CN105719707A - 压水反应堆整体水力模拟试验中的压差测点布置结构 - Google Patents

压水反应堆整体水力模拟试验中的压差测点布置结构 Download PDF

Info

Publication number
CN105719707A
CN105719707A CN201410719418.8A CN201410719418A CN105719707A CN 105719707 A CN105719707 A CN 105719707A CN 201410719418 A CN201410719418 A CN 201410719418A CN 105719707 A CN105719707 A CN 105719707A
Authority
CN
China
Prior art keywords
pressurized water
layout structure
reactor
point layout
test
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410719418.8A
Other languages
English (en)
Inventor
林绍萱
余凡
刘彬
姚伟达
张明
张志昊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Nuclear Engineering Research and Design Institute Co Ltd
Original Assignee
Shanghai Nuclear Engineering Research and Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Nuclear Engineering Research and Design Institute Co Ltd filed Critical Shanghai Nuclear Engineering Research and Design Institute Co Ltd
Priority to CN201410719418.8A priority Critical patent/CN105719707A/zh
Publication of CN105719707A publication Critical patent/CN105719707A/zh
Pending legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E30/00Energy generation of nuclear origin
    • Y02E30/30Nuclear fission reactors

Landscapes

  • Monitoring And Testing Of Nuclear Reactors (AREA)

Abstract

本发明公开了一种压水反应堆整体水力模拟试验中的压差测点布置结构,在堆芯上板和堆芯支承下板的上下表面分别开设有用以预埋引压管的凹槽,引压管包括连接段和预埋段,预埋段的侧壁沿轴向方向间隔设置有通孔;所述凹槽的侧壁上设置有与预埋段的通孔位置相对应的进水间隙槽。通过采用本发明的压差测点布置结构,在压水反应堆整体水力模拟试验中,液体通过预埋在对应位置的引压管的预埋段侧壁上通孔进入引压管内,然后沿引压管内孔引出试验模型,通过外部连接的测量仪器测得堆芯上板、堆芯支承下板上下表面分别与基准位置的压差,来获得反应堆关键段的压降数据,能较好的验证堆内构件结构设计的合理性和流场分析的正确性。

Description

压水反应堆整体水力模拟试验中的压差测点布置结构
技术领域
本发明涉及压水堆核电厂核反应堆设计领域,具体来说涉及压水反应堆整体水力模拟试验中的压差测点布置结构。
背景技术
堆内构件是反应堆本体***中的重要设备之一,其安装在反应堆压力容器内,容纳并支承堆芯,与反应堆压力容器、控制棒驱动机构、燃料组件和相关组件等设备组合在一起实现反应堆功能。根据相应标准法规和安全准则的要求,对于原型堆,为验证堆内构件设计与分析,必须开展反应堆整体水力模拟试验研究。它可以验证堆芯进口流量分配的均匀程度和结构设计、分析计算的合理性;验证堆内水流作用下各关键段的流动阻力(压降)的计算结果;验证反应堆腔室内的流体流速分布。
在压水反应堆整体水力模拟试验中,试验模型通常根据原型按照一定比例缩小并通过一定修改设计得到。在压水反应堆整体水力模拟试验中,堆芯上板和堆芯支承下板上下表面的压降测量具有重要意义,它关系到反应堆内水流作用下堆芯段及其他关键段得流动阻力,为反应堆堆内构件设计和堆内流场分析提供重要数据。
为了测量堆内水流作用下各关键段的流动阻力(压降),需要在试验模型特定位置布置压差测点。根据试验需要,在反应堆堆芯上板和堆芯支承下板的表面均需要布置相应的压差测点。
传统的堆芯上板和堆芯支承下板的压差测点布置方式是通过导向筒组件和二次支承柱组件辅助布置,取其轴向高度相同的位置安装引压管。这种布置方法的测量结果相对理想,但是由于导向筒和二次支承柱实际位置的关系,其测点位置存在局限,同时容易受到其他结构的影响,带来测量误差。同时在堆芯上板和堆芯支承下板分别靠堆芯燃料组件的表面,无法布置相应测点。
发明内容
针对上述问题,本发明提供一种压水反应堆整体水力模拟试验中的压差测点布置结构,以解决现有技术中的压差测点布置结构容易受其他结构的影响,带来测量误差的问题。
为了实现上述目的,本发明的技术方案如下:
压水反应堆整体水力模拟试验中的压差测点布置结构,其特征在于,在堆芯上板和堆芯支承下板的上下表面分别开设有用以预埋引压管的凹槽,所述引压管包括用以与外部测量设备连接的连接段和用以预埋在所述凹槽内的预埋段,所述预埋段的侧壁沿轴向方向间隔设置有通孔,通孔的开孔方向平行于堆芯上板和堆芯支承下板的上下表面并且垂直于引压管自身的轴线;所述凹槽的侧壁上设置有与预埋段的通孔位置相对应的进水间隙槽。
在本发明的一个优选实施例中,连接段沿反应堆轴向方向将被测流体引出堆外进行测量。
在本发明的一个优选实施例中,所述凹槽的宽度不小于预埋段的宽度。
在本发明的一个优选实施例中,所述凹槽深度与引压管的当量直径之比为0.2:1~3:1。
在本发明的一个优选实施例中,所述预埋段为圆管,凹槽的底面为的圆弧面。
在本发明的一个优选实施例中,所述预埋段为方管或者其他形状的管体。
在本发明的一个优选实施例中,所述通孔布设在预埋段的侧壁上。
在本发明的一个优选实施例中,所述预埋段通过硅胶、环氧树脂、粘结、机械锁紧或焊接方式将其和堆芯上板或堆芯支承下板连接固定。
通过采用本发明的压差测点布置结构,在压水反应堆整体水力模拟试验中,堆芯上板和堆芯支承下板上下表面的液体通过预埋在对应位置的引压管的预埋段侧壁上通孔进入引压管内,然后沿引压管内孔引出试验模型,通过外部连接的测量仪器测得堆芯上板、堆芯支承下板上下表面分别与基准位置的压差,来获得反应堆关键段的压降数据,能较好的验证堆内构件结构设计的合理性和流场分析的正确性。
通过引压管的预埋段侧壁上通孔,可以平均对应表面的液压值,获得堆芯上板和堆芯支承下板上下表面位置的平均压降。
本发明能很好的满足压水反应堆整体水力模拟试验的要求。
本发明的特点可参阅本案图式及以下较好实施方式的详细说明而获得清楚地了解。
附图说明
图1为压水反应堆整体水力模拟试验件的示意图。
图2为引压管预埋在指定测点位置的示意图。
图3为引压管的示意图。
图4为凹槽的示意图。
其中,1、上部堆内构件;2、下部堆内构件;3、堆芯上板;4、堆芯支承下板;5、凹槽;51、进水间隙槽;61、连接段;62、预埋段;63、通孔。
具体实施方式
为了使本发明实现的技术手段、创作特征、达成目的与功效易于明白了解,下面结合具体实施例进一步阐述本发明。
参见图1,在压水反应堆整体水力模拟试验件中,一般均包括上部堆内构件1和下部堆内构件2,堆芯上板3属于上部堆内构件,堆芯支承下板4属于下部堆内构件,这些为常规技术,在此不再详述。
参见图2和4,在堆芯上板和堆芯支承下板的上下表面分别开设有用以预埋引压管的凹槽5。
参见图3,引压管包括用以与外部测量设备连接的连接段61和用以预埋在所述凹槽内的预埋段62,引压管的连接段61与预埋段62垂直(在折弯处要注意确保引压管保持畅通),连接段沿反应堆轴向方向将被测流体引出堆外进行测量。在本实施例中,预埋段为圆管。当然,预埋段也可以为方管或者其他形状的管体。凹槽宽度不小于预埋段的宽度,预埋段的外径为4mm,内径为2mm,堆芯上板和堆芯支承下板上下表面分别对应的凹槽宽度为6mm,开槽的底面为一半径为3mm的圆弧面,圆弧面最低位置距离对应表面5mm,方便引压管的预埋并保持其稳定性。
预埋段62的两侧壁沿轴向方向间隔设置有直径为2mm通孔(对称设置)63,通孔63的开孔方向平行于堆芯上板和堆芯支承下板的上下表面并且垂直于引压管自身的轴线。凹槽深度与引压管的当量直径之比为0.2:1~3:1,并且在本发明的其中一个优选实施方式中,凹槽5的侧壁上设置有与预埋段的通孔位置相对应的进水间隙槽51,如图4所示,进水间隙槽51的长宽深分别为12mm、3mm和4.5mm,通过进水间隙槽51使流体能顺利进入到引压管内。
最后对于预埋在堆芯上板和堆芯支承下板上下表面的预埋段,通过硅胶、环氧树脂、粘结、机械锁紧或焊接方式将其和堆芯上板或堆芯支承下板连接固定,但不得堵塞预埋段侧壁上的通孔。
具体加工过程如下:
先按照要求完成引压管的加工,然后加工堆芯上板和堆芯支承下板上下表面的凹槽,通过与引压管配作完成板上对应进水间隙槽的加工,再将引压管分别安装到堆芯上板和堆芯支承下板上下表面的凹槽内,最后用硅胶或者环氧树脂固定引压管,注意不要堵塞引压管侧壁上开孔即可。
在压水反应堆整体水力模拟试验中,堆芯上板和堆芯支承下板上下表面的液体通过预埋在对应位置的引压管的侧壁上开孔进入引压管内,然后沿引压管内孔引出试验模型,通过外部连接的测量仪器测得堆芯上板、堆芯支承下板上下表面分别与基准位置的压差,来获得反应堆关键段的压降数据,能较好的验证堆内构件结构设计的合理性和流场分析的正确性。本发明可以获得堆芯上板和堆芯支承下板上下表面位置的平均压降。能很好的满足压水反应堆整体水力模拟试验的要求。
以上显示和描述了本发明的基本原理、主要特征和本发明的优点。本行业的技术人员应该了解,本发明不受上述实施例的限制,上述实施例和说明书中描述的只是本发明的原理,在不脱离本发明精神和范围的前提下本发明还会有各种变化和改进,这些变化和改进都落入要求保护的本发明的范围内。本发明要求的保护范围由所附的权利要求书及其等同物界定。

Claims (8)

1.压水反应堆整体水力模拟试验中的压差测点布置结构,其特征在于,在堆芯上板和堆芯支承下板的上下表面分别开设有用以预埋引压管的凹槽,所述引压管包括用以与外部测量设备连接的连接段和用以预埋在所述凹槽内的预埋段,所述预埋段的侧壁沿轴向方向间隔设置有通孔,通孔的开孔方向平行于堆芯上板和堆芯支承下板的上下表面并且垂直于引压管自身的轴线;所述凹槽的侧壁上设置有与预埋段的通孔位置相对应的进水间隙槽。
2.根据权利要求1所述的压水反应堆整体水力模拟试验中的压差测点布置结构,其特征在于,连接段沿反应堆轴向方向将被测流体引出堆外进行测量。
3.根据权利要求1所述的压水反应堆整体水力模拟试验中的压差测点布置结构,其特征在于,所述凹槽的宽度不小于预埋段的宽度。
4.根据权利要求1所述的压水反应堆整体水力模拟试验中的压差测点布置结构,其特征在于,所述凹槽深度与引压管的当量直径之比为0.2:1~3:1。
5.根据权利要求1所述的压水反应堆整体水力模拟试验中的压差测点布置结构,其特征在于,所述预埋段为圆管,凹槽的底面为的圆弧面。
6.根据权利要求1所述的压水反应堆整体水力模拟试验中的压差测点布置结构,其特征在于,所述预埋段为方管或者其他形状的管体。
7.根据权利要求1所述的压水反应堆整体水力模拟试验中的压差测点布置结构,其特征在于,所述通孔布设在预埋段的侧壁上。
8.根据权利要求1所述的压水反应堆整体水力模拟试验中的压差测点布置结构,其特征在于,所述预埋段通过硅胶、环氧树脂、粘结、机械锁紧或焊接方式将其和堆芯上板或堆芯支承下板连接固定。
CN201410719418.8A 2014-12-01 2014-12-01 压水反应堆整体水力模拟试验中的压差测点布置结构 Pending CN105719707A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410719418.8A CN105719707A (zh) 2014-12-01 2014-12-01 压水反应堆整体水力模拟试验中的压差测点布置结构

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410719418.8A CN105719707A (zh) 2014-12-01 2014-12-01 压水反应堆整体水力模拟试验中的压差测点布置结构

Publications (1)

Publication Number Publication Date
CN105719707A true CN105719707A (zh) 2016-06-29

Family

ID=56146490

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410719418.8A Pending CN105719707A (zh) 2014-12-01 2014-12-01 压水反应堆整体水力模拟试验中的压差测点布置结构

Country Status (1)

Country Link
CN (1) CN105719707A (zh)

Citations (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4290315A (en) * 1979-01-25 1981-09-22 Fincoil-Teollisuus Oy Apparatus for determining the differential pressure and the volumetric fluid flow in a conduit
FR2673032A1 (fr) * 1991-02-19 1992-08-21 Framatome Sa Procede et dispositif de remplacement d'une broche de centrage d'un assemblage combustible fixee sur la plaque superieure de cóoeur d'un reacteur nucleaire a eau sous pression.
CN1260570A (zh) * 1998-12-23 2000-07-19 通用电气公司 沸水堆的堆芯板和反应堆内泵压差管线
JP2003057384A (ja) * 2001-08-09 2003-02-26 Toshiba Corp 原子力発電所の炉心流量計測演算方法およびその装置
CN101149991A (zh) * 2007-10-19 2008-03-26 中国核动力研究设计院 用于燃料组件流量测量的模拟组件
CN201066596Y (zh) * 2007-08-31 2008-05-28 中国核动力研究设计院 核燃料组件下管座
CN101584007A (zh) * 2007-01-02 2009-11-18 西屋电气有限责任公司 核反应堆对准板结构
WO2009149946A1 (de) * 2008-06-13 2009-12-17 Ksg Kraftwerks-Simulator-Gesellschaft Mbh Verfahren zur simulation von in einem druckwasserreaktor auftretenden thermohydraulischen phänomenen
CN101794629A (zh) * 2010-03-12 2010-08-04 清华大学 一种数字差压式的棒位测量装置
CN102063947A (zh) * 2010-10-29 2011-05-18 中国原子能科学研究院 核反应堆水池液位测量装置
CN102322903A (zh) * 2011-06-03 2012-01-18 徐蠡 带引压管的脉动式流量计
CN202350841U (zh) * 2011-09-30 2012-07-25 杭州哲达科技股份有限公司 具有量程可调节功能的威力巴流量传感器
CN102629110A (zh) * 2012-04-12 2012-08-08 余大利 一种基于实物模型的压水堆半实物仿真***
CN102840886A (zh) * 2012-08-31 2012-12-26 中国核动力研究设计院 一种基于多孔介质的流量测量装置及其实现方法
CN102855802A (zh) * 2012-08-31 2013-01-02 中国核动力研究设计院 球形燃料元件等效模型热工水力实验装置
CN103177780A (zh) * 2013-01-14 2013-06-26 上海核工程研究设计院 一种压水核反应堆流量分配装置
CN203026160U (zh) * 2012-12-26 2013-06-26 中国核动力研究设计院 压水型核反应堆堆内构件
CN103256047A (zh) * 2013-05-17 2013-08-21 常州大学 一种研究水平井压裂完井方式下变质量多相流动规律的方法
CN103398733A (zh) * 2013-08-16 2013-11-20 中煤科工集团重庆研究院 风速、风向检测装置的防堵引压探头
CN203385452U (zh) * 2013-08-29 2014-01-08 广东大唐国际潮州发电有限责任公司 多点风量测量装置
CN203406050U (zh) * 2013-08-27 2014-01-22 中科华核电技术研究院有限公司 燃料组件水力学模拟体
WO2014104030A1 (ja) * 2012-12-28 2014-07-03 三菱重工業株式会社 管台補修方法及び原子炉容器
JP2014122856A (ja) * 2012-12-21 2014-07-03 Toshiba Corp 加圧水型原子炉の原子炉構造

Patent Citations (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4290315A (en) * 1979-01-25 1981-09-22 Fincoil-Teollisuus Oy Apparatus for determining the differential pressure and the volumetric fluid flow in a conduit
FR2673032A1 (fr) * 1991-02-19 1992-08-21 Framatome Sa Procede et dispositif de remplacement d'une broche de centrage d'un assemblage combustible fixee sur la plaque superieure de cóoeur d'un reacteur nucleaire a eau sous pression.
CN1260570A (zh) * 1998-12-23 2000-07-19 通用电气公司 沸水堆的堆芯板和反应堆内泵压差管线
JP2003057384A (ja) * 2001-08-09 2003-02-26 Toshiba Corp 原子力発電所の炉心流量計測演算方法およびその装置
CN101584007A (zh) * 2007-01-02 2009-11-18 西屋电气有限责任公司 核反应堆对准板结构
CN201066596Y (zh) * 2007-08-31 2008-05-28 中国核动力研究设计院 核燃料组件下管座
CN101149991A (zh) * 2007-10-19 2008-03-26 中国核动力研究设计院 用于燃料组件流量测量的模拟组件
WO2009149946A1 (de) * 2008-06-13 2009-12-17 Ksg Kraftwerks-Simulator-Gesellschaft Mbh Verfahren zur simulation von in einem druckwasserreaktor auftretenden thermohydraulischen phänomenen
CN101794629A (zh) * 2010-03-12 2010-08-04 清华大学 一种数字差压式的棒位测量装置
CN102063947A (zh) * 2010-10-29 2011-05-18 中国原子能科学研究院 核反应堆水池液位测量装置
CN102322903A (zh) * 2011-06-03 2012-01-18 徐蠡 带引压管的脉动式流量计
CN202350841U (zh) * 2011-09-30 2012-07-25 杭州哲达科技股份有限公司 具有量程可调节功能的威力巴流量传感器
CN102629110A (zh) * 2012-04-12 2012-08-08 余大利 一种基于实物模型的压水堆半实物仿真***
CN102840886A (zh) * 2012-08-31 2012-12-26 中国核动力研究设计院 一种基于多孔介质的流量测量装置及其实现方法
CN102855802A (zh) * 2012-08-31 2013-01-02 中国核动力研究设计院 球形燃料元件等效模型热工水力实验装置
JP2014122856A (ja) * 2012-12-21 2014-07-03 Toshiba Corp 加圧水型原子炉の原子炉構造
CN203026160U (zh) * 2012-12-26 2013-06-26 中国核动力研究设计院 压水型核反应堆堆内构件
WO2014104030A1 (ja) * 2012-12-28 2014-07-03 三菱重工業株式会社 管台補修方法及び原子炉容器
CN103177780A (zh) * 2013-01-14 2013-06-26 上海核工程研究设计院 一种压水核反应堆流量分配装置
CN103256047A (zh) * 2013-05-17 2013-08-21 常州大学 一种研究水平井压裂完井方式下变质量多相流动规律的方法
CN103398733A (zh) * 2013-08-16 2013-11-20 中煤科工集团重庆研究院 风速、风向检测装置的防堵引压探头
CN203406050U (zh) * 2013-08-27 2014-01-22 中科华核电技术研究院有限公司 燃料组件水力学模拟体
CN203385452U (zh) * 2013-08-29 2014-01-08 广东大唐国际潮州发电有限责任公司 多点风量测量装置

Non-Patent Citations (6)

* Cited by examiner, † Cited by third party
Title
XINLI GAO 等: "《Thermal-hydraulic design of water-cooled pressure tube blanket for a fusion driven subcritical reactor》", 《FUSION ENGINEERING AND DESIGN》 *
夏浩: "《M310核电机组影响蒸汽发生器液位测量通道的因素分析》", 《自动化与仪器仪表》 *
张佑杰: "《研究堆用自然循环阀样机实验验证_张佑杰研究堆用自然循环阀样机实验验证》", 《核动力工程》 *
核反应堆热工计算及实验: "压水堆无盒燃料组件水力特性试验研究", 《核反应堆热工计算及实验 1979年核反应热工流体会议资料汇编》 *
贺友光: "《堆内构件设计与研制》", 《中国核科技报告》 *
黄靖宁黄靖宁: "《锅炉燃烧***监测装置测量方法分析与应用》", 《中国电力》 *

Similar Documents

Publication Publication Date Title
Yang et al. Measurement and modeling of two-phase flow parameters in scaled 8× 8 BWR rod bundle
CN103903656B (zh) 压水型核反应堆堆内构件
Zhao et al. Three-dimensional study on the hydraulic characteristics under the steam generator (SG) tube plugging operations for AP1000
CN107664567B (zh) 一种传热管束流致振动试验加速度传感器固定装置
CN102257575A (zh) 用于压水反应堆的上部堆内构件布置
CN103400613B (zh) 核电厂驱动线冷态试验的横向流试验装置和试验方法
CN103578586A (zh) 双层玻璃t型管实验段连接结构
CN105509913A (zh) 热电偶多点测温装置和具有其的模拟压力反应堆
CN105513657A (zh) 核电站一体化堆芯测量组件
JP4863414B2 (ja) 熱流動現象の模擬方法及び模擬試験装置
CN107421761A (zh) 一种双侧火灾中沉管隧道变形和温度的检测方法及其装置
Wang et al. CFD simulation on the flow characteristics in the PWR lower plenum with different internal structures
Barjastehmaleki et al. Spillway stilling basins lining design via Taylor hypothesis
Chang et al. Experimental study of the flow characteristics in an SFR type 61-pin rod bundle using iso-kinetic sampling method
Meng et al. Entrainment at T-junction: A review work
Kim et al. Investigations of single-phase flow mixing characteristics in a wire-wrapped 37-pin bundle for a sodium-cooled fast reactor
CN104458455B (zh) 窄基输电钢管塔空间塔腿结构测试法
CN109386298B (zh) 一种带有监测设备的预制隧道钢拱架
CN105719707A (zh) 压水反应堆整体水力模拟试验中的压差测点布置结构
Jeon et al. Thermal-hydraulic evaluation of passive containment cooling system of improved APR+ during LOCAs
WO2016074436A1 (zh) 热管道
CN204496935U (zh) 压水反应堆整体水力模拟试验中的压差测点布置结构
CN204577114U (zh) 三角形布置梅花形管孔管子支承板水力特性试验的装置
Lee et al. Sensitivity study on turbulence models for the prediction of the reactor internal flow
Qiu et al. Influence of inlet turbulent flow generated by periodic computations on the pressure drop and axial velocity distribution predictions

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: No. 29 Hong Cao Road, Xuhui District, Shanghai

Applicant after: Shanghai Nuclear Engineering Research and Design Institute Co.,Ltd.

Address before: No. 29 Hong Cao Road, Xuhui District, Shanghai

Applicant before: SHANGHAI NUCLEAR ENGINEERING RESEARCH & DESIGN INSTITUTE

WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20160629