CN105762702B - The method of replacing ± 800kV DC power transmission line L insulator strings - Google Patents

The method of replacing ± 800kV DC power transmission line L insulator strings Download PDF

Info

Publication number
CN105762702B
CN105762702B CN201610201317.0A CN201610201317A CN105762702B CN 105762702 B CN105762702 B CN 105762702B CN 201610201317 A CN201610201317 A CN 201610201317A CN 105762702 B CN105762702 B CN 105762702B
Authority
CN
China
Prior art keywords
electrician
rope
transmission rope
transmission
insulator chain
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610201317.0A
Other languages
Chinese (zh)
Other versions
CN105762702A (en
Inventor
李昌甫
吴正树
陆文叁
王剑坤
刘宝龙
樊长海
黄荣海
潘有志
杨耀祖
陈鹏康
韦海效
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanning Bureau of Extra High Voltage Power Transmission Co
Original Assignee
Nanning Bureau of Extra High Voltage Power Transmission Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanning Bureau of Extra High Voltage Power Transmission Co filed Critical Nanning Bureau of Extra High Voltage Power Transmission Co
Priority to CN201610201317.0A priority Critical patent/CN105762702B/en
Publication of CN105762702A publication Critical patent/CN105762702A/en
Application granted granted Critical
Publication of CN105762702B publication Critical patent/CN105762702B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/02Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables

Landscapes

  • Electric Cable Installation (AREA)

Abstract

The method of replacing ± 800kV DC power transmission line L insulator strings, hydraulic pressure silk tool is replaced using double gearing leading screws, eliminate the drawbacks of hydraulic screw rod oil leak is stuck, and dexterously utilize the spatial relation of transmission rope, complete the replacing of transmission rope hanging point, manpower and materials are made full use of, the replacing to L insulator strings is realized.In addition, the present invention is braked using 8 subrings, manpower is reduced, it is flexibly practical.

Description

The method of replacing ± 800kV DC power transmission line L insulator strings
Technical field
The invention mainly relates to replacing insulator string technical field, more particularly to a kind of replacing ± 800kV DC transmission lines The method of road L insulator strings.
Background technology
The general emigrant's direct currents of ± 800kV are the circuits that Southern Power Grid Company puts into operation for 2014, and its load is big, is related to area extensively, no Allow unplanned property stoppage in transit occur, therefore when damaged, aging or other abnormal conditions occurs in composite insulation substring, need to take The mode of livewire work is changed.But circuit time of putting into operation is short, and the corresponding general emigrant's direct current transportation of replacing ± 800kV is not found Circuit L insulator string operational methods.
The content of the invention
The present invention provides a kind of method of replacing ± 800kV DC power transmission line L insulator strings, can be completed using this method The work of the general emigrant's direct current L insulator strings of charged for replacement ± 800kV, eliminate causes circuit abnormal running because insulator is abnormal Possibility, improve the safe and stable operation reliability of circuit.
The technical solution adopted in the present invention is:
The method of replacing ± 800kV DC power transmission line L insulator strings, comprises the following steps:
1) Work tool is prepared:Prepare first transmission rope, second transmission rope, hanging basket, electric potential transferring stick, the 3rd corner block, Tower head end T connector, the first pair of gearing leading screw, the first suspension rod, conductor wire end are T-shaped, second pair of gearing screw mandrel, second hang Bar, the first electrodeless rope sling, the one 8 subring, the first shackle, the second electrodeless rope sling, the 2nd 8 subring, the second shackle, the 3rd continuous rope Set;
2) the upper tower of the first electrician:First electrician carries the first transmission rope and climbs up steel tower, and the first transmission rope is hung over into steel tower On;Ground electrician is using the first transmission rope by the second upper tower of transmission rope transmission, and the second transmission rope is hung over steel tower by the first electrician On cross-arm;
3) the second electrician climbs up the conductor wire end of insulator chain to be replaced:Ground electrician connects on the first transmission rope and hung Basket;Second electrician is seated in hanging basket, and by the use of the second transmission rope as backup protection rope, using the first transmission rope lifting hanging basket, Second electrician is transported to the conductor wire end of insulator chain to be replaced, it is laggard that the second electrician completes potential transfer using electric potential transferring stick Enter the conductor wire end, while pulling down hanging basket;
4) conducting wire end corner block:5T the 3rd corner block is fixed on insulator chain to be replaced and led by the second electrician On the yoke plate of line end;
5) hanging point position of the transmission of transfer first rope:First electrician carries the first transmission rope and reaches insulator chain to be replaced Hanging point position, and the first transmission rope is fixed on the hanging point position of insulator chain to be replaced;
6) the second transmission rope penetrates the 3rd corner block:Second electrician penetrates the second transmission rope in the 3rd corner block;
7) assembling tool:Ground electrician is by tower head end T connector, the first pair of gearing leading screw, the first suspension rod and wire End T connector is in turn connected into first group of instrument, then the second suspension rod and second pair of gearing leading screw are in turn connected into second Group instrument;
8) upload and first and second group of instrument is installed:Ground electrician transmits first pair of gearing leading screw of colligation of restricting with first, With the second transmission rope colligation conductor wire end T connector, pull the first transmission rope that first pair of gearing leading screw is passed into the first electricity Work, the first electrician constructs the yoke plate that tower head end T connector is fixed on insulator chain tower head end to be replaced hole site, then lifts the Conductor wire end T connector is passed to the second electrician by two transmission ropes, and the conductor wire end T connector is fixed on to be replaced exhausted by the second electrician The yoke plate construction hole site of edge substring conductor wire end;Ground electrician transmits the free end for the suspension rod of colligation second of restricting with first, with second Transmission rope second pair of gearing leading screw of colligation, pulls the first transmission rope that the free end of the second suspension rod is passed into the first electrician, The free end of second suspension rod is connected in place by the first electrician with tower head end T connector, and second pair is driven by the transmission rope of lifting second Mechanical leading screw passes to the second electrician, and second pair of gearing leading screw is connected in place by the second electrician with conductor wire end T connector;
9) leading screw is tightened up:First electrician tightens up first pair of gearing leading screw, and the second electrician tightens up second pair of gearing Leading screw, the pulling force for bearing insulator chain to be replaced is transferred on first and second group of instrument;
10) the 3rd corner block hanging point is shifted:Second electrician is by the hanging point of the 3rd corner block by insulator chain to be replaced On yoke plate position transfer to the wire of conductor wire end, the 3rd corner block is hung on wire by the first continuous rope set so that passed through Second transmission rope can apply the power that insulator chain conductor wire end to be replaced is pulled to the insulator chain conductor wire end connection gold utensil to be replaced;
11) colligation and insulator chain is dismantled:First electrician utilizes the first tower head for transmitting rope colligation insulator chain to be replaced End, the second electrician utilizes the second conductor wire end for transmitting rope colligation insulator chain to be replaced;The second transmission rope is pulled to cause to be replaced The gold utensil of insulator chain conductor wire end is loose, and the second electrician takes out insulator chain wire terminal bolt to be replaced, and then ground electrician will The tail rope part of second transmission rope bypasses the one 8 subring, the one 8 subring pass sequentially through the first shackle, the second electrodeless rope sling with The tower leg connection of steel tower, is restricted using the transmission of the one 8 subring braking second;Pulling first to transmit rope makes insulator chain tower head to be replaced The gold utensil at end is loose, and the first electrician takes out insulator chain tower head terminal bolt to be replaced, is passed while loosening the first transmission rope and second Rope is passed, insulator chain to be replaced is put to ground;
12) insulator chain is changed:Ground electrician unties the first transmission rope and the second transmission rope on insulator chain to be replaced, And the tower head end for the new insulator chain of colligation of being restricted with the first transmission, the conductor wire end for the new insulator chain of colligation of being restricted with the second transmission;
13) it is lifted up and new insulator chain is installed:The first transmission rope is pulled to make the new insulation to lift new insulator chain The tower head end of substring reaches ground electrician in the mount point at the new insulator chain tower head end, lifting process and utilizes the second transmission rope control New insulator chain is made, new insulator chain is not encountered wire, when the tower head end of the new insulator chain reaches the new insulator chain After the mount point at tower head end, the first electrician is with tower head terminal bolt through the tower head end of the new insulator chain with by the new insulator chain On steel tower, the second transmission rope is pulled to lift new insulator chain to the mount point of the new insulator chain conductor wire end, then The conductor wire end of the new insulator chain is arranged in conductor wire end by the second electrician with wire terminal bolt;
14) first and second group of instrument is removed:First electrician is with the first transmission rope connection by first group of instrument, second group of instrument The tower head end of the solid tool of composition, the second electrician connects the conductor wire end of the solid tool with the second transmission rope, then loosens the A pair of gearing leading screw, second pair of gearing leading screw, make first pair of gearing leading screw, second pair of gearing leading screw by Power is transferred to new insulator chain stress;Ground electrician restricts the first transmission, the second transmission rope is rotating around being connected on the one 8 subring, the In 28 subrings, the one 8 subring is connected by the tower leg of the first shackle, the second electrodeless rope sling and steel tower, and the 2nd 8 subring passes through the Two shackles, the tower leg connection of the 3rd electrodeless rope sling and steel tower;Slowly loosen the first transmission rope and the 2nd 8 in the one 8 subring again The second transmission rope in subring, makes the solid tool slowly put to ground;
15) tower under the second electrician:First electrician hangs the hanging point position that the first transmission rope is carried to the second transmission rope, the After two electricians check conductor wire end without legacy, hanging basket is connected to the first transmission rope, back-up protection is used as by the use of the second transmission rope First transmission rope is connected on tower leg by rope, ground staff by the one 8 subring, the first shackle, the second electrodeless rope sling, by second Transmission rope be connected to by the 2nd 8 subring, the second shackle, the 3rd electrodeless rope sling on tower leg, then slowly loosen the first transmission rope with The tail rope of second transmission rope, makes hanging basket drop to ground;
16) transmission of decentralization second rope:After hanging basket landing, the first electrician is slowly put the second transmission rope using the first transmission rope To ground;
17) tower under the first electrician:After first electrician is checked on tower without legacy, the first lower tower of transmission rope is carried.
The work of the general emigrant's direct current L insulator strings of charged for replacement ± 800kV, safe operation, letter can be completed using the above method Single, can quickly eliminate causes the possibility of circuit abnormal running because insulator is abnormal, improves the safe and stable operation of circuit Reliability.
Preferably, connected on the first transmission rope on the first corner block, the second transmission rope and connect the second corner block, in step It is rapid 4) and step 5) between comprise the following steps:
I) hanging point position of the transmission of conversion second rope:Second transmission rope is hung over the by the first electrician together with the second corner block On one transmission rope, the second transmission rope is transmitted to the second electrician together with the second corner block using the first transmission rope, the second electrician will Second transmission rope is bypassed together with the second corner block and hung over again after wire on the first transmission rope, and the is transmitted to using the first transmission rope One electrician, the first electrician again hangs over the second transmission rope on steel tower cross-arm;
Ii) the hanging point position of the transmission of conversion first rope:First electrician hangs over the first transmission rope together with the first corner block On second transmission rope, the first transmission rope is transmitted to the second electrician, the second electrician together with the first corner block using the second transmission rope First transmission rope is bypassed together with the first corner block and hung over again after wire on the second transmission rope, is transmitted to using the second transmission rope First electrician, the first electrician again hangs over the first transmission rope on steel tower cross-arm.
By above-mentioned steps i) and step ii) it is that can be achieved the first transmission rope, the second transmission rope by close to steel tower tower body Wire side be transferred to the wire side away from steel tower tower body, facilitate the first electrician that the first transmission is restricted, the second transmission rope fortune On the correspondence position for being sent to outside insulator chain hanging point, outside insulator chain is changed with facilitating.
To after the conductor wire end of insulator chain to be replaced on the second electrician, when the first electrician need to carry the first transmission rope, the When two transmission ropes are moved on tower, the second electrician holds the bottom of the first transmission rope and the second transmission rope, to mitigate the first electrician Heavy burden.In actual applications, the gross weight of the first transmission rope and the second transmission rope is heavier, passes through the cooperation of the second electrician, side Just the first electrician carries the first transmission rope and the second transmission rope is walked about on the cross-arm of steel tower.
What the present invention was brought has the beneficial effect that:
1st, safe operation, simple, can be rapidly completed the work of the general emigrant's direct current L insulator strings of charged for replacement ± 800kV;
2nd, rationally by the use of the construction hole of yoke plate as the strong point, the seamless connection of instrument is reached;
3rd, it is safe and reliable using double gearing leading screws, it is less prone to potential safety hazard;
4th, the ingenious spatial relation using transmission rope, completes the replacing of transmission rope hanging point;
5th, braked using 8 subrings, reduce manpower, it is more flexible.
Brief description of the drawings
Fig. 1 is the job site figure of the embodiment of the present invention;
Fig. 2 is the structural representation in the embodiment of the present invention during replacing insulator chain;
Reference:
1st, steel tower;2nd, cross-arm;3rd, insulator chain to be replaced;4th, the first electrician;5th, the second electrician;6th, wire;7th, the first nothing Pole rope sling;8th, the first transmission rope;9th, the second transmission rope;10th, the 3rd corner block;11st, tower head end T connector;12nd, first pair of biography Motivation tool leading screw;13rd, the first suspension rod;14th, conductor wire end T connector.
Embodiment
As shown in Figure 1-2, a kind of method of replacing ± 800kV DC power transmission line L insulator strings, comprises the following steps:
1) Work tool is prepared:Prepare the first transmission rope 8 (carrying the first corner block), the second transmission rope 9 and (carry second turn To coaster), hanging basket, safety belt, electric potential transferring stick, long waist rope, the 3rd corner block 10, tower head end T connector 11, first pair biography Motivation tool leading screw 12, the first suspension rod 13, conductor wire end are T-shaped, second pair of gearing screw mandrel, the second suspension rod, motor-driven grinding mill, the first nothing Pole rope sling 7, the one 8 subring, the first shackle, the second electrodeless rope sling, the 2nd 8 subring, the second shackle, the 3rd electrodeless rope sling;
2) tower on the first electrician 4:First electrician 4 carries the first transmission rope 8 and climbs up steel tower 1, and the first transmission rope 8 is hung over On steel tower 1;Ground electrician transmits the upper tower of 9 transmission of restricting by second using the first transmission rope 8, and the first electrician 4 hangs the second transmission rope 9 On the cross-arm 2 of steel tower 1;
3) on the second electrician 5 in the conductor wire end of insulator chain 3 to be replaced:Ground electrician connects on the first transmission rope 8 Hanging basket;Second electrician 5, which is accomplished fluently after safety belt, to be seated in hanging basket, and by the use of the second transmission rope 9 as backup protection rope, then by the One transmission rope 8 is connected to motor-driven grinding mill, starts the conductor wire end that the second electrician 5 is transported to insulator chain 3 to be replaced by motor-driven grinding mill, Second electrician 5 using electric potential transferring stick complete potential transfer after enter the conductor wire end, and by safety belt short rope by safety belt with The conductor wire end is connected, while pulling down hanging basket;
4) the second electrician 5 connection backup protection rope:Ground electrician is restricted using the first transmission and 8 13 meters long waist rope is passed into the One end of long waist rope is fixed on the cross-arm 2 of steel tower 1 by one electrician 4, the first electrician 4, and the second electrician 5 is by the other end of long waist rope It is connected on safety belt, receives short as far as possible, as backup protection rope, safety belt is connected with long waist rope and untied afterwards in the conductor wire end in place Safety belt short rope;
5) conducting wire end corner block:5T the 3rd corner block 10 is fixed on insulator to be replaced by the second electrician 5 Go here and there on the yoke plate of 3 conductor wire ends;
6) hanging point position of the transmission of transfer first rope 8:First electrician 4 carries the first transmission rope 8 and reaches insulator to be replaced The hanging point position of string 3, and the first transmission rope 8 is fixed on the hanging point position of insulator chain 3 to be replaced;
7) the second transmission rope 9 penetrates the 3rd corner block 10:Second transmission rope 9 is penetrated the 3rd steering cunning by the second electrician 5 In car 10;
8) assembling tool:Ground electrician is by tower head end T connector 11, first pair of gearing leading screw 12, the first suspension rod 13 First group of instrument is in turn connected into conductor wire end T connector 14, then the second suspension rod and second pair of gearing leading screw are connected successively It is connected into second group of instrument;
9) upload and first and second group of instrument is installed:Ground electrician transmits 8 colligation, first pair of gearing leading screw of restricting with first 12, with the second transmission 9 colligation conductor wire end T connectors 14 of rope, pull the first transmission rope 8 to transmit first pair of gearing leading screw 12 To the first electrician 4, tower head end T connector 11 is fixed on the yoke plate construction hole at the tower head end of insulator chain 3 to be replaced by the first electrician 4 Position, is installed in place, then lifts the second transmission rope 9 conductor wire end T connector 14 is passed into the second electrician 5, and the second electrician 5 should Conductor wire end T connector 14 is fixed on the yoke plate construction hole site of the conductor wire end of insulator chain 3 to be replaced, is installed in place;Ground electrician Restricted with the first transmission the free ends of 8 the second suspension rods of colligation, restricted 9 colligation, second pair of gearing leading screw with the second transmission, pull the The free end of second suspension rod is passed to the first electrician 4 by one transmission rope 8, and the first electrician 4 is by the free end of the second suspension rod and tower head End T connector 11 is connected in place, and second pair of gearing leading screw is passed to the second electrician 5, the second electricity by the transmission of lifting second rope 9 Second pair of gearing leading screw is connected in place with conductor wire end T connector 14;
10) leading screw is tightened up:First electrician 4 tightens up first pair of gearing leading screw 12, and the second electrician 5 tightens up second pair of transmission Mechanical leading screw, the pulling force for bearing insulator chain 3 to be replaced is transferred on first and second group of instrument;
11) hanging point of the 3rd corner block 10 is shifted:Second electrician 5 is by the hanging point of the 3rd corner block 10 by insulation to be replaced On the yoke plate position transfer of the conductor wire end of substring 3 to wire 6, wherein, the 3rd corner block 10 is hung over by the first electrodeless rope sling 7 and led On line 6 so that being restricted by the second transmission 9 can apply and the conductor wire end of insulator chain 3 to be replaced is pulled into the insulator chain 3 to be replaced led The power of line end connection gold utensil;
12) colligation and insulator chain is dismantled:First electrician 4 utilizes the first tower for transmitting rope 8 colligations insulator chain 3 to be replaced Head end, the second electrician 5 utilizes the second conductor wire end for transmitting rope 9 colligations insulator chain 3 to be replaced;Ground electrician restricts the second transmission 9 are connected to motor-driven grinding mill, because the hanging point of the 3rd corner block 10 is located on wire 6, thus can pull the by motor-driven grinding mill Two transmission ropes 9 may be such that the gold utensil of the conductor wire end of insulator chain 3 to be replaced is loose, and the second electrician 5 takes out insulator chain 3 to be replaced Wire terminal bolt, then ground electrician by second transmission restrict 9 tail rope part bypass the one 8 subring, the one 8 subring is led to successively Cross the first shackle, the second electrodeless rope sling to be connected with the tower leg of steel tower 1, then take out the second transmission rope 9 from motor-driven grinding mill, profit With the second transmission of the one 8 subring braking rope 9;First transmission rope 8 is connected to motor-driven grinding mill by ground electrician, is drawn by motor-driven grinding mill Dynamic first transmission rope 8 makes that the gold utensil at the tower head end of insulator chain 3 to be replaced is loose, and the first electrician 4 takes out the tower of insulator chain 3 to be replaced Head end bolt;Ground electrician loosens the first transmission rope 8 and the second transmission rope 9 simultaneously, insulator chain 3 to be replaced is put to ground;
13) insulator chain is changed:Ground electrician unties the first transmission rope 8 and the second transmission on insulator chain 3 to be replaced Rope 9, and with the tower head end of the first transmission rope new insulator chain of 8 colligations, with the wire of the second transmission rope new insulator chain of 9 colligations End;
14) it is lifted up and new insulator chain is installed:First transmission rope 8 is connected to motor-driven grinding mill by ground electrician, is passed through Motor-driven grinding mill pulls the first transmission rope 8 the tower head end of the new insulator chain is reached the new insulator chain to lift new insulator chain Ground electrician makes new insulator chain not using the new insulator chain of control of the second transmission rope 9 in the mount point at tower head end, lifting process Wire 6 can be encountered, after the tower head end of the new insulator chain reaches the mount point at the new insulator chain tower head end, the first electrician 4 Then loosen the through the tower head end of the new insulator chain so that the new insulator chain is arranged on steel tower 1 with tower head terminal bolt One transmission rope 8, makes the first transmission rope 8 not stress, switchs to the new insulator chain tower head end gold utensil stress;Ground electrician passes first Pass rope 8 to take out from motor-driven grinding mill, the second transmission rope 9 is connected to motor-driven grinding mill, pass through motor-driven grinding mill and pull the second transmission rope 9 To lift new insulator chain to the mount point of the new insulator chain conductor wire end, then the second electrician 5 is new by this with wire terminal bolt The conductor wire end of insulator chain is arranged in conductor wire end;
16) first and second group of instrument is removed:First electrician 4 restricts 8 connections by first group of instrument, second group of work with the first transmission Has the tower head end of the solid tool of composition, the second electrician 5 connects the conductor wire end of the solid tool, Ran Houfang with the second transmission rope 9 Loose first pair of gearing leading screw 12, second pair of gearing leading screw, make first pair of gearing leading screw 12, second pair of driver Tool leading screw stress is transferred to new insulator chain stress;First transmission is restricted the 8, second transmission rope 9 rotating around being connected on the by ground electrician In one 8 subrings, the 2nd 8 subring, the one 8 subring is connected by the first shackle, the second electrodeless rope sling with the tower leg of steel tower 1, and the 2nd 8 Subring is connected by the second shackle, the 3rd electrodeless rope sling with the tower leg of steel tower 1;First slowly loosened again in the one 8 subring passes The second transmission rope 9 in the 8 and the 2nd 8 subring of rope is passed, the solid tool is slowly put to ground;
17) 5 times towers of the second electrician:First electrician 4 hangs the hanging point position that the first transmission rope 8 is carried to the second transmission rope 9 , the second electrician 5 check conductor wire end without legacy after, hanging basket is connected to the first transmission rope 8, by the use of second transmission rope 9 as First transmission rope 8 is unloaded mouth, the second electrodeless rope sling by the one 8 subring, first and is connected to tower leg by backup protection rope, ground staff On, the second transmission is restricted and 9 mouth, the 3rd electrodeless rope sling are unloaded by the 2nd 8 subring, second is connected on tower leg, then slowly loosens the The tail rope of one transmission rope 8 and the second transmission rope 9, makes hanging basket drop to ground;
18) transmission of decentralization second rope 9:After hanging basket landing, the first electrician 4 is delayed the second transmission rope 9 using the first transmission rope 8 Slow play is to ground;
19) 4 times towers of the first electrician:First electrician 4 check tower on without legacy after, carry first transmission rope 8 times towers;
20) finishing tool:Ground electrician's finishing tool, sweeps operation field.
And in replacing ± 800kV DC power transmission line L insulator strings, insulator chain to be replaced includes inner side insulator (hanging point is arranged on the insulator in the outside of 1 cross-arm of steel tower 2 for string (i.e. close to the insulator chain of the side of steel tower 1) and outside insulator chain String), need to be by the hanging point of outside insulator chain in the outside of 1 cross-arm of steel tower 2, and in the first electricity and on the outside of replacing during insulator chain Work 4 and ground electrician pull together to transport first the 8, second transmission of transmission rope rope 9 after steel tower 1, and the first transmission rope 8, second transmits rope 9 Between the tower body for being respectively positioned on wire 6 and steel tower 1 at the beginning, the transfer to first the 8, second transmission of transmission rope rope 9 need to be completed.That is, On the outside of replacing during insulator chain, it is preferable that in step 4) and step 5) between comprise the following steps:
I) hanging point position of the transmission of conversion second rope 9:First electrician 4 transmits 9 (together with the second corner blocks) of restricting by second Hang on the first transmission rope 8, second transmission 9 (together with the second corner blocks) of rope are transmitted to the second electrician using the first transmission rope 8 5, the second transmission 9 (together with the second corner blocks) of rope are bypassed and hung over again after wire 6 on first transmission rope 8 by the second electrician 5, profit The first electrician 4 is transmitted to the first transmission rope 8, the first electrician 4 again hangs over the second transmission rope 9 on the cross-arm 2 of steel tower 1;
Ii) the hanging point position of the transmission of conversion first rope 8:First electrician 4 transmits 8 (together with the first corner blocks) of restricting by first Hang on the second transmission rope 9, first transmission 8 (together with the first corner blocks) of rope are transmitted to the second electrician using the second transmission rope 9 5, the first transmission 8 (together with the first corner blocks) of rope are bypassed and hung over again after wire 6 on second transmission rope 9 by the second electrician 5, profit The first electrician 4 is transmitted to the second transmission rope 9, the first electrician 4 again hangs over the first transmission rope 8 on the cross-arm 2 of steel tower 1.
By above-mentioned steps i) and step ii) it is that can be achieved the first transmission restricting the 8, second transmission rope 9 by close to the tower of steel tower 1 The side of wire 6 of body is transferred to the side of wire 6 away from the tower body of steel tower 1, facilitates the first electrician 4 to pass the first transmission rope 8, second Pass rope 9 to be transported on the correspondence position of outside insulator chain hanging point, to realize the replacing of outside insulator chain.
And in actual applications, first transmission rope 8 and second transmission rope 9 gross weight it is heavier, if the first electrician 4 not by External strength, it is more difficult to complete to take leading for insulator chain 3 to be replaced to respectively after rolling the first transmission rope 8 and the second transmission rope 9 Above line end hanging point and on the outside hanging point of 1 cross-arm of steel tower 2.
Moved to ensure that the first electrician 4 carries first the 8, second transmission of transmission rope rope 9 on steel tower 1, on the second electrician 5 To after the conductor wire end of insulator chain 3 to be replaced, moved up when the first electrician 4 need to carry the first transmission rope 8, second transmission rope 9 in tower When dynamic, the second electrician 5 holds the bottom of the first transmission rope 8 and the second transmission rope 9, to mitigate the heavy burden of the first electrician 4, facilitates the One electrician 4 carries the first transmission rope 8 and the second transmission rope 9 is walked about on the cross-arm 2 of steel tower 1.
Above-listed detailed description is illustrating for one of present invention possible embodiments, and the embodiment is simultaneously not used to limitation The scope of the claims of the present invention, all equivalence enforcements or change without departing from carried out by the present invention are intended to be limited solely by the scope of the claims of this case In.

Claims (3)

1. the method for replacing ± 800kV DC power transmission line L insulator strings, it is characterised in that:Comprise the following steps:
1) Work tool is prepared:Prepare the first transmission rope, the second transmission rope, hanging basket, electric potential transferring stick, the 3rd corner block, tower head Hold T-shaped T connector, the first pair of gearing leading screw, the first suspension rod, conductor wire end, the second pair of gearing screw mandrel, the second suspension rod, First electrodeless rope sling, the one 8 subring, the first shackle, the second electrodeless rope sling, the 2nd 8 subring, the second shackle, the 3rd electrodeless rope sling;
2) the upper tower of the first electrician:First electrician carries the first transmission rope and climbs up steel tower, and the first transmission rope is hung on steel tower;Ground Face electrician is using the first transmission rope by the second upper tower of transmission rope transmission, and the first electrician hangs over the second transmission rope the cross-arm of steel tower On;
3) the second electrician climbs up the conductor wire end of insulator chain to be replaced:Ground electrician connects hanging basket on the first transmission rope;The Two electricians are seated in hanging basket, and by the use of the second transmission rope as backup protection rope, using the first transmission rope lifting hanging basket, by second Electrician is transported to the conductor wire end of insulator chain to be replaced, and using entrance after electric potential transferring stick completion potential transfer, this leads the second electrician Line end, while pulling down hanging basket;
4) conducting wire end corner block:5T the 3rd corner block is fixed on insulator chain conductor wire end to be replaced by the second electrician Yoke plate on;
5) hanging point position of the transmission of transfer first rope:First electrician carries the hanging point that the first transmission rope reaches insulator chain to be replaced Position, and the first transmission rope is fixed on the hanging point position of insulator chain to be replaced;
6) the second transmission rope penetrates the 3rd corner block:Second electrician penetrates the second transmission rope in the 3rd corner block;
7) assembling tool:Ground electrician is T-shaped by tower head end T connector, the first pair of gearing leading screw, the first suspension rod and conductor wire end Joint is in turn connected into first group of instrument, then the second suspension rod and second pair of gearing leading screw are in turn connected into second group of work Tool;
8) upload and first and second group of instrument is installed:Ground electrician is restricted first pair of gearing leading screw of colligation with the first transmission, with the Two transmission rope colligation conductor wire end T connectors, pull the first transmission rope that first pair of gearing leading screw is passed into the first electrician, the Tower head end T connector is fixed on the yoke plate construction hole site at insulator chain tower head end to be replaced by one electrician, then lifts the second biography Pass rope and conductor wire end T connector is passed into the second electrician, the conductor wire end T connector is fixed on insulator to be replaced by the second electrician The yoke plate construction hole site of string conductor wire end;Ground electrician is transmitted with the free end of the first transmission rope suspension rod of colligation second with second Rope second pair of gearing leading screw of colligation, pulls the first transmission rope that the free end of the second suspension rod is passed into the first electrician, first The free end of second suspension rod is connected in place by electrician with tower head end T connector, and the transmission of lifting second is restricted second pair of gearing Leading screw passes to the second electrician, and second pair of gearing leading screw is connected in place by the second electrician with conductor wire end T connector;
9) leading screw is tightened up:First electrician tightens up first pair of gearing leading screw, and the second electrician tightens up second pair of gearing leading screw, The pulling force for bearing insulator chain to be replaced is transferred on first and second group of instrument;
10) the 3rd corner block hanging point is shifted:Second electrician is by the hanging point of the 3rd corner block by insulator chain wire to be replaced On yoke plate position transfer to the wire at end, the 3rd corner block is hung on wire by the first continuous rope set so that pass through second Transmission rope can apply the power that insulator chain conductor wire end to be replaced is pulled to the insulator chain conductor wire end connection gold utensil to be replaced;
11) colligation and insulator chain is dismantled:First electrician transmits the tower head end for colligation insulator chain to be replaced of restricting using first, the Two electricians utilize the second conductor wire end for transmitting rope colligation insulator chain to be replaced;The second transmission rope is pulled to cause insulator to be replaced The gold utensil of string conductor wire end is loose, and the second electrician takes out insulator chain wire terminal bolt to be replaced, and then ground electrician passes second The tail rope part for passing rope bypasses the one 8 subring, and the one 8 subring passes sequentially through the first shackle, the second electrodeless rope sling and steel tower Tower leg is connected, and is restricted using the transmission of the one 8 subring braking second;The first transmission rope is pulled to make the gold at insulator chain tower head end to be replaced Tool is loose, and the first electrician takes out insulator chain tower head terminal bolt to be replaced, while loosening the first transmission rope and the second transmission rope, makes Insulator chain to be replaced is put to ground;
12) insulator chain is changed:Ground electrician unties the first transmission rope and the second transmission rope on insulator chain to be replaced, is used in combination The tower head end of the first transmission rope new insulator chain of colligation, the conductor wire end for the new insulator chain of colligation of being restricted with the second transmission;
13) it is lifted up and new insulator chain is installed:The first transmission rope is pulled to make the new insulator chain to lift new insulator chain To reach ground electrician in the mount point at the new insulator chain tower head end, lifting process new using the second transmission rope control at tower head end Insulator chain, makes new insulator chain not encounter wire, when the tower head end of the new insulator chain reaches the new insulator chain tower head After the mount point at end, the first electrician passes through the tower head end of the new insulator chain to install the new insulator chain with tower head terminal bolt On steel tower, the second transmission rope is pulled to lift new insulator chain to the mount point of the new insulator chain conductor wire end, then second The conductor wire end of the new insulator chain is arranged in conductor wire end by electrician with wire terminal bolt;
14) first and second group of instrument is removed:First electrician is made up of with the first transmission rope connection first group of instrument, second group of instrument Solid tool tower head end, the second electrician with second transmission rope connect the solid tool conductor wire end, then loosen first pair Gearing leading screw, second pair of gearing leading screw, turn first pair of gearing leading screw, second pair of gearing leading screw stress Move to new insulator chain stress;Ground electrician by first transmission restrict, second transmission rope rotating around be connected on the one 8 subring, the 2nd 8 son On ring, the one 8 subring is connected by the tower leg of the first shackle, the second electrodeless rope sling and steel tower, and the 2nd 8 subring is unloaded by second The tower leg connection of button, the 3rd electrodeless rope sling and steel tower;Slowly loosen the first transmission rope and the 2nd 8 subring in the one 8 subring again On second transmission rope, the solid tool is slowly put to ground;
15) tower under the second electrician:First electrician hangs the hanging point position that the first transmission rope is carried to the second transmission rope, the second electricity After work checks conductor wire end without legacy, hanging basket is connected to the first transmission rope, backup protection rope, ground are used as by the use of the second transmission rope First transmission rope is connected on tower leg by dough figurine person by the one 8 subring, the first shackle, the second electrodeless rope sling, by the second transmission Rope is connected on tower leg by the 2nd 8 subring, the second shackle, the 3rd electrodeless rope sling, then slowly loosens the first transmission rope and second The tail rope of rope is transmitted, hanging basket is dropped to ground;
16) transmission of decentralization second rope:After hanging basket landing, the first electrician is slowly put the second transmission rope to ground using the first transmission rope Face;
17) tower under the first electrician:After first electrician is checked on tower without legacy, the first lower tower of transmission rope is carried.
2. the method for replacing ± 800kV DC power transmission line L insulator strings according to claim 1, it is characterised in that:Institute State and the first corner block connected on the first transmission rope, the second corner block is connected on the second transmission rope, in step 4) and step It is rapid 5) between comprise the following steps:
I) hanging point position of the transmission of conversion second rope:Second transmission rope together with the second corner block, is hung over first by the first electrician On transmission rope, the second transmission rope is transmitted to the second electrician together with the second corner block using the first transmission rope, the second electrician is by the Two transmission ropes are bypassed and hung over again after wire on the first transmission rope together with the second corner block, and the is transmitted to using the first transmission rope One electrician, the first electrician again hangs over the second transmission rope on steel tower cross-arm;
Ii) the hanging point position of the transmission of conversion first rope:First transmission rope together with the first corner block, is hung over second by the first electrician On transmission rope, the first transmission rope is transmitted to the second electrician together with the first corner block using the second transmission rope, the second electrician is by the One transmission rope is bypassed and hung over again after wire on the second transmission rope together with the first corner block, and the is transmitted to using the second transmission rope One electrician, the first electrician again hangs over the first transmission rope on steel tower cross-arm.
3. the method for replacing ± 800kV DC power transmission line L insulator strings according to claim 1 or 2, its feature exists In:Arrived on the second electrician after the conductor wire end of insulator chain to be replaced, when the first electrician need to carry the first transmission rope, the second transmission When rope is moved on tower, the second electrician holds the bottom of the first transmission rope and the second transmission rope, to mitigate the heavy burden of the first electrician.
CN201610201317.0A 2016-04-01 2016-04-01 The method of replacing ± 800kV DC power transmission line L insulator strings Active CN105762702B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610201317.0A CN105762702B (en) 2016-04-01 2016-04-01 The method of replacing ± 800kV DC power transmission line L insulator strings

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610201317.0A CN105762702B (en) 2016-04-01 2016-04-01 The method of replacing ± 800kV DC power transmission line L insulator strings

Publications (2)

Publication Number Publication Date
CN105762702A CN105762702A (en) 2016-07-13
CN105762702B true CN105762702B (en) 2017-08-04

Family

ID=56347108

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610201317.0A Active CN105762702B (en) 2016-04-01 2016-04-01 The method of replacing ± 800kV DC power transmission line L insulator strings

Country Status (1)

Country Link
CN (1) CN105762702B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107123948B (en) * 2017-06-29 2018-12-21 国网河南省电力公司济源供电公司 A kind of replacement route weight sheet devices
CN107512655B (en) * 2017-08-22 2019-08-13 江苏省送变电公司 A kind of hanging method of ultralong overweight wire insulation substring

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2013086488A1 (en) * 2011-12-09 2013-06-13 Quanta Associates , L .P. Boom mountable robotic arm
CN104064990A (en) * 2014-06-17 2014-09-24 中国南方电网有限责任公司超高压输电公司南宁局 Novel in-out equal potential working method
CN104143782A (en) * 2014-07-15 2014-11-12 中国南方电网有限责任公司超高压输电公司南宁局 Electrified replacement tool and method for +/-800 kV circuit strain insulator string
CN104283146A (en) * 2014-07-07 2015-01-14 中国南方电网有限责任公司超高压输电公司南宁局 Device and method for replacing insulator string
CN104505763A (en) * 2014-10-08 2015-04-08 国家电网公司 Operating method for changing duplex V chain composite insulator on live line of extra-high voltage DC line
KR20150087785A (en) * 2014-01-20 2015-07-30 서광전기통신공사(주) Method for hot line work of power distribution equipment

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2013086488A1 (en) * 2011-12-09 2013-06-13 Quanta Associates , L .P. Boom mountable robotic arm
KR20150087785A (en) * 2014-01-20 2015-07-30 서광전기통신공사(주) Method for hot line work of power distribution equipment
CN104064990A (en) * 2014-06-17 2014-09-24 中国南方电网有限责任公司超高压输电公司南宁局 Novel in-out equal potential working method
CN104283146A (en) * 2014-07-07 2015-01-14 中国南方电网有限责任公司超高压输电公司南宁局 Device and method for replacing insulator string
CN104143782A (en) * 2014-07-15 2014-11-12 中国南方电网有限责任公司超高压输电公司南宁局 Electrified replacement tool and method for +/-800 kV circuit strain insulator string
CN104505763A (en) * 2014-10-08 2015-04-08 国家电网公司 Operating method for changing duplex V chain composite insulator on live line of extra-high voltage DC line

Also Published As

Publication number Publication date
CN105762702A (en) 2016-07-13

Similar Documents

Publication Publication Date Title
CN101582572B (en) Method of extra-high voltage tension stringing
CN101252264B (en) Equipotential electrical highfield hot-line working method
CN105762702B (en) The method of replacing ± 800kV DC power transmission line L insulator strings
CN202997425U (en) Hoisting device capable of replacing suspension type insulator chain under electrified state
CN105743013B (en) The method of charged for replacement ± 500kV AC line anchor support insulator chains
CN105305317B (en) Live wire hangs the instrument of insulated flexible ladder
CN103594976B (en) Combination stringing instrument for line conductor stringing
CN207530438U (en) Tangent tower ground wire line lifter
CN207030773U (en) The loop wheel machine special cart of secondary spring hooking device is installed
CN104158112B (en) Multi-purpose pedaled flying vehicle
CN106786157A (en) Transmission line of electricity Great span above the navigation water surface tears aging method open
CN106356763A (en) Method for entering equal potential of compact type electric transmission line and used folding ladder
CN110854734B (en) Method for replacing large yoke plate of strain insulator string of extra-high voltage direct current transmission line
CN103274311A (en) Rotary suspension arm of pole-hanging transformer
CN207243306U (en) Tower crane two sides jacks stock
CN117200110A (en) Double-insulator-string soft bus wire hanging method and device
CN218231511U (en) Self-unloading lifting appliance
CN203536865U (en) Combined wire-tightening tool for tightening line wire
CN109038365B (en) Load hoisting system for live replacement of 500kV linear insulator string
CN215267389U (en) Earth potential all-terrain load operation special tool
CN103579952B (en) Bulb fixing-line device for overhead transmission line stringing
CN207158591U (en) A kind of ultralong overweight wire insulation substring hangs auxiliary lifting appliance
CN102403670A (en) Quick wire picking device applied to 10 KV and below overhead power transmission lines
CN221235135U (en) Crane power-off heavy object safe lowering control device
CN205063803U (en) Rope ladder head of preventing falling

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant