CN105788666A - 一种核反应堆临界过程控制方法 - Google Patents
一种核反应堆临界过程控制方法 Download PDFInfo
- Publication number
- CN105788666A CN105788666A CN201410808460.7A CN201410808460A CN105788666A CN 105788666 A CN105788666 A CN 105788666A CN 201410808460 A CN201410808460 A CN 201410808460A CN 105788666 A CN105788666 A CN 105788666A
- Authority
- CN
- China
- Prior art keywords
- critical
- reactor
- nuclear reactor
- flux level
- neutron
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E30/00—Energy generation of nuclear origin
- Y02E30/30—Nuclear fission reactors
Landscapes
- Monitoring And Testing Of Nuclear Reactors (AREA)
Abstract
本发明涉及一种核反应堆临界过程控制方法,其特征在于:依次包括以下步骤:步骤一、在引入反应性变化前,测量反应堆中子通量水平;采集m次独立的中子通量水平ni,求作为参考中子通量的平均水平n0;步骤二、通过提棒、稀释或者装卸料,向反应堆引入反应性变化;步骤三、等待中子通量水平稳定,待倍增周期大于2000秒;步骤四、采集t时刻反应堆的中子通量水平n(t),采用当前反应堆物理量x(t),根据上一时刻的(n(t-1),x(t-1))与当前(n(t),x(t))进行临界外推计算,获取外推临界参数;步骤五、判断临界状态;本发明的外推临界结果相对准确、稳定、一致性好,利于临界判断,提高了反应堆达临界过程的安全性。
Description
技术领域
本发明涉及核反应堆物理技术领域,具体涉及一种核反应堆临界过程控制方法。
背景技术
使用外推临界公式来计算反应堆偏离临界的程度,根据反应性引入前后的物理量(如棒位、稀释水量、硼浓度或燃料元件数量等)和倒计数率ICRR(参考中子通量水平n0与当前中子通量水平n(x)的比值),外推得到临界状态的物理量。
外推临界原理是根据点堆中子动力学模型,用来监督反应堆所处的临界状态。点堆中子动力学方程如下:
其中:n(t)为与时间相关的中子密度;βieff为第i组有效缓发中子份额;βeff为有效缓发中子份额;λi为第i组缓发中子先驱核的衰变常数;ci(t)为第i组先驱核密度;l0为瞬发中子平均寿命;S为中子源;keff是反应堆有效增殖系数。
当反应堆处于次临界稳定时,即由式(1)、(2)得:
在源强一定的情况下,该式揭示了中子密度与有效增殖系数的关系。根据倒计数率ICRR的定义,得出下式:
由上述分析可知,keff0是某一定值,倒计数率ICRR与keff(x)成线性关系;
当keff(x)随着物理量x成线性关系,则倒计数率的关系曲线可以转化ICRR随物理量x的线性关系曲线;
已知物理量x1、x2,其对应的稳定中子水平是n1、n2,倒计数率是ICRR1、ICRR2,可以得到外推临界公式:
由ICRR的定义,可以得到外推临界公式:
由于反应性变化后中子通量水平稳定需要一段时间,不同时刻的数据外推得到的临界物理量不同,如何得到准确的外推物理量关系到反应堆的安全,因此控制反应性变化过程十分必要。目前对临界过程的没有量化控制,如某核电厂首次临界规程中描述如下“在每完成一次提棒操作后,须使堆芯稍作稳定,然后分别从两个源量程测量通道SRC1和SRC2中获取五次独立的计数测量……”。其中“堆芯稍作稳定”不利于判断,若提棒后堆芯稳定时间不够,在中子通量水平离稳定水平差异较大的情况下记录数据进行临界外推,造成外推结果不准确,可能使反应堆出现短周期或意外临界等事件,威胁反应堆安全。
发明内容
本发明目的在于提供一种有效地控制反应堆提棒、稀释、反射层变化或燃料元件变化的临界过程的核反应堆临界过程控制方法。
为了解决上述技术问题,本发明的技术方案为,一种核反应堆临界过程控制方法,其特征在于:依次包括以下步骤:
步骤一、在引入反应性变化前,测量反应堆中子通量水平;
采集m次独立的中子通量水平ni,求作为参考中子通量的平均水平n0;
步骤二、通过提棒、稀释或者装卸料,向反应堆引入反应性变化;
步骤三、等待中子通量水平稳定,待倍增周期大于2000秒;
步骤四、采集t时刻反应堆的中子通量水平n(t),采用当前反应堆物理量x(t),根据上一时刻的(n(t-1),x(t-1))与当前(n(t),x(t))进行临界外推计算,获取外推临界参数
步骤五、判断临界状态;
当x(t)=xc时,表示临界;
反应堆达临界过程中,当x(t)≠xc时,返回步骤二,通过提棒或稀释,直到临界,停止稀释或提棒;
反应堆装卸过程中,当完成一步装卸料后,返回步骤二,当x(t)<xc,方可进行下一步装卸料操作,直到装卸料结束。
所述倍增周期为反应堆中子通量水平增长为原来一倍所需要的时间。
步骤四中所述反应堆物理量x(t)包括棒位、稀释水量或者燃料元件数目。
本发明的有益效果:
本发明的外推临界结果相对准确、稳定、一致性好,利于临界判断,提高了反应堆达临界过程的安全性。
具体实施方式
以下结合实施例对本发明做进一步描述。
本发明一种核反应堆临界过程控制方法,依次包括以下步骤:
步骤一、在引入反应性变化前,测量反应堆中子通量水平;
核测仪表中采集m次独立的中子通量水平ni,求作为参考中子通量的平均水平n0;
步骤二、通过提棒、稀释或者装卸料,向反应堆引入反应性变化;
步骤三、等待中子通量水平稳定,待倍增周期大于2000秒;
所述倍增周期为反应堆中子通量水平增长为原来一倍所需要的时间;
步骤四、采集t时刻反应堆的中子通量水平n(t),采用当前反应堆物理量x(t),根据上一时刻的(n(t-1),x(t-1))与当前(n(t),x(t))进行临界外推计算,获取外推临界参数
步骤五、判断临界状态;
当x(t)=xc时,表示临界;
反应堆达临界过程中,当x(t)≠xc时,返回步骤二,通过提棒或稀释,直到临界,停止稀释或提棒;
反应堆装卸过程中,当完成一步装卸料后,返回步骤二,当x(t)<xc,方可进行下一步装卸料操作,直到装卸料结束。
步骤四中所述反应堆物理量x(t)包括棒位、稀释水量或者燃料元件数目。
Claims (3)
1.一种核反应堆临界过程控制方法,其特征在于:依次包括以下步骤:
步骤一、在引入反应性变化前,测量反应堆中子通量水平;
采集m次独立的中子通量水平ni,求作为参考中子通量的平均水平n0;
步骤二、通过提棒、稀释或者装卸料,向反应堆引入反应性变化;
步骤三、等待中子通量水平稳定,待倍增周期大于2000秒;
步骤四、采集t时刻反应堆的中子通量水平n(t),采用当前反应堆物理量x(t),根据上一时刻的(n(t-1),x(t-1))与当前(n(t),x(t))进行临界外推计算,获取外推临界参数
步骤五、判断临界状态;
当x(t)=xc时,表示临界;
反应堆达临界过程中,当x(t)≠xc时,返回步骤二,通过提棒或稀释,直到临界,停止稀释或提棒;
反应堆装卸过程中,当完成一步装卸料后,返回步骤二,当x(t)<xc,方可进行下一步装卸料操作,直到装卸料结束。
2.按照权利要求1所述的核反应堆临界过程控制方法,其特征在于:所述倍增周期为反应堆中子通量水平增长为原来一倍所需要的时间。
3.按照权利要求2所述的核反应堆临界过程控制方法,其特征在于:步骤四中所述反应堆物理量x(t)包括棒位、稀释水量或者燃料元件数目。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410808460.7A CN105788666A (zh) | 2014-12-23 | 2014-12-23 | 一种核反应堆临界过程控制方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410808460.7A CN105788666A (zh) | 2014-12-23 | 2014-12-23 | 一种核反应堆临界过程控制方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105788666A true CN105788666A (zh) | 2016-07-20 |
Family
ID=56386454
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410808460.7A Pending CN105788666A (zh) | 2014-12-23 | 2014-12-23 | 一种核反应堆临界过程控制方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105788666A (zh) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107122545A (zh) * | 2017-04-27 | 2017-09-01 | 西安交通大学 | 一种精确计算核反应堆内时空中子分布的方法 |
CN107122534A (zh) * | 2017-04-18 | 2017-09-01 | 中广核研究院有限公司 | 一种核反应堆功率倍增周期计算方法及装置 |
CN107146641A (zh) * | 2017-05-11 | 2017-09-08 | 中国科学院近代物理研究所 | 核能***和控制核能***的方法 |
CN109741838A (zh) * | 2019-02-01 | 2019-05-10 | 中国原子能科学研究院 | 反中子阱型研究堆首次临界方法 |
CN110033871A (zh) * | 2019-03-14 | 2019-07-19 | 广东核电合营有限公司 | 一种百万千瓦级核电站的压水反应堆首次临界的控制方法 |
CN111554418A (zh) * | 2020-05-18 | 2020-08-18 | 中国核动力研究设计院 | 一种核反应堆外推临界方法 |
CN113345605A (zh) * | 2021-04-29 | 2021-09-03 | 广西防城港核电有限公司 | 核反应堆换料启动快速达临界控制方法 |
CN117198573A (zh) * | 2023-11-07 | 2023-12-08 | 福建福清核电有限公司 | 堆芯次临界度的修正方法、堆芯次临界刻棒方法及装置 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH06331773A (ja) * | 1993-05-21 | 1994-12-02 | Hitachi Ltd | 原子炉起動方法 |
CN101105986A (zh) * | 2007-08-03 | 2008-01-16 | 蔡光明 | 反应堆反应性测量方法 |
CN101162455A (zh) * | 2006-10-13 | 2008-04-16 | 核电秦山联营有限公司 | 核反应堆达临界状态模拟方法 |
CN101252026A (zh) * | 2008-03-25 | 2008-08-27 | 蔡光明 | 反应堆中子源和伽马噪声测量法 |
WO2010074788A2 (en) * | 2008-12-11 | 2010-07-01 | Westinghouse Electric Company Llc | Subcritical reactivity measurement method |
CN102306508A (zh) * | 2011-09-07 | 2012-01-04 | 中国核动力研究设计院 | 可用于反应堆临界监督和临界外推的反应性仪 |
-
2014
- 2014-12-23 CN CN201410808460.7A patent/CN105788666A/zh active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH06331773A (ja) * | 1993-05-21 | 1994-12-02 | Hitachi Ltd | 原子炉起動方法 |
CN101162455A (zh) * | 2006-10-13 | 2008-04-16 | 核电秦山联营有限公司 | 核反应堆达临界状态模拟方法 |
CN101105986A (zh) * | 2007-08-03 | 2008-01-16 | 蔡光明 | 反应堆反应性测量方法 |
CN101252026A (zh) * | 2008-03-25 | 2008-08-27 | 蔡光明 | 反应堆中子源和伽马噪声测量法 |
WO2010074788A2 (en) * | 2008-12-11 | 2010-07-01 | Westinghouse Electric Company Llc | Subcritical reactivity measurement method |
CN102306508A (zh) * | 2011-09-07 | 2012-01-04 | 中国核动力研究设计院 | 可用于反应堆临界监督和临界外推的反应性仪 |
Non-Patent Citations (2)
Title |
---|
代前进 等: "压水反应堆达临界的外推修正", 《核动力工程》 * |
杨兰和 等: "《核电厂物理热工》", 31 March 2012, 中国原子能出版社 * |
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107122534A (zh) * | 2017-04-18 | 2017-09-01 | 中广核研究院有限公司 | 一种核反应堆功率倍增周期计算方法及装置 |
CN107122545B (zh) * | 2017-04-27 | 2020-08-04 | 西安交通大学 | 一种精确计算核反应堆内时空中子分布的方法 |
CN107122545A (zh) * | 2017-04-27 | 2017-09-01 | 西安交通大学 | 一种精确计算核反应堆内时空中子分布的方法 |
CN107146641A (zh) * | 2017-05-11 | 2017-09-08 | 中国科学院近代物理研究所 | 核能***和控制核能***的方法 |
CN109741838A (zh) * | 2019-02-01 | 2019-05-10 | 中国原子能科学研究院 | 反中子阱型研究堆首次临界方法 |
CN109741838B (zh) * | 2019-02-01 | 2019-12-20 | 中国原子能科学研究院 | 反中子阱型研究堆首次临界方法 |
CN110033871A (zh) * | 2019-03-14 | 2019-07-19 | 广东核电合营有限公司 | 一种百万千瓦级核电站的压水反应堆首次临界的控制方法 |
CN110033871B (zh) * | 2019-03-14 | 2020-11-24 | 广东核电合营有限公司 | 一种百万千瓦级核电站的压水反应堆首次临界的控制方法 |
CN111554418A (zh) * | 2020-05-18 | 2020-08-18 | 中国核动力研究设计院 | 一种核反应堆外推临界方法 |
CN111554418B (zh) * | 2020-05-18 | 2022-04-29 | 中国核动力研究设计院 | 一种核反应堆外推临界方法 |
CN113345605A (zh) * | 2021-04-29 | 2021-09-03 | 广西防城港核电有限公司 | 核反应堆换料启动快速达临界控制方法 |
CN117198573A (zh) * | 2023-11-07 | 2023-12-08 | 福建福清核电有限公司 | 堆芯次临界度的修正方法、堆芯次临界刻棒方法及装置 |
CN117198573B (zh) * | 2023-11-07 | 2024-03-01 | 福建福清核电有限公司 | 堆芯次临界度的修正方法、堆芯次临界刻棒方法及装置 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105788666A (zh) | 一种核反应堆临界过程控制方法 | |
CN101105986B (zh) | 反应堆反应性测量方法 | |
CN104934083A (zh) | 一种测量缓发中子有效份额的方法 | |
CN106782710A (zh) | 一种反应堆测瞬发中子衰减参数的数据处理方法 | |
CN111751866A (zh) | 基于中子符合计数的溶液***钚浓度估算方法及监测*** | |
Evans et al. | A new fast neutron collar for safeguards inspection measurements of fresh low enriched uranium fuel assemblies containing burnable poison rods | |
CN101252026B (zh) | 反应堆中子源和伽马噪声测量法 | |
CN104898151A (zh) | 一种海水中去钾总β放射性核素活度浓度的测定方法 | |
CN109192341A (zh) | 基于三维时空动力学的大反应性测量方法 | |
CN104898155A (zh) | 一种基于中子平均能量的次临界***次临界度测量方法 | |
CN108828651B (zh) | 一种废包壳中铀钚含量的有源中子分析方法 | |
Naymushin et al. | Features of fuel burnup calculations for IRT-T reactor using MCU-PTR code | |
CN102799792B (zh) | 一种反应堆反应性测量值的死时间修正方法 | |
Cao et al. | MCNPX Monte Carlo burnup simulations of the isotope correlation experiments in the NPP Obrigheim | |
CN105185421A (zh) | 堆芯燃料组件清洁度的检测方法 | |
Bultot et al. | Zinc effect on the primary circuit contamination of a Belgian PWR using the OSCAR V1. 3 code | |
Landsberger et al. | Monitoring of neutron flux changes in short-lived neutron activation analysis | |
RU2243603C2 (ru) | Способ определения эффективности стержней регулирования реакторной установки | |
US20240134073A1 (en) | Real-Tune Change Detection Monitoring Using Isotopic Ratio Signatures | |
RU2457558C1 (ru) | Способ измерения расхода теплоносителя первого контура ядерного реактора | |
Gonnelli et al. | An alternative experimental approach for subcritical configurations of the IPEN/MB-01 nuclear reactor | |
Růčka et al. | Physical startup tests calculations for Dukovany NPP using MOBY-DICK macrocode | |
Hoogerheide | Measuring the Neutron Lifetime | |
Hughes et al. | Evaluation of statistical control charts for on-line radiation monitoring | |
Esch | Temperature Dependence of the Neutron Transport Cross Section in Polyethylene and Paraffin |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20160720 |
|
RJ01 | Rejection of invention patent application after publication |