with the inner wall of the cylinder respectively, described Spring stack is in compressive state, and the neonychium upper end is connect with one end of the first steel cable, the other end of first steel cable with Second lock connection, the neonychium lower end are connect with one end of the second steel cable, and the other end and third of second steel cable are locked Button connection;The sunpender includes: the first sub bar and the second sub bar, and first sub bar is cylindrical shape, first sub bar both ends For openning shape, the first sub bar inner wall is shape of threads, and second sub bar outer surface is shape of threads, the second sub bar insertion The first sub bar internal screw thread connection forms the sunpender, and the chassis left side and right side are respectively connected with a guide plate, described to lead It is connected with M pulley to plate surface, the M is the integer more than or equal to 10;Wherein, the base upper surface is equipped with transmission belt, The motor of the transmission belt is connect by control switch with battery, the battery and solar panel and wind-power electricity generation Device is all connected with;The sunpender, the annulus, the sunpender are all made of bearing steel and are made, and the sunpender, described is hung the annulus Bar surface is coated with antirust paint;The N root steel bar is uniformly inserted in the cylinder inner wall;The M pulley is evenly distributed on institute It states on guide plate;The pedestal is made of bearing steel, and the pedestal is rectangular-shape, and the susceptor surface is coated with antirust paint; The length of the cylinder is greater than 0.5 meter less than 1 meter.
CN201610384735.8A 2016-06-02 2016-06-02 Energy-saving and environment-friendly oil pipeline installs equipment Expired - Fee Related CN105800454B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610384735.8A CN105800454B (en) 2016-06-02 2016-06-02 Energy-saving and environment-friendly oil pipeline installs equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610384735.8A CN105800454B (en) 2016-06-02 2016-06-02 Energy-saving and environment-friendly oil pipeline installs equipment

Publications (2)

Publication Number Publication Date
CN105800454A CN105800454A (en) 2016-07-27
CN105800454B true CN105800454B (en) 2018-12-28

Family

ID=56428244

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610384735.8A Expired - Fee Related CN105800454B (en) 2016-06-02 2016-06-02 Energy-saving and environment-friendly oil pipeline installs equipment

Country Status (1)

Country Link
CN (1) CN105800454B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114671338B (en) * 2022-05-27 2022-12-06 徐州市全球通精密钢管有限公司 Pipe crane for precise slender steel pipes

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09301673A (en) * 1996-05-09 1997-11-25 Hitachi Plant Eng & Constr Co Ltd Metal fitting for suspending and lifting large diameter pipe
CN202812702U (en) * 2012-07-11 2013-03-20 深圳三升高科技股份有限公司 Thread expansion derrick boom
CN103359603A (en) * 2013-07-11 2013-10-23 扬州金鑫管业有限公司 Pipeline clamping tool
CN203865840U (en) * 2014-06-06 2014-10-08 江苏华阳金属管件有限公司 Steel pipe lifting device
CN104085775A (en) * 2014-07-08 2014-10-08 成都高普石油工程技术有限公司 Device for installing petroleum transmission pipeline
CN203946136U (en) * 2014-06-27 2014-11-19 天津市管道工程集团有限公司 The special pipe car of transport pipeline in large diameter pipeline
CN203959639U (en) * 2014-04-30 2014-11-26 江苏德创制管有限公司 A kind of steel pipe hoisting fixture
CN205662230U (en) * 2016-06-02 2016-10-26 成都大漠石油技术有限公司 Energy -concerving and environment -protective oil pipeline installation device

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09301673A (en) * 1996-05-09 1997-11-25 Hitachi Plant Eng & Constr Co Ltd Metal fitting for suspending and lifting large diameter pipe
CN202812702U (en) * 2012-07-11 2013-03-20 深圳三升高科技股份有限公司 Thread expansion derrick boom
CN103359603A (en) * 2013-07-11 2013-10-23 扬州金鑫管业有限公司 Pipeline clamping tool
CN203959639U (en) * 2014-04-30 2014-11-26 江苏德创制管有限公司 A kind of steel pipe hoisting fixture
CN203865840U (en) * 2014-06-06 2014-10-08 江苏华阳金属管件有限公司 Steel pipe lifting device
CN203946136U (en) * 2014-06-27 2014-11-19 天津市管道工程集团有限公司 The special pipe car of transport pipeline in large diameter pipeline
CN104085775A (en) * 2014-07-08 2014-10-08 成都高普石油工程技术有限公司 Device for installing petroleum transmission pipeline
CN205662230U (en) * 2016-06-02 2016-10-26 成都大漠石油技术有限公司 Energy -concerving and environment -protective oil pipeline installation device

Also Published As

Publication number Publication date
CN105800454A (en) 2016-07-27

Similar Documents

Publication Publication Date Title
CN201501729U (en) Air turning device of equipment
CN103723622B (en) Trident connecting rod Self-adjusting coils suspender
CN105800454B (en) Energy-saving and environment-friendly oil pipeline installs equipment
CN103795005A (en) Special tool for dual protection of wire of strain tower
CN207404708U (en) The petroleum pipeline suspender of stability can be improved
CN105800455B (en) Oil pipeline the service of connection devices
CN205662230U (en) Energy -concerving and environment -protective oil pipeline installation device
CN105819325B (en) The higher oil pipeline of installation effectiveness installs equipment
CN105836602B (en) The higher oil pipeline of safety installs equipment
CN205662231U (en) Oil pipeline installation device
CN205675994U (en) The oil pipeline erecting device that installation effectiveness is higher
CN207645607U (en) A kind of anchor winch experiment loading unit
CN205675993U (en) The oil pipeline erecting device that safety is higher
CN205772792U (en) Oil pipeline handling apparatus
CN203112258U (en) Box type coil cable winch
CN205772793U (en) Oil pipeline docking facilities
CN113123303A (en) Supporting and storing system for overhauling gate in water conservancy and hydropower engineering
CN207518190U (en) A kind of borehole cable laying apparatus
CN207209766U (en) A kind of nitric acid bucket boom hoisting
CN206014242U (en) A kind of aid for lifting insulator
CN202038804U (en) Special binding tackle for modifying agricultural power grid
CN105836604A (en) Oil conveying pipeline carrying device
CN205772791U (en) Device built by oil pipeline
CN203781653U (en) Grab bucket adopting cable to input power
CN204624144U (en) Drilling spool storing unit

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 610000 No. 880, Gao Dong Road, East Industrial Zone, Xindu District, Chengdu, Sichuan

Applicant after: Chengdu great energy technology Co.,Ltd.

Address before: 610000 No. 880, Gao Dong Road, East Industrial Zone, Xindu District, Chengdu, Sichuan

Applicant before: Chengdu Damo Petroleum Technology Co.,Ltd.

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20181206

Address after: 610000 Rong Ou, 144 Qingbaijiang Road, Chengdu, Sichuan.

Applicant after: Chengdu Zhirong Zhichuang Intellectual Property Operation Co.,Ltd.

Address before: 610000 No. 880, Gao Dong Road, East Industrial Zone, Xindu District, Chengdu, Sichuan

Applicant before: Chengdu great energy technology Co.,Ltd.

GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181228