CN105780925B CN201610205060.6A CN201610205060A CN105780925B CN 105780925 B CN105780925 B CN 105780925B CN 201610205060 A CN201610205060 A CN 201610205060A CN 105780925 B CN105780925 B CN 105780925B
Authority
CN
China
Prior art keywords
truss
hanging
combined system
column
construction method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201610205060.6A
Other languages
Chinese (zh)
Other versions
CN105780925A (en
Inventor
赵宇新
赵娜
王红媛
任书华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction First Group Corp Ltd
China Construction First Division Steel Structure Engineering Co Ltd
Original Assignee
China Construction First Group Corp Ltd
China Construction First Division Steel Structure Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction First Group Corp Ltd, China Construction First Division Steel Structure Engineering Co Ltd filed Critical China Construction First Group Corp Ltd
Priority to CN201610205060.6A priority Critical patent/CN105780925B/en
Publication of CN105780925A publication Critical patent/CN105780925A/en
Application granted granted Critical
Publication of CN105780925B publication Critical patent/CN105780925B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/342Structures covering a large free area, whether open-sided or not, e.g. hangars, halls
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/34Extraordinary structures, e.g. with suspended or cantilever parts supported by masts or tower-like structures enclosing elevators or stairs; Features relating to the elastic stability

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention relates to a truss-hanging combined system installation and construction method, and belongs to the technical field of construction of building steel structures. The method comprises the following steps: step 1, mounting a support column; fixedly installing support columns on a support surface at the bottom of the original building structure at intervals along a straight line; step 2, installing a hanging structure; firstly, fixedly mounting a hanging structural beam on the top end of a support column; two ends of the hanging structure beam are respectively connected with two ends of the original building structure; then mounting the hanging structural column on the hanging structural beam; step 3, installing a truss; firstly, mounting a truss lower chord on a hanging structural column by taking the hanging structural column as a support; then installing the web members of the truss; finally, installing the truss upper chord member on the web member; and 4, dismantling the support columns, and respectively connecting the two ends of the hanging structure beam with the two ends of the original building structure. By the method, a scaffold supporting system is not required to be erected when the truss-hanging combined system is installed, so that the construction efficiency can be improved, and the construction period of a steel structure on site can be effectively shortened.

Description

A kind of truss-hanging combined system construction method of installation
Technical field
The invention belongs to construction steel structure technical field of construction, are installed more particularly to a kind of truss-hanging combined system Construction method.
Background technology
The moulding of space truss structure is abundant, it is succinct it is smooth, rod piece is few, materials economy, be rectangle plane long span building Object is (such as:Exhibition center, boarding lounge, gymnasium etc.) in a kind of ideal structure type selecting.Its advantages of is and truss structural phase Than lateral stability and torsion stiffness all improve a lot;And compared with space grid structure, rod piece arranges that quantity is few, knot Structure is simple, not only makes one to feel that roof truss is lighter and handier, and cost relative moderate.
With the development of construction industry, truss structural design towards large span, big section, varied cross section trend development.By Big in truss and volume, weight, component whole Transporting is difficult, is usually taken by factory process rod piece, it is assembled that scene carries out truss Method.
Large span steel truss structure is prevalent in structural steelwork, and is set up below truss and set hanging structure.It is this The setting common construction method of hanging structure is all first to install the steel truss frame system on top, then install hanging for lower part below steel truss Hanging hang structure.This construction method has a defect that the steel truss frame system on installation top needs to install corresponding scaffold support System, the hanging structure in installation lower part are also required to install corresponding scaffold support system, and entire work progress needs a large amount of Scaffold support system.
Invention content
Technical problem to be solved by the invention is to provide truss-hanging combined system construction methods of installation, and this method is not Need a large amount of scaffold support system that truss-hanging combined system installation can be completed.
The technical solution that the present invention solves above-mentioned technical problem is as follows:A kind of truss-hanging combined system installation side Method includes the following steps for truss-hanging combined system to be installed to original building structure:
Step 1, support column is installed;Support column is fixedly installed to the supporting surface of original building structural base along linear interval;
Step 2, hanging structure is installed;Hanging structure beam is fixedly mounted on support top end first;Hanging structure beam Both ends are attached with original building structure both ends respectively;Then hanging structure column is mounted on hanging structure beam;
Step 3, truss is installed;It is first that truss lower boom is mounted on hanging structure column by support with hanging structure column; Then the web member of truss is installed;Finally pricncipal rafter is mounted on web member;
Step 4, support column is removed;Support column is unloaded, and by the both ends of hanging structure beam respectively with original building structure two End is fixedly connected.
Present invention truss as described above-hanging combined system construction method of installation, further, the web member packet of the truss Include diagonal web member and vertical web rod.
Present invention truss as described above-hanging combined system construction method of installation, further, hanging structure column is in purlin The underface of frame vertical web rod.
Present invention truss as described above-hanging combined system construction method of installation, further, every support column drawing set cable Wind rope, installation contact bar between adjacent supports column.
Present invention truss as described above-hanging combined system construction method of installation, further, truss-hanging assembly The distance of supporting surface of the system apart from original building structural base is no more than 30 meters.
Present invention truss as described above-hanging combined system construction method of installation, further, the truss are steel truss Frame;The support column is bracing members column.
The beneficial effects of the invention are as follows:
The present invention has broken conventional construction method, uses contrary sequence method.Hanging knot is installed first with temporary steel support Structure recycles hanging structure to be formed by system with temporary steel branch system and is supported as the installation of truss, installed to truss, After waiting for that truss installa-tion is completed, temporary support is unloaded, the conversion of power is completed, finally carries out the welding of hanging structure.Utilize this Truss-hanging combined system is installed to original building structure by inventive method, without being installed when installing truss-hanging combined system Construction efficiency can be improved in scaffold support system, effective to shorten the steel construction site operation duration.
Description of the drawings
Fig. 1 is a kind of truss-hanging combined system construction method of installation flow chart of the present invention;
Fig. 2 is a kind of support column installation process schematic diagram provided in an embodiment of the present invention;
Fig. 3 is a kind of hanging structure beam installation process schematic diagram provided in an embodiment of the present invention;
Fig. 4 is a kind of hanging structure column installation process schematic diagram provided in an embodiment of the present invention;
Fig. 5 is a kind of truss lower boom installation process schematic diagram provided in an embodiment of the present invention;
Fig. 6 is a kind of web member installation process schematic diagram provided in an embodiment of the present invention;
Fig. 7 is a kind of pricncipal rafter installation process schematic diagram provided in an embodiment of the present invention;
Fig. 8 is a kind of support column uninstall process schematic diagram provided in an embodiment of the present invention.
In attached drawing, parts list represented by the reference numerals are as follows:
1, support column, 11, cable wind rope, 12, contact bar, 2, hanging structure beam, 3, hanging structure column, 4, truss lower boom, 5, vertical web rod, 6, diagonal web member, 7, pricncipal rafter, 8, the supporting surface of original building structural base.
Specific implementation mode
Large span steel truss structure is prevalent in structural steelwork, and is set up below truss and set hanging structure.It is this The setting common construction method of hanging structure is all first to install the steel truss frame system on top, then install hanging for lower part below steel truss Hanging hang structure.The present invention has broken conventional construction method, uses contrary sequence method.Hanging knot is installed first with temporary steel support Structure recycles hanging structure to be formed by system with temporary steel branch system and is supported as the installation of truss, installed to truss, After waiting for that truss installa-tion is completed, temporary support is unloaded, the conversion of power is completed, finally carries out the welding of hanging structure.
The principle and features of the present invention will be described below with reference to the accompanying drawings, and the given examples are served only to explain the present invention, and It is non-to be used to limit the scope of the present invention.
As shown in Figure 1, being a kind of truss-hanging combined system construction method of installation flow provided in an embodiment of the present invention Figure, this method are used to truss-hanging combined system being installed to original building structure, include the following steps:
Step 1, support column is installed;Support column 1 is fixedly installed to the supporting surface of original building structural base along linear interval 8;The effect of support column is to provide the temporary support of top truss installa-tion process, until truss installa-tion finishes;Truss welding finishes Temporary support when unloading is provided afterwards.As shown in Figure 2.
Step 2, hanging structure is installed;Hanging structure beam 2 is fixedly mounted on support top end first;Hanging structure beam Both ends are attached with original building structure both ends respectively;Then hanging structure column 3 is mounted on hanging structure beam 2;Such as Fig. 3 and Shown in Fig. 4.
Step 3, truss is installed;It is first that truss lower boom 4 is mounted on hanging structure column 3 by support with hanging structure column On;Then the web member of truss is installed, the web member of the truss includes diagonal web member 6 and vertical web rod 5;Finally pricncipal rafter 7 is pacified On web member;As shown in Fig. 5, Fig. 6 and Fig. 7.
Step 4, support column is removed;Support column is unloaded, and by the both ends of hanging structure beam 2 respectively with original building structure two End is fixedly connected.As shown in Figure 8.
Truss-hanging combined system is installed to original building structure using the above embodiment of the present invention method, without pacifying Scaffold support system is installed when filling truss-hanging combined system, construction efficiency can be improved, effective steel construction scene of shortening is applied The work duration.
In the application process of truss-hanging combined system construction method of installation described in as above embodiment of the invention, in order to The stability for further increasing support force suffered by truss structure, is further improved the above method, and hanging structure column 3 is in truss The underface of vertical web rod 5.
In the application process of truss-hanging combined system construction method of installation described in as above embodiment of the invention, in order to The stability for further increasing support column support, is further improved the above method, and the every drawing of support column 1 sets cable wind rope 11, phase Installation contact bar 12 between adjacent support column 1.By the setting of cable wind rope 11 and contact bar 12, make support column and original building structure bottom The connection of the supporting surface in portion is more firm, and more firm temporary support is provided for truss-hanging combined system.
In the application process of truss-hanging combined system construction method of installation described in as above embodiment of the invention, truss- The distance for hanging supporting surface of the combined system apart from original building structural base is no more than 30 meters.
It is described in the application process of truss-hanging combined system construction method of installation described in as above embodiment of the invention Truss is steel truss, and the truss of other materials can be used for the present invention, be not particularly limited in embodiments of the present invention;It is described Support column is bracing members column, and the support column of other materials can be used for the present invention, not do specific limit in embodiments of the present invention System.
The foregoing is merely presently preferred embodiments of the present invention, is not intended to limit the invention, it is all the present invention spirit and Within principle, any modification, equivalent replacement, improvement and so on should all be included in the protection scope of the present invention.

Claims (6)

1. a kind of truss-hanging combined system construction method of installation, for truss-hanging combined system to be installed to original building knot Structure, which is characterized in that include the following steps:
Step 1, support column is installed;Support column is fixedly installed to the supporting surface of original building structural base along linear interval;
Step 2, hanging structure is installed;Hanging structure beam is fixedly mounted on support top end first;The both ends of hanging structure beam It is attached respectively with original building structure both ends;Then hanging structure column is mounted on hanging structure beam;
Step 3, truss is installed;It is first that truss lower boom is mounted on hanging structure column by support with hanging structure column;Then The web member of truss is installed;Finally pricncipal rafter is mounted on web member;
Step 4, support column is removed;Support column is unloaded, and by the both ends of hanging structure beam respectively with original building structure both ends into Row is fixedly connected.
2. truss according to claim 1-hanging combined system construction method of installation, which is characterized in that the truss Web member includes diagonal web member and vertical web rod.
3. truss according to claim 2-hanging combined system construction method of installation, which is characterized in that hanging structure column In the underface of truss vertical web rod.
4. according to claim 1-3 any one of them truss-hanging combined system construction method of installation, which is characterized in that every The drawing of root support column sets cable wind rope, and contact bar is installed between adjacent supports column.
5. according to claim 1-3 any one of them truss-hanging combined system construction method of installation, which is characterized in that purlin The distance of frame-supporting surface of the hanging combined system apart from original building structural base is no more than 30 meters.
6. truss according to claim 1-hanging combined system construction method of installation, which is characterized in that the truss is Steel truss;The support column is bracing members column.
CN201610205060.6A 2016-04-05 2016-04-05 Truss-hanging combined system installation construction method Expired - Fee Related CN105780925B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610205060.6A CN105780925B (en) 2016-04-05 2016-04-05 Truss-hanging combined system installation construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610205060.6A CN105780925B (en) 2016-04-05 2016-04-05 Truss-hanging combined system installation construction method

Publications (2)

Publication Number Publication Date
CN105780925A CN105780925A (en) 2016-07-20
CN105780925B true CN105780925B (en) 2018-08-10

Family

ID=56394721

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610205060.6A Expired - Fee Related CN105780925B (en) 2016-04-05 2016-04-05 Truss-hanging combined system installation construction method

Country Status (1)

Country Link
CN (1) CN105780925B (en)

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106436890B (en) * 2016-08-30 2019-01-22 江苏嘉洋华联建筑装饰股份有限公司 A kind of interim conversion layer being arranged on flooring
CN106759909B (en) * 2016-12-15 2019-05-31 中建城市建设发展有限公司 Bearing structure system and its construction method are hung up under one kind
CN108343157A (en) * 2018-01-22 2018-07-31 燕山大学 Inverse construction method for steel truss conversion layer Construction control
CN109829239A (en) * 2019-02-16 2019-05-31 中建一局集团第一建筑有限公司 steel pipe truss simulation pre-assembly construction method based on three-dimensional software
CN110107095B (en) * 2019-04-30 2021-01-01 中国建筑第八工程局有限公司 Mounting method of high-altitude large-span steel truss
CN110359548A (en) * 2019-07-18 2019-10-22 合肥工业大学 A kind of steel truss suspension hybrid system and construction method
CN112252733A (en) * 2020-09-07 2021-01-22 广东省工业设备安装有限公司 Method for installing hanging steel structure
CN113513174B (en) * 2021-04-27 2022-04-22 北京建工集团有限责任公司 Inverse installation method for steel truss hanging type structure
CN114319885B (en) * 2022-01-14 2023-11-07 中建钢构天津有限公司 Truss installation method
CN115110640B (en) * 2022-04-21 2023-04-04 中建二局安装工程有限公司 Method for installing circular ring steel truss of experimental building

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3848758B2 (en) * 1997-10-06 2006-11-22 宮地建設工業株式会社 Construction method for direct suspension of structures
CN101200916B (en) * 2007-11-29 2010-09-08 浙江精工钢结构有限公司 Construction method of prestressed suspension type building structure
CN201614738U (en) * 2009-10-30 2010-10-27 华南理工大学 Support device for mould board assembly of steel reinforced concrete transfer beams
CN103628680B (en) * 2013-11-15 2015-09-16 天津三建建筑工程有限公司 Large steel space truss hanging layer construction method
CN103669832B (en) * 2013-12-13 2016-06-29 中建三局第一建设工程有限责任公司 A kind of standard type Bailey bracket assembled jacking formwork system

Also Published As

Publication number Publication date
CN105780925A (en) 2016-07-20

Similar Documents

Publication Publication Date Title
CN105780925B (en) Truss-hanging combined system installation construction method
CN108560719B (en) Supporting and mounting method for super-large-span double-layer bidirectional suspension cable structure
CN103935911B (en) Tower crane attached wall supporting construction and construction method thereof
CN109138454A (en) A kind of installation method of super high-rise building outline border bandy truss
CN105442839A (en) Erecting method of cantilever structure formwork bent
CN105804400A (en) Curved surface net frame lifting construction method
CN108729640B (en) Mounting method of cantilever plate of assembled building
CN205777580U (en) Automatic lifting type discharging platform
CN105040591A (en) Positioning device for waveform steel web and positioning method thereof
CN110318344B (en) Novel steel box girder No. 0 block support and No. 0 block erection construction method
CN210134357U (en) Pi-shaped bracket for construction of upper cross beam of H-shaped cable tower
CN104060841A (en) Large-span steel girder installation construction method
CN108952207B (en) Steel structure building storey adding structure and storey adding method
CN106337564A (en) Unstayed construction method for high-altitude oversized cantilever steel structure
CN202899639U (en) Concrete column structure
CN203559570U (en) Operating platform for steel pipe support frame overhung on surrounding columns
CN206753087U (en) A kind of lighting roof operating platform structure
CN204225503U (en) Large span steel truss high altitude bulk conversion beam moulding bed
CN209941512U (en) Supporting shear part for lower cross beam of inclined tower of cable-stayed bridge
CN114439253A (en) Hanging construction method for wrapping concrete on peripheral part of steel beam
CN113737661A (en) Construction method for steel-concrete combined section of tower base of cable-stayed bridge
CN210289112U (en) Through type support template system
CN202790959U (en) Steel pipe truss structure based on aloft lateral support
CN203225074U (en) Advertising board of net rack structure
CN203080988U (en) Umbrella-shaped standard processing shed

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180810

Termination date: 20200405