CN105737338A - Electricity consumption information computing method and device, multi-split air conditioner system and external machine of multi-split air conditioner system - Google Patents

Electricity consumption information computing method and device, multi-split air conditioner system and external machine of multi-split air conditioner system Download PDF

Info

Publication number
CN105737338A
CN105737338A CN201610104558.3A CN201610104558A CN105737338A CN 105737338 A CN105737338 A CN 105737338A CN 201610104558 A CN201610104558 A CN 201610104558A CN 105737338 A CN105737338 A CN 105737338A
Authority
CN
China
Prior art keywords
equipment
information
master
record
power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610104558.3A
Other languages
Chinese (zh)
Other versions
CN105737338B (en
Inventor
廖南海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Midea Group Co Ltd
Guangdong Midea HVAC Equipment Co Ltd
Original Assignee
Midea Group Co Ltd
Guangdong Midea HVAC Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Midea Group Co Ltd, Guangdong Midea HVAC Equipment Co Ltd filed Critical Midea Group Co Ltd
Priority to CN201610104558.3A priority Critical patent/CN105737338B/en
Publication of CN105737338A publication Critical patent/CN105737338A/en
Application granted granted Critical
Publication of CN105737338B publication Critical patent/CN105737338B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/30Control or safety arrangements for purposes related to the operation of the system, e.g. for safety or monitoring
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/30Control or safety arrangements for purposes related to the operation of the system, e.g. for safety or monitoring
    • F24F11/46Improving electric energy efficiency or saving
    • F24F11/47Responding to energy costs

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Air Conditioning Control Device (AREA)

Abstract

The invention provides an electricity consumption information computing method and device for a master-slave system, a multi-split air conditioner system and an external machine of the multi-split air conditioner system. The master-slave system comprises a master device and one or more slave devices. The electricity consumption information computing method comprises the following steps: detecting the operation state information of each slave device in each unit time and detecting the electricity consumption information of the slave devices in each unit time by the master device; and recording the operation state information of each slave device in each unit time and the electricity consumption information of the slave devices in each unit time, and computing the electricity consumption information of each slave device according to data recorded in the predetermined time period. Through the adoption of the technical scheme, the statistics of the electricity consumption information of the master-slave system can be realized simply and conveniently; and besides, the structure is simple, and the mounting and the maintaining are convenient.

Description

Information about power computational methods, device, multi-gang air-conditioner device system and outer machine thereof
Technical field
The present invention relates to master-slave system technical field, in particular to the information about power computational methods of a kind of master-slave system, the information about power calculation element of a kind of master-slave system, the outer machine of a kind of multi-gang air-conditioner device system and a kind of multi-gang air-conditioner device system.
Background technology
At present, the billing function of multi-gang air-conditioner device system carries out billing statistics often through the real-time status of the indoor and outdoor machine that external gateway gathers multi-gang air-conditioner device system, various go offline owing to this mode needs to process, power down, the complicated case such as communication abnormality, therefore realize complexity, relatively costly, and install difficult in maintenance.
Therefore, how can realize simply and easily the information about power of master-slave system is added up the technical problem becoming urgently to be resolved hurrily.
Summary of the invention
It is contemplated that at least solve one of technical problem of existence in prior art or correlation technique.
For this, it is an object of the present invention to propose the information about power numerical procedure of a kind of new master-slave system, it is possible to realize the statistics of the information about power to master-slave system simply and easily, simple in construction, convenient for installation and maintenance simultaneously.
Further object is that and propose a kind of multi-gang air-conditioner device system and outer machine thereof.
For achieving the above object, embodiment according to the first aspect of the invention, propose the information about power computational methods of a kind of master-slave system, described master-slave system includes a main equipment and at least one from equipment, described information about power computational methods, including the detection of: described main equipment described at least one from equipment every from equipment running state information within each unit interval, and detect described at least one from equipment power consumption information within described each unit interval;Record described every from equipment running state information within described each unit interval, and described at least one from equipment power consumption information within described each unit interval, according to the data of record in predetermined amount of time, to calculate described every information about power consumed from equipment.
The information about power computational methods of master-slave system according to an embodiment of the invention, by being detected and record every by main equipment from equipment running state information within each unit interval, and detect and record all power consumption information from equipment (namely above-mentioned at least one from equipment) within each unit interval, enable main device or the computing equipment specified according to statistical data (namely in predetermined amount of time) in some cycles, calculate every information about power consumed from equipment easily, owing to technical scheme is without adopting external gateway to carry out billing statistics, but realized from the running status of equipment by adding up every by main equipment, therefore simple in construction, convenient for installation and maintenance, it also is able to realize simply and easily the statistics of the information about power to master-slave system simultaneously.
The information about power computational methods of master-slave system according to the abovementioned embodiments of the present invention, it is also possible to there is techniques below feature:
According to one embodiment of present invention, also include:
By the data transmission of record in described predetermined amount of time to designated equipment, so that described designated equipment is according to the data of record in described predetermined amount of time, calculate described every information about power consumed from equipment;Or
Described main equipment, according to the data of record in described predetermined amount of time, calculates described every information about power consumed from equipment.
In this embodiment, having two ways to calculate every information about power consumed from equipment: mode one, the data recorded in predetermined amount of time are sent to designated equipment by main equipment, designated equipment be calculated, wherein, it is intended that equipment can be the equipment with computing function;Mode two, main equipment self is calculated according to the data of record in predetermined amount of time.
According to one embodiment of present invention, described master-slave system includes multi-gang air-conditioner device system, and described main equipment is the outer machine of described multi-gang air-conditioner device system, described from the interior machine that equipment is described multi-gang air-conditioner device system.
According to one embodiment of present invention, described running state information includes the operational mode of described interior machine and runs duration;Described at least one from equipment every the step from equipment running state information within each unit interval of described main equipment detection, specifically include: detect described every from equipment work within described each unit interval time operational mode, and the operation duration that every kind of operational mode is corresponding.
Specifically, the operational mode of interior machine includes refrigeration mode, heating mode, air supply pattern, dehumidifier pattern etc., due within the identical time, the electricity that different operational modes consume is likely to difference, therefore by detect every from equipment work within each unit interval time operational mode, and the operation duration that every kind of operational mode is corresponding, enabling carry out accurately adding up all sidedly, and then being able to ensure that calculating every information about power consumed from equipment exactly from the running status of equipment to every.
Embodiment according to a second aspect of the present invention, also proposed the information about power calculation element of a kind of master-slave system, described master-slave system includes a main equipment and at least one from equipment, described information about power calculation element, including: detection unit, for detect described at least one from equipment every from equipment running state information within each unit interval, and detect described at least one from equipment power consumption information within described each unit interval;Record unit, for record described every from equipment running state information within described each unit interval, and described at least one from equipment power consumption information within described each unit interval, according to the data of record in predetermined amount of time, to calculate described every information about power consumed from equipment.
The information about power calculation element of master-slave system according to an embodiment of the invention, main equipment is by detecting and record every from equipment running state information within each unit interval, and detect and record all power consumption information from equipment (namely above-mentioned at least one from equipment) within each unit interval, enable main device or the computing equipment specified according to statistical data (namely in predetermined amount of time) in some cycles, calculate every information about power consumed from equipment easily, owing to technical scheme is without adopting external gateway to carry out billing statistics, but realized from the running status of equipment by adding up every by main equipment, therefore simple in construction, convenient for installation and maintenance, it also is able to realize simply and easily the statistics of the information about power to master-slave system simultaneously.
The information about power calculation element of master-slave system according to the abovementioned embodiments of the present invention, it is also possible to there is techniques below feature:
According to one embodiment of present invention, also include:
Transmission unit, for transmitting the data of record in described predetermined amount of time to designated equipment, so that described designated equipment is according to the data of record in described predetermined amount of time, calculates described every information about power consumed from equipment;Or
Computing unit, for according to the data of record in described predetermined amount of time, calculating described every information about power consumed from equipment.
In this embodiment, having two ways to calculate every information about power consumed from equipment: mode one, the data recorded in predetermined amount of time are sent to designated equipment by main equipment, designated equipment be calculated, wherein, it is intended that equipment can be the equipment with computing function;Mode two, main equipment self is calculated according to the data of record in predetermined amount of time.
According to one embodiment of present invention, described master-slave system includes multi-gang air-conditioner device system, and described main equipment is the outer machine of described multi-gang air-conditioner device system, described from the interior machine that equipment is described multi-gang air-conditioner device system.
According to one embodiment of present invention, described running state information includes the operational mode of described interior machine and runs duration;Described detection unit specifically for: detect described every from equipment work within described each unit interval time operational mode, and the operation duration that every kind of operational mode is corresponding.
Specifically, the operational mode of interior machine includes refrigeration mode, heating mode, air supply pattern, dehumidifier pattern etc., due within the identical time, the electricity that different operational modes consume is likely to difference, therefore by detect every from equipment work within each unit interval time operational mode, and the operation duration that every kind of operational mode is corresponding, enabling carry out accurately adding up all sidedly, and then being able to ensure that calculating every information about power consumed from equipment exactly from the running status of equipment to every.
Embodiment according to a third aspect of the present invention, it is also proposed that the outer machine of a kind of multi-gang air-conditioner device system, including: the information about power calculation element of the master-slave system as according to any one of above-described embodiment.
Embodiment according to a fourth aspect of the present invention, it is also proposed that a kind of multi-gang air-conditioner device system, including: machine at least one;And the outer machine of the multi-gang air-conditioner device system as described in above-described embodiment.
The additional aspect of the present invention and advantage will part provide in the following description, and part will become apparent from the description below, or is recognized by the practice of the present invention.
Accompanying drawing explanation
Above-mentioned and/or the additional aspect of the present invention and advantage are from conjunction with will be apparent from easy to understand the accompanying drawings below description to embodiment, wherein:
Fig. 1 illustrates the schematic flow diagram of the information about power computational methods of master-slave system according to an embodiment of the invention;
Fig. 2 illustrates the schematic block diagram of the information about power calculation element of master-slave system according to an embodiment of the invention;
Fig. 3 illustrates the schematic block diagram of the outer machine of multi-gang air-conditioner device system according to an embodiment of the invention;
Fig. 4 illustrates the schematic block diagram of multi-gang air-conditioner device system according to an embodiment of the invention;
Fig. 5 illustrates the structural representation of multi-gang air-conditioner device system according to an embodiment of the invention.
Detailed description of the invention
In order to be more clearly understood that the above-mentioned purpose of the present invention, feature and advantage, below in conjunction with the drawings and specific embodiments, the present invention is further described in detail.It should be noted that when not conflicting, embodiments herein and the feature in embodiment can be mutually combined.
Elaborate a lot of detail in the following description so that fully understanding the present invention; but; the present invention can also adopt other to be different from other modes described here to implement, and therefore, protection scope of the present invention is by the restriction of following public specific embodiment.
Fig. 1 illustrates the schematic flow diagram of the information about power computational methods of master-slave system according to an embodiment of the invention.
The master-slave system that the present invention proposes includes a main equipment and at least one from equipment.As it is shown in figure 1, the information about power computational methods of master-slave system according to an embodiment of the invention, including:
Step 102, main equipment detection described at least one from equipment every from equipment running state information within each unit interval, and detect described at least one from equipment power consumption information within described each unit interval;
Step 104, record described every from equipment running state information within described each unit interval, and described at least one from equipment power consumption information within described each unit interval, according to the data of record in predetermined amount of time, to calculate described every information about power consumed from equipment.
By being detected and record every by main equipment from equipment running state information within each unit interval, and detect and record all power consumption information from equipment (namely above-mentioned at least one from equipment) within each unit interval, enable main device or the computing equipment specified according to statistical data (namely in predetermined amount of time) in some cycles, calculate every information about power consumed from equipment easily, owing to technical scheme is without adopting external gateway to carry out billing statistics, but realized from the running status of equipment by adding up every by main equipment, therefore simple in construction, convenient for installation and maintenance, it also is able to realize simply and easily the statistics of the information about power to master-slave system simultaneously.
The information about power computational methods of master-slave system according to the abovementioned embodiments of the present invention, it is also possible to there is techniques below feature:
According to one embodiment of present invention, also include:
By the data transmission of record in described predetermined amount of time to designated equipment, so that described designated equipment is according to the data of record in described predetermined amount of time, calculate described every information about power consumed from equipment;Or
Described main equipment, according to the data of record in described predetermined amount of time, calculates described every information about power consumed from equipment.
In this embodiment, having two ways to calculate every information about power consumed from equipment: mode one, the data recorded in predetermined amount of time are sent to designated equipment by main equipment, designated equipment be calculated, wherein, it is intended that equipment can be the equipment with computing function;Mode two, main equipment self is calculated according to the data of record in predetermined amount of time.
According to one embodiment of present invention, described master-slave system includes multi-gang air-conditioner device system, and described main equipment is the outer machine of described multi-gang air-conditioner device system, described from the interior machine that equipment is described multi-gang air-conditioner device system.
According to one embodiment of present invention, described running state information includes the operational mode of described interior machine and runs duration;Described at least one from equipment every the step from equipment running state information within each unit interval of described main equipment detection, specifically include: detect described every from equipment work within described each unit interval time operational mode, and the operation duration that every kind of operational mode is corresponding.
Specifically, the operational mode of interior machine includes refrigeration mode, heating mode, air supply pattern, dehumidifier pattern etc., due within the identical time, the electricity that different operational modes consume is likely to difference, therefore by detect every from equipment work within each unit interval time operational mode, and the operation duration that every kind of operational mode is corresponding, enabling carry out accurately adding up all sidedly, and then being able to ensure that calculating every information about power consumed from equipment exactly from the running status of equipment to every.
Fig. 2 illustrates the schematic block diagram of the information about power calculation element of master-slave system according to an embodiment of the invention.
The master-slave system that the present invention proposes includes a main equipment and at least one from equipment.As in figure 2 it is shown, the information about power calculation element 200 of master-slave system according to an embodiment of the invention, including:
Detection unit 202, for detect described at least one from equipment every from equipment running state information within each unit interval, and detect described at least one from equipment power consumption information within described each unit interval;Record unit 204, for record described every from equipment running state information within described each unit interval, and described at least one from equipment power consumption information within described each unit interval, according to the data of record in predetermined amount of time, to calculate described every information about power consumed from equipment.
Specifically, main equipment is by detecting and record every from equipment running state information within each unit interval, and detect and record all power consumption information from equipment (namely above-mentioned at least one from equipment) within each unit interval, enable main device or the computing equipment specified according to statistical data (namely in predetermined amount of time) in some cycles, calculate every information about power consumed from equipment easily, owing to technical scheme is without adopting external gateway to carry out billing statistics, but realized from the running status of equipment by adding up every by main equipment, therefore simple in construction, convenient for installation and maintenance, it also is able to realize simply and easily the statistics of the information about power to master-slave system simultaneously.
The information about power calculation element 200 of master-slave system according to the abovementioned embodiments of the present invention, it is also possible to there is techniques below feature:
According to one embodiment of present invention, also include:
Transmission unit 206, for transmitting the data of record in described predetermined amount of time to designated equipment, so that described designated equipment is according to the data of record in described predetermined amount of time, calculates described every information about power consumed from equipment;Or
Computing unit 208, for according to the data of record in described predetermined amount of time, calculating described every information about power consumed from equipment.
In this embodiment, having two ways to calculate every information about power consumed from equipment: mode one, the data recorded in predetermined amount of time are sent to designated equipment by main equipment, designated equipment be calculated, wherein, it is intended that equipment can be the equipment with computing function;Mode two, main equipment self is calculated according to the data of record in predetermined amount of time.
According to one embodiment of present invention, described master-slave system includes multi-gang air-conditioner device system, and described main equipment is the outer machine of described multi-gang air-conditioner device system, described from the interior machine that equipment is described multi-gang air-conditioner device system.
According to one embodiment of present invention, described running state information includes the operational mode of described interior machine and runs duration;Described detection unit 202 specifically for: detect described every from equipment work within described each unit interval time operational mode, and the operation duration that every kind of operational mode is corresponding.
Specifically, the operational mode of interior machine includes refrigeration mode, heating mode, air supply pattern, dehumidifier pattern etc., due within the identical time, the electricity that different operational modes consume is likely to difference, therefore by detect every from equipment work within each unit interval time operational mode, and the operation duration that every kind of operational mode is corresponding, enabling carry out accurately adding up all sidedly, and then being able to ensure that calculating every information about power consumed from equipment exactly from the running status of equipment to every.
Fig. 3 illustrates the schematic block diagram of the outer machine of multi-gang air-conditioner device system according to an embodiment of the invention.
As it is shown on figure 3, the outer machine 300 of multi-gang air-conditioner device system according to an embodiment of the invention, including: the information about power calculation element 200 of master-slave system as shown in Figure 2.
Fig. 4 illustrates the schematic block diagram of multi-gang air-conditioner device system according to an embodiment of the invention.
As shown in Figure 4, multi-gang air-conditioner device system 400 according to an embodiment of the invention, including: machine 402 at least one;And the outer machine 300 of as shown in Figure 3 multi-gang air-conditioner device system.
Below for master-slave system for multi-gang air-conditioner device system, describe technical scheme in detail.
Fig. 5 illustrates the structural representation of multi-gang air-conditioner device system according to an embodiment of the invention.
As shown in fig. 5, it is assumed that there is machine in X platform in multi-gang air-conditioner device system, every interior machine has refrigeration, heats, blows, dehumidifier isotype.Wherein, integrated in outer machine RTC (Real-TimeClock, real-time clock) module is used for providing date-time information;Memorizer is used for storing the statistical information of each unit interval (such as every day);Ammeter interface is used for gathering whole system information about power.
Exemplarily illustrate with the unit interval for sky:
Outer machine daily stores ammeter reading, real-time statistics the running status statistical information of every interior machine in daily storing one day, such as freezes how many minutes, heats how many minutes.
Such as there being the multi-gang air-conditioner device system of 64 interior machines, the timing statistics of 4 states of storage, the timing statistics of each state takies 2 bytes, then need 2 × 4 × 64=512 byte/sky=0.5KB/ days, then 1 year required memory space of record is: 366 × 0.5=183KB/, the memory space that recording 10 years needs is 183 × 10=1830KB, therefore 10 annual datas are enough stored with the FLASH of a 2MB, and owing to 64 interior machines generally will not all exist, it can be considered to compression storage, to reduce the memory space shared by record data further.
After machine have recorded running status statistical information outside, outer machine can share electricity according to the interior machine that algorithm calculates in some cycles, data can also be derived to upper computer software, so that upper computer software calculates the information about power obtaining sharing in every interior machine some cycles.
The technical scheme of the above embodiment of the present invention, by being built in outer machine by the statistical function of information about power, is possible not only to realize simply the statistics of internal machine information about power, and system structure is simple, it is easy to accomplish.
Technical scheme is described in detail above in association with accompanying drawing, the present invention proposes the information about power numerical procedure of a kind of new master-slave system, can realizing the statistics of the information about power to master-slave system simply and easily, simple in construction, convenient for installation and maintenance simultaneously.
The foregoing is only the preferred embodiments of the present invention, be not limited to the present invention, for a person skilled in the art, the present invention can have various modifications and variations.All within the spirit and principles in the present invention, any amendment of making, equivalent replacement, improvement etc., should be included within protection scope of the present invention.

Claims (10)

1. the information about power computational methods of a master-slave system, it is characterised in that described master-slave system includes a main equipment and at least one from equipment, described information about power computational methods, including:
The detection of described main equipment described at least one from equipment every from equipment running state information within each unit interval, and detect described at least one from equipment power consumption information within described each unit interval;
Record described every from equipment running state information within described each unit interval, and described at least one from equipment power consumption information within described each unit interval, according to the data of record in predetermined amount of time, to calculate described every information about power consumed from equipment.
2. the information about power computational methods of master-slave system according to claim 1, it is characterised in that also include:
By the data transmission of record in described predetermined amount of time to designated equipment, so that described designated equipment is according to the data of record in described predetermined amount of time, calculate described every information about power consumed from equipment;Or
Described main equipment, according to the data of record in described predetermined amount of time, calculates described every information about power consumed from equipment.
3. the information about power computational methods of master-slave system according to claim 1 and 2, it is characterized in that, described master-slave system includes multi-gang air-conditioner device system, and described main equipment is the outer machine of described multi-gang air-conditioner device system, described from the interior machine that equipment is described multi-gang air-conditioner device system.
4. the information about power computational methods of master-slave system according to claim 3, it is characterised in that described running state information includes the operational mode of described interior machine and runs duration;
The detection of described main equipment described at least one from equipment every from the step of equipment running state information within each unit interval, specifically include:
Detect described every from equipment work within described each unit interval time operational mode, and the operation duration that every kind of operational mode is corresponding.
5. the information about power calculation element of a master-slave system, it is characterised in that described master-slave system includes a main equipment and at least one from equipment, described information about power calculation element, including:
Detection unit, for detect described at least one from equipment every from equipment running state information within each unit interval, and detect described at least one from equipment power consumption information within described each unit interval;
Record unit, for record described every from equipment running state information within described each unit interval, and described at least one from equipment power consumption information within described each unit interval, according to the data of record in predetermined amount of time, to calculate described every information about power consumed from equipment.
6. the information about power calculation element of master-slave system according to claim 5, it is characterised in that also include:
Transmission unit, for transmitting the data of record in described predetermined amount of time to designated equipment, so that described designated equipment is according to the data of record in described predetermined amount of time, calculates described every information about power consumed from equipment;Or
Computing unit, for according to the data of record in described predetermined amount of time, calculating described every information about power consumed from equipment.
7. the information about power calculation element of the master-slave system according to claim 5 or 6, it is characterized in that, described master-slave system includes multi-gang air-conditioner device system, and described main equipment is the outer machine of described multi-gang air-conditioner device system, described from the interior machine that equipment is described multi-gang air-conditioner device system.
8. the information about power calculation element of master-slave system according to claim 7, it is characterised in that described running state information includes the operational mode of described interior machine and runs duration;
Described detection unit specifically for: detect described every from equipment work within described each unit interval time operational mode, and the operation duration that every kind of operational mode is corresponding.
9. the outer machine of a multi-gang air-conditioner device system, it is characterised in that including: the information about power calculation element of the master-slave system as according to any one of claim 5 to 8.
10. a multi-gang air-conditioner device system, it is characterised in that including:
Machine at least one;And
The outer machine of multi-gang air-conditioner device system as claimed in claim 9.
CN201610104558.3A 2016-02-25 2016-02-25 Information about power calculation method, device, multi-gang air-conditioner device system and its outer machine Active CN105737338B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610104558.3A CN105737338B (en) 2016-02-25 2016-02-25 Information about power calculation method, device, multi-gang air-conditioner device system and its outer machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610104558.3A CN105737338B (en) 2016-02-25 2016-02-25 Information about power calculation method, device, multi-gang air-conditioner device system and its outer machine

Publications (2)

Publication Number Publication Date
CN105737338A true CN105737338A (en) 2016-07-06
CN105737338B CN105737338B (en) 2019-02-12

Family

ID=56249455

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610104558.3A Active CN105737338B (en) 2016-02-25 2016-02-25 Information about power calculation method, device, multi-gang air-conditioner device system and its outer machine

Country Status (1)

Country Link
CN (1) CN105737338B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106556105A (en) * 2016-10-27 2017-04-05 广东美的暖通设备有限公司 The control method and device of multi-gang air-conditioner
CN107238175A (en) * 2017-06-06 2017-10-10 珠海格力电器股份有限公司 Electric quantity charging method and device of air conditioner
WO2020077810A1 (en) * 2018-10-16 2020-04-23 珠海格力电器股份有限公司 Method and apparatus for calculating electricity consumption for central air conditioner, and central air conditioner
CN115095957A (en) * 2022-07-06 2022-09-23 贵州汇通华城股份有限公司 Method and system for metering electric quantity of air conditioner under different working conditions

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2384145Y (en) * 1999-03-29 2000-06-21 广东美的集团股份有限公司 One driven multiple air conditioner
CN1553105A (en) * 2003-05-30 2004-12-08 乐金电子(天津)电器有限公司 Electric power separable multi-chamber air conditioner system and computing method
JP2004353883A (en) * 2003-05-27 2004-12-16 Osaka Gas Co Ltd Engine driven air-conditioning system
CN1590883A (en) * 2003-08-25 2005-03-09 乐金电子(天津)电器有限公司 Power consumption calculating method of are machine multiterminal type air conditioner
CN1712843A (en) * 2004-06-21 2005-12-28 乐金电子(天津)电器有限公司 Air conditioning system with plural indoor units and its operation

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2384145Y (en) * 1999-03-29 2000-06-21 广东美的集团股份有限公司 One driven multiple air conditioner
JP2004353883A (en) * 2003-05-27 2004-12-16 Osaka Gas Co Ltd Engine driven air-conditioning system
CN1553105A (en) * 2003-05-30 2004-12-08 乐金电子(天津)电器有限公司 Electric power separable multi-chamber air conditioner system and computing method
CN1590883A (en) * 2003-08-25 2005-03-09 乐金电子(天津)电器有限公司 Power consumption calculating method of are machine multiterminal type air conditioner
CN1712843A (en) * 2004-06-21 2005-12-28 乐金电子(天津)电器有限公司 Air conditioning system with plural indoor units and its operation

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106556105A (en) * 2016-10-27 2017-04-05 广东美的暖通设备有限公司 The control method and device of multi-gang air-conditioner
CN107238175A (en) * 2017-06-06 2017-10-10 珠海格力电器股份有限公司 Electric quantity charging method and device of air conditioner
WO2020077810A1 (en) * 2018-10-16 2020-04-23 珠海格力电器股份有限公司 Method and apparatus for calculating electricity consumption for central air conditioner, and central air conditioner
CN115095957A (en) * 2022-07-06 2022-09-23 贵州汇通华城股份有限公司 Method and system for metering electric quantity of air conditioner under different working conditions

Also Published As

Publication number Publication date
CN105737338B (en) 2019-02-12

Similar Documents

Publication Publication Date Title
US11595076B2 (en) Low power, centralized data collection
US11190918B1 (en) Systems and methods for sensing, recording, analyzing and reporting environmental conditions in data centers and similar facilities
US11537178B2 (en) Server rack for improved data center management
CN105737338A (en) Electricity consumption information computing method and device, multi-split air conditioner system and external machine of multi-split air conditioner system
US11284544B1 (en) Systems and methods for sensing, recording, analyzing and reporting environmental conditions in data centers and similar facilities
CN102539860B (en) Multiple on-line electricity measuring method, multiple on-line electricity measuring system and electric equipment unit system
CN104040820A (en) System for building management of electricity via network control of point-of-use devices
CN104052631A (en) Equipment information collecting method, device and system
CN111182052A (en) Mine engineering visual linkage data early warning system based on BIM and Internet of things
CN102333020A (en) Sub-district terminal network oriented security system
CN110658752A (en) Data acquisition system applied to remote cloud monitoring
CN112770285A (en) Digital twin factory modeling method and device based on 5G network
WO2019085002A1 (en) Intelligent water pump controller based on internet of things
CN103929483B (en) Underground water is layered automatic monitoring system
JP6108269B2 (en) Measuring device
CN203644199U (en) General type Internet of Things data acquisition terminal
CN102734896A (en) Method and device for monitoring operation environments of multi-split air-conditioning system
CN104484753A (en) Server asset information tracing method
CN102736588B (en) Monitoring method and system
CN209342867U (en) A kind of test device of water meter teletransmission circuit board
CN106789185A (en) A kind of information technoloy equipment management method based on outband management
CN102937793A (en) Method and apparatus for achieving device monitoring
CN214623728U (en) Building construction supervisory systems based on BIM
CN106210832A (en) Smart bluetooth remote controller low electricity scheme based on user behavior analysis and system
IT201800000675U1 (en) Process data monitoring and storage system in industrial applications.

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant