CN105757656A - Novel supporting slag cooling device of boiler - Google Patents

Novel supporting slag cooling device of boiler Download PDF

Info

Publication number
CN105757656A
CN105757656A CN201410792516.4A CN201410792516A CN105757656A CN 105757656 A CN105757656 A CN 105757656A CN 201410792516 A CN201410792516 A CN 201410792516A CN 105757656 A CN105757656 A CN 105757656A
Authority
CN
China
Prior art keywords
slag
equipment
heat exchange
ash
lime
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201410792516.4A
Other languages
Chinese (zh)
Inventor
巨杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xian Liyuan Intelligent Technology Co Ltd
Original Assignee
Xian Liyuan Intelligent Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xian Liyuan Intelligent Technology Co Ltd filed Critical Xian Liyuan Intelligent Technology Co Ltd
Priority to CN201410792516.4A priority Critical patent/CN105757656A/en
Publication of CN105757656A publication Critical patent/CN105757656A/en
Withdrawn legal-status Critical Current

Links

Abstract

The invention discloses a novel supporting slag cooling device of a boiler. The slag cooling device is characterized in that the slag cooling device comprises a heat exchange device 1; the lower part of the heat exchange device 1 is connected to a coal slag and ash feeding pipe 2; the outlet of the coal slag and ash feeding pipe 2 is disposed at the lower part of the heat exchange device 1; the inlet of a coal slag and ash discharging pipe 4 is disposed at the upper part of the heat exchange device 1; the heat exchange device 1 is connected to a gas guide pipe 5 and a matched bottom slag conveying system; compared with the prior art, the slag cooling device is reasonable in structure and simple and convenient in operation, effectively increases the heat exchange efficiency, prolongs the service lifetime of heat exchange pipes, completely overcomes the water leakage problem of dynamic and static sealing parts, and avoids water leakage due to abrasion of sealing rings at the dynamic and static connecting parts for feeding and discharging water or abrasion of fillers because of long-term running; and novel cold-drawn hexagon seamless steel tubes are adopted as heat exchange paths, and far wings are welded from inside by adopting an automatic welding manner, and therefore the heat exchange coefficient is increased, the heat exchange area is increased, abrasion of the heat exchange paths is greatly reduced, and the service lifetime of the slag cooling device is effectively prolonged.

Description

A kind of supporting cold slag equipment of New-type boiler
Technical field
The present invention relates to a kind of lime-ash waste heat recovery recycling equipment technical field that can improve lime-ash heat recovery rate, a kind of supporting cold slag equipment of New-type boiler specifically.
Background technology
Recirculating fluidized bed (CFB) boiler is the existing novel boiler of power plant of one attempting carrying out of China, and can slag cooler effect in CFBB is fairly heavy to be wanted, be allow the capital equipment of the normal deslagging of boiler.
High-temperature coking is that bed abnormal combustion is fierce, and temperature steeply rises owing in running, temperature is too high, when temperature exceedes the fusion temperature of ash, high-temperature coking will occur.Bed clinkering is because bad the making of fluidisation and locally reaches ignition temperature, but air quantity now is enough to make material burn rapidly, causes this place's temperature of charge to exceed ash fusion point, as processed not in time, coking will occur.The dreg removing system of CFBB is made up of bottom ash cooling, bottom ash conveying, slag storehouse and supporting slag dumping equipment.The capital equipment of cold slag system is made up of high-temperature slap discharging valves and slag cooler etc., the capital equipment of bottom ash conveying system buries the compositions such as scraper slag removing machine (or belt conveyor), bucket elevator, and slag storehouse and supporting slag dumping equipment are mainly made up of pulsed jet cloth filter, dry slag bulk machine, Double shaft stirring humidifier, vacuum pressure relief valve etc..But the situation that slag cooler coking results in blockage often occurs, and being a technical difficult problem, the unreliability of slag cooler also just determines the unstability of boiler.
In order to well solve the problems referred to above, the present invention provides a kind of supporting cold slag equipment of New-type boiler.
Summary of the invention
It is an object of the invention to provide a kind of supporting cold slag equipment of New-type boiler, adopt novel cold-drawn hexagon seamless steel pipe as heat exchanger channels, and adopt automatic welding mode by the remote fin of interior welding, both improve the coefficient of heat transfer, increase heat exchange area, the abrasion of heat exchanger channels is greatly reduced again, effectively extends service life of equipment.Lag cooler water inlet pipe and water outlet pipe is Double-layer clamp sleeve pipe, select at the widely used high-speed joint manufactured by Johnson's Technology design of weaving drying apparatus, it is fully solved static and dynamic sealing seepy question, it is to avoid Inlet and outlet water sound junction sealing ring or flavoring agent longtime running wear and tear and leak.
The solved technical problem of the present invention be the technical scheme is that a kind of supporting cold slag equipment of New-type boiler, it is characterized in that: include heat transmission equipment 1, the bottom of described heat transmission equipment 1 is connected with cinder lime-ash inlet pipe 2, the exit of described cinder lime-ash inlet pipe 2 is positioned at the bottom of heat transmission equipment 1, the porch that described cinder lime-ash goes out pipe 4 is positioned at the top of heat transmission equipment 1, and described heat transmission equipment 1 is connected to airway 5 and the bottom ash conveying system cooperated.
The method for designing of described cold-rolling equipment is that difference in flow calculates method, namely according to thermo parameters method, tube side (slag side) 6 and shell-side (water side) 3 heat transfer characteristics in cinder heat exchanging equipment and flow behavior, shell-side water-flow equation uniformity, tube pitch person of outstanding talent's space, subregion is made to make tube side center reduce the process of difference in flow with neighboring area by optimizing structure.
Described lag cooler cinder lime-ash inlet pipe 2, cinder lime-ash go out pipe 4 for multilayer sleeve and high-speed joint, solve static and dynamic sealing seepy question, it is to avoid Inlet and outlet water sound junction sealing ring or flavoring agent longtime running wear and tear and leak.
Described airway 5 is internal is provided with chiller, it is possible to separates in cylinder, applies cluster of grains heat-transfer mechanism, improves the heat transfer coefficient of lime-ash.
Mainly bury scraper slag removing machine (or belt conveyor), the bucket elevator etc. of described bottom ash conveying system form, and slag storehouse and supporting slag dumping equipment are mainly made up of pulsed jet cloth filter, dry slag bulk machine, Double shaft stirring humidifier etc..Producer can select different systems and equipment according to being actually needed of oneself scene.
The invention has the beneficial effects as follows: 1, due to the supporting cold slag equipment of New-type boiler, adopt novel cold-drawn hexagon seamless steel pipe as heat exchanger channels, and adopt automatic welding mode by the remote fin of interior welding, both improve the coefficient of heat transfer, increase heat exchange area, the abrasion of heat exchanger channels is greatly reduced again, effectively extends service life of equipment.Lag cooler water inlet pipe and water outlet pipe is Double-layer clamp sleeve pipe, select at the widely used high-speed joint manufactured by Johnson's Technology design of weaving drying apparatus, it is fully solved static and dynamic sealing seepy question, it is to avoid Inlet and outlet water sound junction sealing ring or flavoring agent longtime running wear and tear and leak;
2, owing to the method for designing of described cold-rolling equipment is that difference in flow calculates method, namely according to thermo parameters method, tube side (slag side) 6 and shell-side (water side) 3 heat transfer characteristics in cinder heat exchanging equipment and flow behavior, shell-side water-flow equation uniformity, tube pitch person of outstanding talent's space, subregion is made to make tube side center reduce the process of difference in flow with neighboring area by optimizing structure.Improve the coefficient of heat transfer, increase heat exchange area, the abrasion of heat exchanger channels is greatly reduced;
3, owing to described lag cooler cinder lime-ash inlet pipe 2, cinder lime-ash go out pipe 4 for multilayer sleeve and high-speed joint, static and dynamic sealing seepy question is solved, it is to avoid Inlet and outlet water sound junction sealing ring or flavoring agent longtime running wear and tear and leak;
4, it is provided with chiller owing to described airway 5 is internal, it is possible to separate in cylinder, applies cluster of grains heat-transfer mechanism, improve the heat transfer coefficient of lime-ash, improve the heat transfer coefficient of lime-ash, maintain again the activity of lime-ash, improve utilization of ash and slag and be worth;
5, burying the compositions such as scraper slag removing machine (or belt conveyor), bucket elevator due to the capital equipment of bottom ash conveying system, slag storehouse and supporting slag dumping equipment are mainly made up of pulsed jet cloth filter, dry slag bulk machine, Double shaft stirring humidifier etc..Producer can select different systems and equipment, effectively save manufacturing cost according to being actually needed of oneself scene.
Accompanying drawing explanation
Below in conjunction with specific embodiment, the present invention is further illustrated:
Fig. 1 is the structural representation of the embodiment of the present invention;
In figure: 1, heat transmission equipment;2, cinder lime-ash inlet pipe;3, shell-side (water side);4, cinder lime-ash goes out pipe;5, airway;6, tube side (slag side).
Detailed description of the invention
The supporting cold slag equipment of 1 one kinds of New-type boilers of embodiment, it is characterized in that: include heat transmission equipment 1, the bottom of described heat transmission equipment 1 is connected with cinder lime-ash inlet pipe 2, the exit of described cinder lime-ash inlet pipe 2 is positioned at the bottom of heat transmission equipment 1, the porch that described cinder lime-ash goes out pipe 2 is positioned at the top of heat transmission equipment 1, and described heat transmission equipment 1 is connected to airway 5 and the bottom ash conveying system cooperated.
Embodiment 2 is as shown in Figure 1, it is to improve on the basis of embodiment 1, the method for designing of its described cold-rolling equipment is that difference in flow calculates method, namely according to thermo parameters method, tube side (slag side) 6 and shell-side (water side) 3 heat transfer characteristics in cinder heat exchanging equipment and flow behavior, shell-side water-flow equation uniformity, tube pitch person of outstanding talent's space, subregion is made to make tube side center reduce the process of difference in flow with neighboring area by optimizing structure.Improve the coefficient of heat transfer, increase heat exchange area, the abrasion of heat exchanger channels is greatly reduced.
Embodiment 3 is as shown in Figure 1, it is to improve on the basis of embodiment 1, its lag cooler cinder lime-ash inlet pipe 2, cinder lime-ash go out pipe 4 for multilayer sleeve and high-speed joint, solve static and dynamic sealing seepy question, avoid Inlet and outlet water sound junction sealing ring or flavoring agent longtime running abrasion and leak, heat transmission equipment 1 is placed on cinder lime-ash inlet pipe 2, cinder lime-ash go out the parallel upper end of pipe 4 obtained by drip carry from heat transmission equipment 1 cinder lime-ash.
Embodiment 4 is as it is shown in figure 1, it is to improve on the basis of embodiment 1, and its described airway 5 is internal is provided with chiller, it is possible to separates in cylinder, applies cluster of grains heat-transfer mechanism, improves the heat transfer coefficient of lime-ash.Chiller passes through compressed-air supply system, carry out cooling technique, cooling fluid box fluid box is provided with compressed air inlet port and compressed air outlet port, compressed-air supply system is filled with compression air by compressed air hose road direction fluid box air inlet, discharging compression air by fluid box gas outlet, compression air forms convection current in fluid box.
Embodiment 5 is as shown in Figure 1, it is to improve on the basis of embodiment 1, mainly bury scraper slag removing machine (or belt conveyor), the bucket elevator etc. of its bottom ash conveying system form, and slag storehouse and supporting slag dumping equipment are mainly made up of pulsed jet cloth filter, dry slag bulk machine, Double shaft stirring humidifier etc..Producer can select different systems and equipment according to being actually needed of oneself scene.
The supporting cold slag equipment of this New-type boiler of embodiment 6, including heat transmission equipment 1, the bottom of described heat transmission equipment 1 is connected with cinder lime-ash inlet pipe 2, the exit of described cinder lime-ash inlet pipe 2 is positioned at the bottom of heat transmission equipment 1, the porch that described cinder lime-ash goes out pipe 2 is positioned at the top of heat transmission equipment 1, and described heat transmission equipment 1 is connected to airway 5 and the bottom ash conveying system cooperated;The method for designing of its cold-rolling equipment is that difference in flow calculates method, namely according to thermo parameters method, tube side (slag side) 6 and shell-side (water side) 3 heat transfer characteristics in cinder heat exchanging equipment and flow behavior, shell-side water-flow equation uniformity, tube pitch person of outstanding talent's space, subregion is made to make tube side center reduce the process of difference in flow with neighboring area by optimizing structure;Described lag cooler cinder lime-ash inlet pipe 2, cinder lime-ash go out pipe 4 for multilayer sleeve and high-speed joint, solve static and dynamic sealing seepy question, it is to avoid Inlet and outlet water sound junction sealing ring or flavoring agent longtime running wear and tear and leak;Described airway 5 is internal is provided with chiller, it is possible to separates in cylinder, applies cluster of grains heat-transfer mechanism, improves the heat transfer coefficient of lime-ash;Mainly bury scraper slag removing machine (or belt conveyor), the bucket elevator etc. of described bottom ash conveying system form, and slag storehouse and supporting slag dumping equipment are mainly made up of pulsed jet cloth filter, dry slag bulk machine, Double shaft stirring humidifier etc..Producer can select different systems and equipment according to being actually needed of oneself scene.

Claims (5)

1. the supporting cold slag equipment of New-type boiler, it is characterized in that: include heat transmission equipment (1), the bottom of described heat transmission equipment (1) is connected with cinder lime-ash inlet pipe (2), the exit of described cinder lime-ash inlet pipe (2) is positioned at the bottom of heat transmission equipment (1), described cinder lime-ash goes out the porch of pipe (4) and is positioned at the top of heat transmission equipment (1), and described heat transmission equipment (1) is connected to airway (5) and the bottom ash conveying system cooperated.
2. a kind of supporting cold slag equipment of New-type boiler according to claim 1, it is characterized in that: the method for designing of described cold-rolling equipment is that difference in flow calculates method, namely according to thermo parameters method, tube side (slag side) (6) and shell-side (water side) (3) heat transfer characteristic in cinder heat exchanging equipment and flow behavior, shell-side water-flow equation uniformity, tube pitch person of outstanding talent's space, subregion is made to make tube side center reduce the process of difference in flow with neighboring area by optimizing structure.
3. a kind of supporting cold slag equipment of New-type boiler according to claim 1, it is characterized in that: it is multilayer sleeve and high-speed joint that described lag cooler cinder lime-ash inlet pipe (2), cinder lime-ash go out pipe (4), solve static and dynamic sealing seepy question, it is to avoid Inlet and outlet water sound junction sealing ring or flavoring agent longtime running wear and tear and leak.
4. a kind of supporting cold slag equipment of New-type boiler according to claim 1, is characterized in that: described airway (5) is internal is provided with chiller, it is possible to separates in cylinder, applies cluster of grains heat-transfer mechanism, improves the heat transfer coefficient of lime-ash.
5. a kind of supporting cold slag equipment of New-type boiler according to claim 1, it is characterized in that: mainly bury scraper slag removing machine (or belt conveyor), the bucket elevator etc. of described bottom ash conveying system form, slag storehouse and supporting slag dumping equipment are mainly made up of pulsed jet cloth filter, dry slag bulk machine, Double shaft stirring humidifier etc., and producer can select different systems and equipment according to being actually needed of oneself scene.
CN201410792516.4A 2014-12-19 2014-12-19 Novel supporting slag cooling device of boiler Withdrawn CN105757656A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410792516.4A CN105757656A (en) 2014-12-19 2014-12-19 Novel supporting slag cooling device of boiler

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410792516.4A CN105757656A (en) 2014-12-19 2014-12-19 Novel supporting slag cooling device of boiler

Publications (1)

Publication Number Publication Date
CN105757656A true CN105757656A (en) 2016-07-13

Family

ID=56339772

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410792516.4A Withdrawn CN105757656A (en) 2014-12-19 2014-12-19 Novel supporting slag cooling device of boiler

Country Status (1)

Country Link
CN (1) CN105757656A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107120643A (en) * 2017-06-13 2017-09-01 中国华电科工集团有限公司 A kind of CFBB slag storage is deposited and discharge system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107120643A (en) * 2017-06-13 2017-09-01 中国华电科工集团有限公司 A kind of CFBB slag storage is deposited and discharge system

Similar Documents

Publication Publication Date Title
CN101598334B (en) Bottom slag cooling method of circulating fluidized bed
CN103307617B (en) Pneumatic dust cleaning device of boiler
CN103968406B (en) A kind of hydrophily flue gas-smoke heat exchanging system and method that can prevent low temperature corrosion
CN215982516U (en) Wall of ring-sealed heat exchanger
CN102221201A (en) Equal-bed pressure cold slag fluidized bed of circulating fluidized bed boiler and operation method thereof
CN105757656A (en) Novel supporting slag cooling device of boiler
CN104528851B (en) Black water treatment device for coal gasification system of entrained flow
CN204474699U (en) Liquid steel slag gas quenching residual neat recovering system
CN107830750A (en) Coal gasifier ash-dregs cooler
CN202321536U (en) Self-sealing shaft-free spiral conveyor
CN204678332U (en) The supporting cold slag equipment of a kind of New-type boiler
CN103884019A (en) Graphite-tube type low-temperature air preheater
CN102748753B (en) Soot cooler
CN106743675A (en) A kind of pneumatic ash conveying pipe system for economizer
CN102419110B (en) Recovery device for sensible heat of powdery solid
CN207456227U (en) Oscillatory type multilayer variable cross-section membrane wall turbulent flow particle heat-exchanger rig
CN104515138A (en) Deslagging device applicable to coal powder industrial boiler
CN110567282A (en) Kiln with water cooling structure
CN201539858U (en) Slag cooler of circulating fluidized bed
CN104654291A (en) Novel CFB circulating fluidized bed supported slag cooling device
CN211570543U (en) Water-cooled wall indirect heating equipment
CN204421025U (en) A kind of slag-draining device being applicable to industrial coal powder boiler
CN208431501U (en) A kind of coal spout expansion joint device
CN201858650U (en) Water-cooling slag discharge device
CN219045751U (en) Slag inlet pipe leakage-proof expansion device of slag cooler

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20160713