CN105728898B - Pulse welding equipment and its control method - Google Patents

Pulse welding equipment and its control method Download PDF

Info

Publication number
CN105728898B
CN105728898B CN201610187878.XA CN201610187878A CN105728898B CN 105728898 B CN105728898 B CN 105728898B CN 201610187878 A CN201610187878 A CN 201610187878A CN 105728898 B CN105728898 B CN 105728898B
Authority
CN
China
Prior art keywords
background current
current
wire feed
feed rate
background
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610187878.XA
Other languages
Chinese (zh)
Other versions
CN105728898A (en
Inventor
苏立虎
安小东
孙永涛
谷孝满
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Panasonic Welding Systems Tangshan Co Ltd
Original Assignee
Tangshan Matsushita Industrial Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tangshan Matsushita Industrial Equipment Co Ltd filed Critical Tangshan Matsushita Industrial Equipment Co Ltd
Priority to CN201610187878.XA priority Critical patent/CN105728898B/en
Publication of CN105728898A publication Critical patent/CN105728898A/en
Application granted granted Critical
Publication of CN105728898B publication Critical patent/CN105728898B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K9/00Arc welding or cutting
    • B23K9/09Arrangements or circuits for arc welding with pulsed current or voltage
    • B23K9/091Arrangements or circuits for arc welding with pulsed current or voltage characterised by the circuits
    • B23K9/092Arrangements or circuits for arc welding with pulsed current or voltage characterised by the circuits characterised by the shape of the pulses produced
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K9/00Arc welding or cutting
    • B23K9/095Monitoring or automatic control of welding parameters

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Plasma & Fusion (AREA)
  • Mechanical Engineering (AREA)
  • Arc Welding Control (AREA)

Abstract

The present invention provides a kind of pulse welding equipment, and it includes:Preset current acquiring unit, the first wire feed rate computing unit, the first background current computing unit, the second background current computing unit and control unit.Described control unit is within the first scheduled period from arc welding gun switch connection, control is exported based on first background current, and within the second scheduled period for terminating to play since the first scheduled period main weldering was connect the stage, control causes background current from the first background current gradual change to second background current.It can effectively improve welding quality.

Description

Pulse welding equipment and its control method
[technical field]
The present invention relates to welding field, more particularly to a kind of welding equipment that is welded of use pulse welding mode and its Control method.
[background technology]
Welding equipment (also referred to as welding machine) is widely used to all kinds of manufacturing industry.Welding equipment is different according to its welding manner, Two kinds of short circuiting transfer and pulse welding can be divided into.Pulse welding has an electric arc pinch effect, and electric arc is concentrated, and it is excellent that deflection is good etc. Point, thus be widely used in plate sheet welding (such as welding of stainless steel, steel and titanium non-ferrous metal).Hereinafter, pulse will be used The welding equipment that mode is welded is referred to as pulse welding equipment.
At present, mainly there is the following two kinds welding method when carrying out plate sheet welding using pulse welding equipment:(1) small electricity is used Fluid welding connects (for example, preset current is below 100A), and wire feed rate is relatively slow.(2) using high current welding (for example, preset Electric current is more than 100A), wire feed rate is relatively fast.However, due to using during high current welding, even if accelerating wire feed rate, Also often by thin plate burn-through, therefore, most producers are preferred to use small current welding.
When being welded using pulse welding equipment to thin plate, existing striking stage control is as follows:Such as Fig. 6 institutes Show, after arc welding gun switch connection, in whole striking stage T2, with the wire feed rate increase of wire-feed motor, control causes base value electricity Stream I is slowly increased.When wire feed rate reaches the setting speed that main weldering connects, the striking stage terminates, into main weldering connect the stage (T2 it Afterwards).The stage is connect in main weldering, background current I keeps constant, and wire feed rate keeps constant.
Fig. 7 is the output voltage wave monitored when preset welding current is low current by oscillograph.As shown in fig. 7, Have that base value voltage is unstable a striking stage, the phenomenon of even more than crest voltage can be gradually risen.In the case, if base Threshold voltage is continued for some time more than crest voltage, then can produce current interruption, has had a strong impact on striking performance.In addition, along with base Threshold voltage is too high to produce ear-piercing sound, welder can be made to do not feel like oneself.
In addition, market is it is also expected to the striking stage control for welding thin plate to existing use high current is optimized.
[content of the invention]
[technical problem]
It is contemplated that for existing pulse welding equipment when using small current welding thin plate the striking stage exist it is disconnected The problems such as arc, high noise, there is provided a kind of pulse welding equipment and its control method.
[solution]
The present invention provides a kind of pulse welding equipment, and it includes:Preset current acquiring unit, it is used to obtain user's input Preset current;First wire feed rate computing unit, it is used to connect the of the stage according to the predetermined preset current and main weldering The corresponding relation of one wire feed rate, and the preset current, to calculate first wire feed rate;First background current is calculated Unit, it is used for the first corresponding relation according to first wire feed rate and the first background current, and first wire feed Speed, to calculate first background current;Second background current computing unit, for according to predetermined first wire feed speed Second corresponding relation of degree and the second background current, and first wire feed rate, to calculate second background current, institute State the background current that the second background current connects the stage for the main weldering;And control unit, in the from arc welding gun switch connection In one scheduled period, control is exported based on first background current, and terminates to play main weldering from the first scheduled period In the second scheduled period that the stage of connecing has started, control causes background current from the first background current gradual change to described second Background current.
The present invention also provides a kind of control method of pulse welding equipment, and it comprises the following steps:Obtain user's input Preset current;The corresponding relation of first wire feed rate in stage is connect according to the predetermined preset current and main weldering, and it is described Preset current, to calculate first wire feed rate;It is corresponding according to the first of first wire feed rate and the first background current Relation, and first wire feed rate, to calculate first background current;According to predetermined first wire feed rate with Second corresponding relation of the second background current, and first wire feed rate, to calculate second background current, described Two background currents are the background current that the main weldering connects the stage;And within the first scheduled period from arc welding gun switch connection, Control is exported based on first background current, and is terminated to play main weldering connect the stage since the first scheduled period In second scheduled period, control causes background current from the first background current gradual change to second background current.
[invention beneficial effect]
The present invention by above-mentioned technical proposal, can effectively overcome existing pulse welding equipment by during small current welding Easy current interruption and the ear-piercing defect of noise that the striking stage is present, so as to improve striking performance and welding comfort level, additionally The control in striking stage when can be to being welded using high current provides further optimization.
[brief description of the drawings]
Fig. 1 is the software architecture diagram of the pulse welding equipment of first embodiment of the invention.
Fig. 2 is the control flow chart in the pulse welding equipment striking stage of first embodiment of the invention.
Fig. 3 be first embodiment of the invention pulse welding equipment in the corresponding relation figure that changes over time of background current.
Fig. 4 is the oscillogram of the output voltage in the pulse welding equipment striking stage of first embodiment of the invention.
Fig. 5 be second embodiment of the invention pulse welding equipment in the corresponding relation figure that changes over time of background current.
Fig. 6 is the corresponding relation figure that background current is changed over time in existing pulse welding equipment.
Fig. 7 is the oscillogram of the output voltage in existing pulse welding equipment striking stage.
[embodiment]
The embodiment to the present invention is illustrated below in conjunction with the accompanying drawings.
First, the basic welding process to the pulse welding equipment of the present invention is described.In welding, weldering is connected first Equipment (including the source of welding current and wire feeder) is connect, user inputs various welding parameters, such as material, silk by guidance panel Footpath, preset current etc..Afterwards, user presses arc welding gun switch, and now welding equipment enters the striking stage, meanwhile, welding equipment control Wire feeder processed starts wire feed.When wire feed rate reaches predetermined value, welding equipment control connects the stage into main weldering.Connect in main weldering Base value in stage, the output current wave of pulse welding equipment keeps constant.Afterwards, when user presses arc welding gun switch again, Welding equipment control, which enters, flashes back the stage.In the stage of flashing back, wire feed rate is gradually reduced, while the welding current of output is also gradually Reduction is until for 0, now welding terminates.
User presses the process that arc welding gun switch is welded repeatedly, exactly repeats the process in each above-mentioned stage.The present invention It is the improvement of the control method to the pulse welding equipment striking stage.The control method can be by the controller of welding equipment Corresponding program is performed to realize.
Further, since the present invention is the improvement to pulse welding device interior control program (software), therefore omit herein The description constituted to the hardware of the pulse power.
[first embodiment]
The first embodiment of the present invention is described referring to Fig. 1 to Fig. 4.In the first embodiment, to pulse welding equipment It is described using control during small current welding.In the present embodiment, the preset current no more than 100A is defined as small electricity Stream.Fig. 1 shows the software configuration of the pulse welding equipment of first embodiment.
As shown in figure 1, the pulse welding equipment of the present invention includes:Preset current acquiring unit, it is used to obtaining user defeated The preset current entered;First wire feed rate computing unit, it is used to connect the stage according to the predetermined preset current and main weldering The corresponding relation of first wire feed rate, and the preset current, to calculate first wire feed rate;First background current meter Unit is calculated, it is used for the first corresponding relation according to predetermined first wire feed rate and the first background current, and described First wire feed rate, to calculate first background current.
The pulse welding equipment of the present invention also includes:Second background current computing unit, for according to predetermined described One wire feed rate and the second corresponding relation of the second background current, and first wire feed rate, to calculate second base It is worth electric current, second background current is the background current that the main weldering connects the stage;And control unit, connect from arc welding gun switch In the first scheduled period led to, control is exported based on first background current, and is terminated from the first scheduled period Main weldering is played to connect in the second scheduled period that the stage started, control cause background current from the first background current gradual change to Second background current.
In the first embodiment, it is assumed that user input preset current be 80A, but the invention is not restricted to this, Ke Yiwei 70A or 60A.The size of preset current can be determined according to the gauge of sheet of required welding and the welding conditions of reality.
Next, reference picture 2 describes the control method in the pulse welding equipment striking stage of first embodiment of the invention.Institute Control method is stated as the corresponding software program of modules shown in the controller (CPU) of pulse welding equipment is performed with Fig. 1 To realize.
As shown in Fig. 2 first, in step s 201, CPU obtains the preset current of user's input.Specifically, CPU is read Take the preset current value that family is inputted by the operating unit (for example, guidance panel) of welding equipment.
Then, in step S202, CPU connects first wire feed rate in stage according to the predetermined preset current and main weldering Corresponding relation, and the preset current, to calculate first wire feed rate.The preset current connects the stage with main weldering The corresponding relation of first wire feed rate can be stored in advance in the internal storage of pulse welding equipment as table.In addition, this Invention not limited to this, the table can also be stored in external memory storage.
Then, in step S203, CPU is according to predetermined first wire feed rate and the first couple of the first background current It should be related to, and first wire feed rate, to calculate first background current.It is corresponding with used in step S202 to close It is similar, in the present embodiment, first corresponding relation also serves as the storage inside that table is stored in advance in pulse welding equipment In device.In addition, the first corresponding relation can be obtained by testing repeatedly, i.e., for each in multiple wires feed rate, make The test in striking stage is carried out with the first different background currents, optimal value is determined, and is stored as table, or fits phase The homologous thread answered.
In step S204, CPU is according to second corresponding pass of predetermined first wire feed rate with the second background current System, and first wire feed rate, to calculate second background current, second background current is that the main weldering connects rank The background current of section.It is similar with the corresponding relation used in step S202, in the present embodiment, second corresponding relation In the internal storage that pulse welding equipment is stored in advance in as table.
Then, in step S205, CPU is within the first scheduled period from arc welding gun switch connection, and control is based on described First background current is exported, and is terminating to play the second scheduled period main weldering was connect the stage since the first scheduled period Interior, control causes background current from the first background current gradual change (linear change) to second background current.
Specifically, CPU calculates the angle of flow of device for power switching (IGBT) according to the first background current, and first Corresponding drive signal is exported to IGBT in scheduled period, so as to realize the output of the first scheduled period electric current.And it is pre- second In periodically, background currents of the CPU according to corresponding to each moment calculates the IGBT angle of flow, and export corresponding driving letter Number, so as to realize the output of the second scheduled period electric current.
It is for convenience, unrelated with the preset current that user inputs it should be noted that in the present embodiment, and by first Scheduled period is set as fixed value.But the invention is not restricted to this, user can be according to the flexibly setting first of actual welding situation Scheduled period, if the first scheduled period be less than the striking stage it is whole during, that is, require to reserve the in the striking stage Two scheduled periods.
It should be noted that the step S201 in Fig. 2 is to S204, it can enter in the case where pulse welding equipment is in holding state OK, i.e., carried out in a period of being inputted from user before preset current is connected to arc welding gun switch.Certainly, the invention is not restricted to this, Above-mentioned steps can be carried out after arc welding gun switch connection.
Fig. 3 shows the corresponding relation figure that background current is changed over time in first embodiment.In figure 3, T2 is striking The complete period in stage.T1 represented for the first scheduled period, and T2-T1 represented for the second scheduled period.After T2, carry out main weldering and connect rank Section.As shown in figure 3, the value I1 (the first background current) of the background current of the first scheduled period connects the base value electricity in stage higher than main weldering The value I2 (the second background current) of stream.Within the second scheduled period, background current is (linear to drop from the first background current I1 gradual changes It is low) to the second background current I2.
Fig. 4 shows the oscillogram of the output voltage in the pulse welding equipment striking stage of first embodiment.Such as Fig. 4 institutes Show, by the control method of first embodiment, it is unstable to eliminate base value voltage present in prior art, can gradually rise The even more than phenomenon of crest voltage, so as to effectively improve welding quality.
[second embodiment]
The second embodiment of the present invention is described referring to Fig. 5.Second embodiment is using big electricity to pulse welding equipment Control when fluid welding connects is described.In the present embodiment, the preset current more than 100A is defined as high current.
Because the software sharing and control method of second embodiment are identical with first embodiment, just it is not repeated to retouch herein State.
The difference of second embodiment and first embodiment is the of different sizes of the first background current.As shown in figure 5, In a second embodiment, the value I3 (the first background current) of the first scheduled period T1 background current connects the base in stage less than main weldering It is worth the value I4 (the second background current) of electric current.Within the second scheduled period (T2-T1), background current from the first background current I3 gradually Become (linear rise) to the second background current I4.
More than, with reference to detailed or specific embodiment, the present invention is described, but those skilled in the art manage Solution, can carry out various changes and amendment on the premise of the thought and scope of the present invention is not departed from.
[industrial applicibility]
Present invention can apply in existing pulse welding equipment, can effectively improve welding quality.

Claims (6)

1. a kind of pulse welding equipment, it includes:
Preset current acquiring unit, it is used for the preset current for obtaining user's input;
First wire feed rate computing unit, it is used for the first wire feed speed that the stage is connect according to the predetermined preset current and main weldering The corresponding relation of degree, and the preset current, to calculate first wire feed rate;
First background current computing unit, it is used for the first corresponding pass with the first background current according to first wire feed rate System, and first wire feed rate, to calculate first background current;
Second background current computing unit, for the second couple according to predetermined first wire feed rate and the second background current It should be related to, and first wire feed rate, to calculate second background current, second background current is the main weldering Connect the background current in stage;And
Control unit, within the first scheduled period from arc welding gun switch connection, control is carried out based on first background current Output, and terminate to play in the second scheduled period the main weldering was connect the stage since the first scheduled period, control causes Background current is from the first background current gradual change to second background current.
2. pulse welding equipment according to claim 1, it is characterised in that the preset current is no more than 100A, and First background current is higher than second background current.
3. pulse welding equipment according to claim 1, it is characterised in that the preset current is more than 100A, and institute The first background current is stated less than second background current.
4. a kind of control method of pulse welding equipment, it comprises the following steps:
Obtain the preset current of user's input;
The corresponding relation of first wire feed rate in stage, and the preset electricity are connect according to the predetermined preset current and main weldering Stream, to calculate first wire feed rate;
According to first wire feed rate and the first corresponding relation of the first background current, and first wire feed rate, come Calculate first background current;
According to predetermined first wire feed rate and the second corresponding relation of the second background current, and first wire feed speed Degree, to calculate second background current, second background current is the background current that the main weldering connects the stage;And
Within the first scheduled period from arc welding gun switch connection, control is exported based on first background current, and Terminate to play in the second scheduled period the main weldering was connect the stage since the first scheduled period, control cause background current from The first background current gradual change is to second background current.
5. the control method of pulse welding equipment according to claim 4, it is characterised in that the preset current is no more than 100A, and first background current is higher than second background current.
6. the control method of pulse welding equipment according to claim 4, it is characterised in that the preset current exceedes 100A, and first background current is less than second background current.
CN201610187878.XA 2016-03-29 2016-03-29 Pulse welding equipment and its control method Active CN105728898B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610187878.XA CN105728898B (en) 2016-03-29 2016-03-29 Pulse welding equipment and its control method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610187878.XA CN105728898B (en) 2016-03-29 2016-03-29 Pulse welding equipment and its control method

Publications (2)

Publication Number Publication Date
CN105728898A CN105728898A (en) 2016-07-06
CN105728898B true CN105728898B (en) 2017-09-29

Family

ID=56252392

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610187878.XA Active CN105728898B (en) 2016-03-29 2016-03-29 Pulse welding equipment and its control method

Country Status (1)

Country Link
CN (1) CN105728898B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108127220B (en) * 2017-12-20 2019-09-17 唐山松下产业机器有限公司 The striking method of pulsed gas metal arc welding

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3941802B2 (en) * 2004-07-08 2007-07-04 松下電器産業株式会社 Arc welding control method and arc welding apparatus
JP5558881B2 (en) * 2010-03-29 2014-07-23 株式会社ダイヘン Plasma MIG welding method
DE102010003530A1 (en) * 2010-03-31 2011-10-06 Robert Bosch Gmbh Hardware data processing unit and method for monitoring a rounding duration of a routing unit
CN102873433B (en) * 2012-07-03 2014-11-26 广东技术师范学院 Method for predicting and setting wire feed speed of double-wire arc welding
US10906114B2 (en) * 2012-12-21 2021-02-02 Illinois Tool Works Inc. System for arc welding with enhanced metal deposition

Also Published As

Publication number Publication date
CN105728898A (en) 2016-07-06

Similar Documents

Publication Publication Date Title
JP3203250U (en) Method and system for welding with a power supply having a single welding mode
US7968822B2 (en) Arc welding system
US10376981B2 (en) Arc welding power supply and methods for controlling arc welding power supply
EP3219428B1 (en) Arc welding control method
CN103404020B (en) The drive circuit of motor, its integrated circuit and include the electronic equipment of this integrated circuit and the control method of the drive circuit of motor
NZ618231A (en) System for and method of generating a weld with selection of weld control algorithms according to set voltage magnitude
CN105728899A (en) Pulse welding equipment and control method thereof
CN105728898B (en) Pulse welding equipment and its control method
CN105710505B (en) Pulse welding equipment and its control method
US11370051B2 (en) Time-based short circuit response
CN104057179B (en) The control method of electric arc power source device for welding and electric arc power source device for welding
US20130092673A1 (en) Wire feed motor speed control
JP4490011B2 (en) Arc start control method
JP2007160350A (en) Method for setting welding condition of arc welding robot
EP3646978B1 (en) Two-stage pulse ramp
JP2007216303A (en) Arc start control method
JP5257403B2 (en) Consumable electrode arc welding equipment
JP6260587B2 (en) Power supply
JP4661164B2 (en) Consumable electrode arc welding equipment
CN106925863B (en) Arc welding control method
JP6370565B2 (en) Power supply device and power supply device for arc machining
KR950002093B1 (en) Wire cutting machine
JP4155107B2 (en) Electric power steering device
JP7158327B2 (en) Arc welding control method
JP6593923B2 (en) Arc welding control method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant