CN105756329A - Wall plastering device for construction - Google Patents
Wall plastering device for construction Download PDFInfo
- Publication number
- CN105756329A CN105756329A CN201610235681.9A CN201610235681A CN105756329A CN 105756329 A CN105756329 A CN 105756329A CN 201610235681 A CN201610235681 A CN 201610235681A CN 105756329 A CN105756329 A CN 105756329A
- Authority
- CN
- China
- Prior art keywords
- fixing
- support
- bar
- cross bar
- spring
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000010276 construction Methods 0.000 title abstract description 3
- 238000005452 bending Methods 0.000 claims abstract description 11
- 230000000694 effects Effects 0.000 abstract description 3
- 238000005096 rolling process Methods 0.000 abstract 5
- 239000003973 paint Substances 0.000 description 10
- 238000000034 method Methods 0.000 description 4
- 238000009435 building construction Methods 0.000 description 1
- 239000013536 elastomeric material Substances 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000007788 liquid Substances 0.000 description 1
- 239000011505 plaster Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F21/00—Implements for finishing work on buildings
- E04F21/02—Implements for finishing work on buildings for applying plasticised masses to surfaces, e.g. plastering walls
- E04F21/06—Implements for applying plaster, insulating material, or the like
- E04F21/08—Mechanical implements
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Rehabilitation Tools (AREA)
- Coating Apparatus (AREA)
Abstract
Description
Claims (9)
- null1. a building wall whitewashes device,It is characterized in that: described building wall whitewashes device and includes base plate、It is positioned at the first support bar above described base plate、It is positioned at the grip device on the left of described first support bar、It is positioned at the storage device on the right side of described first support bar、It is positioned at whitewashing structure and being positioned at the electric machine above described first support bar above described storage device,Described base plate is provided with the first bent stick below、It is arranged at the first roller in described first bent stick、It is positioned at the first support of the described first bent stick left and right sides and is arranged at the first spring in described first bent stick,Described first support bar is provided with the first cross bar on the right side of it、It is positioned at the second spring of the described first upper and lower both sides of cross bar、It is positioned at the first brace on the left of it、It is positioned at the second cross bar above described second spring,Described grip device includes the second support、It is positioned at the second brace below described second support、It is positioned at the second support bar on the right side of described second brace、It is positioned at the 3rd cross bar below described second support bar、It is positioned at the gripper rings on the left of described second support and is positioned at first bracer above described second support,Described storage device includes casing、It is positioned at the baffle plate of described casing、It is positioned at the 3rd spring below described baffle plate、It is positioned at the first swash plate above described casing、It is positioned at the second bent stick below described first swash plate、4th cross bar、It is positioned at the second roller above described casing、It is arranged at the first bristle on described second roller、It is positioned at the 3rd brace on the left of described second roller and is arranged at the 4th brace on described 3rd brace,Described structure of whitewashing includes mobile bar、What be arranged at described mobile bar right-hand member whitewashes wheel、It is positioned at the 3rd support below described mobile bar、It is arranged at the 3rd roller on described 3rd support、It is arranged at the slide block on described mobile bar、It is positioned at the 4th spring below described mobile bar、It is positioned at the 5th brace on the right side of described 3rd support、It is positioned at the 5th spring below described 3rd support、It is positioned at the 6th spring on the right side of described 5th spring and is positioned at the retainer ring above described mobile bar,Described electric machine includes the 5th cross bar、It is positioned at the 4th roller of described 5th cross bar right-hand member、It is positioned at the location bar below described 5th cross bar、It is positioned at the bracing wire above described 5th cross bar、It is positioned at the first montant above described first support bar、It is arranged at the 5th roller on described first montant、It is positioned at the 6th cross bar on the left of described first support bar、It is positioned at the motor above described 6th cross bar、It is arranged at the output shaft on described motor and is positioned at the 7th cross bar on the right side of described motor.
- null2. building wall according to claim 1 whitewashes device,It is characterized in that: described first bent stick is bending,The two ends of described first bent stick are fixing with the lower surface of described base plate to be connected,Described first bent stick is provided with the first through hole,Described first through hole is provided with two,Described first roller is provided with two,Described first roller is contained in described first through hole and turns with described first bent stick axle and is connected,Described first support is provided with two and lays respectively at the left and right sides of described first bent stick,Described first support is L-shaped,One end of described first support is fixing with described base plate to be connected,The other end of described first support is fixing with described first bent stick to be connected,Described first spring is provided with two,Described first spring is vertical shape,The upper end of described first spring is fixing with described base plate to be connected,The lower end of described first spring is fixing with described first bent stick to be connected.
- 3. building wall according to claim 2 whitewashes device, it is characterized in that: described first cross bar is cuboid, described first cross bar horizontal positioned, the left end of described first cross bar is fixing with the right surface of described first support bar to be connected, described second spring is provided with two and lays respectively at the described first upper and lower both sides of cross bar, described second spring is horizontal, the left end of described second spring is fixing with described first support bar to be connected, the described first inclined shape of brace, the lower end of described first brace is fixing with described base plate to be connected, the upper end of described first brace is fixing with described first support bar to be connected, described second cross bar is cuboid, described second cross bar horizontal positioned, the left end of described second cross bar is fixing with the right surface of described first support bar to be connected.
- null4. building wall according to claim 3 whitewashes device,It is characterized in that: described second support is concave shape,The two ends of described second support are fixing with the left surface of described first support bar to be connected,The described second inclined shape of brace,The lower end of described second brace is fixing with described base plate to be connected,The upper end of described second brace is fixing with described second support to be connected,Described second support bar is vertical shape,The upper end of described second support bar is fixing with described second support to be connected,The lower end of described second support bar is fixing with described first brace to be connected,Described 3rd cross bar is horizontal,The left end of described 3rd cross bar is fixing with described second brace to be connected,The right-hand member of described 3rd cross bar is fixing with described first brace to be connected,Described gripper rings is semi-annular shape,The two ends of described gripper rings are fixing with the left surface of described second support to be connected,Described first bracer is cuboid,The lower surface of described first bracer is fixing with the upper surface of described second support to be connected.
- null5. building wall according to claim 4 whitewashes device,It is characterized in that: described casing is hollow cuboid,Described casing is placed on described base plate,The right-hand member of described second spring is fixing with the left surface of described casing to be connected,The left surface of described casing is provided with and leans ring,The left surface at the described two ends and described casing leaning ring is fixed and is connected,Described first cross bar leans the left side of ring described in being positioned at,Described baffle plate is cuboid,Described baffle plate horizontal positioned,The inner surface of the side of described baffle plate and described casing is slidably connected,Described 3rd spring is provided with two,Described 3rd spring is vertical shape,The lower end of described 3rd spring is fixing with the inner surface of described casing to be connected,The upper end of described 3rd spring is fixing with the lower surface of described baffle plate to be connected,The described first inclined shape of swash plate,The lower end of described first swash plate is contained in described casing,The upper end of described first swash plate is positioned at the top of described casing,Described second bent stick is bending,The upper end of described second bent stick is fixing with described first swash plate to be connected,The lower end of described second bent stick is fixing with the right surface of described casing to be connected.
- null6. building wall according to claim 5 whitewashes device,It is characterized in that: described 4th cross bar is horizontal,The right-hand member of described 4th cross bar is fixing with the inner surface of described casing to be connected,The left end of described 4th cross bar is fixing with described first swash plate to be connected,Described second roller is cylinder,Described first bristle is provided with several,Described first bristle is evenly distributed on described second roller and is secured to connect,The described 3rd inclined shape of brace,The lower end of described 3rd brace is fixing with the upper surface of described casing to be connected,The upper end of described 3rd brace is provided with twisted plate,Described twisted plate is bending,The left end of described twisted plate is fixing with the upper end of described 3rd brace to be connected,The described 4th inclined shape of brace,The lower end of described 4th brace is fixing with described 3rd brace to be connected,The upper end of described 4th brace is fixing with described twisted plate to be connected.
- null7. building wall according to claim 6 whitewashes device,It is characterized in that: the left end of described mobile bar is horizontal,The inclined shape of its right-hand member,Described mobile bar is provided with the first groove of its right-hand member and runs through the second through hole of its upper and lower surface,The left surface of described mobile bar is connected with described second bracket slide,The described wheel that whitewashes is in cylinder,The described wheel that whitewashes is contained in described first groove and turns with described mobile bar axle and is connected,Described 3rd support is L-shaped,One end of described 3rd support is fixing with described mobile bar to be connected,The other end of described 3rd support is horizontal and is provided with the second groove,Described 3rd roller is cylinder,Described 3rd roller is contained in described second groove and turns with described 3rd support shaft and is connected,Described 3rd roller acts against on the right surface of described first support bar,Described slide block is cuboid,Described slide block is contained in described second through hole and fixes with described mobile bar and is connected,Described first support bar runs through the upper and lower surface of described slide block and is slidably connected with it,Described 4th spring is vertical shape,The upper end of described 4th spring is fixing with described mobile bar to be connected,The lower end of described 4th spring is fixing with described second support to be connected,The described 5th inclined shape of brace,The upper end of described 5th brace is fixing with described mobile bar to be connected,The lower end of described 5th brace is fixing with described 3rd support to be connected,Described 5th spring is vertical shape,The upper end of described 5th spring is fixing with described 3rd support to be connected,The lower end of described 5th spring is fixing with the upper surface of described second cross bar to be connected,Described 6th spring is vertical shape,The upper end of described 6th spring is fixing with described mobile bar to be connected,The lower end of described 6th spring is fixing with described twisted plate to be connected,Described retainer ring is semi-annular shape,The two ends of described retainer ring are fixing with the upper surface of described mobile bar to be connected.
- null8. building wall according to claim 7 whitewashes device,It is characterized in that: described 5th cross bar is cuboid,Described 5th cross bar horizontal positioned,The left end of described 5th cross bar is fixing with the right surface of described first support bar to be connected,The right-hand member of described 5th cross bar is provided with the 3rd groove,Described 4th roller is cylinder,Described 4th roller is contained in described 3rd groove and turns with described 5th cross bar axle and is connected,Described location bar is cuboid,Described location bar is vertically placed,The upper end of described location bar is fixing with the lower surface of described 5th cross bar to be connected,Described first montant is cuboid,Described first montant is vertically placed,The lower end of described first montant is fixing with the upper surface of described first support bar to be connected,The upper end of described first montant is provided with the 4th groove,Described 5th roller is cylinder,Described 5th roller is contained in described 4th groove and turns with described first montant axle and is connected.
- 9. building wall according to claim 8 whitewashes device, it is characterized in that: described 6th cross bar is cuboid, described 6th cross bar horizontal positioned, the right-hand member of described 6th cross bar is fixing with the left surface of described first support bar to be connected, the upper surface of described first bracer is fixing with the lower surface of described 6th cross bar to be connected, the lower surface of described motor is fixing with the upper surface of described 6th cross bar to be connected, described output shaft is cylinder, described output shaft is connected with motor, one end of described bracing wire is fixing with described retainer ring to be connected, the other end of described bracing wire is fixing with described output shaft to be connected, described 7th cross bar is cuboid, described 7th cross bar horizontal positioned, the right-hand member of described 7th cross bar is fixing with described first support bar to be connected, the left end of described 7th cross bar is fixing with the right surface of described motor to be connected.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610235681.9A CN105756329B (en) | 2016-04-15 | 2016-04-15 | A kind of building wall paints device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610235681.9A CN105756329B (en) | 2016-04-15 | 2016-04-15 | A kind of building wall paints device |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105756329A true CN105756329A (en) | 2016-07-13 |
CN105756329B CN105756329B (en) | 2017-09-29 |
Family
ID=56335047
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610235681.9A Active CN105756329B (en) | 2016-04-15 | 2016-04-15 | A kind of building wall paints device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105756329B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106088549A (en) * | 2016-08-05 | 2016-11-09 | 周末 | Wall plastering device outside a kind of heavy construction |
CN107740566A (en) * | 2017-10-10 | 2018-02-27 | 火星盛世机械制造有限公司 | Building wall mortar strikes off robot |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2282174B (en) * | 1993-08-16 | 1995-11-15 | Tah Hee Tan | Plastering machine |
CN104179337A (en) * | 2014-07-22 | 2014-12-03 | 徐州香柏年家具有限公司 | Novel wall plastering machine |
CN104179335A (en) * | 2014-07-06 | 2014-12-03 | 湖南江南建筑工程有限公司 | Wall plastering machine |
CN204040422U (en) * | 2014-09-01 | 2014-12-24 | 东莞市平华精密机械科技有限公司 | A kind of wall telephone of putting on powder with positioning indicating function |
CN205502532U (en) * | 2016-04-15 | 2016-08-24 | 龙江汇 | Wall plaster device for building |
-
2016
- 2016-04-15 CN CN201610235681.9A patent/CN105756329B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2282174B (en) * | 1993-08-16 | 1995-11-15 | Tah Hee Tan | Plastering machine |
CN104179335A (en) * | 2014-07-06 | 2014-12-03 | 湖南江南建筑工程有限公司 | Wall plastering machine |
CN104179337A (en) * | 2014-07-22 | 2014-12-03 | 徐州香柏年家具有限公司 | Novel wall plastering machine |
CN204040422U (en) * | 2014-09-01 | 2014-12-24 | 东莞市平华精密机械科技有限公司 | A kind of wall telephone of putting on powder with positioning indicating function |
CN205502532U (en) * | 2016-04-15 | 2016-08-24 | 龙江汇 | Wall plaster device for building |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106088549A (en) * | 2016-08-05 | 2016-11-09 | 周末 | Wall plastering device outside a kind of heavy construction |
CN107740566A (en) * | 2017-10-10 | 2018-02-27 | 火星盛世机械制造有限公司 | Building wall mortar strikes off robot |
CN107740566B (en) * | 2017-10-10 | 2024-01-30 | 火星盛世机械制造有限公司 | Building wall mortar strickle robot |
Also Published As
Publication number | Publication date |
---|---|
CN105756329B (en) | 2017-09-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106733962B (en) | A kind of building materials pipeline cleanser with telescopic device | |
CN205502532U (en) | Wall plaster device for building | |
JP2021041393A (en) | Painting equipment for ceiling wall surface | |
CN105756329A (en) | Wall plastering device for construction | |
CN211275214U (en) | Plate waxing machine | |
CN105281280A (en) | Cable stretching and retracting device | |
CN204980661U (en) | Portable pay off rack of contractile phenotype | |
CN205032449U (en) | Oil transport pipe inner wall belt cleaning device | |
CN107975212A (en) | Instrument is painted on a kind of fixable type top | |
CN106691323A (en) | Daily and domestic ceiling sweeping device | |
CN106238618A (en) | A kind of building bar bending system | |
CN205527595U (en) | Miniature hoist device for building multi -functional | |
CN105775927B (en) | A kind of Simple detatchable wire device applied to cable hank | |
CN105752891A (en) | Multifunctional miniature hoisting device for construction | |
CN110116359B (en) | Pre-buried exposing reinforcing bar rust cleaning device of building engineering of adaptable different diameters | |
CN105986661A (en) | Rolling wheel type wall painting plastering device | |
CN205772362U (en) | A kind of friction driving type cable coiling device | |
CN209402123U (en) | A kind of construction project special isolation hook | |
CN105692467A (en) | Agricultural hoisting device convenient to move | |
CN216008388U (en) | Shallow rock-soil drilling equipment | |
CN103252699A (en) | Vertical counterweight balance type numerical-controlled mold cleaning machine | |
CN104003257B (en) | Spraying pipe recycling device for car washer | |
CN109610784B (en) | Automatic plastering device capable of quickly plastering wall | |
CN105967073A (en) | Novel agricultural lifting device | |
CN208502629U (en) | A kind of bathroom wound membrane shower curtain |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20180813 Address after: 545100 Liuzhou, the Guangxi Zhuang Autonomous Region, the Liujiang River Town, the Liujiang River Town, the capital of the comprehensive area four North 138 Patentee after: Qin Xiangwei Address before: 325200 No. 2111, Shanghai East Road, Ruian Economic Development Zone, Wenzhou, Zhejiang Patentee before: Long Jianghui |
|
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20180823 Address after: 545199 No. 888, Fort Liu Road, the Liujiang River District, Liuzhou, the Guangxi Zhuang Autonomous Region Patentee after: Guangxi Haixiang Construction Engineering Co., Ltd. Address before: 545100 Liuzhou, the Guangxi Zhuang Autonomous Region, the Liujiang River Town, the Liujiang River Town, the capital of the comprehensive area four North 138 Patentee before: Qin Xiangwei |
|
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20180920 Address after: 545000 No. 46, Fort Liu Road, the Liujiang River District, Liuzhou, the Guangxi Zhuang Autonomous Region Patentee after: The Liujiang River Fangsheng Engineering Quality Inspection Co., Ltd. Address before: 545199 No. 888, Fort Liu Road, the Liujiang River District, Liuzhou, the Guangxi Zhuang Autonomous Region Patentee before: Guangxi Haixiang Construction Engineering Co., Ltd. |
|
TR01 | Transfer of patent right |