CN105736839A - Through-wall connecting pipe for clean chamber - Google Patents

Through-wall connecting pipe for clean chamber Download PDF

Info

Publication number
CN105736839A
CN105736839A CN201610235079.5A CN201610235079A CN105736839A CN 105736839 A CN105736839 A CN 105736839A CN 201610235079 A CN201610235079 A CN 201610235079A CN 105736839 A CN105736839 A CN 105736839A
Authority
CN
China
Prior art keywords
sleeve pipe
wall
sun
cloudy
toilet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610235079.5A
Other languages
Chinese (zh)
Other versions
CN105736839B (en
Inventor
张大为
吕波
王震锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI MACROPROCESS LUSTRATION TECHNOLOGY Co Ltd
Original Assignee
SHANGHAI MACROPROCESS LUSTRATION TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI MACROPROCESS LUSTRATION TECHNOLOGY Co Ltd filed Critical SHANGHAI MACROPROCESS LUSTRATION TECHNOLOGY Co Ltd
Priority to CN201610235079.5A priority Critical patent/CN105736839B/en
Publication of CN105736839A publication Critical patent/CN105736839A/en
Application granted granted Critical
Publication of CN105736839B publication Critical patent/CN105736839B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L5/00Devices for use where pipes, cables or protective tubing pass through walls or partitions
    • F16L5/02Sealing
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L55/00Devices or appurtenances for use in, or in connection with, pipes or pipe systems
    • F16L55/07Arrangement or mounting of devices, e.g. valves, for venting or aerating or draining

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Sanitary Device For Flush Toilet (AREA)

Abstract

The invention relates to a through-wall connecting pipe for a clean chamber. The through-wall connecting pipe for the clean chamber comprises a cover plate, a positive sleeve, a negative sleeve and a cap, wherein the first end of the positive sleeve and the first end of the negative sleeve are connected in a sealed mode, the second end of the positive sleeve is connected with the cover plate, and the second end of the negative sleeve is connected with the cap. The through-wall connecting pipe for the clean chamber is reasonable in structure and convenient to use; the purposes of isolating and sealing are effectively achieved when medium pipelines in different rooms of the clean chamber pass through walls; and steam sterilization or air purging can be conducted on inner cavities of the sleeves, so that rapid sterilization and disinfection of the inner cavities of the positive sleeve and the negative sleeve are achieved, and the effect that high requirements of the clean industry are met is guaranteed.

Description

Toilet's wall-through connecting pipe
Technical field
The present invention relates to field, toilet, particularly for the wall-through connecting pipe of toilet.
Background technology
There is more occasion to need pipeline from building masonry wall traverse in industrial circle at present, also or by pipeline penetrated another room by a room, therefore commonly used pipe box through walls.In general industry field, through walls for pipeline is not particularly limited, as long as by pipeline from one end of wall through other end, but in clean industry, particularly pharmaceutical industry, the purity requirements in chummery is not different, and therefore chummery domestic demand not keep pressure reduction or need to prevent material from not spreading between chummery.
Existing wall-through connecting pipe generally all cannot meet the clean requirement of toilet, for instance only does wall body structure and does not seal, thus causing toilet's difference room air mutually to circulate, makes the cleanliness factor in each room impacted.It addition, existing wall pipe be enclosed within its pipe box two ends be flexibly connected time pipe interior be difficult to cleaning, sterilizing, even easily cause pipe interior pollution.
Summary of the invention
The applicant is for above-mentioned existing issue, carry out Improvement, a kind of toilet wall-through connecting pipe is provided, its efficiently solve medium pipeline in toilet's not chummery movable through walls time isolating seal problem, additionally can also realize medium pipeline is carried out sterilizing in place or off-line disinfecting action, meet the clean requirement of toilet.
The invention provides a kind of toilet wall-through connecting pipe, it is characterized in that: include cover plate, sun sleeve pipe, cloudy sleeve pipe and block, wherein: the first end of described sun sleeve pipe and the first end of described cloudy sleeve pipe are tightly connected, second end of described sun sleeve pipe connects described cover plate, and the second end of described cloudy sleeve pipe connects described block.
Preferably, the first end of described sun sleeve pipe and the first end of described cloudy sleeve pipe are tightly connected, including:
First end periphery of described sun sleeve pipe arranges external screw thread, and the first end inner circumferential of described cloudy sleeve pipe arranges female thread, and the first end periphery of described sun sleeve pipe and the first end inner circumferential of described cloudy sleeve pipe are threaded connection;Or
First end inner circumferential of described sun sleeve pipe arranges female thread, and the first end periphery of described cloudy sleeve pipe arranges external screw thread, and the first end inner circumferential of described sun sleeve pipe and the first end periphery of described cloudy sleeve pipe are threaded connection;Or
First end of described sun sleeve pipe and the first end of described cloudy sleeve pipe are tightly connected in the way of grafting.
Preferably, described sun sleeve pipe also sets up bobbin seal with the link of described cloudy sleeve pipe.
Preferably, described bobbin seal adopts polytetrafluoroethylmaterial material to make, and described bobbin seal is circular ring structure.
Preferably, the periphery of described sun sleeve pipe and the periphery of described cloudy sleeve pipe all along the circumferential direction stretch out and form the first disk end, first disk end of described sun sleeve pipe seals the side wall compressing body of wall by the first metope, and the first disk end of described cloudy sleeve pipe seals the opposite side metope compressing body of wall by the second metope.
Preferably, described first metope seals and described second metope seals and adopts silica gel material to make, and described first metope seals and described second metope is sealed into planar rings band structure.
Preferably, described toilet wall-through connecting pipe also includes poling, and described poling includes the first port and the second port, and the second port order of described poling runs through sun sleeve pipe and described cloudy sleeve pipe, and stretches in described block.
Preferably, also along the circumferential direction stretch out formation the second disk end on described poling, and described second disk end abuts with the second end of sun sleeve pipe, and the abutting place of described second disk end and described sun sleeve pipe arranges the first lid and seals.
Preferably, described first port and the second port are hose coupling or chuck structure.
Preferably, described poling arranges the first clip with the periphery, junction of described sun sleeve pipe outer end.
Preferably, arrange the second lid in the junction of described block with cloudy sleeve pipe to seal.
Preferably, described cover plate is disc-shaped structure, and outside described cover plate, circle centre position stretches out formation handle, arranges the 3rd lid in the inner side of described cover plate and seals.
Preferably, lid seals and adopts silica gel material to make, and described lid is sealed into O or wavy shaped configuration.
Preferably, described sun the second end of sleeve pipe arranges the second clip with the periphery, junction of described cover plate;And/or, described cloudy second end of sleeve pipe arranges the 3rd clip with the periphery, junction of described block.
Preferably, described sun sleeve pipe also setting up for the air intake to described sun sleeve pipe and cloudy sleeve pipe flowing steam, described air intake stretches out one end of sun sleeve pipe and arranges the first valve.
Preferably, described sun sleeve pipe also setting up the floss hole for discharging condensed water, described floss hole stretches out one end of sun sleeve pipe and arranges the second valve.
Beneficial effects of the present invention is as follows:
Present configuration is reasonable, easy to use, cloudy sleeve pipe is connected with sun sleeve pipe, the cavity for arranging poling is formed with sun inside pipe casing at cloudy sleeve pipe, poling achieves the circulation of medium, isolating seal problem when it efficiently solves that in toilet's not chummery, medium pipeline is through walls, each cannula cavity can carry out steam sterilization or air purges, it realizes sun sleeve pipe, the Quick disinfection of cloudy inside pipe casing cavity, sterilizing, ensure compliance with the high request of clean industry, the present invention is independent of body of wall bore size quality simultaneously, there is connection reliable, sealing property is high, easy installing/dismounting, safety is high, the advantage being easily maintained.
Accompanying drawing explanation
In order to be illustrated more clearly that the technical scheme of the embodiment of the present invention, below the accompanying drawing that embodiment or description of the prior art collect required use is briefly described, apparently, drawings discussed below is only some embodiments of the present invention, for those of ordinary skill in the art, under the premise not paying creative work, it is also possible to obtain other accompanying drawing according to these accompanying drawings.
Fig. 1 is the structural representation of the present invention.
Fig. 2 is the perspective view of embodiment 1 in the present invention.
Fig. 3 is the front view of embodiment 2 in the present invention.
Fig. 4 is the perspective view of embodiment 2 in the present invention.
Wherein: 1, cover plate;101, handle;2, poling;201, the first port;202, the second port;203, the second disk end;3, sun sleeve pipe;4, cloudy sleeve pipe;5, block;6, bobbin seal;7, metope seals;8, lid seals;9, air intake;10, floss hole;11, clip;12, the first disk end.
Detailed description of the invention
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is clearly and completely described, it is clear that described embodiment is a part of embodiment of the present invention, rather than whole embodiments.Based on embodiments of the invention, the every other embodiment that those of ordinary skill in the art obtain under not making creative work premise, broadly fall into the scope of protection of the invention.
As shown in Figure 1, toilet's wall-through connecting pipe that the present embodiment provides, including being installed on the positive sleeve pipe 3 of body of wall both sides and cloudy sleeve pipe 4, first end of sun sleeve pipe 3 and the first end of described cloudy sleeve pipe 4 all go deep into being tightly connected after body of wall and in body of wall, the connected mode of the first end of the first end of its middle-jiao yang, function of the spleen and stomach sleeve pipe 3 and described cloudy sleeve pipe 4 has multiple, the present invention does not limit, concrete:
The first: threaded, first end periphery of sun sleeve pipe 3 arranges external screw thread, first end inner circumferential of cloudy sleeve pipe 4 arranges female thread, or the first end inner circumferential of described sun sleeve pipe 3 arranges female thread, first end periphery of cloudy sleeve pipe 4 arranges external screw thread, and the first end of described sun sleeve pipe 3 can be threadeded with the first end of described cloudy sleeve pipe 4;
The second: socket connection, the interior section radius of the first end of sun sleeve pipe 3 is more than the outer section radius of the first end of cloudy sleeve pipe 4, and the first end of described cloudy sleeve pipe 4 can insert in the first end of sun sleeve pipe 3 just;Or the outer section radius of the first end of sun sleeve pipe 3 is less than the interior section radius of the first end of cloudy sleeve pipe 4, and the first end of described sun sleeve pipe 3 can insert in the first end of cloudy sleeve pipe 4 just;
The third: other are tightly connected mode, are namely capable of being connected the first end of sun sleeve pipe 3 in wall with the first end of cloudy sleeve pipe 4, and the present invention does not limit.
The present embodiment is attached in the way of sun sleeve pipe 3 and cloudy sleeve pipe 4 are threaded connection, and the first end of its middle-jiao yang, function of the spleen and stomach sleeve pipe 3 and the first end of cloudy sleeve pipe 4 are respectively protruding in body of wall and are threaded connection.When sun sleeve pipe 3 is connected with cloudy sleeve pipe 4, its junction can also arrange bobbin seal 6, and bobbin seal 6 makes sun sleeve pipe 3 be formed with cloudy sleeve pipe 4 and seals structure, and wherein bobbin seal 6 adopts polytetrafluoroethylmaterial material to make, and bobbin seal 6 is circular ring structure.
As it is shown in figure 1, block 5 is connected to the second end of cloudy sleeve pipe 4.Time in working order, the second end in sun sleeve pipe 3 is also connected with poling 2, and poling 2 includes the first port 201 and the second port 202, and the first port 201 and the second port 202 are any one in hose coupling or chuck structure.Second port 202 order of poling 2 runs through sun sleeve pipe 3, cloudy sleeve pipe 4 and stretches in block 5, and above-mentioned sun sleeve pipe 3, cloudy sleeve pipe 4, block 5 all adopt stainless steel material to make.The periphery, junction of poling 2 and sun sleeve pipe 3 outer end arranges the first clip 11.
As shown in Figure 1, all along the circumferential direction stretch out formation the first disk end 12 in the periphery of the periphery of sun sleeve pipe 3 and cloudy sleeve pipe 4, first disk end 12 of sun sleeve pipe 3 seals a side wall of 7 compression bodies of wall by the first metope, first disk end 12 of cloudy sleeve pipe 4 seals the opposite side metope of 7 compression bodies of wall by the second metope, above-mentioned metope seals 7 employing silica gel materials and makes, and it is planar rings band structure that metope seals 7.
As shown in Figure 1, poling 2 near the first port 201 end also along the circumferential direction stretch out formation the second disk end 203, second disk end 203 abuts with the second end of sun sleeve pipe 3, and the abutting place of the second disk end 203 and sun sleeve pipe 3 second end also sets up the first lid and seals 8.It is also provided with the second lid in the junction of block 5 with cloudy sleeve pipe 4 and seals 8.The present invention is when taking out poling 2 and entering sealing state, it is also connected with cover plate 1 in sun sleeve pipe 3 outer end, above-mentioned cover plate 1 adopts stainless steel material to make, cover plate 1 is disc-shaped structure, outside cover plate 1 circle centre position stretch out formation handle 101, be also provided with the 3rd lid sealing 8 in the inner side of cover plate 1, aforementioned cover seal 8 employing silica gel materials make, it is O or wavy shaped configuration that lid seals 8, and lid seals 8 for sealing structure by being formed between cover plate 1 and sun sleeve pipe 3, poling 2 and sun sleeve pipe 3 and block 5 and cloudy sleeve pipe 4.
As it is shown in figure 1, also set up the second clip 11 in sun the second end of sleeve pipe 3 with the periphery, junction of cover plate 1, arranging clip 11 in cloudy second end of sleeve pipe 4 with the periphery, junction the 3rd of block 5, clip 11 is also adopted by stainless steel material and makes.
As it is shown in figure 1, also set up the air intake 9 for sleeve pipe 3 on the sunny side and cloudy sleeve pipe 4 flowing steam on the tube wall of sun sleeve pipe 3, air intake 9 stretches out one end of sun sleeve pipe 3 and arranges the first valve, and air intake 9 is rustless steel molectron.In sun sleeve pipe 3 tube wall on also set up the floss hole 10 for discharging condensed water, floss hole 10 stretch out sun sleeve pipe 3 one end the second valve is set, the first valve and the second valve is arranged to instruction valve open-close state colour code.
In the present embodiment, the second end of sun sleeve pipe 3 can also be designed to the structure that is mutually fastenedly connected with other specific productss as required, in order to docks with specific process equipment flow process.
Embodiment 1:
As shown in Figure 2, toilet provided by the present invention wall-through connecting pipe includes cover plate 1, poling 2, sun sleeve pipe 3, cloudy sleeve pipe 4, block 5, bobbin seal 6, metope sealing 7, lid sealing 8, air intake 9, floss hole 10 and clip 11, its concrete structure is not as referring to described above, repeated them here.
nullThe through hole identical with sun sleeve pipe 3 overall diameter is outputed respectively at body of wall both sides metope,One end of sun sleeve pipe 3 with cloudy sleeve pipe 4 is inserted in hole respectively,Sun sleeve pipe 3 lays respectively at body of wall both sides metope with cloudy sleeve pipe 4,Above-mentioned sun sleeve pipe 3 passes through external screw thread with one end that cloudy sleeve pipe 4 stretches into body of wall、Female thread is relative,Sun sleeve pipe 3 is made to threaded with cloudy sleeve pipe 4,Before tightening sun sleeve pipe 3 and cloudy sleeve pipe 4 (this state sun sleeve pipe 3 does not contact with metope with inside the first disk end 12 of cloudy sleeve pipe 4),Between sun sleeve pipe 3 and body of wall one side wall、It is encased inside a metope between cloudy sleeve pipe 4 and body of wall one side wall respectively and seals 7 (the first metope seals and the second metope seals),It is inserted in bobbin seal 6 when sun sleeve pipe 3 screws gradually with cloudy sleeve pipe 4 simultaneously,After the external screw thread of sun sleeve pipe 3 is tightened with the female thread of cloudy sleeve pipe 4,Sun sleeve pipe 3、Cloudy sleeve pipe 4 compresses metope each through the first disk end 12 and seals 7,Simultaneously metope seals 7 stress and is pressed on metope,So that sun sleeve pipe 3、Formed between cloudy sleeve pipe 4 and wall and surface and seal,The link of sun sleeve pipe 3 and cloudy sleeve pipe 4 is formed by bobbin seal 6 and seals structure simultaneously,After now sun sleeve pipe 3 is connected with cloudy sleeve pipe 4, it is internally formed cavity confession poling 2 and passes.Subsequently sun sleeve pipe 3 outer end it is connected with cover plate 1 and uses a clip 11 to fasten, in the junction of sun sleeve pipe 3 outer end with cover plate 1, lid sealing 8 is set, simultaneously cloudy sleeve pipe 4 other end is connected with block 5 and passes through another clip 11 and fastens, it is also provided with lid sealing 8 in the junction of cloudy sleeve pipe 4 with block 5, so that body of wall both sides are formed reliably seals structure simultaneously.
When medium needs to pass into opposite side from body of wall side, utilizing poling 2 to replace cover plate 1, the second disk end 203 of poling 2 abuts against with the outer end of sun sleeve pipe 3 and passes through clip 11 and fastens.Medium is connected to the first port 201 by flexible pipe or stainless steel tube, the junction of flexible pipe or stainless steel tube and the first port 201 is fastened by clip 11, then block 5 is opened, opposite side pipeline is connected the second port 202 and fastens also by clip 11, first port 201 fluid flows into the second port 202 after opening, thus completing the sealed of medium, successively by block 5 after medium circulation, cover plate 1 resets and passes through clip 11 and fastens, now wall-through connecting pipe of the present invention reverts to body of wall two ends and seals structure, the poling 2 that cover plate 1 is displaced carries out off-line cleaning, sterilizing in sterilizing cabinet, standby.
After repeatedly using, sun sleeve pipe 3 needs cleaning with cloudy sleeve pipe 4 internal cavity, steam (or compression air, ozone) pipeline is connected to air intake 9 upper end valve, again floss hole 10 outlet is connected to reliable exhaust position (such as Ozone Absorption device etc.), open steam (or compression air, ozone) and sun sleeve pipe 3, cloudy sleeve pipe 4 internal cavity can be carried out suitable clean operation, after end, steam off (or compression air, ozone), simultaneously closes off air intake 9 and floss hole 10.
Embodiment 2:
As shown in Figure 3, Figure 4, toilet provided by the present invention wall-through connecting pipe includes cover plate 1, poling 2, sun sleeve pipe 3, cloudy sleeve pipe 4, block 5, bobbin seal 6, metope sealing 7, lid sealing 8, and its concrete structure is not as referring to described above, repeated them here.
nullThe through hole identical with sun sleeve pipe 3 overall diameter is outputed respectively at body of wall both sides metope,One end of sun sleeve pipe 3 with cloudy sleeve pipe 4 is inserted in hole respectively,Sun sleeve pipe 3 lays respectively at body of wall both sides metope with cloudy sleeve pipe 4,Above-mentioned sun sleeve pipe 3 passes through external screw thread with one end that cloudy sleeve pipe 4 stretches into body of wall、Female thread is relative,Sun sleeve pipe 3 is made to threaded with cloudy sleeve pipe 4,Before tightening sun sleeve pipe 3 and cloudy sleeve pipe 4 (this state sun sleeve pipe 3 does not contact with metope with inside the first disk end 12 of cloudy sleeve pipe 4),Between sun sleeve pipe 3 and body of wall one side wall、It is encased inside a metope between cloudy sleeve pipe 4 and body of wall one side wall respectively and seals 7 (the first metope seals and the second metope seals),It is inserted in bobbin seal 6 when sun sleeve pipe 3 screws gradually with cloudy sleeve pipe 4 simultaneously,After the external screw thread of sun sleeve pipe 3 is tightened with the female thread of cloudy sleeve pipe 4,Sun sleeve pipe 3、Cloudy sleeve pipe 4 compresses metope each through the first disk end 12 and seals 7,Simultaneously metope seals 7 stress and is pressed on metope,So that sun sleeve pipe 3、Formed between cloudy sleeve pipe 4 and wall and surface and seal,The link of sun sleeve pipe 3 and cloudy sleeve pipe 4 is formed by bobbin seal 6 and seals structure simultaneously,After now sun sleeve pipe 3 is connected with cloudy sleeve pipe 4, it is internally formed cavity confession poling 2 and passes,Insert the outer end of sun sleeve pipe 3 from outside with back shroud 1,Such as Fig. 3、Shown in Fig. 4,Lid in the arranged outside undulate of cover plate 1 seals 8,This waveform lid seals 8 inner chambers stretching into sun sleeve pipe 3 and forms sealing,Then the merga pass lid that block 5 also matched with the outer end of cloudy sleeve pipe 4 seals 8 (it is conventional structure described in embodiment 1 that this lid seals 8) and realizes sealing,So that body of wall both sides are formed reliably seals structure.
When medium needs to pass into opposite side from body of wall side, utilizing poling 2 to replace cover plate 1, the second disk end 203 of poling 2 abuts against with the outer end of sun sleeve pipe 3.Medium is connected to the first port 201 by flexible pipe or stainless steel tube, then block 5 is opened, first port 201 fluid flows into the second port 202 after opening, thus completing the sealed of medium, block 5 and cover plate 1 being resetted successively after medium circulation, now wall-through connecting pipe of the present invention reverts to body of wall two ends and seals structure, and the poling 2 that cover plate 1 is displaced carries out off-line cleaning, sterilizing in sterilizing cabinet, standby.
When repeatedly using Zhiyang sleeve pipe 3 to need to clean with cloudy sleeve pipe 4 internal cavity, first open cover plate 1, internal cavity with water or alcohol wipe sun sleeve pipe 3, treat that cover plate 1 is resetted sealing by this cavity after drying, and then open block 5, with water or alcohol wipe the moon sleeve pipe 4 internal cavity, reset after to be dried sealing by block 5.
It is above some preferably embodiments of the embodiment of the present invention, anyone is under the premise of skilled, in the spirit without departing substantially from the present invention with without departing under the premise of the technical scope that the present invention relates to, it is possible to the details that the present invention is described makees various supplementing and amendment.Protection scope of the present invention is not limited to the scope cited by embodiment, and protection scope of the present invention is as the criterion with claim.

Claims (16)

1. toilet's wall-through connecting pipe, it is characterized in that: include cover plate (1), sun sleeve pipe (3), cloudy sleeve pipe (4) and block (5), wherein: the first end of described sun sleeve pipe (3) and the first end of described cloudy sleeve pipe (4) are tightly connected, second end of described sun sleeve pipe (3) connects described cover plate (1), and the second end of described cloudy sleeve pipe (4) connects described block (5).
2. toilet as claimed in claim 1 wall-through connecting pipe, it is characterised in that: the first end of described sun sleeve pipe (3) and the first end of described cloudy sleeve pipe (4) are tightly connected, including:
First end periphery of described sun sleeve pipe (3) arranges external screw thread, first end inner circumferential of described cloudy sleeve pipe (4) arranges female thread, and the first end periphery of described sun sleeve pipe (3) and the first end inner circumferential of described cloudy sleeve pipe (4) are threaded connection;Or
First end inner circumferential of described sun sleeve pipe (3) arranges female thread, first end periphery of described cloudy sleeve pipe (4) arranges external screw thread, and the first end inner circumferential of described sun sleeve pipe (3) and the first end periphery of described cloudy sleeve pipe (4) are threaded connection;Or
First end of described sun sleeve pipe (3) and the first end of described cloudy sleeve pipe (4) are tightly connected in the way of grafting.
3. toilet as claimed in claim 1 wall-through connecting pipe, it is characterised in that: the link of described sun sleeve pipe (3) and described cloudy sleeve pipe (4) also sets up bobbin seal (6).
4. toilet as claimed in claim 3 wall-through connecting pipe, it is characterised in that: described bobbin seal (6) adopts polytetrafluoroethylmaterial material to make, and described bobbin seal (6) is circular ring structure.
5. toilet as claimed in claim 1 wall-through connecting pipe, it is characterized in that: the periphery of described sun sleeve pipe (3) and the periphery of described cloudy sleeve pipe (4) all along the circumferential direction stretch out and form the first disk end (12), first disk end (12) of described sun sleeve pipe (3) seals (7) by the first metope and compresses a side wall of body of wall, and the first disk end (12) of described cloudy sleeve pipe (4) seals (7) by the second metope and compresses the opposite side metope of body of wall.
6. toilet as claimed in claim 5 wall-through connecting pipe, it is characterized in that: described first metope seals (7) and described second metope seals (7) and adopts silica gel material to make, and described first metope seals (7) and described second metope sealing (7) is planar rings band structure.
7. toilet as claimed in claim 1 wall-through connecting pipe, it is characterized in that: described toilet wall-through connecting pipe also includes poling (2), described poling (2) includes the first port (201) and the second port (202), second port (202) order of described poling (2) runs through sun sleeve pipe (3) and described cloudy sleeve pipe (4), and stretches in described block (5).
8. toilet as claimed in claim 7 wall-through connecting pipe, it is characterized in that: also along the circumferential direction stretch out formation the second disk end (203) on described poling (2), described second disk end (203) abuts with the second end of sun sleeve pipe (3), and the abutting place of described second disk end (203) and described sun sleeve pipe (3) arranges the first lid and seals (8).
9. toilet as claimed in claim 7 wall-through connecting pipe, it is characterised in that: described first port (201) and the second port (202) they are hose coupling or chuck structure.
10. toilet as claimed in claim 7 wall-through connecting pipe, it is characterised in that: the periphery, junction of described poling (2) and described sun sleeve pipe (3) outer end arranges the first clip (11).
11. toilet as claimed in claim 1 wall-through connecting pipe, it is characterised in that: the second lid is set in the junction of described block (5) with cloudy sleeve pipe (4) and seals (8).
12. toilet as claimed in claim 1 wall-through connecting pipe, it is characterized in that: described cover plate (1) is disc-shaped structure, stretch out in described cover plate (1) outside circle centre position and form handle (101), the 3rd lid is set in the inner side of described cover plate (1) and seals (8).
13. the toilet's wall-through connecting pipe as described in claim 8,11 or 12, it is characterised in that: lid seals (8) and adopts silica gel material to make, and it is O or wavy shaped configuration that described lid seals (8).
14. toilet as claimed in claim 1 wall-through connecting pipe, it is characterised in that: described second end of sun sleeve pipe (3) arranges the second clip (11) with the periphery, junction of described cover plate (1);And/or, described cloudy second end of sleeve pipe (4) arranges the 3rd clip (11) with the periphery, junction of described block (5).
15. toilet as claimed in claim 1 wall-through connecting pipe, it is characterized in that: also setting up for the air intake (9) to described sun sleeve pipe (3) and cloudy sleeve pipe (4) flowing steam on described sun sleeve pipe (3), described air intake (9) stretches out one end of sun sleeve pipe (3) and arranges the first valve.
16. toilet as claimed in claim 1 wall-through connecting pipe, it is characterized in that: also set up the floss hole (10) for discharging condensed water on described sun sleeve pipe (3), described floss hole (10) stretches out one end of sun sleeve pipe (3) and arranges the second valve.
CN201610235079.5A 2016-04-15 2016-04-15 Toilet's wall-through connecting pipe Active CN105736839B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610235079.5A CN105736839B (en) 2016-04-15 2016-04-15 Toilet's wall-through connecting pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610235079.5A CN105736839B (en) 2016-04-15 2016-04-15 Toilet's wall-through connecting pipe

Publications (2)

Publication Number Publication Date
CN105736839A true CN105736839A (en) 2016-07-06
CN105736839B CN105736839B (en) 2018-03-06

Family

ID=56254513

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610235079.5A Active CN105736839B (en) 2016-04-15 2016-04-15 Toilet's wall-through connecting pipe

Country Status (1)

Country Link
CN (1) CN105736839B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108910101A (en) * 2018-08-30 2018-11-30 珠海西格膜生物技术有限公司 Across the class transport device of sterile liquid and medicament compartment
CN108953775A (en) * 2018-08-29 2018-12-07 江苏超净电子***工程有限公司 Clean wall bushing system
CN110410607A (en) * 2019-08-07 2019-11-05 陈浩然 A kind of environmental protection expansion bellow
CN112209109A (en) * 2020-10-30 2021-01-12 重庆智翔金泰生物制药有限公司 Isolated material conveying method
CN113944808A (en) * 2021-11-04 2022-01-18 中国科学院武汉病毒研究所 Sealing device for wall-penetrating pipe fitting in biosafety laboratory
CN114249102A (en) * 2021-12-25 2022-03-29 艾美卫信生物药业(浙江)有限公司 Clean district is striden rank with low pollution intercommunication device

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2447599Y (en) * 2000-10-10 2001-09-12 陈树明 Wall-passing through ppie for mounting air conditioner
DE20218979U1 (en) * 2002-12-07 2004-04-15 Wiska Hoppmann & Mulsow Gmbh Wall lead-through assembly for pipes and cables used in e.g. boat construction, has threaded sections extending into space radially within the flanges
CN2760359Y (en) * 2004-11-04 2006-02-22 胡钦侗 Wall bushing in conformity to GMP requirements
US7900971B2 (en) * 2008-01-03 2011-03-08 Teh-Tsung Chiu Fastening device for cable and wave hose
CN202302341U (en) * 2011-10-11 2012-07-04 上海至纯洁净***科技股份有限公司 Sealing device between wallboard for clean room and wall feed-through pipeline
CN202992409U (en) * 2013-04-15 2013-06-12 上海奥星制药技术装备有限公司 Wall bushing
CN203099100U (en) * 2013-02-01 2013-07-31 缪克权 Flange structure of plastic pipe fitting for penetrating waterproof wall
CN205534638U (en) * 2016-04-15 2016-08-31 上海朗脉洁净技术股份有限公司 Chuan qiang of toilet connecting pipe

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2447599Y (en) * 2000-10-10 2001-09-12 陈树明 Wall-passing through ppie for mounting air conditioner
DE20218979U1 (en) * 2002-12-07 2004-04-15 Wiska Hoppmann & Mulsow Gmbh Wall lead-through assembly for pipes and cables used in e.g. boat construction, has threaded sections extending into space radially within the flanges
CN2760359Y (en) * 2004-11-04 2006-02-22 胡钦侗 Wall bushing in conformity to GMP requirements
US7900971B2 (en) * 2008-01-03 2011-03-08 Teh-Tsung Chiu Fastening device for cable and wave hose
CN202302341U (en) * 2011-10-11 2012-07-04 上海至纯洁净***科技股份有限公司 Sealing device between wallboard for clean room and wall feed-through pipeline
CN203099100U (en) * 2013-02-01 2013-07-31 缪克权 Flange structure of plastic pipe fitting for penetrating waterproof wall
CN202992409U (en) * 2013-04-15 2013-06-12 上海奥星制药技术装备有限公司 Wall bushing
CN205534638U (en) * 2016-04-15 2016-08-31 上海朗脉洁净技术股份有限公司 Chuan qiang of toilet connecting pipe

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108953775A (en) * 2018-08-29 2018-12-07 江苏超净电子***工程有限公司 Clean wall bushing system
CN108910101A (en) * 2018-08-30 2018-11-30 珠海西格膜生物技术有限公司 Across the class transport device of sterile liquid and medicament compartment
CN110410607A (en) * 2019-08-07 2019-11-05 陈浩然 A kind of environmental protection expansion bellow
CN112209109A (en) * 2020-10-30 2021-01-12 重庆智翔金泰生物制药有限公司 Isolated material conveying method
CN113944808A (en) * 2021-11-04 2022-01-18 中国科学院武汉病毒研究所 Sealing device for wall-penetrating pipe fitting in biosafety laboratory
CN114249102A (en) * 2021-12-25 2022-03-29 艾美卫信生物药业(浙江)有限公司 Clean district is striden rank with low pollution intercommunication device
CN114249102B (en) * 2021-12-25 2024-04-12 艾美坚持生物制药有限公司 Clean district strides grade with low pollution intercommunication device

Also Published As

Publication number Publication date
CN105736839B (en) 2018-03-06

Similar Documents

Publication Publication Date Title
CN105736839A (en) Through-wall connecting pipe for clean chamber
CN103721980B (en) Small-bore pipeline cleaner for inner wall and cleaning method thereof
CN205534638U (en) Chuan qiang of toilet connecting pipe
CN203571303U (en) Water separator
CN208900729U (en) A kind of multi-layer sealed flexible butterfly valve
CN203614762U (en) External-cleaning aseptic anti-mixing valve
CN206368980U (en) A kind of water purifier feedwater depotition cock
KR100865415B1 (en) Water supply device for branchicng of water pipe
CN203923718U (en) Full automatic washing machine inflow tube joint assembly
CN203139739U (en) Easily cleaned filter
CN201330905Y (en) Conveying tube joint
CN103191592A (en) Filter easy to clean
CN212308986U (en) Disassembly-free cleaning Y-shaped filter
CN220851063U (en) Cross-sterile-level sterile solution through-wall transfer device
WO2018041133A1 (en) Single-pipe double-channel water storage bag
RU137590U1 (en) BALL VALVE
RU2009107888A (en) PREFABRICATED PIPELINE HAVING A LOT OF MODULAR TUBULAR CHANNELS
CN206027220U (en) Abluent Y type filter of dismounting -free
CN201010516Y (en) Drinking machine with detachable water storage bucket and its water storage bucket
CN220034124U (en) Parallel running water sterilizing device
CN221374819U (en) Three-way solenoid valve pipeline connection structure
CN220302866U (en) Anti-leakage water tap
CN214331772U (en) Combined explosion-proof connecting pipe
CN203987784U (en) Override type multifunctional portable bath apparatus
CN219825461U (en) Multi-cavity integrated laminated water supply equipment

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Cleanroom through wall connecting pipe

Granted publication date: 20180306

Pledgee: Shanghai Pudong Development Bank Co.,Ltd. Jiading Sub branch

Pledgor: SHANGHAI MACROPROCESS LUSTRATION TECHNOLOGY Co.,Ltd.

Registration number: Y2024310000644